CN106682828A - Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system - Google Patents
Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system Download PDFInfo
- Publication number
- CN106682828A CN106682828A CN201611212027.2A CN201611212027A CN106682828A CN 106682828 A CN106682828 A CN 106682828A CN 201611212027 A CN201611212027 A CN 201611212027A CN 106682828 A CN106682828 A CN 106682828A
- Authority
- CN
- China
- Prior art keywords
- maintenance task
- maintenance
- task
- upkeep operation
- items
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a communication tower maintenance operation progress monitoring method and a communication tower maintenance operation progress monitoring system. The system comprises a maintenance task recognition module, a maintenance task item state monitoring module, a maintenance task reconstruction triggering module and a new maintenance task recognition module. The method includes monitoring finished or unfinished conditions of all maintenance task items of maintenance personnel, making the maintenance personnel give restructuring directives actively, extracting the unfinished maintenance task items to reconstruct new maintenance tasks, computing an unfinished task proportion, repeating the above operations until all the tasks are finished completely or showing abnormality and terminating when all the tasked are not finished completely after the above operations are repeated for X times. The communication tower maintenance operation progress monitoring method and the communication tower maintenance operation progress monitoring system solve the technical problems involved when an online monitoring system of a communication tower monitors operation progress and arranges maintenance operation items in real time.
Description
Technical field
The invention belongs to communication iron tower maintenance technology field, more particularly to a kind of communication iron tower upkeep operation Schedule monitoring
Method and system.
Background technology
At present communication iron tower is completed on a small quantity mainly by manually being detected and being safeguarded by steel tower on-line monitoring system auxiliary.
Due to existing steel tower on-line monitoring system function it is simple, it is impossible to monitor in real time job scheduling.In addition, when upkeep operation item is more
Shi Rongyi makes attendant obscure the job task for completing and not completing.For this purpose, the present invention proposes that a kind of communication iron tower is safeguarded
Job scheduling monitoring method and system.
The content of the invention
To be solved by this invention is communication iron tower on-line monitoring system monitor in real time job scheduling and reconditioning operation
The problem of item, proposes a kind of communication iron tower upkeep operation Schedule monitoring method and system.
Steel tower system application scenarios based on Internet of Things according to the present invention, as shown in Figure 1.In communication iron tower fixed position
Install sensor equipment, sensor acquisition steel tower relevant parameter is simultaneously transmitted to system by communication module, and system is to sensing data
Preserved and processed, client is obtained information needed with system interaction.
Overall system architecture based on the steel tower system of Internet of Things is as shown in Figure 2.Hardware includes communication iron tower
In itself, the sensing equipment on tower body, communication module and the system of sensing equipment carry out real-time Communication for Power;Systems soft ware part
Including system database, data processing platform (DPP), data management distribution platform, wherein system database is received from sensing equipment
Sensing data simultaneously preserves all system journals, and data processing platform (DPP) transfers the data in system database and processed and analyzed,
Respective record in the data processed result and system database of data management distribution platform receiving data processing platform is managed
Reason and issue;System application platform includes management equipment and client, and management equipment includes but is not limited to work station, computer etc. and sets
Apply, client includes but is not limited to the forms such as APP, wechat, Html webpages;The application personnel of the system including but not limited to manage
Personnel and attendant, its interface is respectively management equipment and client.
The realization of the present invention relies on above-mentioned application scenarios and system architecture, and in tower body certain position various kinds of sensors inspection is installed
Steel tower correspondence parameter is surveyed, the sensing data that systematic analysiss are collected generates upkeep operation list, and system detectio is to attendant
Safeguarded in place and according to job ticket.
Communication iron tower upkeep operation Schedule monitoring system proposed by the present invention, including identification maintenance task module, monitoring dimension
The new maintenance task module of shield task items block of state, triggering reconstruct maintenance task module, identification.
1st, maintenance task module is recognized:System calls the upkeep operation list of steel tower, and its maintenance task item set is designated as W, knows
Task items set H=W is currently safeguarded in maintenance task item number N in other W, order.
2nd, monitoring and maintenance task items block of state:Whether every maintenance task completes in system real-time monitoring set H, and
Each maintenance task item state is labeled as into completion statuses or unfinished state.
3rd, triggering reconstruct maintenance task module:The reconstruct maintenance task instruction that the attendant to be received such as system sends, be
System receives and completed task items will be labeled as in set H add to task items set U is completed, then not after reconstruct maintenance instruction
Complete task items collection and be combined into W-U, by the new maintenance task set of each element reconstruct composition in unfinished task items set W-U, note
For V.
4th, new maintenance task module is recognized:System extracts new maintenance task item set V and task items are currently safeguarded in order
Set H=V, recognizes the item number M of maintenance task item in set V, calculates and does not complete task items ratio p=M/N;If M>0, then follow
Ring frequency n adds 1 and whether judges cycle-index n more than fixed value X, and the wherein initial value of n is previously set for 0, X by system
Abnormality decision value, if n>X, the then maintenance task item appearance during system judges to gather is abnormal, and upkeep operation terminates;Otherwise return
Monitoring and maintenance task items block of state;If M=0, judge that all maintenance task Xiang Junyi are completed, upkeep operation terminates.
The system block diagram of communication iron tower upkeep operation Schedule monitoring system, as shown in Figure 3.
The present invention proposes a kind of communication iron tower upkeep operation Schedule monitoring method, and its practice processes is that system generates maintenance
Job ticket, attendant is safeguarded in place and according to the maintenance task in upkeep operation list.It is as follows:
Step 1, identification maintenance task item.
System calls the upkeep operation list of steel tower, and its maintenance task item set is designated as W, recognizes the maintenance task item number in W
Task items set H=W is currently safeguarded in N, order.
Step 2, monitoring and maintenance task items state.
Whether every maintenance task completes in system real-time monitoring set H, and each maintenance task item state is labeled as
Completion statuses or unfinished state.
Step 3, triggering reconstruct maintenance task.
The reconstruct maintenance task instruction that the attendant to be received such as system sends, system is received will collection after reconstruct maintenance instruction
Completed task items are labeled as in conjunction H to add to task items set U is completed, then do not complete task items collection and be combined into W-U, will not
The new maintenance task set of each element reconstruct composition in task items set W-U is completed, V is designated as.
The new maintenance task of step 4, identification.
System extracts new maintenance task item set V and task items set H=V is currently safeguarded in order, safeguards in identification set V
The item number M of task items, calculates and does not complete task items ratio p=M/N;If M>0, then cycle-index n add 1 and judge cycle-index
Whether n is more than fixed value X, and the wherein initial value of n is the abnormality decision value being previously set by system for 0, X, if n>X, then be
It is abnormal that system judges that the maintenance task item in set occurs, and upkeep operation terminates;Otherwise return to step 2;If M=0, institute is judged
There is maintenance task Xiang Junyi to complete, upkeep operation terminates.
The method flow diagram of communication iron tower upkeep operation Schedule monitoring method is as shown in Figure 4.
The system and method for the present invention has following two advantages:
(1) auto-real-time monitoring of upkeep operation list processing progress is realized, can effectively instructs attendant to be tieed up
Shield operation.
(2) maintenance task is arranged and is updated according to attendant's demand, be favorably improved the maintenance of attendant
Efficiency.
Description of the drawings
Fig. 1 is the application scenarios schematic diagram of the present invention;
Fig. 2 is the application scenarios overall system architecture figure of the present invention;
Fig. 3 is the system block diagram of the present invention;
Fig. 4 is method of the present invention flow chart.
Specific embodiment
The preferred embodiment of the present invention is elaborated below.
Steel tower system application scenarios based on Internet of Things according to the present invention, as shown in Figure 1.In communication iron tower fixed position
Install sensor equipment, sensor acquisition steel tower relevant parameter is simultaneously transmitted to system by communication module, and system is to sensing data
Preserved and processed, client is obtained information needed with system interaction.
Overall system architecture based on the steel tower system of Internet of Things is as shown in Figure 2.Hardware includes communication iron tower
In itself, the sensing equipment on tower body, communication module and the system of sensing equipment carry out real-time Communication for Power;Systems soft ware part
Including system database, data processing platform (DPP), data management distribution platform, wherein system database is received from sensing equipment
Sensing data simultaneously preserves all system journals, and data processing platform (DPP) transfers the data in system database and processed and analyzed,
Respective record in the data processed result and system database of data management distribution platform receiving data processing platform is managed
Reason and issue;System application platform includes management equipment and client, and management equipment includes but is not limited to work station, computer etc. and sets
Apply, client includes but is not limited to the forms such as APP, wechat, Html webpages;The application personnel of the system including but not limited to manage
Personnel and attendant, its interface is respectively management equipment and client.
The realization of the present invention relies on above-mentioned application scenarios and system architecture, and in tower body certain position various kinds of sensors inspection is installed
Steel tower correspondence parameter is surveyed, the sensing data that systematic analysiss are collected generates upkeep operation list, and system detectio is to attendant
Safeguarded in place and according to job ticket order.The embodiment of the inventive method and system is realized as follows:
Communication iron tower upkeep operation Schedule monitoring system proposed by the present invention, including identification maintenance task module, monitoring dimension
The new maintenance task module of shield task items block of state, triggering reconstruct maintenance task module, identification.
1st, maintenance task module is recognized:System calls the upkeep operation list of steel tower, and its maintenance task item set is designated as W, knows
Task items set H=W is currently safeguarded in maintenance task item number N in other W, order.The maintenance task of upkeep operation list W in the present embodiment
Collection is combined into { perpendicularity problem, column foot depression problem, integrity issue, lightning protection problem, the upper tower problem of non-attendant, company
Binding structure gap problem, stability problem }, recognize that it has 7 tasks, then N=7.
2nd, monitoring and maintenance task items block of state:Whether every maintenance task completes in system real-time monitoring set H, and
Each maintenance task item state is labeled as into completion statuses or unfinished state.In the present embodiment, system real-time detection is simultaneously marked
Each task state has respectively completed, has completed, do not completed, not completed, having completed, not completed, having completed.
3rd, triggering reconstruct maintenance task module:The reconstruct maintenance task instruction that the attendant to be received such as system sends, be
System receives and completed task items will be labeled as in set H add to task items set U is completed, then not after reconstruct maintenance instruction
Complete task items collection and be combined into W-U, by the new maintenance task set of each element reconstruct composition in unfinished task items set W-U, note
For V.System is received after the reconstruct maintenance task instruction that attendant sends in the present embodiment, judge U=perpendicularity problem,
Column foot depression problem, the upper tower problem of non-attendant, stability problem }, then W-U=column foot depression problem, integrity issue,
Attachment structure gap problem }, { column foot depression is asked to obtain new maintenance task set V=according to the sequence reconstruct of the problem order of severity
Topic, attachment structure gap problem, integrity issue }.
4th, new maintenance task module is recognized:System extracts new maintenance task item set V and task items are currently safeguarded in order
Set H=V, recognizes the item number M of maintenance task item in set V, calculates and does not complete task items ratio p=M/N;If M>0, then follow
Ring frequency n adds 1 and whether judges cycle-index n more than fixed value X, and the wherein initial value of n is previously set for 0, X by system
Abnormality decision value, if n>X, the then maintenance task item appearance during system judges to gather is abnormal, and upkeep operation terminates;Otherwise return
Monitoring and maintenance task items block of state;If M=0, judge that all maintenance task Xiang Junyi are completed, upkeep operation terminates.This
In embodiment, there are 3 elements in identification V, then M=3, do not complete task items ratio p=M/N=3/7=42.9%, n=1, X=
3, now M=3>0, n<3, then return monitoring and maintenance task items block of state and make n=n+1=1.Detect after circulating for second
All maintenance tasks are and complete, i.e. V is null set, now M=0, do not complete task items ratio p=0, judge all maintenances
Task items have been completed, and upkeep operation terminates.
The present invention proposes a kind of communication iron tower upkeep operation Schedule monitoring method, and its practice processes is that system generates maintenance
Job ticket, system detectio to attendant is safeguarded in place and according to job ticket order.It is as follows:
Step 1, identification maintenance task item.
System calls the upkeep operation list of steel tower, and its maintenance task item set is designated as W, recognizes the maintenance task item number in W
Task items set H=W is currently safeguarded in N, order.In the present embodiment the maintenance task collection of upkeep operation list W be combined into perpendicularity problem,
Column foot depression problem, integrity issue, lightning protection problem, the upper tower problem of non-attendant, attachment structure gap problem is stable
Sex chromosome mosaicism }, recognize that it has 7 tasks, then N=7.
Step 2, monitoring and maintenance task items state.
Whether every maintenance task completes in system real-time monitoring set H, and each maintenance task item state is labeled as
Completion statuses or unfinished state.In the present embodiment, system real-time detection and mark each task state respectively completed,
Complete, do not complete, not completing, having completed, not completing, having completed.
Step 3, triggering reconstruct maintenance task.
The reconstruct maintenance task instruction that the attendant to be received such as system sends, system is received will collection after reconstruct maintenance instruction
Completed task items are labeled as in conjunction H to add to task items set U is completed, then do not complete task items collection and be combined into W-U, will not
The new maintenance task set of each element reconstruct composition in task items set W-U is completed, V is designated as.System is received in the present embodiment
After the reconstruct maintenance task instruction that attendant sends, U={ perpendicularity problem, column foot depression problem, on non-attendant are judged
Tower problem, stability problem }, then W-U={ column foot depression problem, integrity issue, attachment structure gap problem }, according to problem
Order of severity sequence reconstruct obtains new maintenance task set V={ column foot depression problem, attachment structure gap problem, integrity
Problem }.
The new maintenance task of step 4, identification.
System extracts new maintenance task item set V and task items set H=V is currently safeguarded in order, safeguards in identification set V
The item number M of task items, calculates and does not complete task items ratio p=M/N;If M>0, then cycle-index n add 1 and judge cycle-index
Whether n is more than fixed value X, and the wherein initial value of n is the abnormality decision value being previously set by system for 0, X, if n>X, then be
It is abnormal that system judges that the maintenance task item in set occurs, and upkeep operation terminates;Otherwise return to step 2;If M=0, institute is judged
There is maintenance task Xiang Junyi to complete, upkeep operation terminates.In the present embodiment, there are 3 elements in identification V, then M=3, do not complete and appoint
Business item ratio p=M/N=3/7=42.9%, n=1, X=3, now M=3>0, n<3, then return to step 2 and make n=n+1=
1.Second circulate after detect all maintenance tasks and be and complete, i.e. V is null set, now M=0, does not complete task items
Ratio p=0, judges that all maintenance task Xiang Junyi are completed, and upkeep operation terminates.
Certainly, those of ordinary skill in the art is it should be appreciated that above example is intended merely to illustrate this
Bright, and limitation of the invention is not intended as, as long as within the scope of the invention, the change, modification to above example is all
Protection scope of the present invention will be fallen into.
Claims (10)
1. a kind of communication iron tower upkeep operation Schedule monitoring system, it is characterised in that including identification maintenance task module, monitoring dimension
The new maintenance task module of shield task items block of state, triggering reconstruct maintenance task module and identification.
2. communication iron tower upkeep operation Schedule monitoring system according to claim 1, the spy of its identification maintenance task module
Levy and be:System calls the upkeep operation list of steel tower, and its maintenance task item set is designated as W, recognizes the maintenance task item number N in W,
Task items set H=W is currently safeguarded in order.
3. communication iron tower upkeep operation Schedule monitoring system according to claim 1, its monitoring and maintenance task items state mould
Block is characterised by:Whether every maintenance task completes in system real-time monitoring set H, and by each maintenance task item state mark
Note as completion statuses or unfinished state.
