CN106677079A - 基于拱桥拱脚水平推力减小的连续拱桥加固方法 - Google Patents
基于拱桥拱脚水平推力减小的连续拱桥加固方法 Download PDFInfo
- Publication number
- CN106677079A CN106677079A CN201710014516.5A CN201710014516A CN106677079A CN 106677079 A CN106677079 A CN 106677079A CN 201710014516 A CN201710014516 A CN 201710014516A CN 106677079 A CN106677079 A CN 106677079A
- Authority
- CN
- China
- Prior art keywords
- arch
- antiarch
- horizontal thrust
- bridge
- reinforce
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种基于拱桥拱脚水平推力减小的连续拱桥加固方法,通过在连续拱桥的各跨主拱圈拱肋下方设置反拱,并在反拱和拱肋之间用斜腹杆相连,再通过抗弯预埋件和抗剪锚栓把反拱的拱脚和拱肋连接在一起,使得用来加固的反拱结构和原拱肋形成刚性约束支撑体系;并且该刚性约束支撑体系中拱桥拱脚水平推力减小程度与待加固拱和反拱的7个参数有密切的关系,通过设置7个参数的不同变量值,采用待加固拱与加固后拱拱脚水平推力的比值作为弯矩变化表征量,基于有限元参数分析拟合方法,得到了以上7个参数与弯矩变化表征量的关系式。应用本发明,结合前述关系式即可求解结构特征内力值,从而实现选取最优方案进行反拱加固。
Description
技术领域
本发明属于拱桥加固技术领域,尤其涉及一种基于拱桥拱脚水平推力减小的连续拱桥加固方法。
背景技术
拱桥是我国公路上使用广泛且历史悠久的一种桥梁结构型式,但是随着材料的老龄化和日益增加的交通量,大部分桥梁已经满足不了运营需求。有些混凝土拱桥自重较大,主拱圈主要承受压力,当外荷载较大或温度影响较大时,拱脚水平推力增加,拱脚处裂缝增多,桥梁承载力下降。对于连续拱桥而言,拱脚水平推力的增加对桥梁的安全运营更为不利;若拆掉重建,费时费力,但目前又没有很好的加固方法。
混凝土拱桥常用加固方法是增大主拱圈截面、调整拱上建筑恒载以及增强横向整体性、粘贴钢板和纤维复合材料、施加体外预应力等。大量实例表明原有方法加固的效果甚微,且新旧材料的粘合好坏程度直接影响加固的效果,桥梁加固后运营不久就会出现新老材料的脱离,粘结力下降等问题,待加固桥梁拱脚水平推力过大导致裂缝等通病得不到很好的改善。
发明内容
本发明要解决的技术问题是提供一种施工方便、简单可靠、效果良好的基于拱桥拱脚水平推力减小的连续拱桥加固方法。
为解决上述技术问题,本发明采用以下技术方案:
基于拱桥拱脚水平推力减小的连续拱桥加固方法,通过在连续拱桥的各跨主拱圈拱肋下方设置反拱,并在反拱和拱肋之间用斜腹杆相连,再通过抗弯预埋件和抗剪锚栓把反拱的拱脚和拱肋连接在一起,使得用来加固的反拱结构和原拱肋形成刚性约束支撑体系;并且该刚性约束支撑体系符合以下关系式:
式中:
待加固拱和反拱的7个参数分别为反拱与待加固拱的等效半径比i、待加固拱的计算跨径L、待加固拱的矢跨比S1、待加固拱的拱轴系数m1,反拱的矢高与待加固拱跨径比S2、反拱的拱轴系数m2,反拱的跨径与待加固拱跨径的比值KR;
Rf为反拱等效半径,Ix,f为反拱的x方向惯性矩,Rori为待加固拱等效半径,Ix,ori为待加固拱x方向惯性矩;
S1=f1/L,S2=f2/L,L为待加固拱计算跨径,f1、f2分别为反拱和待加固拱的矢高,Fx为反拱加固后的拱脚水平推力,Fxori为待加固拱结构拱脚水平推力。
反拱跨度为主拱跨度的1/4-1/2。
待加固拱的拱轴系数m1的取值在2-8之间、反拱的拱轴系数m2的取值在2-6之间。
待加固拱的矢跨比S1范围为3/25-1/5之间,反拱的矢高与待加固拱跨径比S2的范围在0.02-0.06之间。
反拱与待加固拱的等效半径比i取值在0.5-1.0之间。
斜腹杆截面积取值为反拱截面积的0.5-0.75倍之间。
