CN106704275B - Hydraulic loading system of hydraulic pitch control test bed of wind generating set - Google Patents

Hydraulic loading system of hydraulic pitch control test bed of wind generating set Download PDF

Info

Publication number
CN106704275B
CN106704275B CN201611257218.0A CN201611257218A CN106704275B CN 106704275 B CN106704275 B CN 106704275B CN 201611257218 A CN201611257218 A CN 201611257218A CN 106704275 B CN106704275 B CN 106704275B
Authority
CN
China
Prior art keywords
control valve
hydraulic
valve
pressure
proportional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611257218.0A
Other languages
Chinese (zh)
Other versions
CN106704275A (en
Inventor
李萌
朱兵
苏振年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Original Assignee
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Goldwind Science and Creation Windpower Equipment Co Ltd filed Critical Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority to CN201611257218.0A priority Critical patent/CN106704275B/en
Publication of CN106704275A publication Critical patent/CN106704275A/en
Application granted granted Critical
Publication of CN106704275B publication Critical patent/CN106704275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B1/00Installations or systems with accumulators; Supply reservoir or sump assemblies
    • F15B1/02Installations or systems with accumulators
    • F15B1/027Installations or systems with accumulators having accumulator charging devices
    • F15B1/0275Installations or systems with accumulators having accumulator charging devices with two or more pilot valves, e.g. for independent setting of the cut-in and cut-out pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/08Servomotor systems without provision for follow-up action; Circuits therefor with only one servomotor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M15/00Testing of engines
    • G01M15/02Details or accessories of testing apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/80Other types of control related to particular problems or conditions
    • F15B2211/89Control specific for achieving vacuum or "negative pressure"

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Wind Motors (AREA)

Abstract

The utility model provides a wind generating set hydraulic pressure becomes oar test bench loading hydraulic system includes: a hydraulic oil tank (1); a hydraulic pump (2); a first electromagnetic directional valve (5); a first check valve (7.1), a second check valve (7.2) and a third check valve (7.3); a proportional directional valve (8); a stop valve (9); an accumulator assembly (10); a first pressure sensor (11.1), a second pressure sensor (11.2) and a third pressure sensor (11.3); a second electromagnetic directional valve (12); a first proportional relief valve (13.1) and a second proportional relief valve (13.2); a load cylinder (14).

