CN106677177A - Anchoring part with recyclable anchor bars - Google Patents

Anchoring part with recyclable anchor bars Download PDF

Info

Publication number
CN106677177A
CN106677177A CN201710014673.6A CN201710014673A CN106677177A CN 106677177 A CN106677177 A CN 106677177A CN 201710014673 A CN201710014673 A CN 201710014673A CN 106677177 A CN106677177 A CN 106677177A
Authority
CN
China
Prior art keywords
dowel
pressure diffusion
anchoring
diffusion plate
anchor bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710014673.6A
Other languages
Chinese (zh)
Inventor
凌国根
刘全林
张扬
倪亚君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical Shanghai Qiangjin Foundation Engineering Co Ltd
Priority to CN201710014673.6A priority Critical patent/CN106677177A/en
Publication of CN106677177A publication Critical patent/CN106677177A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • E02D5/765Anchorings for bulkheads or sections thereof in as much as specially adapted therefor removable

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an anchoring part with recyclable anchor bars. The anchoring part comprises spiral locking type anchorage devices, a plurality of pressure diffusion plates, a bearing body, the anchor bars and a sleeve. The anchor bars are inserted into the spiral locking type anchorage devices, and by controlling the positions of bar clocking clamping plates in a conical anchor pipe, the interlocking degree between the bar locking clamping plates and the anchor bars is adjusted, and locking or unlocking separation between the bar locking clamping plates and the anchor bars are achieved. By adoption of the pressure diffusion plates and the bearing body, pressure diffusion is achieved, and the forced deformation amount of an anchoring body is controlled. The anchoring part is high in construction operability, large in anchoring force generated in soft soil, high in anchoring reliability and recycle rate of the anchor bars and efficient in construction. The anchor bars are recycled, the project construction cost is lowered, underground obstacles are removed, and a green anchoring construction technology is achieved.

Description

A kind of dowel recoverable anchoring piece
Technical field
The present invention relates to the control of technical field of civil engineering, more particularly to soft soil foundation pit slope deforming and deep pit support nurse Anchoring used in journey is put more energy into piled anchor.
Background technology
At present, in the side slope and Deep Foundation Pit Supporting Project on rock and pan soil stratum, prestress anchorage cable has higher anchor Gu power, anchored pile supporting are widely applied.But the anchoring of soft soil layer is still the bottleneck of anchorage technology.Soft soil layer Frictional resistance is low, and the application that the deformation such as rheology limits anchorage technology is also easy to produce after stress.Additionally, frequently with steel in civil engineering Used as prestressing force dowel, which after side slope and foundation pit enclosure structure complete mission often stays and forms barrier in underground twisted wire, this Also limit the popularization and application of this kind of support form.Therefore, higher anchor force can be produced in soft soil layer, controls which soft The deflection of soil, and after supporting construction mission is completed, dowel can be reclaimed from the soil body, it is that engineering circles are in the urgent need to address A difficult problem.
In soft clay area, as water level is universal higher, the water content of weak soil is big.Meanwhile, traditional anchoring body diameter only has 100~150mm, less with the bond area of weak soil, the frictional resistance of weak soil is relatively low in addition, and the anchor force for obtaining is relatively low.Additionally, soft Soil has rheological property, and when the prestressing force for applying is higher, the Rheological Deformation characteristic on stratum will be highlighted, and deformation is difficult to control System.
In soft soil layer anchoring support, the anchoring body formed by removable anchorage (patent No. ZL2015203006781) Intensity is relatively low, when applying more high-prestressed, frequently results in anchoring bulk damage.If applying less prestressing force, the control effect of deformation Fruit is often poor.Therefore, also in the urgent need to research and development have anchor pole (rope) technology of higher anchor force to meet wanting for soft oil support Ask.
In order to solve larger anchor force, effective control deformation, the recovery for improving anchor cable how are obtained in soft soil layer Rate and guarantee anchoring security problems, in the urgent need to developing a kind of novel pre-stressed anchoring piece.
The content of the invention
Present invention solves the technical problem that be overcome existing Recyclable anchor rope anchor force is little, Support Deformation big and returns The low shortcoming of yield, there is provided a kind of anchoring piece of the pressure dissipation formula Recyclable anchor rope for pattern foundation pit supporting structure, inside its anchoring body With multiple supporting bodies, so as to improve its withdrawal resistance.After support action is completed, dowel can be reclaimed out from anchoring body Come, anchoring body is departed from dowel, realize the recycling of dowel, reduce the purpose of construction costs.Meanwhile, removing is stayed in Barrier in stratum.
The technical scheme is that to solve the above problems such:
A kind of dowel recoverable anchoring piece, is characterized in that, anchoring piece includes screw lock formula anchorage, pressure diffusion plate, carries Body, dowel;The pressure diffusion plate of more than 1 is set in vivo in anchoring, and pressure diffusion front edge of board arranges screw lock formula anchorage, and pressure expands Fall apart rear end setting supporting body, and dowel passes through supporting body and pressure diffusion plate to be connected with screw lock formula anchorage, each screw lock formula anchor Tool pins a dowel.
The dowel is provided with sleeve pipe.
Pressure diffusion plate is distributed in anchoring body, at regular intervals each other;Pressure diffusion plate is connected to supporting body Integrally.
Pressure diffusion plate is made up of high strength plastics or steel, and the hole of more than 1 is distributed with pressure diffusion plate.
Supporting body is in cylindrical structural, is made up of high strength plastics or steel.
Screw lock formula anchorage is by controlling position of the lock muscle clamping plate in taper anchor tube, adjusting lock muscle clamping plate with dowel Degree of engagement, realizes locking dowel or unlocks.
Beneficial effect:A kind of dowel recoverable anchoring piece for controlling side slope and foundation pit deformation of the present invention, The locking and unblock recycling of dowel are realized by screw lock formula anchorage, manually i.e. recyclable dowel, improves returning for dowel Rate of producing effects and reuse ratio;By arranging multiple supporting bodies, it is to avoid anchoring body stress is concentrated, disperseed the pressure to anchoring body with And with by the contact stress of anchoring body, so as to solve the problems, such as to reclaim, anchor force in anchor pole (rope) technology is little and deformation is big.
Description of the drawings
With reference to the accompanying drawings and detailed description describing the present invention in detail;
Fig. 1 is the callable anchoring piece distribution schematic diagram of 1 dowel of the present invention.
Fig. 2 is the callable anchoring piece distribution schematic diagram of 2 dowels of the present invention.
Fig. 3 is the callable anchoring piece distribution schematic diagram of 3 dowels of the present invention.
Fig. 4 is the callable anchoring piece distribution schematic diagram of 4 dowels of the present invention.
Fig. 5 is the callable anchoring piece distribution schematic diagram of 3 dowels of the present invention and 3 pressure diffusion plates.
Fig. 6 is the callable anchoring piece distribution schematic diagram of 5 dowels of the present invention.
Fig. 7 is that screw lock formula anchorage of the present invention locks dowel schematic diagram.
Fig. 8 is that screw lock formula anchorage of the present invention unlocks dowel schematic diagram.
1-screw lock formula anchorage;2-pressure diffusion plate;3-supporting body;4-dowel;5-lock muscle clamping plate;6-anchoring cone Pipe;7-sleeve pipe.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that the present invention is realized are easy to understand, tie below Conjunction is specifically illustrating, and the present invention is expanded on further.
A kind of anchor arrangement of recyclable dowel, described anchor arrangement include screw lock formula anchorage 1, pressure diffusion plate 2nd, supporting body 3, dowel 4, wherein:
The screw lock formula anchorage 1 is the anchoring piece of a kind of rotatable realization locking and unblock.Dowel 4 can be along screw lock formula anchorage 1 axially-movable.In the insertion screw lock formula anchorage of dowel 4, lock muscle clamping plate 5 is held with a firm grip dowel 4, and dowel 4 is locked.Need to remove dowel When 4, dowel 4 is pressed down against and rotates, lock muscle clamping plate 5 opens, and unlocks dowel, is easy to dowel 4 to disengage with anchorage part, realizes anchor The recovery of muscle.
The pressure diffusion plate 2 is made up of high strength plastics or steel, is arranged at regular intervals in anchoring body vertically Multiple pressure diffusion plates 2, screw lock formula anchorage 1 are connected with pressure diffusion plate 2, when applying prestressing force to dowel 4, the pulling force on dowel Just it is delivered on pressure diffusion plate 2 by screw lock formula anchorage.
The supporting body 3 is made up of plastic-steel or steel, positioned at the rear of pressure diffusion plate 2, is connected with pressure diffusion plate 2 Connect.In cylindrical structural, dowel 4 can be extended there through supporting body 3.Supporting body 3 is used for the load for bearing the transmission of pressure diffusion plate 2, The active force transmitted on dowel is disperseed by the large contact of supporting body 3 and anchoring body, to avoid anchoring body stress from concentrating And be damaged.
The dowel 4 be un-bonded prestressed steel strand, total length non junction.Dowel 4 is placed in anchoring body, and dowel is by pressure Power diffuser plate 2, supporting body 3 are transferred to prestressing force on anchoring body, then are transferred in the stratum for being anchored by anchoring body dispersion.
Referring to Fig. 1, the anchoring piece distribution schematic diagram of the Recyclable anchor rope of 1 dowel.It includes 1 screw lock formula anchorage 1,1 Individual pressure diffusion plate 2, supporting body 3 and 1 dowel 4.
Referring to Fig. 2, the anchoring piece distribution schematic diagram of the Recyclable anchor rope of 2 dowels, including 2 screw lock formula anchorages 1,2 Pressure diffusion plate 2, supporting body 3 and 2 dowels 4.
Referring to Fig. 3, the anchoring piece distribution schematic diagram of the Recyclable anchor rope of 3 dowels, including 3 screw lock formula anchorages 1,2 Pressure diffusion plate 2, supporting body 3 and 3 dowels 4.Connect 2 screw lock formula anchorages on one pressure diffusion plate, in the middle of another Connect 1 screw lock formula anchorage, and a dowel 4 on pressure diffusion plate.
Referring to Fig. 4, the anchoring piece distribution schematic diagram of the Recyclable anchor rope of 4 dowels, including 4 screw lock formula anchorages 1,2 Pressure diffusion plate 2, supporting body 3 and 4 dowels 4.Connect 2 screw lock formula anchorages on each pressure diffusion plate.Wherein, middle pressure Connect 2 screw lock formula anchorages, and two dowels 4 on power diffuser plate.
Referring to the anchoring piece distribution schematic diagram of the Recyclable anchor rope of Fig. 5,3 dowels and 3 pressure diffusion plates, including 3 1,3 pressure diffusion plates 2 of screw lock formula anchorage, supporting body 3 and 3 dowels 4.Connect 1 screw lock formula anchor on each pressure diffusion plate Tool.
Referring to Fig. 6, the anchoring piece distribution schematic diagram of the Recyclable anchor rope of 5 dowels, including 5 screw lock formula anchorages 1,3 Pressure diffusion plate 2, supporting body 3 and 4 dowels 4.Connect 2 screw lock formula anchorages, 1 pressure diffusion plate on 2 pressure diffusion plates 1 screw lock formula anchorage of upper connection.
The dowel 4 is un-bonded prestressed steel strand.
The supporting body 3 is made up of plastic-steel or steel, in cylindrical structural.
The pressure diffusion plate 2 is made up of high strength plastics or steel, reserving hole, is easy to be sent in place with drilling rod.
Referring to Fig. 7, the screw lock formula anchorage 1 is, by taper anchor tube 6, to hold lock muscle clamping plate 5;Locking dowel 4, by pressure Power diffuser plate 2 and supporting body 3 will act on the pulling force of dowel 4 and be delivered in the stratum for being anchored.
Referring to Fig. 8, when needing to reclaim dowel constantly, dowel 4 is pressed down against and is rotated, is opened lock muscle clamping plate 5, is made dowel Unlock and disengage with screw lock formula anchorage 1, you can dowel 4 is extracted out.
Ultimate principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and description this The principle of invention, of the invention without departing from the spirit and scope of the present invention also to have various changes and modifications, these changes Change and improvement is both fallen within scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent is defined.

Claims (6)

1. a kind of dowel recoverable anchoring piece, is characterized in that, anchoring piece include screw lock formula anchorage, pressure diffusion plate, supporting body, Dowel;The pressure diffusion plate of more than 1 is set in vivo in anchoring, and pressure diffusion front edge of board arranges screw lock formula anchorage, pressure diffusion Plate rear end arranges supporting body, and dowel passes through supporting body and pressure diffusion plate to be connected with screw lock formula anchorage, each screw lock formula anchorage Pin a dowel.
2. dowel recoverable anchoring piece according to claim 1, it is characterised in that the dowel is provided with sleeve pipe.
3. dowel recoverable anchoring piece according to claim 1, it is characterised in that pressure diffusion plate is distributed in anchoring body In, it is at regular intervals each other;Pressure diffusion plate is connected to one with supporting body.
4. dowel recoverable anchoring piece according to claim 1, it is characterised in that pressure diffusion plate is by high strength plastics Or steel are made, the hole of more than 1 on pressure diffusion plate, is distributed with.
5. dowel recoverable anchoring piece according to claim 1, it is characterised in that supporting body is in cylindrical structural, by High strength plastics or steel are made.
6. dowel recoverable anchoring piece according to claim 1, it is characterised in that screw lock formula anchorage is by controlling lock Position of the muscle clamping plate in taper anchor tube, adjusts the degree of engagement of lock muscle clamping plate and dowel, realizes locking dowel or unlocks.
CN201710014673.6A 2017-01-10 2017-01-10 Anchoring part with recyclable anchor bars Pending CN106677177A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710014673.6A CN106677177A (en) 2017-01-10 2017-01-10 Anchoring part with recyclable anchor bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710014673.6A CN106677177A (en) 2017-01-10 2017-01-10 Anchoring part with recyclable anchor bars

Publications (1)

Publication Number Publication Date
CN106677177A true CN106677177A (en) 2017-05-17

Family

ID=58849471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710014673.6A Pending CN106677177A (en) 2017-01-10 2017-01-10 Anchoring part with recyclable anchor bars

Country Status (1)

Country Link
CN (1) CN106677177A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2878511Y (en) * 2006-04-19 2007-03-14 重庆大学 Tensile compression combined self-anchored rock anchor rod
CN201801862U (en) * 2010-08-19 2011-04-20 上海强劲地基工程股份有限公司 Anchoring piece provided with bushing
CN104674811A (en) * 2015-03-03 2015-06-03 厦门市金海明工贸有限公司 Anchor and locking and unlocking method thereof
CN106088088A (en) * 2016-08-08 2016-11-09 上海强劲地基工程股份有限公司 The stress decentralized stiffening pile of recyclable dowel and construction method thereof
CN206408613U (en) * 2017-01-10 2017-08-15 上海强劲地基工程股份有限公司 A kind of dowel recoverable anchoring piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2878511Y (en) * 2006-04-19 2007-03-14 重庆大学 Tensile compression combined self-anchored rock anchor rod
CN201801862U (en) * 2010-08-19 2011-04-20 上海强劲地基工程股份有限公司 Anchoring piece provided with bushing
CN104674811A (en) * 2015-03-03 2015-06-03 厦门市金海明工贸有限公司 Anchor and locking and unlocking method thereof
CN106088088A (en) * 2016-08-08 2016-11-09 上海强劲地基工程股份有限公司 The stress decentralized stiffening pile of recyclable dowel and construction method thereof
CN206408613U (en) * 2017-01-10 2017-08-15 上海强劲地基工程股份有限公司 A kind of dowel recoverable anchoring piece

Similar Documents

Publication Publication Date Title
RU2408765C2 (en) Pyramid or cone ramming tip and method of its use to erect rammed crushed stone supports
CN101487355B (en) Telegraph pole and its mounting and fixing method
CN104179178A (en) Flexible umbrella supporting anchor bolt and method for supporting soil slope thereby
CN105862870B (en) Recyclable pattern foundation pit supporting structure Anchor cable-rod support stand body
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN104389315B (en) Consolidation grouting drilled pile wall and construction method thereof
CN104532851A (en) Recycling assembling type double-row pile and supporting method thereof
CN108386217B (en) A kind of the automatic classification expansion head Pulling-Resistant Anchor Rod and its application method of reinforcing soft rock mass
CN207512752U (en) A kind of tall earth fill supporting construction
CN208996032U (en) A kind of dowel recoverable umbrella-type anchoring piece
CN101942830A (en) Combined concrete soil pile with core pile and construction method as well as construction device thereof
CN101718098A (en) Micro-pile combined dug composite foundation and construction method thereof
CN101949151A (en) Recyclable locking anchor rod and construction method thereof
CN206408613U (en) A kind of dowel recoverable anchoring piece
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN106088088B (en) The construction method of the stress dispersing type stiffening pile of recyclable dowel
CN106677177A (en) Anchoring part with recyclable anchor bars
CN104264671A (en) Recyclable anchor rod
CN102235004A (en) Recyclable end-bearing friction-type anchor rod and constructing method thereof
CN116770803A (en) Assembly type support structure for soft foundation and construction method
CN203867598U (en) Anchor cable capable of applying prestress repeatedly
CN203808055U (en) Screw post-reinforced compacted pile
CN202164599U (en) Reinforcing pile enabling reinforcing rib body to be recycled
CN205875150U (en) Stake of putting more energy into of stress dispersion type of recoverable dowel
CN101608449B (en) Big-end anchor rod and construction method for implementing same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517

RJ01 Rejection of invention patent application after publication