CN106684862A - Method of searching distribution network load transfer path based on greedy algorithm - Google Patents

Method of searching distribution network load transfer path based on greedy algorithm Download PDF

Info

Publication number
CN106684862A
CN106684862A CN201611159025.1A CN201611159025A CN106684862A CN 106684862 A CN106684862 A CN 106684862A CN 201611159025 A CN201611159025 A CN 201611159025A CN 106684862 A CN106684862 A CN 106684862A
Authority
CN
China
Prior art keywords
power supply
power
load
distribution network
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611159025.1A
Other languages
Chinese (zh)
Inventor
王志伟
孙晓波
李冶天
田石刚
李世纶
李兵
崔旭
付黎苏
闵成男
刘坤
李天�
李天一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, State Grid Heilongjiang Electric Power Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN201611159025.1A priority Critical patent/CN106684862A/en
Publication of CN106684862A publication Critical patent/CN106684862A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention belongs to the field of distribution network load transfer, and in particular relates to a method of searching a distribution network load transfer path based on a greedy algorithm. The method comprises the steps of (S1) searching for all the blocks adjacent to ai and in a normal power supply state when a power point of the power supply block ai exits, finding a connection switch which is required to be closed for the transfer for ai, and denoting the total number of adjacent power supply blocks that can transfer power for ai as t; (S2) finding an uninterruptible power transfer scheme, the process containing no load shedding operation; and (S3) obtaining a viable transfer scheme by shedding a part of the load. According to the invention, a transfer path is quickly found in an area where the power is cut off due to sudden failure during the actual operation of a distribution network, and the probability of operation failure of an operator is reduced with the minimum number of switching operations as the target, thereby effectively improving the power supply reliability.