Description

Wind power generating set hydraulic vane change testing stand loads hydraulic system
Technical field
This application involves wind power generation fields, add more particularly, to a kind of wind power generating set hydraulic vane change testing stand Load hydraulic system.
Background technology
As wind power generating set develops to enlargement direction, in wind when because hydraulic variable propeller system power density is high the advantages that The application of power generator group is more and more extensive.Therefore, understand the characteristic of hydraulic variable propeller system and grasp the fortune of hydraulic variable propeller system Professional etiquette is restrained, and what is just become is more and more important.It is exactly to establish relevant testing stand to understand the most directly simple method of hydraulic variable propeller system, By experimental study, the characteristic of hydraulic variable propeller system is grasped.
Traditional wind group hydraulic vane change testing stand loading hydraulic system is capable of the operation of wind-driven generator simulation group Load, generally uses proportional pressure control valve, however proportional pressure control valve dynamic response frequency is relatively low in systems.Therefore, it is necessary to one kind Response frequency is high, load accurately and reliably, meet the wind power generating set hydraulic vane change testing stand loadings of system loads characteristic requirements Hydraulic system.
Invention content
According to an aspect of the present invention, a kind of wind power generating set hydraulic vane change testing stand loading hydraulic system is provided, Including:Hydraulic oil container;Hydraulic pump, including hydraulic pressure pump inlet and hydraulic pump outlet;First solenoid directional control valve is changed including the first electromagnetism To the first working hole of valve, the first solenoid directional control valve oil return opening, first the second working hole of solenoid directional control valve and the first solenoid directional control valve Oil inlet;First check valve, including the first check valve inlet and the first one-way valved outlet;Second check valve, it is unidirectional including second Valve import and the second one-way valved outlet;Third check valve, including third check valve inlet and third one-way valved outlet;Proportion directional Valve, including proportional direction valve working hole, proportional direction valve oil return opening, proportional direction valve working hole and proportional direction valve oil inlet; Accumulator package, including accumulator package hydraulic fluid port;First pressure sensor, second pressure sensor and third pressure sensor; Second solenoid directional control valve, including second the first working hole of solenoid directional control valve and second the second working hole of solenoid directional control valve;First ratio Example overflow valve, including the first proportional pressure control valve oil inlet and the first proportional pressure control valve oil return opening;Second proportional pressure control valve, including Two proportional pressure control valve oil inlets and the second proportional pressure control valve oil return opening;Loading cylinders, including big chamber and small chamber, wherein, the liquid The press pump import connection hydraulic oil container, the hydraulic pump outlet connection the first solenoid directional control valve oil inlet, described first The first working hole of solenoid directional control valve and the first solenoid directional control valve oil return opening connect the hydraulic oil container, first solenoid directional control valve Second working hole connects the first solenoid directional control valve oil inlet, and first check valve inlet connects first electromagnetic switch Valve oil inlet, first one-way valved outlet connect the accumulator package hydraulic fluid port, the proportional direction valve oil inlet and described Second the first working hole of solenoid directional control valve, second check valve inlet connect hydraulic oil container with the third check valve inlet, Second one-way valved outlet and the third one-way valved outlet connect the big chamber and the small chamber, the proportion directional respectively The first working hole of valve connects the big chamber, and the proportional direction valve oil return opening connects the hydraulic oil container, the proportional direction valve Second working hole ends, and the proportional direction valve oil inlet connects the first solenoid directional control valve oil inlet, the accumulator group Part hydraulic fluid port connects the first working hole of the proportional direction valve oil inlet and the solenoid directional control valve, and the first pressure sensor connects The accumulator package hydraulic fluid port is connect to detect the pressure in the accumulator package, the second pressure sensor connection is described big For chamber to detect the pressure in the big chamber, the third pressure sensor connects the small chamber to detect the pressure in the small chamber Power, first working hole of the second solenoid directional control valve connect first one-way valved outlet, second solenoid directional control valve second Working hole connects the small chamber, and the first proportional pressure control valve oil inlet connects the big chamber, second proportional pressure control valve into Hydraulic fluid port connects the small chamber, and the first proportional pressure control valve oil return opening connects the liquid with the second proportional pressure control valve oil return opening Pressure oil case.
The wind power generating set hydraulic vane change testing stand loading hydraulic system may also include:Filter, including filter Import and filter outlet, wherein, the filter inlet connects the hydraulic pump outlet, described in the filter outlet connection First solenoid directional control valve oil inlet and first check valve inlet.
The wind power generating set hydraulic vane change testing stand loading hydraulic system may also include:Overflow valve, including overflow valve Oil inlet and overflow valve oil return opening, wherein, the overflow valve oil inlet connects the first solenoid directional control valve oil inlet, described to overflow It flows valve oil return opening and connects first the first working hole of solenoid directional control valve and the filter outlet.
The wind power generating set hydraulic vane change testing stand loading hydraulic system may also include:Motor drives the hydraulic pressure Pump;Shut-off valve connects the hydraulic oil container and the accumulator package hydraulic fluid port.
The situation of emergency shutdown or power-down state is in wind power generating set hydraulic vane change testing stand loading hydraulic system Under, wind power generating set hydraulic vane change testing stand loads all element dead electricity of hydraulic system, during the proportional direction valve is in , Opening pressure is 0 after first proportional pressure control valve and the second proportional pressure control valve dead electricity, in the accumulator package Hydraulic oil after second solenoid directional control valve and second proportional pressure control valve by flowing back to the hydraulic oil container.
In the case where wind power generating set hydraulic vane change testing stand loading hydraulic system is in shutdown status, described first Solenoid directional control valve, the proportional direction valve, second solenoid directional control valve, first proportional pressure control valve and second ratio It is 0 that overflow valve, which is in controllable state and Opening pressure, and the proportional direction valve is in middle position, at second solenoid directional control valve In low level and left position is operated in, the hydraulic oil in the accumulator package passes through first proportional pressure control valve and described second The hydraulic oil container is flowed back to after proportional pressure control valve.
In the case where wind power generating set hydraulic vane change testing stand loading hydraulic system is in standby mode, described first Solenoid directional control valve, the proportional direction valve, second solenoid directional control valve, first proportional pressure control valve and second ratio Overflow valve is in controllable state, and the proportional direction valve obtains maximum negative voltage and is simultaneously operated in left position, the loading cylinders it is big Chamber communicates with the hydraulic oil container and is in quick condition, and first proportional pressure control valve and second proportional pressure control valve are opened It is 0 to open pressure, and second solenoid directional control valve is in high level and is operated in right position, and the hydraulic pump gives the accumulator package Pressurising when the pressure of the accumulator package reaches first predetermined value, closes the motor, and the hydraulic pump stops to accumulation of energy Device assembly pressurising.
In the case where wind power generating set hydraulic vane change testing stand loading hydraulic system is in operating status, the ratio Direction valve is in closed-loop control state, and the Opening pressure of first proportional pressure control valve and second proportional pressure control valve is described The maximum working pressure (MWP) of loading cylinders, second solenoid directional control valve are in low level and are operated in left position, the accumulator group Part is connected with the small chamber of the loading cylinders, and the opening direction for the spool for passing through the proportional direction valve and aperture size are controlled The pressure of the big chamber of the loading cylinders is made to prevent negative pressure, the motor drives the hydraulic pump, and the hydraulic pump is given The accumulator package pressurising when the pressure of the accumulator package reaches first predetermined value, closes the motor, works as system When the pressure of the accumulator package is less than second predetermined value after work a period of time, start the motor, until the accumulation of energy The pressure of device assembly reaches first predetermined value.
It is described in the case where wind power generating set hydraulic vane change testing stand loading hydraulic system is in emergency feathering state Proportional direction valve is in closed-loop control state, and second solenoid directional control valve is in high level and is operated in right position, the accumulation of energy Device assembly and the small chamber of the loading cylinders are not turned on, and the Opening pressure of first proportional pressure control valve is the loading cylinders Maximum working pressure (MWP), the Opening pressure of second proportional pressure control valve are adjusted in real time, the piston rods of the loading cylinders to Outer stretching, and the opening direction for the spool for passing through the proportional direction valve and aperture size control the big chamber of the loading cylinders Pressure to prevent negative pressure.
Exemplary embodiment according to the present invention can provide the experimental study of wind power generating set hydraulic variable propeller system Loading demand;Using proportional direction valve as hydraulic control component, response frequency is high, and load accurately and reliably, meets system loads Characteristic requirements;During wind power generating set emergency feathering, the control mode that is combined using proportional direction valve and proportional pressure control valve is full The test requirements document during emergency feathering of sufficient wind power generating set, energy structure provide load work during wind power generating set emergency feathering Condition.
Description of the drawings
By the detailed description carried out below in conjunction with the accompanying drawings, above and other objects of the present invention and feature will become more Add it is clear, wherein:
Fig. 1 is to show wind power generating set hydraulic vane change testing stand loading hydraulic pressure system according to an exemplary embodiment of the present invention The schematic diagram of system.
Specific embodiment
Now, detailed description of the present invention exemplary embodiment, example represent in the accompanying drawings, wherein, identical label Always show identical component.
Fig. 1 is to show wind power generating set hydraulic vane change testing stand loading hydraulic pressure system according to an exemplary embodiment of the present invention The schematic diagram of system 100.
Wind power generating set hydraulic vane change testing stand loading hydraulic system 100 according to an exemplary embodiment of the present invention includes Hydraulic oil container 1, hydraulic pump 2, motor 3, filter 4, the first solenoid directional control valve 5, overflow valve 6, the first check valve 7.1, second are single To valve 7.2, third check valve 7.3, proportional direction valve 8, shut-off valve 9, accumulator package 10, first pressure sensor 11.1, Two pressure sensors 11.2, third pressure sensor 11.3, the second solenoid directional control valve 12, the first proportional pressure control valve 13.1, second Proportional pressure control valve 13.2 and loading cylinders 14.Further it should be noted that motor 3, filter 4, overflow valve 6 and shut-off valve 9 are only roots The optional element of hydraulic system 100 is loaded according to the wind power generating set hydraulic vane change testing stand of exemplary embodiment of the present, it Can wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention load hydraulic system 100 outside It realizes without being included in wind power generating set hydraulic vane change testing stand loading hydraulic system according to an exemplary embodiment of the present invention In 100.
Hydraulic pump 2 includes hydraulic pressure pump inlet I and hydraulic pump outlet O, wherein, hydraulic pressure pump inlet I connections hydraulic oil container 1, liquid Press pump outlet O connection filter inlets I.
Motor 3 drives hydraulic pump 2.
Filter 4 includes filter inlet I and filter outlet O, wherein, filter inlet I connection hydraulic pump outlet O, Filter outlet O connects the first solenoid directional control valve oil inlet P, the first check valve inlet I and overflow valve oil inlet P, mistake respectively Filter 4 is used to be filtered hydraulic oil.
First solenoid directional control valve 5 includes first the first working hole of solenoid directional control valve A, the first solenoid directional control valve oil return inlet T, the One solenoid directional control valve the second working hole B and the first solenoid directional control valve oil inlet P, wherein, first the first working hole of solenoid directional control valve A It is connect with the first solenoid directional control valve oil return inlet T with hydraulic oil container 1, first solenoid directional control valve the second working hole B is changed with the first electromagnetism It is connected to valve oil inlet P.The flow direction of hydraulic oil that first solenoid directional control valve 5 control hydraulic pump 2 pumps out.Only as an example, first Solenoid directional control valve 5 can be two four-way electromagnetic reversing valves.
Overflow valve 6 includes overflow valve oil inlet P and overflow valve oil return inlet T, wherein, the first electricity of overflow valve oil inlet P connection Magnetic reversal valve oil inlet P, overflow valve oil return inlet T connect the first solenoid directional control valve the first working hole A and filter outlet O, overflow Valve 6 controls the maximum pressure of wind power generating set hydraulic vane change testing stand loading hydraulic system 100.
First check valve 7.1 includes the first check valve inlet I and the first one-way valved outlet O, wherein, the first check valve inlet I connection filter outlets O, the first one-way valved outlet O connection accumulator package hydraulic fluid ports O, proportional direction valve oil inlet P and the second electricity The first working hole of magnetic reversal valve A.Hydraulic oil enters the working connection of system, the work of the first check valve 7.1 by the first check valve 7.1 With being to prevent system high pressure oil from flowing back into hydraulic pump 2, so as to be damaged to hydraulic pump 2.
Second check valve 7.2 includes the second check valve inlet I and the second one-way valved outlet O, and third check valve 7.3 includes the Three check valve inlet I and third one-way valved outlet O, wherein, the second check valve inlet I connects hydraulic pressure with third check valve inlet I Fuel tank 1, the second one-way valved outlet O and third one-way valved outlet O connect the big chamber of loading cylinders 14 and small chamber respectively, and second is unidirectional Valve 7.2 and third check valve 7.3 can prevent load oil when vacuum occur in the big chamber of loading cylinders 14 and small chamber to its repairing There is vacuum in cylinder 14.
Proportional direction valve 8 includes the first working hole of proportional direction valve A, proportional direction valve oil return inlet T, proportional direction valve second Working hole B and proportional direction valve oil inlet P, wherein, the big chamber of proportional direction valve the first working hole A connections loading cylinders 14, than Proportional direction valve oil return inlet T connects hydraulic oil container 1, the second working hole of proportional direction valve B cut-offs.Proportional direction valve 8 is by controller control System, controller control the opening direction and size of 8 spool of proportional direction valve, and then the load of control system as needed. Here, controller is not shown in Fig. 1, and may not include and becomes in wind power generating set hydraulic pressure according to an exemplary embodiment of the present invention In paddle testing stand loading hydraulic system 100, and realized by peripheral control unit.Only as an example, proportional direction valve 8 can be three Four-way proportional direction valve.
Shut-off valve 9 connects hydraulic oil container 1 and accumulator package hydraulic fluid port O, shut-off valve 9 are closed when flat, opens to put when safeguarding Fall the high pressure liquid pressure oil in accumulator package 10.
Accumulator package 10 includes accumulator package hydraulic fluid port O, accumulator package hydraulic fluid port O connection proportional direction valve oil inlet Ps With solenoid directional control valve the first working hole A, give proportional direction valve 8 and solenoid directional control valve 12 fuel feeding.Accumulator package 10 is by several Accumulator composition, a constant pressure source is equivalent to, required flow and pressure are provided for system.
First pressure sensor 11.1 connects accumulator package hydraulic fluid port O, detects the pressure of hydraulic oil in accumulator package 10, And detection signal is sent to controller.Second pressure sensor 11.2 and third pressure sensor 11.3 connect load oil respectively The big chamber and small chamber of cylinder 14, and the big chamber of loading cylinders 14 and the operating pressure of small chamber are detected, and detection signal is sent to control Device processed.
Second solenoid directional control valve 12 includes second solenoid directional control valve the first working hole A and the second solenoid directional control valve second works Mouth B, wherein, second solenoid directional control valve the first working hole A connection the first one-way valved outlet O, the second solenoid directional control valve second works The small chamber of mouth B connections loading cylinders 14, controller control the work oil level of the second solenoid directional control valve 12.Only as an example, second Solenoid directional control valve 12 can be 2/2-way solenoid directional control valve.
First proportional pressure control valve 13.1 includes the first proportional pressure control valve oil inlet P and the first proportional pressure control valve oil return inlet T, the Two proportional pressure control valves 13.2 include the second proportional pressure control valve oil inlet P and the second proportional pressure control valve oil return inlet T, wherein, the first ratio Example overflow valve oil inlet P and the second proportional pressure control valve oil inlet P respectively connected the big chamber of loading cylinders 14 and small chamber, the first ratio Example overflow valve oil return inlet T connects hydraulic oil container 1 with the second proportional pressure control valve oil return inlet T.Controller is according to different working conditions Different signals is sent to control the oil pressure relief of the first proportional pressure control valve 13.1 and the second proportional pressure control valve 13.2, the first ratio The oil pressure relief of 13.1 and second proportional pressure control valve 13.2 of overflow valve determines the highest work pressure of 14 big chamber of loading cylinders and small chamber Power.
Wind power generating set hydraulic vane change testing stand loading hydraulic system 100 according to an exemplary embodiment of the present invention, which is divided, is Following several working conditions:Emergency shutdown or power-down state, shutdown status, standby mode, operating status and emergency feathering state.
At wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention loading hydraulic system 100 In the case of emergency shutdown or power-down state, wind power generating set hydraulic vane change experiment according to an exemplary embodiment of the present invention Platform loads all element dead electricity of hydraulic system 100, and proportional direction valve 8 is in middle position, the first proportional pressure control valve 13.1 and second Opening pressure is 0 after 13.2 dead electricity of proportional pressure control valve, and the hydraulic oil in accumulator package 10 passes through 12 He of the second solenoid directional control valve Fuel tank 1 is flowed back to after second proportional pressure control valve 13.2.
At wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention loading hydraulic system 100 In the case of shutdown status, all electro hydraulic valves are (that is, the first solenoid directional control valve 5, proportional direction valve 8, the second electromagnetic switch Valve 12, the first proportional pressure control valve 13.1 and the second proportional pressure control valve 13.2) in controllable state, proportional direction valve 8 is in middle position, Second solenoid directional control valve 12 is in low level, is operated in left position, the first proportional pressure control valve 13.1 and the second proportional pressure control valve 13.2 Opening pressure is 0, and the hydraulic oil in accumulator package 10 passes through the first proportional pressure control valve 13.1 and the second proportional pressure control valve 13.2 After flow back to fuel tank 1.
At wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention loading hydraulic system 100 In the case of standby mode, all electro hydraulic valves are (that is, the first solenoid directional control valve 5, proportional direction valve 8, the second electromagnetic switch Valve 12, the first proportional pressure control valve 13.1 and the second proportional pressure control valve 13.2) in controllable state, proportional direction valve 8 obtains maximum Negative voltage is operated in left position, and 14 big chamber of loading cylinders is communicated with fuel tank 1, and 13.1 and 13.2 Opening pressure of proportional pressure control valve is 0, Loading cylinders 14 are in quick condition.Second solenoid directional control valve 12 is in high level, is operated in right position.Hydraulic pump 2 gives accumulator 10 pressurising of component is until reaching first predetermined value (only as an example, not a limit, such as, 270bar), controller control motor 3 It is stopped, hydraulic pump 2 stops giving accumulator package 10 pressurising.
At wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention loading hydraulic system 100 In the case of operating status, proportional direction valve 8 is in closed-loop control state, and the first proportional pressure control valve 13.1 and the second ratio are overflow Flow the maximum working pressure (MWP) for setting Opening pressure and being set as loading cylinders 14 of valve 13.2.Second solenoid directional control valve 12 is in low electricity It is flat, be operated in left position, accumulator package 10 is connected with the small chamber of loading cylinders 14, the small cavity pressures of loading cylinders 14 always with storage Energy 10 pressure of device assembly is consistent.Second pressure sensor 11.2 and third pressure sensor 11.3 detect loading cylinders 14 in real time The pressure of big chamber and small chamber, and the signal of detection is sent to controller, controller is as desired by control proportional direction valve 8 Spool opening direction and aperture size control the pressure of the big chamber of loading cylinders 14, so as to which loading cylinders 14 can be according to big The pressure differential of chamber and small chamber carrys out the required load of output system, realizes hydraulic system loading.In addition, motor 3 drives hydraulic pump 2 Work, hydraulic pump 2 is oil-filled to accumulator package 10, when the pressure of accumulator package 10 reaches first predetermined value (only as example And it is unrestricted, such as, 270bar) when, controller receives the detection signal of first pressure sensor 11.1, closes motor 3, when After system work a period of time (only as an example, not a limit, such as, the pressure of accumulator package 10 is less than second predetermined value When 240bar), controller receives the detection signal of first pressure sensor 11.1, starts motor 3, until accumulator package 10 Pressure reach first predetermined value.
At wind power generating set hydraulic vane change testing stand according to an exemplary embodiment of the present invention loading hydraulic system 100 In the case of emergency feathering state, proportional direction valve 8 is in closed-loop control state, and the second solenoid directional control valve 12 is in high electricity It is flat, it is operated in right position, the conducting of cut-out accumulator package 10 and the small chamber of loading cylinders 14.First proportional pressure control valve 13.1 is set It is the maximum working pressure (MWP) that loading cylinders 14 are set to determine Opening pressure, and the setting Opening pressure of the second proportional pressure control valve 13.2 is by controlling Device processed adjusts in real time as needed, and the piston rod of loading cylinders 14 is protruding, controller control proportional direction valve 8 aperture with Big chamber for loading cylinders 14 provides the hydraulic oil of needs, prevents the big chamber of loading cylinders 14 from negative pressure occur.
Exemplary embodiment according to the present invention can provide the experimental study of wind power generating set hydraulic variable propeller system Loading demand;Using proportional direction valve as hydraulic control component, response frequency is high, and load accurately and reliably, meets system loads Characteristic requirements;During wind power generating set emergency feathering, the control mode that is combined using proportional direction valve and proportional pressure control valve is full The test requirements document during emergency feathering of sufficient wind power generating set, energy structure provide load work during wind power generating set emergency feathering Condition.
Although the present invention has shown and described with reference to certain exemplary embodiments, those skilled in the art will Understand, shape can be made in the case where not departing from the spirit and scope of the present invention that range limits by claim and its equivalent Various changes in formula and details.

Claims (9)

1. a kind of wind power generating set hydraulic vane change testing stand loads hydraulic system, including:
Hydraulic oil container (1);
Hydraulic pump (2), including hydraulic pressure pump inlet (I) and hydraulic pump outlet (O);
First check valve (7.1), including the first check valve inlet (I) and the first one-way valved outlet (O);
Proportional direction valve (8), including the first working hole of proportional direction valve (A), proportional direction valve oil return opening (T), proportional direction valve Second working hole (B) and proportional direction valve oil inlet (P);
Accumulator package (10), including accumulator package hydraulic fluid port (O);
Second pressure sensor (11.2) and third pressure sensor (11.3);
Loading cylinders (14), including big chamber and small chamber,
Wherein, the hydraulic pressure pump inlet (I) connects the hydraulic oil container (1),
First one-way valved outlet (O) connects the accumulator package hydraulic fluid port (O),
First working hole of proportional direction valve (A) connects the big chamber, and the proportional direction valve oil return opening (T) connects the liquid Pressure oil case (1),
The accumulator package hydraulic fluid port (O) connects the proportional direction valve oil inlet (P),
The second pressure sensor (11.2) connects the big chamber to detect the pressure in the big chamber, and the third pressure passes Sensor (11.3) connects the small chamber to detect the pressure in the small chamber,
It is characterized in that, the wind power generating set hydraulic vane change testing stand loading hydraulic system further includes:
First solenoid directional control valve (5), including first the first working hole of solenoid directional control valve (A), the first solenoid directional control valve oil return opening (T), first the second working hole of solenoid directional control valve (B) and the first solenoid directional control valve oil inlet (P);
Second check valve (7.2), including the second check valve inlet (I) and the second one-way valved outlet (O);
Third check valve (7.3), including third check valve inlet (I) and third one-way valved outlet (O);
First pressure sensor (11.1);Second solenoid directional control valve (12), including second the first working hole of solenoid directional control valve (A) and Second the second working hole of solenoid directional control valve (B);
First proportional pressure control valve (13.1), including the first proportional pressure control valve oil inlet (P) and the first proportional pressure control valve oil return opening (T);
Second proportional pressure control valve (13.2), including the second proportional pressure control valve oil inlet (P) and the second proportional pressure control valve oil return opening (T);
Wherein, the hydraulic pump outlet (O) connects the first solenoid directional control valve oil inlet (P),
First solenoid directional control valve, first working hole (A) and the first solenoid directional control valve oil return opening (T) connect the hydraulic oil container (1), second working hole of the first solenoid directional control valve (B) connects the first solenoid directional control valve oil inlet (P),
First check valve inlet (I) connects the first solenoid directional control valve oil inlet (P), the proportional direction valve oil inlet (P) first working hole of the second solenoid directional control valve (A), second check valve inlet (I) and the third check valve are connected Import (I) connection hydraulic oil container (1), second one-way valved outlet (O) and the third one-way valved outlet (O) connect institute respectively Big chamber and the small chamber are stated,
The second working hole of proportional direction valve (B) cut-off, the proportional direction valve oil inlet (P) connect first electromagnetism and change To valve oil inlet (P), the accumulator package hydraulic fluid port (O) connects first working hole of the second solenoid directional control valve (A), and described the One pressure sensor (11.1) connects the accumulator package hydraulic fluid port (O) to detect the pressure in the accumulator package (10),
Second solenoid directional control valve, first working hole (A) connects first one-way valved outlet (O), second electromagnetic switch The second working hole of valve (B) connects the small chamber,
The first proportional pressure control valve oil inlet (P) connects the big chamber, and the second proportional pressure control valve oil inlet (P) connects institute Small chamber is stated, the first proportional pressure control valve oil return opening (T) and the second proportional pressure control valve oil return opening (T) connect the hydraulic oil Case (1).
2. wind power generating set hydraulic vane change testing stand as described in claim 1 loads hydraulic system, further include:Filter (4), including filter inlet (I) and filter outlet (O), wherein, the filter inlet (I) connects the hydraulic pump outlet (O), the filter outlet (O) connects the first solenoid directional control valve oil inlet (P) and first check valve inlet (I).
3. wind power generating set hydraulic vane change testing stand as claimed in claim 2 loads hydraulic system, further include:Overflow valve (6), including overflow valve oil inlet (P) and overflow valve oil return opening (T), wherein, overflow valve oil inlet (P) connection described first Solenoid directional control valve oil inlet (P), the overflow valve oil return opening (T) connect first working hole of the first solenoid directional control valve (A) and The filter outlet (O).
4. the wind power generating set hydraulic vane change testing stand loading hydraulic system as described in any one of claim 1-3, is also wrapped It includes:
Motor (3) drives the hydraulic pump (2);
Shut-off valve (9) connects the hydraulic oil container (1) and the accumulator package hydraulic fluid port (O).
5. wind power generating set hydraulic vane change testing stand as claimed in claim 4 loads hydraulic system, wherein, in wind-power electricity generation In the case that unit hydraulic vane change testing stand loading hydraulic system is in emergency shutdown or power-down state, wind power generating set hydraulic pressure Variable pitch testing stand loads all element dead electricity of hydraulic system, and the proportional direction valve (8) is overflow in middle position, first ratio Opening pressure is 0 after flowing valve (13.1) and second proportional pressure control valve (13.2) dead electricity, in the accumulator package (10) Hydraulic oil after second solenoid directional control valve (12) and second proportional pressure control valve (13.2) by flowing back to the hydraulic oil container (1)。
6. wind power generating set hydraulic vane change testing stand as claimed in claim 4 loads hydraulic system, wherein, in wind-power electricity generation It is first solenoid directional control valve (5), described in the case that unit hydraulic vane change testing stand loading hydraulic system is in shutdown status Proportional direction valve (8), second solenoid directional control valve (12), first proportional pressure control valve (13.1) and second ratio are overflow It is 0 to flow valve (13.2) in controllable state and Opening pressure, and the proportional direction valve (8) is in middle position, second electromagnetism Reversal valve (12) is in low level and is operated in left position, and the hydraulic oil in the accumulator package (10) passes through first ratio The hydraulic oil container (1) is flowed back to after overflow valve (13.1) and second proportional pressure control valve (13.2).
7. wind power generating set hydraulic vane change testing stand as claimed in claim 4 loads hydraulic system, wherein, in wind-power electricity generation It is first solenoid directional control valve (5), described in the case that unit hydraulic vane change testing stand loading hydraulic system is in standby mode Proportional direction valve (8), second solenoid directional control valve (12), first proportional pressure control valve (13.1) and second ratio are overflow Flow valve (13.2) in controllable state, the proportional direction valve (8) obtains maximum negative voltage and is simultaneously operated in left position, the big chamber with The hydraulic oil container (1) communicates and in quick condition, first proportional pressure control valve (13.1) and second proportional overflow The Opening pressure of valve (13.2) is 0, and second solenoid directional control valve (12) is in high level and is operated in right position, the hydraulic pump (2) accumulator package (10) pressurising is given, when the pressure of the accumulator package (10) reaches first predetermined value, closes institute Motor (3) is stated, the hydraulic pump (2) stops giving accumulator package (10) pressurising.
8. wind power generating set hydraulic vane change testing stand as claimed in claim 4 loads hydraulic system, wherein, in wind-power electricity generation In the case that unit hydraulic vane change testing stand loading hydraulic system is in operating status, the proportional direction valve (8) is in closed loop The Opening pressure of state of a control, first proportional pressure control valve (13.1) and second proportional pressure control valve (13.2) is described negative The maximum working pressure (MWP) of oil cylinder (14) is carried, second solenoid directional control valve (12) is in low level and is operated in left position, the storage Energy device assembly (10) is connected, and the opening direction of spool and aperture size for passing through the proportional direction valve (8) with the small chamber The pressure of the big chamber is controlled to prevent negative pressure, the motor (3) drives the hydraulic pump (2), the hydraulic pump (2) The accumulator package (10) pressurising is given, when the pressure of the accumulator package (10) reaches first predetermined value, described in closing Motor (3), when the pressure of the accumulator package (10) after system works a period of time is less than second predetermined value, described in startup Motor (3), until the pressure of the accumulator package (10) reaches first predetermined value.
9. wind power generating set hydraulic vane change testing stand as claimed in claim 4 loads hydraulic system, wherein, in wind-power electricity generation In the case that unit hydraulic vane change testing stand loading hydraulic system is in emergency feathering state, the proportional direction valve (8) is in Closed-loop control state, second solenoid directional control valve (12) is in high level and is operated in right position, the accumulator package (10) It is not turned on the small chamber, the Opening pressure of first proportional pressure control valve (13.1) is the maximum work of the loading cylinders (14) Make pressure, the Opening pressure of second proportional pressure control valve (13.2) is adjusted in real time, the piston of the loading cylinders (14) Bar is protruding, and the opening direction for the spool for passing through the proportional direction valve (8) and aperture size control the big chamber Pressure is to prevent negative pressure.
CN201611257218.0A 2016-12-30 2016-12-30 Hydraulic loading system of hydraulic pitch control test bed of wind generating set Active CN106704275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611257218.0A CN106704275B (en) 2016-12-30 2016-12-30 Hydraulic loading system of hydraulic pitch control test bed of wind generating set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611257218.0A CN106704275B (en) 2016-12-30 2016-12-30 Hydraulic loading system of hydraulic pitch control test bed of wind generating set

Publications (2)

Publication Number Publication Date
CN106704275A CN106704275A (en) 2017-05-24
CN106704275B true CN106704275B (en) 2018-07-03

Family

ID=58906316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611257218.0A Active CN106704275B (en) 2016-12-30 2016-12-30 Hydraulic loading system of hydraulic pitch control test bed of wind generating set

Country Status (1)

Country Link
CN (1) CN106704275B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915426A (en) * 2019-03-18 2019-06-21 广东工业大学 A kind of hydraulic loading device
CN114109927A (en) * 2021-02-04 2022-03-01 上海圣克赛斯液压股份有限公司 Hydraulic variable pitch system for proportional servo control of wind driven generator
CN114151396A (en) * 2021-12-10 2022-03-08 上海电气液压气动有限公司 Fan main bearing stress hydraulic system
CN114321045A (en) * 2022-01-11 2022-04-12 徐州徐工道金特种机器人技术有限公司 Weight reduction control valve, hydraulic control system using weight reduction control valve and mine sweeping vehicle

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705169B (en) * 2012-06-26 2014-05-07 河海大学 Model machine for monitoring and controlling operation state of wind power generation
CN103148032B (en) * 2013-03-26 2016-01-20 河海大学常州校区 A kind of Study of Cyclic Loading hydraulic system
KR20160129391A (en) * 2015-04-30 2016-11-09 주식회사 동신이엔텍 Servo hybrid actuator system for pitch or yaw bearing tester
CN205298148U (en) * 2016-01-20 2016-06-08 山东科技大学 Servo pneumatic cylinder test bench

Also Published As

Publication number Publication date
CN106704275A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106704275B (en) Hydraulic loading system of hydraulic pitch control test bed of wind generating set
CN204646828U (en) Servo-hydraulic final controlling element
CN104925685A (en) Winch hydraulic system controlling guide rope through stepless speed regulating constant tension
CN207568956U (en) Deflect the hydraulic system of pulse test bench
CN208653742U (en) It is a kind of sealing and the testing integrated machine of pulse
CN206960072U (en) A kind of device for valve pressure testing
CN110206771A (en) A kind of hydraulic system for recreation facility
CN207195363U (en) A kind of hydraulic system of six hydraulic fluid ports electrohydraulic servo valve static and dynamic performance testing stand
CN108302073A (en) A kind of automobile-used impeller rotating hydraulic system of sand throwing fire extinguishing
CN207161404U (en) The master winch control system and rotary drilling rig of rotary drilling rig
CN208089650U (en) A kind of automobile-used impeller rotating hydraulic system of sand throwing fire extinguishing
CN203809417U (en) Multifunctional hydraulic test device
CN104564854A (en) Multi-executer heavy load digital hydraulic loop based on high-voltage common rail cabin
CN103423217B (en) A kind of hydraulic load analog of low noise
CN101893007B (en) Plunger case lifting hydraulic control system
JP2016109143A5 (en)
CN101865172B (en) Active piloted active servo proportional valve
CN208966773U (en) A kind of hydraulic automatic test oil source block system
CN203705267U (en) Bearing soil constant pressure loading testing equipment
CN203230677U (en) Automatic oil supplementing system of closed hydraulic cargo winch
CN109114071A (en) A kind of hydraulic automatic test oil source block system
CN107989847A (en) A kind of three-position four-way hydraulic combination valve high temperature and pressure oil circuit system
CN102285143B (en) Variable displacement piston pump system for hydraulic machine
CN206221419U (en) A kind of oil circuit control to pilot operated valve device implements the locking loop of individually control
CN203809418U (en) Hydraulic oil cylinder testing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant