CN106684894A - Method and device for regulating three-phase loads of low-voltage power grid - Google Patents

Method and device for regulating three-phase loads of low-voltage power grid Download PDF

Info

Publication number
CN106684894A
CN106684894A CN201611148717.6A CN201611148717A CN106684894A CN 106684894 A CN106684894 A CN 106684894A CN 201611148717 A CN201611148717 A CN 201611148717A CN 106684894 A CN106684894 A CN 106684894A
Authority
CN
China
Prior art keywords
user
phase
time
load
preset period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611148717.6A
Other languages
Chinese (zh)
Inventor
林涛
辛锋
李向阳
李彬
程序
冯英
兰剑
孙建
王兴越
马振华
赵明杰
王彦楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Beijing Lead Electric Equipment Co Ltd
Beijing Huashang Sanyou New Energy Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Beijing Lead Electric Equipment Co Ltd
Beijing Huashang Sanyou New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd, Beijing Lead Electric Equipment Co Ltd, Beijing Huashang Sanyou New Energy Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611148717.6A priority Critical patent/CN106684894A/en
Publication of CN106684894A publication Critical patent/CN106684894A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/26Arrangements for eliminating or reducing asymmetry in polyphase networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a method and device for regulating three-phase loads of a low-voltage power grid. The method comprises the following steps: acquiring a historical load record of each user in a preset low-voltage power grid area, wherein the historical load record comprises load parameters and acquisition time corresponding to the load parameters; determining an electricity consumption law curve of each user according to the historical load record of each user; and according to the electricity consumption law curve of each user, determining the load distribution on three-phase in the preset low-voltage power grid area so that the loads on the three-phase reach a preset balance condition. The method for regulating the three-phase loads of the low-voltage power grid provided by the invention solves the technical problem in the related technology that the three-phase loads in the low-voltage power grid cannot be effectively balanced.