Description

A kind of distribution network load based on greedy algorithm turns to supply method for searching path
Technical field
The invention belongs to distribution network load turns to supply field, more particularly to a kind of distribution network load based on greedy algorithm to turn to supply Method for searching path.
Background technology
Used as the final tache of power system, its power supply reliability directly determines the power quality of user to power distribution network.When When power distribution network breaks down, except needing isolated fault region and as early as possible repairing it, in addition it is also necessary to the greatest extent may be used by load transfer Failure can be reduced to the overall impact of power distribution network.After load transfer refers to that power distribution network breaks down and isolated, by opening The excision of the inessential load of the operation of pass and part, under conditions of security constraint is met, quick preferential recovery fault down stream While important load is powered, the power supply of other loads is also recovered as far as possible.Load transfer can substantially reduce failure band because of it The loss for coming, improves power supply reliability, becomes one of Core Feature important in distribution automation system.
At present both at home and abroad many scholars are segmented into following a few classes substantially to the method that load transfer is proposed:Heuristic calculation Method, Stochastic Optimization Algorithms, expert system approach.Above-mentioned algorithm can obtain feasible turning solution output, but exist certain Defect.Heuritic approach cannot accomplish the optimality for solving, and the quality for solving depends on the original state of network;Stochastic Optimization Algorithms The calculating time is often longer, in not being suitable for large scale network;In specialist system the foundation in storehouse and it is integrated waste time and energy, and therefore Barrier huge number, it is impossible to record the whole circumstances.
In distribution actual moving process, need to propose turning solution in time for all kinds of burst power-off, therefore to algorithm Arithmetic speed and the suitability have higher requirement, and existing algorithm has some limitations.And in order to reduce work The probability of human users' error, the turning solution of algorithm output should make switching manipulation number of times as few as possible.For the demand, urgently Must propose that a kind of new distribution network load turns to supply method for searching path.
So-called greedy algorithm, i.e. decision making process do not consider global optimality, and decision objective is only that benefit is most under conditions present It is excellent.
The content of the invention
For the problem in background technology, the present invention proposes that a kind of distribution network load based on greedy algorithm turns to be searched for path Suo Fangfa, is that the region of the power-off because of catastrophic failure in distribution actual moving process is quickly found out and turns to supply path, and with minimum Switch motion number of times is target, reduces the probability of operated by personnel's error, effectively increases power supply reliability.
For achieving the above object, the present invention proposes following technical scheme:
A kind of distribution network load based on greedy algorithm turns to supply method for searching path, in the process, by distribution network Abstract is the topological diagram being made up of point set N and side collection E, and all nodes are classified as into power supply node collection S { si|si∈ N }, load bus Collection L { lj|lj∈ N } and bus nodes collection C { ck|ck∈ N } three class set;Connect the side e of consecutive points on topological diagramijComprising one Switch, is denoted as:
Distribution is divided into into several power supplies block A { a1, a2..., an};
A distributed photovoltaic power generation system in distribution is equivalent to into a power supply node plus a load bus;
Methods described is concretely comprised the following steps:
(S1) as power supply block aiPower supply point it is out of service when, search for all and aiIt is adjacent and in normal power supply state Block, and it is a to find itiTurn the connecting valve for required closure, can be aiTurn total for the adjacent power supply block of electric power Number scale is t;
(S2) a kind of turning solution of not power-off is found, this process is operated not comprising cutting load;
(S3) by a part of load of excision, feasible turning solution is obtained.
Further, the step (S2) is multistep, and most execution step numbers are t;
The step (S2) comprises the steps again:
(S2-1) a connecting valve is arbitrarily closed, traversal is possible to situation;If in the case of any one, Load flow calculation As a result meet normal running (operation) conditions, then stop and export the turning solution;Otherwise, if t >=2, perform (S2-2);If t < 2, enter Enter step (S3);
(S2-2) two connecting valves are arbitrarily closed, traversal is possible to situation;By aiIt is divided into 2 Ge Zi service areas ai1、 ai2;With the corresponding a of connecting valveiIn 2 nodes be end points, search power-supply system;From the beginning of any side, examination successively disconnects Each switch on main line;If in the case of any one, calculation of tidal current meets normal running (operation) conditions, then stop and export this turn For scheme;Otherwise, if t >=3, perform (S2-3);If t < 3, into step (S3);