针对现有拱桥加固存在的问题,发明人建立了一种基于拱桥拱脚水平推力减小的连续拱桥加固方法,通过在连续拱桥的各跨主拱圈拱肋下方设置反拱,并在反拱和拱肋之间用斜腹杆相连,再通过抗弯预埋件和抗剪锚栓把反拱的拱脚和拱肋连接在一起,使得用来加固的反拱结构和原拱肋形成刚性约束支撑体系;并且该刚性约束支撑体系中拱桥拱脚水平推力减小程度与待加固拱和反拱的7个参数(反拱与待加固拱的等效半径比i、待加固拱的计算跨径L、待加固拱的矢跨比S1、待加固拱的拱轴系数m1,反拱的矢高与待加固拱跨径比S2、反拱的拱轴系数m2,反拱的跨径与待加固拱跨径的比值KR)有密切的关系,通过设置7个参数的不同变量值,采用待加固拱与加固后拱拱脚水平推力的比值作为弯矩变化表征量,基于有限元参数分析拟合方法,得到了以上7个参数与弯矩变化表征量的关系式。因此,针对不同设计参数的拱桥,应用本发明,结合前述关系式即可求解结构特征内力值,从而实现选取最优方案进行反拱加固,不但可以增加待加固桥梁的整体刚度,且可以有效的降低关键截面的内力,加固的反拱结构具有很好的受力特性。综上,本发明施工简便,效果明显,计算简单,准确性高,具有广阔的工程运用前景。
附图说明
图1是本发明加固示意图。
图2是拱脚水平推力拟合点位图。
图3是应用本发明的实例中某桥加固后图。
图4是应用本发明加固后水平推力减小百分比随参数等效半径比i变化的曲线图。
图5是应用本发明加固后水平推力减小百分比随参数反拱拱轴系数m2变化的曲线图。
图6是应用本发明加固后水平推力减小百分比随参数跨径之比Kr变化的曲线图。
图7为反拱法加固后水平推力减小百分比随参数反拱矢跨比S2变化的曲线图
图中:1拱脚,2加固的反拱,3原拱肋,4抗弯预埋件,5抗剪锚栓,6斜腹杆,7桥面系。
具体实施方式
一、基本原理
基于拱桥拱脚水平推力减小的连续拱桥加固方法——通过在连续拱桥的各跨主拱圈拱肋下方设置反拱,并在反拱和拱肋之间用多根斜腹杆相连,再通过抗弯预埋件和抗剪锚栓把反拱的拱脚和拱肋连接在一起,使得用来加固的反拱结构和原拱肋形成刚性约束支撑体系,从而可以有效抵抗和分担由拱肋传递的弯矩,同时可以增加拱肋的整体刚度和强度,大大的减少拱脚水平推力值。
针对此体系,采用加固后的拱顶弯矩与未加固的拱顶弯矩比值作为表征值进行拟合,通过大量数据(2700个,见图2)拟合,得到表征值跨总弯矩Mz与已知相关参数的关系式(如下),从而获得最佳的加固参数;
式中:
待加固拱和反拱的7个参数分别为反拱与待加固拱的等效半径比i、待加固拱的计算跨径L、待加固拱的矢跨比S1、待加固拱的拱轴系数m1,反拱的矢高与待加固拱跨径比S2、反拱的拱轴系数m2,反拱的跨径与待加固拱跨径的比值KR;
Rf为反拱等效半径,Ix,f为反拱的x方向惯性矩,Rori为待加固拱等效半径,Ix,ori为待加固拱x方向惯性矩;
S1=f1/L,S2=f2/L,L为待加固拱计算跨径,f1、f2分别为反拱和待加固拱的矢高,Fx为反拱加固后的拱脚水平推力,Fxori为待加固拱结构拱脚水平推力。
根据上述关系式,如果待加固拱的参数已知,即可通过改变反拱参数,获得需要的拱脚水平推力减小目标值。有关参数的取值范围如下:
反拱跨度为主拱跨度的1/4-1/2。
待加固拱的拱轴系数m1的取值在2-8之间、反拱的拱轴系数m2的取值在2-6之间。
待加固拱的矢跨比S1范围为3/25-1/5之间,反拱的矢高与待加固拱跨径比S2的范围在0.02-0.06之间。
反拱与待加固拱的等效半径比i不局限于圆形截面,任意截面型式都可通过上述公式换算得到,且取值在0.5-1.0之间。
斜腹杆截面积取值为反拱截面积的0.5-0.75倍之间,但截面参数对加固后拱肋拱脚水平推力减小的效果不明显。
应用实例
某264m跨径的上承式混凝土连续拱桥,在使用了一段时间后,发现中间桥墩的推力较大,使得拱肋跨中下翼缘出现裂纹,故而需要加固以有效的同时减小拱脚推力与跨中截面弯矩。采用本发明对原桥采用反拱加固的方法进行加固(图3),计算加固后拱脚水平推力与加固前拱脚水平推力的比值。
待加固拱桥单跨跨径L=100m,矢跨比S1=1/6,拱轴系数m1=5,反拱与待加固拱等效半径之比i取值0.85,拱轴系数m2=3,矢高f2=4m,跨径L2=20m,把参数带入前述公式:
式中:可得到加固厚拱脚水平推力值和加固前的比值为0.969,水平推力减少了3.1%。
由此可见,本发明对混凝土桥梁加固有一定效果,通过大量数据分析,通过基于反拱结构加固混凝土拱桥或钢拱桥的方法,可使得本类型混凝土拱桥或钢拱桥拱脚水平推力有一定降低,跨中弯矩显著减小,带来一定的工程效益。
通过不断的调整反拱的参数,得到不同方案对应待加固拱桥拱脚水平推力的减小量情况见表1-4与图4~7:
表1主拱圈拱脚水平推力减小百分比随反拱与待加固拱等效半径比i的变化
表2主拱圈水平推力减小百分比随反拱拱轴系数m2的变化
表3主拱圈水平推力减小百分比随跨径之比Kr的变化
表4主拱圈水平推力减小百分比随S2的变化
综上可见,拱脚水平推力具有以下规律:
(1)反拱跨径越小加固效果越好,但需综合考虑施工及兼顾整体受力;
(2)加固反拱的矢高越高,其加固效果越好;
(3)在条件允许下,加固反拱的跨径越大,其加固效果越好;
(4)待加固拱的拱轴系数很大时,如果采用本本发明进行加固,可以降低拱脚水平推力值,降低的平均幅度达到6%。
Claims (6)
1.一种基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:通过在连续拱桥的各跨主拱圈拱肋下方设置反拱,并在反拱和拱肋之间用斜腹杆相连,再通过抗弯预埋件和抗剪锚栓把反拱的拱脚和拱肋连接在一起,使得用来加固的反拱结构和原拱肋形成刚性约束支撑体系;并且该刚性约束支撑体系符合以下关系式:
式中:
待加固拱和反拱的7个参数分别为反拱与待加固拱的等效半径比i、待加固拱的计算跨径L、待加固拱的矢跨比S1、待加固拱的拱轴系数m1,反拱的矢高与待加固拱跨径比S2、反拱的拱轴系数m2,反拱的跨径与待加固拱跨径的比值KR;
Rf为反拱等效半径,Ix,f为反拱的x方向惯性矩,Rori为待加固拱等效半径,Ix,ori为待加固拱x方向惯性矩;
S1=f1/L,S2=f2/L,L为待加固拱计算跨径,f1、f2分别为反拱和待加固拱的矢高,Fx为反拱加固后的拱脚水平推力,Fxori为待加固拱结构拱脚水平推力。
2.根据权利要求1所述的基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:所述反拱跨度为主拱跨度的1/4-1/2。
3.根据权利要求1所述的基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:所述待加固拱的拱轴系数m1的取值在2-8之间、反拱的拱轴系数m2的取值在2-6之间。
4.根据权利要求1所述的基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:所述待加固拱的矢跨比S1范围为3/25-1/5之间,反拱的矢高与待加固拱跨径比S2的范围在0.02-0.06之间。
5.根据权利要求1所述的基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:所述反拱与待加固拱的等效半径比i取值在0.5-1.0之间。
6.根据权利要求1所述的基于拱桥拱脚水平推力减小的连续拱桥加固方法,其特征在于:所述斜腹杆截面积取值为反拱截面积的0.5-0.75倍之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710014516.5A CN106677079B (zh) | 2017-01-09 | 2017-01-09 | 基于拱桥拱脚水平推力减小的连续拱桥加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710014516.5A CN106677079B (zh) | 2017-01-09 | 2017-01-09 | 基于拱桥拱脚水平推力减小的连续拱桥加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106677079A true CN106677079A (zh) | 2017-05-17 |
CN106677079B CN106677079B (zh) | 2018-06-01 |
Family
ID=58850431
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710014516.5A Active CN106677079B (zh) | 2017-01-09 | 2017-01-09 | 基于拱桥拱脚水平推力减小的连续拱桥加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677079B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416116A (zh) * | 2018-02-09 | 2018-08-17 | 广西交通科学研究院有限公司 | 拱脚增大截面加固抛物线拱时拱顶压重量的确定方法 |
CN109487710A (zh) * | 2018-12-19 | 2019-03-19 | 长沙理工大学 | 一种基于预制装配原则的拱桥加固方法 |
CN112482188A (zh) * | 2020-11-26 | 2021-03-12 | 温州市市政管理中心 | 一种拱桥加固结构及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3867149B2 (ja) * | 2005-06-13 | 2007-01-10 | 国立大学法人東京工業大学 | 橋梁の鋼床版構造および鋼床版補強工法 |
CN202559224U (zh) * | 2012-04-12 | 2012-11-28 | 广西交通科学研究院 | 使用轻质混凝土作为拱上填料的圬工拱桥 |
CN203129026U (zh) * | 2013-01-23 | 2013-08-14 | 陈增顺 | 钢筋混凝土拱桥加固结构 |
CN103557978A (zh) * | 2013-11-15 | 2014-02-05 | 广西交通科学研究院 | 吊杆拱桥短吊杆索力精确测试方法 |
CN103940561A (zh) * | 2014-04-21 | 2014-07-23 | 广西交通科学研究院 | 精确测量吊索(杆)拱桥主拱肋挠度的方法及其装置 |
CN104074139A (zh) * | 2014-06-18 | 2014-10-01 | 广西交通科学研究院 | 一种分区域调节圬工拱桥拱上填料重度的方法 |
CN105507127A (zh) * | 2016-01-13 | 2016-04-20 | 广西大学 | 拱肋面内多点约束及分布式系杆拱桥 |
-
2017
- 2017-01-09 CN CN201710014516.5A patent/CN106677079B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3867149B2 (ja) * | 2005-06-13 | 2007-01-10 | 国立大学法人東京工業大学 | 橋梁の鋼床版構造および鋼床版補強工法 |
CN202559224U (zh) * | 2012-04-12 | 2012-11-28 | 广西交通科学研究院 | 使用轻质混凝土作为拱上填料的圬工拱桥 |
CN203129026U (zh) * | 2013-01-23 | 2013-08-14 | 陈增顺 | 钢筋混凝土拱桥加固结构 |
CN103557978A (zh) * | 2013-11-15 | 2014-02-05 | 广西交通科学研究院 | 吊杆拱桥短吊杆索力精确测试方法 |
CN103940561A (zh) * | 2014-04-21 | 2014-07-23 | 广西交通科学研究院 | 精确测量吊索(杆)拱桥主拱肋挠度的方法及其装置 |
CN104074139A (zh) * | 2014-06-18 | 2014-10-01 | 广西交通科学研究院 | 一种分区域调节圬工拱桥拱上填料重度的方法 |
CN105507127A (zh) * | 2016-01-13 | 2016-04-20 | 广西大学 | 拱肋面内多点约束及分布式系杆拱桥 |
Non-Patent Citations (1)
Title |
---|
李乃强: ""中承式钢管拱桥肋间横梁应力分析及加固"", 《西部交通科技》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416116A (zh) * | 2018-02-09 | 2018-08-17 | 广西交通科学研究院有限公司 | 拱脚增大截面加固抛物线拱时拱顶压重量的确定方法 |
CN108416116B (zh) * | 2018-02-09 | 2021-10-22 | 广西交通科学研究院有限公司 | 拱脚增大截面加固抛物线拱时拱顶压重量的确定方法 |
CN109487710A (zh) * | 2018-12-19 | 2019-03-19 | 长沙理工大学 | 一种基于预制装配原则的拱桥加固方法 |
CN109487710B (zh) * | 2018-12-19 | 2024-02-27 | 长沙理工大学 | 一种基于预制装配原则的拱桥加固方法 |
CN112482188A (zh) * | 2020-11-26 | 2021-03-12 | 温州市市政管理中心 | 一种拱桥加固结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106677079B (zh) | 2018-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836023B (zh) | 基于跨中挠度减小的上承式混凝土拱桥加固方法 | |
CN106758743B (zh) | 一种改善钢混组合多箱连续梁桥负弯矩区受力性能的方法 | |
Abdul-Razzaq et al. | Corbel strut and tie modeling–Experimental verification | |
CN106835926A (zh) | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 | |
CN106677079A (zh) | 基于拱桥拱脚水平推力减小的连续拱桥加固方法 | |
CN106677080B (zh) | 基于拱桥屈曲特征系数增大的中承式钢拱桥加固方法 | |
CN104036149B (zh) | 一种活性粉末混凝土大偏心受压构件极限荷载的计算方法 | |
CN102721562A (zh) | 一种基于裂缝指标的rc梁桥承载能力检算评定方法 | |
CN106758773A (zh) | 一种钢混组合梁桥的剪力连接件 | |
CN108571328A (zh) | 一种地层交界段盾构隧道管片衬砌结构及设计方法 | |
Yuan et al. | Flexure Performance of Externally Bonded CFRP Plates‐Strengthened Reinforced Concrete Members | |
Zou et al. | Investigation on flexural behavior of novel GFRP grid web-concrete hybrid beam | |
CN104036094B (zh) | 一种活性粉末混凝土大偏心受压构件开裂荷载的计算方法 | |
CN101942863B (zh) | 超长混凝土框架结构裂缝控制的设计方法 | |
CN100523407C (zh) | 后张法预应力混凝土结构内部锚固区配筋设计方法 | |
Singh et al. | Performance evaluation of triangular and circular bulged perforated headed stud shear connector in composite junction | |
CN106702913B (zh) | 基于拱桥跨中弯矩减小的反拱结构加固方法 | |
CN109024233A (zh) | 变高里衬混凝土的大跨径波形钢腹板组合梁桥的施工方法 | |
CN106836022B (zh) | 基于拱桥拱脚负弯矩减小的反拱结构加固方法 | |
Sun et al. | Slip analysis of prestressed steel-concrete continuous composite beam | |
Terzioglu | Behavior and design of spread prestressed concrete slab beam bridges | |
Wu | Rational modeling of arching action in laterally restrained beams | |
Liu et al. | Design of lining concrete of multi-cell composite girder bridge with corrugated steel webs | |
CN117574522B (zh) | 基于钢纤维及高强纵筋的方形柱构件最小配箍率计算方法 | |
Schmitz | Design and experimental validation of 328 ft (100 m) tall wind turbine towers utilizing high strength and ultra-high performance concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |