CN106703224A - Overlength concrete wall crack control design method based on hidden-type crack induction inserts - Google Patents

Overlength concrete wall crack control design method based on hidden-type crack induction inserts Download PDF

Info

Publication number
CN106703224A
CN106703224A CN201710006429.5A CN201710006429A CN106703224A CN 106703224 A CN106703224 A CN 106703224A CN 201710006429 A CN201710006429 A CN 201710006429A CN 106703224 A CN106703224 A CN 106703224A
Authority
CN
China
Prior art keywords
wall
concrete
crack
steel plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710006429.5A
Other languages
Chinese (zh)
Other versions
CN106703224B (en
Inventor
邵剑文
肖志斌
王理军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Zhejiang University Co Ltd
Original Assignee
Architectural Design and Research Institute of Zhejiang University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Zhejiang University Co Ltd filed Critical Architectural Design and Research Institute of Zhejiang University Co Ltd
Priority to CN201710006429.5A priority Critical patent/CN106703224B/en
Publication of CN106703224A publication Critical patent/CN106703224A/en
Application granted granted Critical
Publication of CN106703224B publication Critical patent/CN106703224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses an overlength concrete wall crack control design method based on hidden-type crack induction inserts. A crack control device comprises concrete reinforcement bars in a concrete wall. A first reinforcement bar fixing frame and a second reinforcement bar fixing frame are arranged in a wall body between the concrete reinforcement bars. A first cross-shaped insert and a second cross-shaped insert, both formed by bending of steel plates, are arranged at the bottoms of the first reinforcement bar fixing frame and the second reinforcement bar fixing frame. The overlength concrete wall crack control design method has the advantages that the hidden-type crack induction inserts have low tensile strength and can deform greatly under the action of horizontal force, and accordingly, good temperature stress release effect can be achieved; the steel plates are free from leakage risks under tension, so that wall cracks can be controlled well, and the water stop effect can be achieved.