(S2-j) j connecting valve is arbitrarily closed, traversal is possible to situation;By aiIt is divided into j Ge Zi service area ai1、 ai2…aij;With the corresponding a of connecting valveiIn j node be end points, search power-supply system;Examination successively disconnects the j-1 on main line Individual switch;If in the case of any one, calculation of tidal current meets normal running (operation) conditions, then stop and export the turning solution; Otherwise, if t >=j+1, execution step (S2- (j+1));If t is < j+1, into step (S3);
(S2-t) whole t connecting valves are closed;By aiIt is divided into t Ge Zi service area ai1、ai2…ait;With connecting valve Corresponding aiIn t node be end points, search power-supply system;Examination successively disconnects t-1 switch on main line;If any one In the case of, calculation of tidal current meets normal running (operation) conditions, then stop and export the turning solution;Otherwise, into step (S3).
Further, the step (S3) comprises the steps again:
(S3-1) whole t switches are closed;
(S3-2) with the corresponding a of t connecting valveiIn t node be end points, search power-supply system;Examination disconnects main line On t-1 switch by aiT Ge Zi service areas are divided into, until meeting Qiant-1Ge Zi service areas at utmost using being connected Neighbouring power supply block;
(S3-3) load being connected thereto is cut off successively according to order from small to large, when remaining load be able to meet normally During service condition, stop and export the turning solution.
Further, each the power supply block in described several power supply blocks are in tree-shaped, load bus therein and Power supply node is the leaf node in dendrogram, that is, remove any power supply node or load bus, and remaining part is still in tree Shape.
Further, when the photovoltaic generating system is provided out energy as power supply, by load bus power consumption It is labeled as 0;When the photovoltaic generating system absorbs outside energy as battery, power supply node generated output is labeled as into 0.
The beneficial effects of the present invention is:
(1) can be the region of the dead electricity because of catastrophic failure the invention provides a kind of distribution turns to supply method for searching path Feasible turning solution is provided, the reliability of supplying power allocation is improved.
(2) present invention can export the turning solution of minimal switches action, reduce the probability of operated by personnel's error.
(3) present invention need not set up the Sample Storehouse of complexity, and amount of calculation is also less, therefore has the preferable suitability and timeliness Property.
(4) the invention provides a kind of modeling pattern with net topology, and system is considered comprising distributed photovoltaic Situation, can turn to provide reference for the research of association area for distribution.
Description of the drawings
Fig. 1 is that the distribution network load based on greedy algorithm turns to supply the flow chart of method for searching path;
Fig. 2 is certain power distribution network wiring diagram;
Fig. 3 is distribution network topology corresponding with Fig. 2.
Specific embodiment
The present invention is illustrated with reference to the accompanying drawings and examples.The present embodiment is with technical solution of the present invention as front Carry and being implemented, give detailed embodiment and specific operating process, but protection scope of the present invention be not limited to it is following Embodiment, protection scope of the present invention is still defined by claim, and those skilled in the art wait similar shapes to the various of the present invention The modification of formula belongs to protection scope of the present invention.
For a distribution network, can by its it is abstract be the topological diagram that is made up of point set N and side collection E.According to each node All nodes can be classified as 3 class set by heterogeneity --- power supply node collection S { si|si∈ N }, load bus collection L { lj|lj∈ N } and bus nodes collection C { ck|ck∈N}.Because bus may be considered, each point is indiscriminate, and abstract seeing is exactly one Node.All node Unified numbers, writing represents the subscript of node property letter.Connect the side e of consecutive points on topological diagramijComprising One switch.
Fig. 2 is certain low-voltage distribution network wiring diagram, and topological diagram as shown in Figure 3 is formed after abstract simplification.Side e in Fig. 334On The switch that represents in corresponding line of "×" be off.According to the topological diagram of Fig. 3, it can be found that distribution can be divided into Several power supplies block A { a1, a2..., an}.Each power supply block is in tree-shaped, and load bus therein and power supply node are equal For the leaf node in dendrogram, that is, remove any power supply node or load bus, remaining part is still in tree-shaped.
As distributed photovoltaic power generation system proportion is increasing in distribution, in order to strengthen the suitable of invention institute extracting method With property, with reference to real-time condition, a distributed photovoltaic power generation system in distribution can be equivalent to a power supply node plus one Individual load bus.When the photovoltaic generating system is provided out energy as power supply, load bus power consumption can be labeled as 0;When the photovoltaic generating system absorbs outside energy as battery, power supply node generated output can be labeled as 0.Do not changing On the premise of net topology, the method can characterize the various working conditions of distributed photovoltaic power generation system.
The greedy algorithm of the present invention includes two main process.Process one is operated not comprising cutting load, that is, find one kind not The turning solution of power-off;If process one can not find this scheme, into process two, by cutting off a part of load, obtain Feasible turning solution.As shown in figure 1, this method is comprised the steps of:
(1) as power supply block aiPower supply point it is out of service, search for all and aiIt is adjacent and in the area of normal power supply state Block, and it is a to find itiTurn the connecting valve for required closure.Note can be aiTurn total for t for the adjacent power supply block of electric power.
(2) into greedy algorithm process one.One point of process is multistep, and most execution step numbers are t.
(3) step of process 1 the 1st:Arbitrarily one connecting valve of closure, travels through and is possible to situation.If any one situation Under, calculation of tidal current meets normal running (operation) conditions, then stop and export the turning solution.Otherwise, if t >=2, implementation procedure one 2nd step;If t < 2, into greedy process two.
(4) step of process 1 the 2nd.Arbitrarily two connecting valves of closure, travel through and are possible to situation.In order to avoid there is ring-type Structure, needs aiIt is divided into 2 Ge Zi service areas ai1、ai2.With the corresponding a of connecting valveiIn 2 nodes be end points, search Power-supply system.From the beginning of any side, examination successively disconnects each switch on main line.If in the case of any one, Load flow calculation knot Fruit meets normal running (operation) conditions, then stop and export the turning solution.Otherwise, if t >=3, the step of implementation procedure 1 the 3rd;If t < 3, Into greedy process two.
(5) jth of process one step.Arbitrarily j connecting valve of closure, travels through and is possible to situation.In order to avoid there is ring-type Structure, needs aiIt is divided into j Ge Zi service area ai1、ai2…aij.With the corresponding a of connecting valveiIn j node be end points, Search power-supply system.Examination successively disconnects j-1 switch on main line.If in the case of any one, calculation of tidal current meets just Often service condition, then stop and export the turning solution.Otherwise, if t >=j+1, the step of one jth of implementation procedure+1;If t is < j+1, enter Enter greedy process two.
(6) t of process one steps.The whole t connecting valve of closure.In order to avoid there is circulus, need aiDivide For t Ge Zi service area ai1、ai2…ait.With the corresponding a of connecting valveiIn t node be end points, search power-supply system.Successively Examination disconnects t-1 switch on main line.If in the case of any one, calculation of tidal current meets normal running (operation) conditions, then stop And export the turning solution.Otherwise, into greedy process two.
(7) the greedy step of process 2 the 1st.Qualitative analyses understand, there is provided turn more for the adjacent block of electric power, dead electricity block institute The load that need to be cut off is fewer, therefore in process two, t connecting valve is both needed to closure.
(8) the greedy step of process 2 the 2nd.With the corresponding a of t connecting valveiIn t node be end points, search power supply dry Road.T-1 on examination disconnection main line is switched aiT Ge Zi service areas are divided into, until meeting Qiant-1Ge Zi service areas maximum journey Degree utilizes the neighbouring power supply block for being connected.
(9) the greedy step of process 2 the 3rd.It is apparent from, last Ge Zi service area is necessarily not normally functioning.According to from small to large Order cut off the load being connected thereto successively, when remaining load be able to meet normal running (operation) conditions, stop and export this turn For scheme.
Embodiment:
By taking Fig. 3 as an example, the implementation process of the method provided by the present invention is explained in detail.Photovoltaic-energy-storage system in Fig. 3 is in suction Outside energy state is received, therefore equivalent power supply node is labeled as 0.The figure can be divided into 3 power supply blocks
a1{s1,c2,c3,l8,c9,l10,l11,e1,2,e2,3,e2,8,e3,9,e9,10,e9,11}、a2{c4,C5,c6,s7,l12,l13, l14,e4,5,e5,6,e6,7,e4,12,e5,13,e5,14}、a3{c15,l16,c17,l18,s19,e15,16,e15,17,e17,18,e17,19}.It is each negative Lotus size and power supply node maximum size see the table below.
l8 l10 l11 l12
Load/kW 1800 2000 2000 1000
l13 l14 l16 l18
Load/kW 1500 1500 1500 2000
s1 s7 s19
Capacity/kW 8000 7000 6000
(1) s is worked as7It is out of service for some reason, search for a2Neighbouring power supply block, have a1、a3, then t=2, connecting valve is respectively e3,4、e6,15
(2) greedy process one is initially entered, because t=2, two steps is at most performed.
(3) step of process 1 the 1st, closes e3,4、e6,15In any one switch.s1And s19Spare capacity be respectively 2200kW and 2500kW, and dead electricity area a2Total load is 4000kW, is apparent from the 1st step and meets normal running (operation) conditions without any situation.
(4) step of process 1 the 2nd, closes e3,4、e6,15Two switches.Search and connecting valve e3,4、e6,15Corresponding node c4、 c6Between power-supply system { e4,5,e5,6}。c6On not on-load, therefore switch e should be disconnected4,5.Due to c5Institute band total load be 3000kW, more than S19Spare capacity, then the 2nd step still meet normal running (operation) conditions without any situation.
(5) greedy process two is entered, e is closed3,4、e6,15Two switches.
(6) e is disconnected4,5, l12Sub- service area be located at utmost using a1
(7) l is cut off13, remaining l14, last Ge Zi service area can normally run.Output turning solution { e3,4=0 → 1, e6,15=0 → 1, e4,5=1 → 0, e5,13=1 → 0 }.Overall process terminates.
Staff operates according to output scheme to respective switch, you can completes the electric power to dead electricity region and turns to supply.

Claims (5)

1. a kind of distribution network load based on greedy algorithm turns to supply method for searching path, it is characterised in that in the process, will It is the topological diagram being made up of point set N and side collection E that distribution network is abstract, and all nodes are classified as into power supply node collection S { si|si∈N}、 Load bus collection L { lj|lj∈ N } and bus nodes collection C { ck|ck∈ N } three class set;Connect the side e of consecutive points on topological diagramij Comprising a switch, it is denoted as:
Distribution is divided into into several power supplies block A { a1, a2..., an};
A distributed photovoltaic power generation system in distribution is equivalent to into a power supply node plus a load bus;
Methods described is concretely comprised the following steps:
(S1) as power supply block aiPower supply point it is out of service when, search for all and aiIt is adjacent and in the area of normal power supply state Block, and it is a to find itiTurn the connecting valve for required closure, can be aiTurn the adjacent power supply block sum note for electric power For t;
(S2) a kind of turning solution of not power-off is found, this process is operated not comprising cutting load;
(S3) by a part of load of excision, feasible turning solution is obtained.
2. a kind of distribution network load based on greedy algorithm according to claim 1 turns to supply method for searching path, its feature It is:The step (S2) is multistep, and most execution step numbers are t;
The step (S2) comprises the steps again:
(S2-1) a connecting valve is arbitrarily closed, traversal is possible to situation;If in the case of any one, calculation of tidal current Meet normal running (operation) conditions, then stop and export the turning solution;Otherwise, if t >=2, perform (S2-2);If t < 2, into step Suddenly (S3);
(S2-2) two connecting valves are arbitrarily closed, traversal is possible to situation;By aiIt is divided into 2 Ge Zi service areas ai1、ai2;With The corresponding a of connecting valveiIn 2 nodes be end points, search power-supply system;From the beginning of any side, examination successively disconnects main line On each switch;If in the case of any one, calculation of tidal current meets normal running (operation) conditions, then stop and export this and turn supplier Case;Otherwise, if t >=3, perform (S2-3);If t < 3, into step (S3);
(S2-j) j connecting valve is arbitrarily closed, traversal is possible to situation;By aiIt is divided into j Ge Zi service area ai1、ai2… aij;With the corresponding a of connecting valveiIn j node be end points, search power-supply system;Successively j-1 on examination disconnection main line opens Close;If in the case of any one, calculation of tidal current meets normal running (operation) conditions, then stop and export the turning solution;Otherwise, If t >=j+1, execution step (S2- (j+1));If t is < j+1, into step (S3);
(S2-t) whole t connecting valves are closed;By aiIt is divided into t Ge Zi service area ai1、ai2…ait;It is corresponding with connecting valve aiIn t node be end points, search power-supply system;Examination successively disconnects t-1 switch on main line;If any one situation Under, calculation of tidal current meets normal running (operation) conditions, then stop and export the turning solution;Otherwise, into step (S3).
3. a kind of distribution network load based on greedy algorithm according to claim 1 turns to supply method for searching path, its feature It is:The step (S3) comprises the steps again:
(S3-1) whole t switches are closed;
(S3-2) with the corresponding a of t connecting valveiIn t node be end points, search power-supply system;Examination disconnects the t- on main line 1 switchs aiT Ge Zi service areas are divided into, until meeting Qiant-1Ge Zi service areas connected neighbouring is at utmost utilized Power supply block;
(S3-3) load being connected thereto is cut off successively according to order from small to large, when remaining load be able to meet normal operation During condition, stop and export the turning solution.
4. a kind of distribution network load based on greedy algorithm according to claim 1 turns to supply method for searching path, its feature It is:In tree-shaped, load bus therein and power supply node are each power supply block in described several power supply blocks Leaf node in dendrogram, that is, remove any power supply node or load bus, and remaining part is still in tree-shaped.
5. a kind of distribution network load based on greedy algorithm according to claim 1 turns to supply method for searching path, its feature It is:When the photovoltaic generating system is provided out energy as power supply, load bus power consumption is labeled as into 0;Work as institute When stating photovoltaic generating system as battery absorption outside energy, power supply node generated output is labeled as into 0.
CN201611159025.1A 2016-12-15 2016-12-15 Method of searching distribution network load transfer path based on greedy algorithm Pending CN106684862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611159025.1A CN106684862A (en) 2016-12-15 2016-12-15 Method of searching distribution network load transfer path based on greedy algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611159025.1A CN106684862A (en) 2016-12-15 2016-12-15 Method of searching distribution network load transfer path based on greedy algorithm