Description

The regulation and control method and apparatus of low voltage electric network three-phase load
Technical field
The present invention relates to power domain, in particular to a kind of regulation and control method and apparatus of low voltage electric network three-phase load.
Background technology
The three-phase imbalance of low voltage electric network is always one of the subject matter for perplexing power supply unit, low voltage electric network be mostly through After the transformer pressure-reducing of 10/0.4KV, with three-phase four-wire system to customer power supply, low voltage electric network is three-phase productive power negative with single-phase Carry the supply network of mixing electricity consumption.In the single-phase user of attaching, single-phase load should be balancedly tapped at A, B, C by power supply department On three-phase.But in real work and operation, the mark of circuit, connect electric personnel carelessness along with due to single-phase user can not Asynchronism of increase-volume, the access of great power single phase load and single-phase load electricity consumption etc. is controlled, threephase load is all caused not Balance.If low voltage electric network runs in the case where three-phase load unbalance degree is larger, it will made with electrical equipment to low voltage electric network Into harmful effect.
For the technical problem of the load that three-phase in low voltage electric network can not be effectively balanced in correlation technique, not yet carry at present Go out effective solution.
The content of the invention
A kind of regulation and control method and apparatus of low voltage electric network three-phase load are the embodiment of the invention provides, at least to solve correlation The technical problem of the load of three-phase in low voltage electric network can not be effectively balanced in technology.
A kind of one side according to embodiments of the present invention, there is provided regulation and control method of low voltage electric network three-phase load, including: Obtain the historical load record of each user in pre-set low pressure Grid, wherein, historical load record include load parameter with The corresponding acquisition time of load parameter;Historical load record according to each user determines the electricity consumption law curve of each user; Electricity consumption law curve according to each user determines sharing of load in pre-set low pressure Grid on three-phase so that on three-phase Load reaches default equilibrium condition.
Further, the historical load record for obtaining each user in pre-set low pressure Grid includes:According to it is default when Between interval carry out sampling processing, wherein, sampling processing be gather pre-set low pressure Grid in all users load parameter;Really The time of fixed each sampling processing, the historical load record according to each user determines the electricity consumption law curve bag of each user Include:The load parameter of each user and the relation curve of time are drawn respectively.
Further, the electricity consumption law curve according to each user determines the load in pre-set low pressure Grid on three-phase Distribution is so that the load on three-phase reaches default equilibrium condition and includes:Determine three default balance strips of phase line in preset period of time Part;The corresponding annexation of three phase lines and all users in preset period of time is determined according to default equilibrium condition;According to it is default when Phase line of the corresponding annexation of three phase lines and all users to all users in preset period of time is adjusted in section.
Further, all users include first user, corresponding with all users according to three phase lines in preset period of time Annexation the phase line of all users is adjusted in preset period of time including:First user is determined according to correspondence annexation The phase line of connection is needed in preset period of time;The current connected phase line of detection first user;Judge first in preset period of time Whether the current connected phase line of user is the phase line determined according to correspondence annexation;If it is judged that be no, by The phase line of one user connection switches to the phase line determined according to correspondence annexation.
Further, determine that three phase line connections corresponding with all users are closed in preset period of time according to default equilibrium condition System includes:Determined in preset period of time according to the load parameter of each user and the relation curve of time by big data analysis method The corresponding annexation of three phase lines and all users, so that three phase lines are reached in preset period of time internal loading time curve The error of waveform default equilibrium condition within a preset range.
Another aspect according to embodiments of the present invention, additionally provides a kind of regulation device of low voltage electric network three-phase load, bag Include:Acquiring unit, the historical load for obtaining each user in pre-set low pressure Grid is recorded, wherein, historical load note Record includes load parameter and the corresponding acquisition time of load parameter;First determining unit, for negative according to the history of each user Lotus record determines the electricity consumption law curve of each user;Second determining unit, for the electricity consumption law curve according to each user The sharing of load in pre-set low pressure Grid on three-phase is determined so that the load on three-phase reaches default equilibrium condition.