4. communication iron tower upkeep operation Schedule monitoring system according to claim 1, its triggering reconstruct maintenance task module
It is characterised by:The reconstruct maintenance task instruction that the attendant to be received such as system sends, system is received after reconstruct maintenance instruction
Completed task items will be labeled as in set H to add to task items set U is completed, then do not complete task items collection and be combined into W-U,
By the new maintenance task set of each element reconstruct composition in unfinished task items set W-U, V is designated as.
5. communication iron tower upkeep operation Schedule monitoring system according to claim 1, the new maintenance task module of its identification
It is characterised by:System extracts new maintenance task item set V and task items set H=V is currently safeguarded in order, in identification set V
The item number M of maintenance task item, calculates and does not complete task items ratio p=M/N;If M>0, then cycle-index n add 1 and judge circulation
Whether frequency n is more than fixed value X, and the wherein initial value of n is the unusual determination threshold value being previously set by system for 0, X, if n>
X, the then maintenance task item appearance during system judges to gather is abnormal, and upkeep operation terminates;Otherwise return monitoring and maintenance task items shape
Morphotype block;If M=0, judge that all maintenance task Xiang Junyi are completed, upkeep operation terminates.
6. a kind of communication iron tower upkeep operation Schedule monitoring method, it is characterised in that comprise the following steps:
Step 1, identification maintenance task item;
Step 2, monitoring and maintenance task items state;
Step 3, triggering reconstruct maintenance task;
The new maintenance task of step 4, identification.
7. communication iron tower upkeep operation Schedule monitoring method according to claim 6, its step 1 is characterised by:System
The upkeep operation list of steel tower is called, its maintenance task item set is designated as W, recognize the maintenance task item number N in W, order is current to be safeguarded
Task items set H=W.
8. communication iron tower upkeep operation Schedule monitoring method according to claim 6, its step 2 is characterised by:System
Whether every maintenance task completes in real-time monitoring set H, and by each maintenance task item state be labeled as completion statuses or
Unfinished state.
9. communication iron tower upkeep operation Schedule monitoring method according to claim 6, its step 3 is characterised by:System
The reconstruct maintenance task sent etc. attendant to be received is instructed, and system is received and will be labeled as in set H after reconstruct maintenance instruction
Completed task items are added to task items set U is completed, then do not complete task items collection and be combined into W-U, by unfinished task items
The new maintenance task set of each element reconstruct composition, is designated as V in set W-U.
10. communication iron tower upkeep operation Schedule monitoring method according to claim 6, its step 4 is characterised by:System
Extract new maintenance task item set V and task items set H=V is currently safeguarded in order, recognize the item number of maintenance task item in set V
M, calculates and does not complete task items ratio p=M/N;If M>0, then cycle-index n add 1 and judge cycle-index n whether more than solid
The initial value of definite value X, wherein n is the abnormality decision value being previously set by system for 0, X, if n>X, then during system judges to gather
Maintenance task item occur abnormal, upkeep operation terminates;Otherwise described step 2;If M=0, all maintenance task items are judged
Complete, upkeep operation terminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611212027.2A CN106682828A (en) | 2016-12-25 | 2016-12-25 | Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611212027.2A CN106682828A (en) | 2016-12-25 | 2016-12-25 | Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106682828A true CN106682828A (en) | 2017-05-17 |
Family
ID=58870492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611212027.2A Pending CN106682828A (en) | 2016-12-25 | 2016-12-25 | Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106682828A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416510A (en) * | 2018-02-10 | 2018-08-17 | 杭州后博科技有限公司 | A kind of steel tower patrol task list method of real-time adjustment and system |
CN116823192A (en) * | 2023-08-31 | 2023-09-29 | 浙江钢信检测技术有限公司 | Iron tower intelligent detection system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102013042A (en) * | 2009-09-08 | 2011-04-13 | 英业达股份有限公司 | Marking and querying system and method for conducting project management task according to time |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
CN105117866A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress state data processing method and apparatus |
CN105654243A (en) * | 2015-12-31 | 2016-06-08 | 上海筑想信息科技股份有限公司 | Orbital graph based project information automated processing system |
US20160260047A1 (en) * | 2015-03-03 | 2016-09-08 | BetterWorks Systems, Inc. | Monitoring individual and aggregate progress of multiple team members |
CN106096908A (en) * | 2016-06-02 | 2016-11-09 | 深圳铂睿智恒科技有限公司 | A kind of project process monitor prompt method and system |
CN106156998A (en) * | 2016-07-21 | 2016-11-23 | 乐视控股(北京)有限公司 | The management method of a kind of Pending tasks and device |
-
2016
- 2016-12-25 CN CN201611212027.2A patent/CN106682828A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102013042A (en) * | 2009-09-08 | 2011-04-13 | 英业达股份有限公司 | Marking and querying system and method for conducting project management task according to time |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
US20160260047A1 (en) * | 2015-03-03 | 2016-09-08 | BetterWorks Systems, Inc. | Monitoring individual and aggregate progress of multiple team members |
CN105117866A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress state data processing method and apparatus |
CN105654243A (en) * | 2015-12-31 | 2016-06-08 | 上海筑想信息科技股份有限公司 | Orbital graph based project information automated processing system |
CN106096908A (en) * | 2016-06-02 | 2016-11-09 | 深圳铂睿智恒科技有限公司 | A kind of project process monitor prompt method and system |
CN106156998A (en) * | 2016-07-21 | 2016-11-23 | 乐视控股(北京)有限公司 | The management method of a kind of Pending tasks and device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416510A (en) * | 2018-02-10 | 2018-08-17 | 杭州后博科技有限公司 | A kind of steel tower patrol task list method of real-time adjustment and system |
CN108416510B (en) * | 2018-02-10 | 2021-04-27 | 杭州后博科技有限公司 | Iron tower inspection task list real-time adjustment method and system |
CN116823192A (en) * | 2023-08-31 | 2023-09-29 | 浙江钢信检测技术有限公司 | Iron tower intelligent detection system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105488185B (en) | A kind of optimization method and device of knowledge base | |
CN109544399B (en) | Power transmission equipment state evaluation method and device based on multi-source heterogeneous data | |
CN105095990B (en) | A kind of predictive maintenance method and apparatus | |
CN103544554B (en) | The system and method for the program degree of deferring to of evaluation operation personnel in nuclear power station | |
WO2014173270A1 (en) | Human-machine interface detection method and system | |
CN106682828A (en) | Communication tower maintenance operation progress monitoring method and communication tower maintenance operation progress monitoring system | |
CN114155614A (en) | Method and system for identifying anti-violation behaviors in operation site | |
CN112380126B (en) | Web system health prediction device and method | |
CN113830681A (en) | Unmanned crane safety transmission system based on 5G transmission | |
CN106656618B (en) | The recognition methods of communication iron tower sensor abnormality and system based on traffic analysis | |
CN113191676A (en) | Method and system for managing engineering consultation quality in whole process | |
CN106708786A (en) | Method and system for calculating problem severity of iron tower based on sensor detection | |
CN116759355A (en) | Wafer transmission control method and system | |
CN106709661A (en) | Communication tower maintenance operation item execution method and system | |
CN106650962A (en) | Communication tower maintenance worksheet generation method and system | |
CN110413482B (en) | Detection method and device | |
CN106682746B (en) | Method and system for generating maintenance operation list of communication tower | |
CN106530551A (en) | Non-maintenance personnel tower climbing detection method and system based on optical fiber fence | |
CN106709648A (en) | Method and system for generating communication tower electronic maintenance work record sheet | |
CN106682748A (en) | Method and system for curtailing and displaying communication iron tower maintenance work item | |
CN106651205A (en) | Method and system for detecting personnel in place of iron tower maintenance based on position identification | |
CN106651035A (en) | Method and system for prediction of iron tower verticality fault probability caused by strong breeze weather | |
CN106680885A (en) | Non-maintenance personnel on-tower two-stage detection method and system | |
Dziaduch | The Concept of the Method for Forecasting the Life Cycle Costs of Technical Objects Supporting the Process of Making Purchasing Decisions | |
CN114913670B (en) | Personnel going out of sea safety management system based on safety code management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170517 |