Publications (1)

Publication Number Publication Date
CN106684862A true CN106684862A (en) 2017-05-17

Family

ID=58869414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611159025.1A Pending CN106684862A (en) 2016-12-15 2016-12-15 Method of searching distribution network load transfer path based on greedy algorithm

Country Status (1)

Country Link
CN (1) CN106684862A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110011410A (en) * 2019-03-01 2019-07-12 国网浙江杭州市富阳区供电有限公司 A kind of power network line based on big data turns for state monitoring method
CN110212539A (en) * 2019-05-27 2019-09-06 上海工程技术大学 A kind of load transfer method and device improving distribution network reliability
CN111753385A (en) * 2020-07-03 2020-10-09 石家庄科林电气股份有限公司 Power supply searching method based on water flow path simulating algorithm
CN113469432A (en) * 2021-06-29 2021-10-01 海南电网有限责任公司三亚供电局 Distribution network transfer intelligent analysis auxiliary method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130261829A1 (en) * 2012-04-01 2013-10-03 State Grid Corporation Of China Method for generating current differential protection supernode based on electrical topology of regional distribution network
CN103368192A (en) * 2012-03-30 2013-10-23 中国电力科学研究院 Method and system for controlling power of battery energy storage power station based on greedy strategy
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
CN105207213A (en) * 2015-10-23 2015-12-30 国家电网公司 Power distribution network N-1 calibration method taking segmental load transfer into consideration
CN105552898A (en) * 2016-01-05 2016-05-04 东方电子股份有限公司 Load transfer method for power distribution network
CN105701568A (en) * 2016-01-11 2016-06-22 华北电力大学 Heuristic power distribution network state estimation measurement position rapid optimization method
CN105958486A (en) * 2016-06-15 2016-09-21 华北电力大学 Power distribution network multi-period dynamic fault recovery method considering DG (Distributed Generation) output curve
CN106022973A (en) * 2016-07-04 2016-10-12 国网江苏省电力公司扬州供电公司 Greedy algorithm-based scheduling policy for three-phase load balance of real-time-allocating distribution network

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103368192A (en) * 2012-03-30 2013-10-23 中国电力科学研究院 Method and system for controlling power of battery energy storage power station based on greedy strategy
US20130261829A1 (en) * 2012-04-01 2013-10-03 State Grid Corporation Of China Method for generating current differential protection supernode based on electrical topology of regional distribution network
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
CN105207213A (en) * 2015-10-23 2015-12-30 国家电网公司 Power distribution network N-1 calibration method taking segmental load transfer into consideration
CN105552898A (en) * 2016-01-05 2016-05-04 东方电子股份有限公司 Load transfer method for power distribution network
CN105701568A (en) * 2016-01-11 2016-06-22 华北电力大学 Heuristic power distribution network state estimation measurement position rapid optimization method
CN105958486A (en) * 2016-06-15 2016-09-21 华北电力大学 Power distribution network multi-period dynamic fault recovery method considering DG (Distributed Generation) output curve
CN106022973A (en) * 2016-07-04 2016-10-12 国网江苏省电力公司扬州供电公司 Greedy algorithm-based scheduling policy for three-phase load balance of real-time-allocating distribution network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于文鹏 等: "含分布式电源的配电网供电恢复模型及改进贪婪算法", 《电力***自动化》 *
杨凯峰 等: "配电网络重构算法综述", 《南方电网技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110011410A (en) * 2019-03-01 2019-07-12 国网浙江杭州市富阳区供电有限公司 A kind of power network line based on big data turns for state monitoring method
CN110212539A (en) * 2019-05-27 2019-09-06 上海工程技术大学 A kind of load transfer method and device improving distribution network reliability
CN111753385A (en) * 2020-07-03 2020-10-09 石家庄科林电气股份有限公司 Power supply searching method based on water flow path simulating algorithm
CN111753385B (en) * 2020-07-03 2023-07-25 石家庄科林电气股份有限公司 Power supply searching method based on water flow path simulating algorithm
CN113469432A (en) * 2021-06-29 2021-10-01 海南电网有限责任公司三亚供电局 Distribution network transfer intelligent analysis auxiliary method

Similar Documents

Publication Publication Date Title
CN106684862A (en) Method of searching distribution network load transfer path based on greedy algorithm
CN103532140B (en) A kind of method and system containing service restoration after the distribution network failure of distributed power source
CN105785231B (en) A kind of linear integer programming method of the online fault tolerance positioning of power distribution network
CN103138227B (en) Power distribution network fast power restoration method containing distributed power connected grid
CN103426033B (en) Power distribution network fault recovery optimization rebuilding method based on critical path method
CN110350511B (en) Power distribution network fault recovery method based on transfer power affinity
CN107017622A (en) The multiple faults multiple target of distribution containing DG combined optimization repairing recovery policy is asked for
CN104809658A (en) Method for rapidly analyzing low-voltage distributing network area line loss
CN104765965A (en) GIS fault diagnosis and reliability analysis method based on fuzzy Petri
CN112491050A (en) Main and distribution network accident recovery processing method based on index set weight
CN107622360A (en) A kind of critical circuits recognition methods for considering subjective and objective factor
CN104899689B (en) Based on the distribution network failure restoration methods that DBCC optimized algorithms and entropy weight are theoretical
CN106709607A (en) Intelligent operation and maintenance monitoring system of distributed photovoltaic power station
CN102570450A (en) Static reliability assessment method for complex power grid
CN107846018A (en) Distribution net capability appraisal procedure based on path search algorithm
CN115395557A (en) Active power distribution network fault rapid recovery method based on directed graph traversal
CN113507116B (en) Power distribution network load transfer method, device, equipment and storage medium
CN104362615A (en) Non-fault segment power supply recovery method based on information platform
CN114421461A (en) Optimal algorithm-based power distribution network transfer auxiliary decision making system and method
CN105139081B (en) A kind of distribution system contact point planing method of high reliability
CN106300339A (en) A kind of Fault Isolation based on unit style power distribution network and service restoration method
WO2018086199A1 (en) Border search method for final circuit breaker
CN105048460A (en) Power supply recovery method adopting heuristic search algorithm and fuzzy comprehensive judgment for power distribution grid
CN104809340A (en) Method for quickly calculating operating point of multi-end flexible direct-current power transmission system
CN104809582B (en) A kind of power distribution network coordinated planning method for considering load transfering channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20210427

AD01 Patent right deemed abandoned