Description

A kind of ultra-long concrete wall body slit control design case using implicit crack-induced plate Method
Technical field
It is specially a kind of using implicit crack-induced plate the present invention relates to concrete wall Crack Control Technology field Ultra-long concrete wall body slit control design case method.
Background technology
Ultra-long concrete wall body structure refers to that construction unit length has exceeded the reinforced concrete structure of specification defined and stretches The concrete wall structure of the maximum spacing of contracting seam, although or expansion joint spacing not less than Criterion restriction structure difference variation compared with Greatly, the larger reinforced concrete wall structure of concrete shrinkage.《Code for design of concrete structures》GB50010-2010 specifies:Typically Reinforced concrete structure expansion joint maximum spacing, for class formations such as cast-type retaining wall, basement side walls, be in indoor or soil 30m, outdoor is 20m.
It is well known that concrete material compression strength is high, tensile strength is but very low, particularly for the concrete for pumping, Its aggregate diameter is small, and slump is big, itself is more easy to crack caused by Shrinkage and temperature stress occur.Ultra-long concrete wall body structure Belong to high-order redundant structure, and the thickness of wall compares very little with length, by concrete hydrating heat release, concrete shrinkage, season The temperature and shrinkage stress that section temperature difference etc. causes are protruded, and engineering experience is proved:Length is more long, and crack is more, and width is bigger.Although This kind of crack belongs to non-loading cracking, element bearing capacity and structure safety will not be typically influenceed in a short time, but can influence structure Durability, globality and water proofing property, long-term crack infiltration can cause steel bar corrosion and influence structure long-term safety, while crack Also sense organ and psychological harmful effect can be brought with infiltration to user.
The representative of ultra-long concrete wall body structure is the outer wall of basement having a large capacity and a wide range, and it receives to use function and basement anti- The limitation of water requirement, generally can not set movement joint, but in architectural design at present, and most basement length are considerably beyond rule Model sets the regulation of the maximum spacing (being 30m in indoor or soil) at expansion joint on concrete structure, and splitting occurs in concrete wall The phenomenon of seam is very important.Investigation shows, 100 basements 95 have a crack, in addition only 50-60 meters of length small basement side Wall also has crack;Outer wall cracking is particularly pertinent, and its quantity is accounted for by more than the 85% of investigation engineering number.Occur splitting in concrete wall It is not only expensive, time-consuming, laborious, it is necessary to slip casing by pressure fracture is carried out to it carries out Seal treatment after seam, and differ and surely eradicate Crack, economic loss is larger.Therefore, the crack Control Measures and method for designing of novel ultralong concrete wall structure are researched and developed Be of great practical significance.
At present, the general method for controlling crack that ultra-long concrete wall body structure is used has two major classes, and a major class is concrete Composition and Construction control (conventional method), another major class is to take special construction measure.The former mixes before having concreting Strengthen concrete moisture retention maintenance etc. when micro-expanding agent (anti-crack fiber), construction after the completion of setting post-cast strip, construction, such measures can Reduce concrete shrinkage stress in itself or improve its tensile strength but amplitude is very limited, when wall length exceedes to a certain degree When, its effect is unsatisfactory.The latter is the new method for occurring in recent years, i.e., reduced by taking special construction measure The crack of concrete wall structure, what is commonly used in engineering is to set crack-induced stitch.The method is in the middle part of concrete wall It is artificial that straight joint is set, the weak part of wall is made, the random distress in concrete for occurring is guided to the fixed position, it is convenient Later stage crack searching and repairing treatment, are a big changes of ultra-long concrete wall body slit control thinking:Since crack is difficult to keep away Exempt from, not as allowing it to concentrate at one, unlikely making a difference everywhere uses.But attractive joint is after all outseam, seam is wide can be bright with temperature Aobvious change, also set every 100-150 meter one in being typically designed, and stress concentration phenomenon is obvious so that seepage at attractive joint Seriously, engineer applied experience have shown that some attractive joints maintenance after not timing cracking, it is difficult to repair completely, later maintenance is cumbersome.
In special measure method, the method that segmentation plate is set newly is occurred in that in recent years, i.e., in the middle part of concrete wall Set sheet metal to split the kernel of concrete wall, be used to discharge non-load (temperature and concrete shrinkage) effect.One As vertically split with sheet metal (1mm thick) along wall length direction in the kernel concrete of concrete wall, then perpendicular to point Steel plate for sealing water (3mm is thick) is set every the axial location of steel plate, both form cross plate by vertical weld seam, and typical practice is shown in Fig. 1, is positioned between the bar-mat reinforcement of the side of wall two.Meanwhile, in order to avoid the surface crack of concrete wall is produced, supplement is set The deformed bar of soap-free emulsion polymeization, typically sets a branch of every 300mm or so, and length is typically at 30 meters or so.Due to the method There are some defects in construction and working measure, often do not reach estimated effect, and practical implementation is few.
Typical crack control method is poured after being set when being and micro-expanding agent (anti-crack fiber), construction are mixed before concreting Band, construction after the completion of strengthen concrete moisture retention maintenance etc., because concreting construction condition, construction technology, environmental condition, Concrete self performance is different, and to play how many effects still unknowable for these measures in Practical Project, can only based on measure Generally use, the concrete wall structure for more than 150 meters in Practical Project, such as without special effective measures, its crack Quantity and size can be in runaway condition.Crack-induced seam is set, and such as setting quantity is few, then setting seepage at seam seriously, can repeatedly Cracking, it is difficult to repair completely, later maintenance is pretty troublesome.Some engineering experiences teach that, even if there is provided crack-induced outseam, A large amount of cracks are still had on concrete wall to occur, actual effect with contemplate that larger difference.The master of segmentation poling board method is set Wanting defect has:A) segmentation steel plate and steel plate for sealing water are relatively thin, easily burn-through pore-forming during welding, it is impossible to sealing and cause wall leakage. B) concrete of segmentation steel plate both sides exists with steel plate for sealing water and bonds, and field test proves that its cohesive force is very big, causes to split steel The concrete of plate both sides is actually an entirety, and wall cannot be separated when shrinking, and sealing is possibly even made when lowering the temperature larger The weld seam of steel plate is broken and loses sealing energy and global failure.C) plate cannot be positioned without fixation before concreting, Being shocked and steel plate thickness is minimum, during concreting under rod is acted on cannot keep free standing condition, it is difficult to ensure that operational phase can reach To desired effects.D) plate after-pouring concrete is set and after reaching intensity, concrete wall is to carry out tensioning soap-free emulsion polymeization in advance should Power reinforcing bar, segmentation steel plate both sides concrete is packed together to complete wall again under prestressing force effect, it is impossible in temperature load Separated in time under contraction, it is impossible to play predetermined action.
It is newly-built the problems such as to solve parking, equipment machine room, underground civil defense engineering with the fast development in economy and city The more and more setting basements of building, its planar dimension is also improved constantly, and maximum can not set seam length in existing engineering construction Degree is up to 500 meters or so.Directly against the effect of underground water and soil, the generation and development in crack can cause concrete wall structure The generation of seepage, small, the normal of influence basement is used, and safety of structure is then influenceed greatly.
The content of the invention
It is an object of the invention to provide a kind of ultra-long concrete wall body slit control using implicit crack-induced plate Method for designing, the device of Crack Control is included between the concrete reinforcement body being arranged in concrete walls, the concrete reinforcement body Wall in be provided with the first reinforcing bar fixed mount and the second reinforcing bar fixed mount, the first reinforcing bar fixed mount and the second reinforcing bar are fixed Frame bottom be provided with using steel plate bending into the first cross plug board and the second cross plug board.
Preferably, rivet is used between first cross plug board and the second cross plug board.
Preferably, first cross plug board and the second cross plug board and the first reinforcing bar fixed mount and the second reinforcing bar fixed mount Between fixed using riveting method.
A kind of ultra-long concrete wall body slit control design case method using implicit crack-induced plate, including following step Suddenly:
S1:Calculation method for stress of the ultra-long concrete wall body structure under the effect of comprehensive equivalent temperature difference preferably uses consideration material Nonlinear elastic and plastic finite element method, when concrete wall total length L meets L≤[Lmax] andWith Cx=Cx1+Cx2It is required that, can only carry out the temperature stress calculation of elastic stage.
S2:Finite element method (fem) analysis basic principle,
1) using the finite element analysis software for considering material nonlinearity, the general finite element analysis such as optional ABAQUS, ANSYS Software;
2) concrete panel preferably use consider in-plane stress two-dimentional film unit or Slab element simulate, beam column bar preferably use with Beam element or bar unit simulation that two-dimensional cell is coordinated, 3D solid unit simulation is used when stress concentration phenomenon is obvious;