Further, acquiring unit includes:Sampling module, for carrying out sampling processing according to prefixed time interval, wherein, Sampling processing is the load parameter for gathering all users in pre-set low pressure Grid;Determining module, for determining sampling every time The time for the treatment of, the first determining unit includes:Drafting module, for drawing the load parameter of each user and the pass of time respectively It is curve.
Further, the second determining unit includes:First determining module, for determining in preset period of time the pre- of three phase lines If equilibrium condition;Second determining module, for determining three phase lines and all users in preset period of time according to default equilibrium condition Corresponding annexation;Adjusting module, for existing with the corresponding annexation of all users according to three phase lines in preset period of time Phase line in preset period of time to all users is adjusted.
Further, all users include first user, and adjusting module includes:Determination sub-module, for being connected according to correspondence The relation of connecing determines that first user needs the phase line of connection in preset period of time;Detection sub-module, for detecting that first user is current The phase line for being connected;Judging submodule, for judging whether the current connected phase line of first user is root in preset period of time According to the phase line that correspondence annexation is determined;Switching submodule, for if it is judged that being phase no, that first user is connected Line switches to the phase line determined according to correspondence annexation.
Further, the second determining module includes:Calculating sub module, for being used according to each by big data analysis method The load parameter at family and the relation curve of time determine the corresponding annexation of three phase lines and all users in preset period of time, with Three phase lines are made to reach the error default balance strip within a preset range in preset period of time internal loading time curve waveform Part.
In embodiments of the present invention, recorded by obtaining the historical load of each user in pre-set low pressure Grid, its In, historical load record includes load parameter and the corresponding acquisition time of load parameter;Historical load note according to each user Record determines the electricity consumption law curve of each user;Electricity consumption law curve according to each user is determined in pre-set low pressure Grid So that the load on three-phase reaches default equilibrium condition, solving in correlation technique can not effective Horizon for sharing of load on three-phase The technical problem of the load of three-phase in weighing apparatus low voltage electric network, and then realize the technology of three-phase load in effectively balance low voltage electric network Effect.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the regulation and control method of a kind of optional low voltage electric network three-phase load according to embodiments of the present invention;
Fig. 2 is the schematic diagram of a kind of optional low voltage electric network user terminal three-phase regulation device according to embodiments of the present invention;
Fig. 3 is the schematic diagram of the regulation device of a kind of optional low voltage electric network three-phase load according to embodiments of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
According to the embodiment of the present application, there is provided a kind of regulation and control method of low voltage electric network three-phase load.
Fig. 1 is the flow chart of the regulation and control method of a kind of optional low voltage electric network three-phase load according to embodiments of the present invention, As shown in figure 1, the method comprises the following steps:
Step S101, obtains the historical load record of each user in pre-set low pressure Grid, wherein, historical load note Record includes load parameter and the corresponding acquisition time of load parameter;
Step S102, the historical load record according to each user determines the electricity consumption law curve of each user;
Step S103, the electricity consumption law curve according to each user determines the load in pre-set low pressure Grid on three-phase Distribution is so that the load on three-phase reaches default equilibrium condition.
Above-mentioned steps are further explained below are described as follows:
Pre-set low pressure Grid is one piece of region to be regulated and controled, to the load of each user in pre-set low pressure Grid It is acquired and records, gets the load record of all users in the region.Load record can include load parameter and be somebody's turn to do The corresponding acquisition time of load parameter.Load parameter can be the electrical parameters such as voltage, electric current, power.
After the historical load record for obtaining each user in pre-set low pressure Grid, according to the history of each user Load record determines the electricity consumption law curve of each user.Electricity consumption law curve is the load parameter of user and between the time The curve of relation.Determining the electricity consumption law curve of each user can determine that peak of power consumption and low power consumption of user etc. are believed Breath, is specifically embodied in the waveform of electricity consumption law curve.
It is determined that after the electricity consumption law curve of each user, the electricity consumption law curve according to each user determines default low Sharing of load in piezoelectricity web area on three-phase is so that the load on three-phase reaches default equilibrium condition.
Power network has three phase lines, if the load secular disequilibrium in every phase line, easily to the electrical equipment in power network Etc. having undesirable effect.By determining the electricity consumption law curve of each user, the user of different load rule can be assigned to In three phase lines so that in the load substantial equilibrium of same time in three phase lines, load error is in preset range.To each use The load adjustment at family can be using the phase change method of manual commutation, and relevant staff is according to the data result after analysis in Tai Qu The manual commutation in rear end of transformer is distributed with performing customer charge.Or, can also be using changing to the load adjustment of each user The switching mode of phase device control, as shown in Fig. 2 adding commutation device between power network and user terminal, commutation device can connect By the control of system platform selected in A, B, C three-phase one meet user terminal connect.The switching mode of system platform can be logical Control switching manually is crossed, for example, the phase line that user terminal is connected is switched by modes such as staff's controlling switches, or, also may be used The control instruction of commutation is sent to indicate commutation device to be connected to user terminal to commutation device by software to be system platform In the selected phase line of control instruction.As shown in Fig. 2 being also provided with monitoring terminal in user terminal to monitor the use of user terminal Electric load, is recorded with the historical load for obtaining user.
The embodiment is recorded by obtaining the historical load of each user in pre-set low pressure Grid, wherein, history is born Lotus record includes load parameter and the corresponding acquisition time of load parameter;Historical load record according to each user determines each The electricity consumption law curve of user;Electricity consumption law curve according to each user determines negative on three-phase in pre-set low pressure Grid Lotus is distributed so that the load on three-phase reaches default equilibrium condition, to be solved and can not effectively balance low voltage electric network in correlation technique The technical problem of the load of middle three-phase, and then realize the technique effect of three-phase load in effectively balance low voltage electric network.
The historical load record for obtaining each user in pre-set low pressure Grid can include:According to prefixed time interval Sampling processing is carried out, wherein, sampling processing is the load parameter for gathering all users in pre-set low pressure Grid;It is determined that every time The time of sampling processing, the historical load record according to each user determines that the electricity consumption law curve of each user can include: The load parameter of each user and the relation curve of time are drawn respectively.
Electricity consumption law curve according to each user determine the sharing of load in pre-set low pressure Grid on three-phase so that Load on three-phase reaches default equilibrium condition can be performed as follows:Determine in preset period of time the default of three phase lines Equilibrium condition;The corresponding annexation of three phase lines and all users in preset period of time is determined according to default equilibrium condition;According to Phase line of the corresponding annexation of three phase lines and all users to all users in preset period of time is adjusted in preset period of time It is whole.
All users include first user, exist with the corresponding annexation of all users according to three phase lines in preset period of time The phase line of all users is adjusted in preset period of time including:Determine first user in preset period of time according to correspondence annexation The interior phase line for needing to connect;The current connected phase line of detection first user;Judge the current institute of first user in preset period of time Whether the phase line of connection is the phase line determined according to correspondence annexation;If it is judged that being no, first user is connected Phase line switch to according to the correspondence phase line determined of annexation.
Preferably, the corresponding annexation of three phase lines and all users in preset period of time is determined according to default equilibrium condition Including:Determined three in preset period of time according to the load parameter of each user and the relation curve of time by big data analysis method The corresponding annexation of individual phase line and all users, so that three phase lines are reached in preset period of time internal loading time curve ripple The error of shape default equilibrium condition within a preset range.
The regulation and control method that the embodiment is provided first carries out the load point of A, B, C three-phase for platform area transformer according to a conventional method Match somebody with somebody, after equipment investment is using a period of time, the Real-time Load information of user is gathered by the monitor terminal for accessing each family, and It is uploaded to system platform.Plateform system carries out Data Integration by the load record to history, finds out the operation rule of customer charge Rule, recycles big data analysis, the load to A, B, C three-phase to re-start distribution, make the real-time change trend base of three-phase load This is identical, reaches the equilibrium,transient of threephase load.The control method manually commutation or can carry out commutation by commutation device. Wherein the control process of commutation device is registered one's residence for three-phase and four-line, and monitor terminal and commutation device are installed additional in port of registering one's residence.A, B, C tri- Phase accessing user after being combined into single-phase electricity with N from after commutation device.System platform is born by A, B, C three-phase After load-carrying is newly allocated, under send instructions to user's commutation device and carry out commutation operation.Manual commutation is then relevant staff By the data result after Platform Analysis, in platform area, the rear end of transformer carries out customer charge distribution.
The regulation and control method that the embodiment is provided, after being analyzed using big data according to user's rule of life, by system The integrally-regulated three-phase load distribution of platform, and manually commutation or power supply commutation device flexibly three alternate loads of switching, make To reach three-phase load in a basic balance, on the basis of safe power supply, price reduction can be damaged with saving energy consumption, drop.The embodiment is carried The regulation and control method of confession can ensure the quality of power supply of user, reduce the electric energy loss of circuit, and the electric energy for reducing distribution transformer is damaged Consumption, increases distribution transforming and exerts oneself, and reduces the zero-sequence current that distribution transforming is produced, and increases motor efficiency, it is ensured that always protection is good for low-voltage leakage Operation, it is ensured that the safe operation of electrical equipment, prevents personal electric shock casualty accident.
It should be noted that accompanying drawing flow chart though it is shown that logical order, but in some cases, can be with Shown or described step is performed different from order herein.
Another aspect according to embodiments of the present invention, additionally provides a kind of regulation device of low voltage electric network three-phase load.
Fig. 3 is the schematic diagram of the regulation device of a kind of optional low voltage electric network three-phase load according to embodiments of the present invention, As shown in figure 3, the device includes acquiring unit 10, the first determining unit 20 and the second determining unit 30.
Acquiring unit, the historical load for obtaining each user in pre-set low pressure Grid is recorded, wherein, history is born Lotus record includes load parameter and the corresponding acquisition time of load parameter;First determining unit, for going through according to each user History load record determines the electricity consumption law curve of each user;Second determining unit, for the electricity consumption rule according to each user Curve determines the sharing of load in pre-set low pressure Grid on three-phase so that the load on three-phase reaches default equilibrium condition.
Preferably, acquiring unit includes:Sampling module, for carrying out sampling processing according to prefixed time interval, wherein, adopt Sample is processed as gathering the load parameter of all users in pre-set low pressure Grid;Determining module, for determining at each sampling The time of reason, the first determining unit includes:Drafting module, for drawing the load parameter of each user and the relation of time respectively Curve.
Preferably, the second determining unit includes:First determining module, for determining in preset period of time the default of three phase lines Equilibrium condition;Second determining module, for determining that three phase lines are with all users' in preset period of time according to default equilibrium condition Correspondence annexation;Adjusting module, for the corresponding annexation according to three phase lines in preset period of time and all users pre- If the phase line in the period to all users is adjusted.
Preferably, all users include first user, and adjusting module includes:Determination sub-module, for being connected according to correspondence Relation determines that first user needs the phase line of connection in preset period of time;Detection sub-module, for detecting the current institute of first user The phase line of connection;Judging submodule, for judge in preset period of time the current connected phase line of first user whether according to The phase line that correspondence annexation is determined;Switching submodule, for if it is judged that being phase line no, that first user is connected Switch to the phase line determined according to correspondence annexation.
Preferably, the second determining module includes:Calculating sub module, for by big data analysis method according to each user Load parameter and the relation curve of time determine the corresponding annexation of three phase lines and all users in preset period of time so that Three phase lines reach the error default equilibrium condition within a preset range in preset period of time internal loading time curve waveform.
Above-mentioned device can include processor and memory, and said units can be as program unit storage in storage In device, corresponding function is realized by computing device storage said procedure unit in memory.
Memory potentially includes the volatile memory in computer-readable medium, random access memory (RAM) and/ Or the form, such as read-only storage (ROM) or flash memory (flashRAM) such as Nonvolatile memory, memory includes at least one storage Chip.
The order of above-mentioned the embodiment of the present application does not represent the quality of embodiment.
In above-described embodiment of the application, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
In addition, during each functional unit in the application each embodiment can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use When, can store in a computer read/write memory medium.Based on such understanding, the technical scheme of the application is substantially The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer Equipment (can be personal computer, server or network equipment etc.) perform the application each embodiment methods described whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the application, it is noted that for the ordinary skill people of the art For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of the application.

Claims (10)

1. a kind of regulation and control method of low voltage electric network three-phase load, it is characterised in that including:
The historical load record of each user in pre-set low pressure Grid is obtained, wherein, the historical load record includes negative Lotus parameter and the corresponding acquisition time of the load parameter;
Historical load record according to each user determines the electricity consumption law curve of each user;
Electricity consumption law curve according to each user determines the sharing of load on three-phase in the pre-set low pressure Grid So that the load on the three-phase reaches default equilibrium condition.
2. method according to claim 1, it is characterised in that
The historical load record for obtaining each user in pre-set low pressure Grid includes:Sampled according to prefixed time interval Treatment, wherein, the sampling processing is the load parameter of all users in the collection pre-set low pressure Grid;It is determined that every time The time of the sampling processing,
Historical load record according to each user determines that the electricity consumption law curve of each user includes:Draw each respectively The load parameter of user and the relation curve of time.
3. method according to claim 2, it is characterised in that the electricity consumption law curve according to each user determines institute The sharing of load in pre-set low pressure Grid on three-phase is stated so that the load on the three-phase reaches default equilibrium condition and includes:
Determine three described default equilibrium conditions of phase line in preset period of time;
The corresponding annexation of three phase lines and all users in the preset period of time is determined according to the default equilibrium condition;
According to the corresponding annexation of three phase lines in the preset period of time and all users in the preset period of time to all The phase line of user is adjusted.
4. method according to claim 3, it is characterised in that all users include first user, according to described pre- If three phase lines are carried out in the preset period of time with the corresponding annexation of all users to the phase line of all users in the period Adjustment includes:
Determine that the first user needs the phase line of connection in the preset period of time according to the correspondence annexation;
Detect the current connected phase line of the first user;
Judge whether the current connected phase line of the first user is to be closed according to the correspondence connection in the preset period of time The phase line that system determines;
If it is judged that being no, the phase line that the first user is connected is switched to and is determined according to the correspondence annexation Phase line.
5. method according to claim 3, it is characterised in that the preset period of time is determined according to the default equilibrium condition Interior three phase lines include with the corresponding annexation of all users:
By big data analysis method, the load parameter of each user and the relation curve of time according to determine described default The corresponding annexation of three phase lines and all users in period, so as to three phase lines reach be born in the preset period of time The error of lotus time curve waveform default equilibrium condition within a preset range.
6. a kind of regulation device of low voltage electric network three-phase load, it is characterised in that including:
Acquiring unit, the historical load for obtaining each user in pre-set low pressure Grid is recorded, wherein, the history is born Lotus record includes load parameter and the corresponding acquisition time of the load parameter;
First determining unit, for determining that the electricity consumption rule of each user is bent according to the historical load record of each user Line;
Second determining unit, for being determined in the pre-set low pressure Grid according to the electricity consumption law curve of each user Sharing of load on three-phase is so that the load on the three-phase reaches default equilibrium condition.
7. device according to claim 6, it is characterised in that
The acquiring unit includes:Sampling module, for carrying out sampling processing according to prefixed time interval, wherein, the sampling It is processed as gathering the load parameter of all users in the pre-set low pressure Grid;Determining module, it is described for determining every time The time of sampling processing,
First determining unit includes:Drafting module, for drawing the load parameter of each user and the relation of time respectively Curve.
8. device according to claim 7, it is characterised in that second determining unit includes:
First determining module, for determining three described default equilibrium conditions of phase line in preset period of time;
Second determining module, for determining three phase lines and all users in the preset period of time according to the default equilibrium condition Corresponding annexation;
Adjusting module, for being preset described with the corresponding annexation of all users according to three phase lines in the preset period of time Phase line in period to all users is adjusted.
9. device according to claim 8, it is characterised in that all users include first user, the adjustment mould Block includes:
Determination sub-module, for determining that the first user needs to connect in the preset period of time according to the correspondence annexation The phase line for connecing;
Detection sub-module, the phase line current connected for detecting the first user;
Judging submodule, for judge in the preset period of time the current connected phase line of the first user whether according to The phase line that the correspondence annexation is determined;
Switching submodule, for if it is judged that be it is no, by the first user connect phase line switch to according to described right Answer the phase line that annexation is determined.
10. device according to claim 8, it is characterised in that second determining module includes:
Calculating sub module, it is bent for the relation by big data the analysis method load parameter of each user and time according to Line determines the corresponding annexation of three phase lines and all users in the preset period of time, so that three phase lines are reached in institute State the error of preset period of time internal loading time curve waveform default equilibrium condition within a preset range.
CN201611148717.6A 2016-12-13 2016-12-13 Method and device for regulating three-phase loads of low-voltage power grid Pending CN106684894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611148717.6A CN106684894A (en) 2016-12-13 2016-12-13 Method and device for regulating three-phase loads of low-voltage power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611148717.6A CN106684894A (en) 2016-12-13 2016-12-13 Method and device for regulating three-phase loads of low-voltage power grid

Publications (1)

Publication Number Publication Date
CN106684894A true CN106684894A (en) 2017-05-17

Family

ID=58869577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611148717.6A Pending CN106684894A (en) 2016-12-13 2016-12-13 Method and device for regulating three-phase loads of low-voltage power grid

Country Status (1)

Country Link
CN (1) CN106684894A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370242A (en) * 2017-08-14 2017-11-21 国网福建石狮市供电有限公司 A kind of intelligent grid low-voltage power distribution station area monitoring system
US20210215774A1 (en) * 2018-09-28 2021-07-15 Sma Solar Technology Ag Method and apparatus for identifying an association of phase lines to connections of an electrical device capable of unbalanced-load operation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102751733A (en) * 2012-06-26 2012-10-24 中国电力科学研究院 On-line three-phase load unbalance processing method suitable for low-voltage distribution network
CN103475000A (en) * 2013-08-20 2013-12-25 广东电网公司佛山供电局 Off-peak monitoring method and system of orderly power utilization
CN103545826A (en) * 2012-07-09 2014-01-29 江西龙跃电子科技有限公司 Intelligent low-voltage power load distribution system and method
CN103545827A (en) * 2013-10-25 2014-01-29 国家电网公司 Method for three-phase imbalance load distribution suitable for low-voltage distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102751733A (en) * 2012-06-26 2012-10-24 中国电力科学研究院 On-line three-phase load unbalance processing method suitable for low-voltage distribution network
CN103545826A (en) * 2012-07-09 2014-01-29 江西龙跃电子科技有限公司 Intelligent low-voltage power load distribution system and method
CN103475000A (en) * 2013-08-20 2013-12-25 广东电网公司佛山供电局 Off-peak monitoring method and system of orderly power utilization
CN103545827A (en) * 2013-10-25 2014-01-29 国家电网公司 Method for three-phase imbalance load distribution suitable for low-voltage distribution network

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370242A (en) * 2017-08-14 2017-11-21 国网福建石狮市供电有限公司 A kind of intelligent grid low-voltage power distribution station area monitoring system
US20210215774A1 (en) * 2018-09-28 2021-07-15 Sma Solar Technology Ag Method and apparatus for identifying an association of phase lines to connections of an electrical device capable of unbalanced-load operation

Similar Documents

Publication Publication Date Title
De Araujo et al. Optimal unbalanced capacitor placement in distribution systems for voltage control and energy losses minimization
CN111614066B (en) Automatic setting method and system for relay protection setting value of power distribution network
CN106684894A (en) Method and device for regulating three-phase loads of low-voltage power grid
CN113258681A (en) Comprehensive information monitoring platform and method for power system
CN115333388A (en) Rectifier module switching method, device, terminal and storage medium
CN111157820B (en) Charging pile testing method, device and system, storage medium and processor
CN104993481B (en) The key element diagnosis of low-voltage platform area six and analysis method and system
US20200195165A1 (en) Converter provided with a circuit for managing alternating power in an alternating part
CN105896693A (en) Charging circuit and charging method and apparatus for intelligent alternating current charging pile
CN108134409A (en) Control method, device, storage medium and the processor of energy accumulation current converter
CN112350327A (en) Distributed power quality control method applied to low-voltage lifting
CN106707183A (en) Method and device for discharge test of storage battery
CN111598420B (en) Regional power quality assessment method considering sensitivity index of main equipment of user
CN106786580A (en) Voltage compensating device
CN110441626B (en) Method and system for detecting pulse load of multi-power electronic device
Padiyar et al. Power flow analysis in MTDC-AC systems—A new approach
CN106684893A (en) Three-phase imbalance adjustment control method and control equipment
Mujovic et al. Multi-parameter mathematical model for determination of PC cluster total harmonic distortion of input current
CN109842110B (en) Low-voltage analysis algorithm for power distribution terminal of low-voltage transformer area
Gehrke et al. Evaluating APLCs placement in a power system based on real-time simulation
CN110110961A (en) Power quality data monitoring method, device and terminal device
CN108573352A (en) Intelligent energy efficiency analysis method for air and intelligent terminal
CN114487915B (en) Method and system for detecting damper of capacitive voltage transformer
CN111736029B (en) Power module output external load type identification system and method
Almajali HVDC Faults Classification by Lab Color based Monitoring System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517

RJ01 Rejection of invention patent application after publication