3) material constitutive relation of concrete and reinforcing bar can be pressed《Code for design of concrete structures》(GB50010) appendix C phase Regulation is closed to select;
4) modeling scope should be chosen by engineering practice, when the stiffness of structural member contribution for considering to be connected with concrete panel When, overhanging modeling size is not preferably less than 10 times of connecting elements larger thickness;
5) boundary condition of Rational choice FEM model, what is relatively guarded is typically fixed using wall bottom, and top is certainly By boundary condition, bottom wallboard and the soil body friction rigidity are also contemplated for when having ready conditions, are such as supported in pile foundation and are also contemplated for stake Horizontal restraint rigidity of the base to wallboard.When considering that base plate and top board scope are modeled by 4 sections, boundary condition can be taken as hold-down support;
6) there is the judgment criterion in crack in wall, and strength indexes of concrete can use its strength standard value when elastic stage is calculated (fck, ftk), it is desirable when elastic-plastic phase is calculated to allow the corresponding ultimate tensile strength of fracture width (typically desirable 400 μ ε).
S3:Wall length meets L≤[Lmax] andAnd Cx=Cx1+Cx2It is required that wall Structure can carry out Reinforcement Design by elastic temperature stress calculating results, when being unsatisfactory for, be set using between the bar-mat reinforcement of wall both sides Segmentation steel plate mode carries out Crack Control Design;
S4:Segmentation steel plate is set between the bar-mat reinforcement of wall both sides, and its design should meet claimed below:
1) the wall body structure computation model that simulation sets segmentation steel plate should be set up, using the elastoplasticity for considering material nonlinearity Finite element method (fem) analysis, the result of calculation for carrying out spacing by wall vertical crack determines that plate sets spacing L, L and is not preferably greater than 18 Rice;
2) implicit induction plate preferably selects the sheet metal of 2mm, and steel plate side to wall edge should be greater than 2 times of protective layer thickness, And the segmentation steel plate big value for not being preferably less than 150 and 1/3 wallboard thickness long;
3) reply sets the wall body structure after separating steel plate and calculates comprehensive using the PLASTIC FINITE ELEMENT ANALYSIS for considering material nonlinearity Close the lower stress of equivalent temperature effect, and be separated steel plate spacing inner wall and separate steel plate set the arrangement of reinforcement of scope wall with Crack-resisting design;
4) segmentation steel plate set scope wall can using it is local add the horizontal bar dowel of wall by the way of control critical eigenvalue it is wide Degree, when crack is unsatisfactory for code requirement, should reduce segmentation steel plate and set spacing, reduce fragmenting plate region internal stress and split with meeting Seam control is required.
Compared with prior art, the beneficial effects of the invention are as follows:Implicit induction plate tension rigidity in the present invention is smaller, Very large deformation can occur under horizontal force action, more preferable temperature stress releasing effect can be reached, and steel plate is in pulling force effect Lower ne-leakage risk, therefore wall body slit can be better controled over, more preferable sealing effect can be played.The present invention is pre- using rivet Connection, final product quality easily ensures, while convenience and reliability when the setting of support also ensure that construction.Proposed in the present invention Complete implicit induction patch panel design method, is given the wall body slit spacing estimation equation of simplicity and is inserted based on implicit induction The PLASTIC FINITE ELEMENT ANALYSIS calculation and analysis methods and crack Control Measures of plate.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the apparatus structure schematic diagram of Crack Control of the present invention.
In figure:1 concrete reinforcement body, 2 first reinforcing bar fixed mounts, 3 first cross plug boards, 4 second reinforcing bar fixed mounts, 5 Two cross plug boards, 6 rivets.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not For limiting the present invention.
Embodiment 1
A kind of ultra-long concrete wall body slit control design case method using implicit crack-induced plate, the dress of Crack Control Put and be provided with the first steel in the wall between the concrete reinforcement body 1 including being arranged in concrete walls, the concrete reinforcement body 1 The reinforcing bar fixed mount 4 of muscle fixed mount 2 and second, the first reinforcing bar fixed mount 2 and the bottom of the second reinforcing bar fixed mount 4 are provided with and use steel The first cross plug board 3 and the second cross plug board 5 that plate is bent into.
Riveted using rivet 6 between the cross plug board 5 of first cross plug board 3 and second.
Between the cross plug board 5 of first cross plug board 3 and second and the first reinforcing bar fixed mount 2 and the second reinforcing bar fixed mount 4 Fixed using riveting method.
A kind of ultra-long concrete wall body slit control design case method using implicit crack-induced plate, it is characterised in that: Comprise the following steps:
S1:Calculation method for stress of the ultra-long concrete wall body structure under the effect of comprehensive equivalent temperature difference preferably uses consideration material Nonlinear elastic and plastic finite element method, when concrete wall total length L meets L≤[Lmax] andAnd Cx=Cx1+Cx2It is required that, can only carry out the temperature stress calculation of elastic stage.
Concrete limit stretching is strained
ft,r(N/mm2) 1.0 1.5 2.0 2.5 3.0 3.5 4.0
εtr(10-6) 65 81 95 107 118 128 137
C' under various grounds and basic constraintx1Value table
Note:1. C' in this tablex1Lower limit be used for embedded depth of foundation and be equal to or less than 5m, higher limit is more than for embedded depth of foundation 5m;
2. when on rock, on mass concrete, pouring novel concrete on bulk armored concrete, C'x1Take 100~150 ×10-2N/mm3
When concrete wall is supported in pile foundation,
In formula:N --- 2 are taken when pile crown is hinged, 4 are taken when affixed;
The elastic modelling quantity (MPa) of E --- pile foundation material;
H --- the horizontal force of pile crown unit sidesway;
F --- area of base F=A × B that each is shared;
F1--- area of base F1=F- π × b2/4;
I --- the moment of inertia (mm in single stake plane of bending4);
Kh--- foundation level endurance and stiffness, take 1 × 10-2N/mm3
The diameter (mm) of b --- stake.
S2:Finite element method (fem) analysis basic principle,
1) using the finite element analysis software for considering material nonlinearity, the general finite element analysis such as optional ABAQUS, ANSYS Software;
2) concrete panel preferably use consider in-plane stress two-dimentional film unit or Slab element simulate, beam column bar preferably use with Beam element or bar unit simulation that two-dimensional cell is coordinated, 3D solid unit simulation is used when stress concentration phenomenon is obvious;
3) material constitutive relation of concrete and reinforcing bar can be pressed《Code for design of concrete structures》(GB50010) appendix C phase Regulation is closed to select;
4) modeling scope should be chosen by engineering practice, when the stiffness of structural member contribution for considering to be connected with concrete panel When, overhanging modeling size is not preferably less than 10 times of connecting elements larger thickness;
5) boundary condition of Rational choice FEM model, what is relatively guarded is typically fixed using wall bottom, and top is certainly By boundary condition, bottom wallboard and the soil body friction rigidity are also contemplated for when having ready conditions, are such as supported in pile foundation and are also contemplated for stake Horizontal restraint rigidity of the base to wallboard.When considering that base plate and top board scope are modeled by 4 sections, boundary condition can be taken as hold-down support;
6) there is the judgment criterion in crack in wall, and strength indexes of concrete can use its strength standard value when elastic stage is calculated (fck, ftk), it is desirable when elastic-plastic phase is calculated to allow the corresponding ultimate tensile strength of fracture width (typically desirable 400 μ ε).
S3:Wall length meets L≤[Lmax] andAnd Cx=Cx1+Cx2It is required that wall Structure can carry out Reinforcement Design by elastic temperature stress calculating results, when being unsatisfactory for, be set using between the bar-mat reinforcement of wall both sides Segmentation steel plate mode carries out Crack Control Design;
S4:Segmentation steel plate is set between the bar-mat reinforcement of wall both sides, and its design should meet claimed below:
1) the wall body structure computation model that simulation sets segmentation steel plate should be set up, using the elastoplasticity for considering material nonlinearity Finite element method (fem) analysis, the result of calculation for carrying out spacing by wall vertical crack determines that plate sets spacing L, L and is not preferably greater than 18 Rice;
2) implicit induction plate preferably selects the sheet metal of 2mm, and steel plate side to wall edge should be greater than 2 times of protective layer thickness, And the segmentation steel plate big value for not being preferably less than 150 and 1/3 wallboard thickness long;
3) reply sets the wall body structure after separating steel plate and calculates comprehensive using the PLASTIC FINITE ELEMENT ANALYSIS for considering material nonlinearity Close the lower stress of equivalent temperature effect, and be separated steel plate spacing inner wall and separate steel plate set the arrangement of reinforcement of scope wall with Crack-resisting design;
4) segmentation steel plate set scope wall can using it is local add the horizontal bar dowel of wall by the way of control critical eigenvalue it is wide Degree, when crack is unsatisfactory for code requirement, should reduce segmentation steel plate and set spacing, reduce fragmenting plate region internal stress and split with meeting Seam control is required.
Implicit induction plate tension rigidity in the present invention is smaller, and very large deformation, energy can occur under horizontal force action Reach more preferable temperature stress releasing effect, and steel plate ne-leakage risk under a stretching force, therefore wall can be better controled over Body crack, can play more preferable sealing effect.The present invention uses rivet pre-connection, final product quality easily ensures, while support sets Put the convenience and reliability when also ensure that construction.Complete implicit induction patch panel design method is proposed in the present invention, is given Gone out simplicity wall body slit spacing estimation equation and the PLASTIC FINITE ELEMENT ANALYSIS calculation and analysis methods based on implicit induction plate and Crack Control Measures.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.

Claims (4)

1. a kind of ultra-long concrete wall body slit control design case method using implicit crack-induced plate, the device of Crack Control Including the concrete reinforcement body (1) being arranged in concrete walls, it is characterised in that:Wall between the concrete reinforcement body (1) In be provided with the first reinforcing bar fixed mount (2) and the second reinforcing bar fixed mount (4), the first reinforcing bar fixed mount (2) and the second reinforcing bar Fixed mount (4) bottom be provided with using steel plate bending into the first cross plug board (3) and the second cross plug board (5).
2. a kind of ultra-long concrete wall body slit control design case using implicit crack-induced plate according to claim 1 Method, it is characterised in that:Riveted using rivet (6) between first cross plug board (3) and the second cross plug board (5).
3. a kind of ultra-long concrete wall body slit control design case using implicit crack-induced plate according to claim 1 Method, it is characterised in that:First cross plug board (3) and the second cross plug board (5) and the first reinforcing bar fixed mount (2) and second Reinforcing bar fixed mount is fixed between (4) using riveting method.
4. a kind of ultra-long concrete wall body slit control design case using implicit crack-induced plate according to claim 1 Method, it is characterised in that:Comprise the following steps:
S1:Calculation method for stress of the ultra-long concrete wall body structure under the effect of comprehensive equivalent temperature difference preferably uses consideration material non-thread The elastic and plastic finite element method of property, when concrete wall total length L meets L≤[Lmax] and And Cx=Cx1+Cx2It is required that, can only carry out the temperature stress calculation of elastic stage.
S2:Finite element method (fem) analysis basic principle,
1) using the finite element analysis software for considering material nonlinearity, the general finite element analysis such as optional ABAQUS, ANSYS are soft Part;
2) concrete panel preferably uses the two-dimentional film unit or Slab element that consider in-plane stress to simulate, and beam column bar is preferably used and two dimension Beam element or bar unit simulation that unit is coordinated, 3D solid unit simulation is used when stress concentration phenomenon is obvious;
3) material constitutive relation of concrete and reinforcing bar can be pressed《Code for design of concrete structures》(GB50010) the related rule of appendix C It is fixed to select;
4) modeling scope should be chosen by engineering practice, when the stiffness of structural member for considering to be connected with concrete panel is contributed, outward Stretch 10 times that modeling size is not preferably less than connecting elements larger thickness;
5) boundary condition of Rational choice FEM model, what is relatively guarded is typically fixed using wall bottom, and top is free Boundary condition, also contemplates for bottom wallboard and the soil body friction rigidity, is such as supported in pile foundation and also contemplates for pile foundation pair when having ready conditions The horizontal restraint rigidity of wallboard.When considering that base plate and top board scope are modeled by 4 sections, boundary condition can be taken as hold-down support;
6) there is the judgment criterion in crack in wall, and strength indexes of concrete can use its strength standard value (f when elastic stage is calculatedck, ftk), it is desirable when elastic-plastic phase is calculated to allow the corresponding ultimate tensile strength of fracture width (typically desirable 400 μ ε).
S3:Wall length meets L≤[Lmax] andAnd Cx=Cx1+Cx2It is required that wall body structure can Reinforcement Design is carried out by elastic temperature stress calculating results, when being unsatisfactory for, steel is split using being set between the bar-mat reinforcement of wall both sides Plate mode carries out Crack Control Design;
S4:Segmentation steel plate is set between the bar-mat reinforcement of wall both sides, and its design should meet claimed below:
1) the wall body structure computation model that simulation sets segmentation steel plate should be set up, using the elastoplastic finite for considering material nonlinearity Unit calculates analysis, and the result of calculation for carrying out spacing by wall vertical crack determines that plate sets not preferably greater than 18 meters of spacing L, L;
2) implicit induction plate preferably selects the sheet metal of 2mm, and steel plate side to wall edge should be greater than 2 times of protective layer thickness, and divide Cut the steel plate big value for not being preferably less than 150 and 1/3 wallboard thickness long;
3) reply sets the wall body structure after separating steel plate and calculates comprehensive etc. using the PLASTIC FINITE ELEMENT ANALYSIS for considering material nonlinearity Stress under effect temperature action, and be separated steel plate spacing inner wall and separate arrangement of reinforcement and cracking resistance that steel plate sets scope wall Design;
4) segmentation steel plate set scope wall can using it is local add the horizontal bar dowel of wall by the way of control critical eigenvalue width, when When crack is unsatisfactory for code requirement, segmentation steel plate should be reduced spacing is set, reduce fragmenting plate region internal stress to meet crack control System is required.
CN201710006429.5A 2017-01-05 2017-01-05 Crack control design method for overlong concrete wall by adopting hidden crack induction inserting plate Active CN106703224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710006429.5A CN106703224B (en) 2017-01-05 2017-01-05 Crack control design method for overlong concrete wall by adopting hidden crack induction inserting plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710006429.5A CN106703224B (en) 2017-01-05 2017-01-05 Crack control design method for overlong concrete wall by adopting hidden crack induction inserting plate

Publications (2)

Publication Number Publication Date
CN106703224A true CN106703224A (en) 2017-05-24
CN106703224B CN106703224B (en) 2022-05-24

Family

ID=58907843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710006429.5A Active CN106703224B (en) 2017-01-05 2017-01-05 Crack control design method for overlong concrete wall by adopting hidden crack induction inserting plate

Country Status (1)

Country Link
CN (1) CN106703224B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612207A (en) * 2018-05-15 2018-10-02 上海东方雨虹防水技术有限责任公司 Concrete induces crack structure and its construction method
CN110864839A (en) * 2019-12-31 2020-03-06 福州大学 Internal stress monitoring device for cement concrete pavement slab and using method thereof
CN112267344A (en) * 2020-10-16 2021-01-26 长沙理工大学 Crack-inducing member and crack-inducing structure
CN112415175A (en) * 2020-12-15 2021-02-26 中国路桥工程有限责任公司 Physical model test device for ground fissure
CN113201990A (en) * 2021-04-22 2021-08-03 中冶南方城市建设工程技术有限公司 Shrinkage joint inducing device suitable for cement concrete pavement and construction method
CN113818578A (en) * 2021-09-18 2021-12-21 北京市建筑设计研究院有限公司 Induced seam structure with prefabricated connecting piece

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608476A (en) * 2009-07-07 2009-12-23 宁波建工股份有限公司 Method for controlling crack of super-long wall body
CN103835523A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Ultra-long extra-large reinforced concrete structure engineering crack prevention process
CN104018701A (en) * 2014-05-23 2014-09-03 浙江勤业建工集团有限公司 Method for controlling super-long reinforced concrete pool wall structure crack
CN104032771A (en) * 2014-06-20 2014-09-10 中建五局第三建设有限公司 Underground structure crack control construction method by adding inducing joints
CN104074285A (en) * 2014-06-30 2014-10-01 浙江省二建建设集团有限公司 ultra-long concrete wall body structure and method for controlling structural cracks by constructing wall body
US20150167328A1 (en) * 2012-07-18 2015-06-18 Illinois Tool Works Inc. Leave-in-place concrete formwork combining plate dowels, divider plates, and/or finishing, armoring and/or sealing molding
EP2946037A1 (en) * 2013-01-18 2015-11-25 Spurrell, Shaun Apparatus for forming a joint

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608476A (en) * 2009-07-07 2009-12-23 宁波建工股份有限公司 Method for controlling crack of super-long wall body
US20150167328A1 (en) * 2012-07-18 2015-06-18 Illinois Tool Works Inc. Leave-in-place concrete formwork combining plate dowels, divider plates, and/or finishing, armoring and/or sealing molding
EP2946037A1 (en) * 2013-01-18 2015-11-25 Spurrell, Shaun Apparatus for forming a joint
CN103835523A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Ultra-long extra-large reinforced concrete structure engineering crack prevention process
CN104018701A (en) * 2014-05-23 2014-09-03 浙江勤业建工集团有限公司 Method for controlling super-long reinforced concrete pool wall structure crack
CN104032771A (en) * 2014-06-20 2014-09-10 中建五局第三建设有限公司 Underground structure crack control construction method by adding inducing joints
CN104074285A (en) * 2014-06-30 2014-10-01 浙江省二建建设集团有限公司 ultra-long concrete wall body structure and method for controlling structural cracks by constructing wall body

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
焦彬如: "超长混凝土墙体温度应力计算及裂缝控制新技术研究", 《土木工程学报》 *
薛云林: "超长地下室混凝土墙体的裂缝控制技术", 《福建建材》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612207A (en) * 2018-05-15 2018-10-02 上海东方雨虹防水技术有限责任公司 Concrete induces crack structure and its construction method
CN110864839A (en) * 2019-12-31 2020-03-06 福州大学 Internal stress monitoring device for cement concrete pavement slab and using method thereof
CN112267344A (en) * 2020-10-16 2021-01-26 长沙理工大学 Crack-inducing member and crack-inducing structure
CN112415175A (en) * 2020-12-15 2021-02-26 中国路桥工程有限责任公司 Physical model test device for ground fissure
CN112415175B (en) * 2020-12-15 2023-01-06 中国路桥工程有限责任公司 Physical model test device for ground fissure
CN113201990A (en) * 2021-04-22 2021-08-03 中冶南方城市建设工程技术有限公司 Shrinkage joint inducing device suitable for cement concrete pavement and construction method
CN113201990B (en) * 2021-04-22 2023-05-30 中冶南方城市建设工程技术有限公司 Shrinkage joint inducing device suitable for cement concrete pavement and construction method
CN113818578A (en) * 2021-09-18 2021-12-21 北京市建筑设计研究院有限公司 Induced seam structure with prefabricated connecting piece
CN113818578B (en) * 2021-09-18 2023-04-18 北京市建筑设计研究院有限公司 Induced seam structure with prefabricated connecting piece

Also Published As

Publication number Publication date
CN106703224B (en) 2022-05-24

Similar Documents

Publication Publication Date Title
CN106703224A (en) Overlength concrete wall crack control design method based on hidden-type crack induction inserts
Amadio et al. Refined numerical modelling for the structural assessment of steel-concrete composite beam-to-column joints under seismic loads
Foraboschi Effectiveness of novel methods to increase the FRP-masonry bond capacity
Lin et al. Out-of-plane testing of unreinforced masonry walls strengthened using ECC shotcrete
Mutalib et al. Development of PI diagrams for FRP strengthened RC columns
Anil et al. An experimental study on reinforced concrete partially infilled frames
Yang et al. Effect of reinforcement stiffeners on square concrete-filled steel tubular columns subjected to axial compressive load
Yang et al. Seismic behaviors of squat reinforced concrete shear walls under freeze-thaw cycles: a pilot experimental study
Yan et al. Experimental study on curved steel-concrete-steel sandwich shells under concentrated load by a hemi-spherical head
Wisser et al. Numerical modelling of compensation grouting above shallow tunnels
Malm et al. Cracking of Concrete Buttress Dam Due to Seasonal Temperature Variation.
Qian et al. Testing and simulation of 3D effects on progressive collapse resistance of RC buildings
Laursen et al. Out-of-plane structural response of interlocking compressed earth block walls
Shabdin et al. Experimental study on seismic behavior of Un-Reinforced Masonry (URM) brick walls strengthened with shotcrete
Xiong et al. Experimental and finite element study on seismic performance of the LCFST-D columns
Shaheen et al. Effect of grout properties on shear strength of column base connections: FEA and analytical approach
Wararuksajja et al. Seismic design of RC moment-resisting frames with concrete block infill walls considering local infill-frame interactions
Shin et al. Seismic performance of reinforced concrete eccentric beam-column connections with floor slabs
Chen et al. Analytical solution for a jointed shield tunnel lining reinforced by secondary linings
Shin et al. Reinforced concrete edge beam—column—slab connections subjected to earthquake loading
Wang et al. Progressive collapse resistance of reinforced-concrete frames with specially shaped columns under loss of a corner column
Hu et al. Analysis of the behaviour of a novel support system in an anisotropically jointed rock mass
Yang et al. Component tests and numerical simulations of composite floor systems under progressive collapse
Su et al. Simulating composite behaviour in SCL tunnels with sprayed waterproofing membrane interface: A state-of-the-art review
Chen et al. Structural behavior of precast reinforced concrete shear walls with large-diameter bars

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant