CN106672023B - A kind of route release method of cross-line overlay region - Google Patents

A kind of route release method of cross-line overlay region Download PDF

Info

Publication number
CN106672023B
CN106672023B CN201611153336.7A CN201611153336A CN106672023B CN 106672023 B CN106672023 B CN 106672023B CN 201611153336 A CN201611153336 A CN 201611153336A CN 106672023 B CN106672023 B CN 106672023B
Authority
CN
China
Prior art keywords
controller
parking
area
route
confirmation message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611153336.7A
Other languages
Chinese (zh)
Other versions
CN106672023A (en
Inventor
郜春海
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201611153336.7A priority Critical patent/CN106672023B/en
Publication of CN106672023A publication Critical patent/CN106672023A/en
Application granted granted Critical
Publication of CN106672023B publication Critical patent/CN106672023B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The present invention provides a kind of route release method of cross-line overlay region, the method includes:The total people of route in condominium region is solved the first area controller that request is sent to its affiliated area by the first interlock device;After the first area controller receives the total people's solution request of the route, parking is ensured that request is sent to Vehicle Controller by the second area controller or is sent directly to Vehicle Controller;The Vehicle Controller receives the parking and ensures after asking, and parking is ensured that confirmation message is sent to the second area controller or the first area controller;After the first area controller receives parking guarantee confirmation message, ensure that confirmation message determines whether that first interlock device sends the total people of route and solves confirmation message according to the parking, to be unlocked to route.The people that the present invention is enable to respond quickly overlay region route solves request, effectively shortens people's Xie Jinlu response times, greatly improves the efficiency of operation of circuit.

Description

A kind of route release method of cross-line overlay region
Technical field
The present invention relates to Train Operation Control Technology field more particularly to a kind of route release methods of cross-line overlay region.
Background technology
With the continuous development that train signal controls, the safe and efficient traveling of train is more and more important.As city rail is handed over Logical fast development, safety and automation while high efficiency operation to entire train control system are proposed higher It is required that.
Current China is low in the automation of Train Control field, intelligence, is especially responded into passerby in cross-line overlay region When solution request, cross-line overlay region is into passerby's solution request processing scheme at present:When route is in close to locking states, interlocking is set Standby (CI) can solve order unlock by total people, after receiving total people's solution, will meet unlocking condition and switch to approach into line state Be delayed unlocked state.If delay time arrives, the state of route close to delay unlocked state by being converted to automatic unlocking state.
It can be seen that CI can only be by a period of time that is delayed, it, could be by route after judging that the state of route meets unlock It is set as idle, lacks to solve into passerby and ask to automatically control measure, and the efficiency of railroad embankment is more low.
Invention content
In view of the drawbacks of the prior art, it the present invention provides a kind of route release method of cross-line overlay region, can solve The total people of route solves delay unlock in the prior art, lacks and solves request into passerby and automatically control measure, and the efficiency of railroad embankment compared with For low problem.
In a first aspect, the present invention provides a kind of route release method of cross-line overlay region, the method includes:
First interlock device solves the total people of route in the condominium region of first area controller and second area controller Request is sent to the first area controller of the first interlock device affiliated area;
The first area controller receives after the total people of the route solves request, ensures request by described the parking Two zone controllers are sent to Vehicle Controller or are sent directly to Vehicle Controller;
The Vehicle Controller receives after the parking ensures request, and parking is ensured that confirmation message is sent to described the Two zone controllers or the first area controller;The parking ensures that confirmation message includes that parking ensures that point and movement are awarded Weigh terminal;
The first area controller receives the parking of the second area controller or Vehicle Controller feedback Ensure confirmation message, and ensures that confirmation message determines whether that first interlock device sends the total people of route according to the parking Confirmation message is solved, to be unlocked to route.
Optionally, it is described will parking ensure request by the second area controller be sent to Vehicle Controller or directly It receives and sends to Vehicle Controller, including:
If the Vehicle Controller is in the control area of the second area controller, the first area controller will The parking ensures that request is sent to the second area controller, so that the second area controller ensures the parking Request is sent to the Vehicle Controller;
If the Vehicle Controller is in the control area of the first area controller, the first area controller will The parking ensures that request is sent to the Vehicle Controller.
Optionally, the Vehicle Controller receives the parking and ensures after asking, and parking is ensured that confirmation message is sent To the second area controller or the first area controller, including:
If the Vehicle Controller is in the control area of the second area controller, the Vehicle Controller will be described Parking ensures that confirmation message is sent to the second area controller, so that the second area controller ensures the parking Confirmation message is sent to the first area control;
If the Vehicle Controller is in the control area of the first area controller, the Vehicle Controller will be described Parking ensures that confirmation message is sent to the first area controller.
Optionally, the first area controller receives the second area controller or Vehicle Controller feedback Parking ensure confirmation message, including:
If the Vehicle Controller is in the control area of the second area controller, the first area controller It receives the parking that the second area controller is sent and ensures confirmation message;
If the Vehicle Controller is in the control area of the first area controller, the first area controller It receives the parking that the Vehicle Controller is sent and ensures confirmation message.
Optionally, the method further includes:
The Vehicle Controller receives the parking and ensures after asking, and the vehicle is calculated according to train status information The parking of set controller ensures point;
Wherein, the train status information includes the location information, traffic direction and velocity information of train.
Optionally, described to ensure that confirmation message determines whether that first interlock device sends route according to the parking Total people solves confirmation message, including:
It is described parking ensure confirmation message in the parking ensure point with mobile authorization terminal consistent and train in institute When can come to a complete stop before stating mobile authorization terminal, the first area controller sends the total people of route to first interlock device Confirmation message is solved, to be unlocked to route.
Optionally, the method further includes:
In mobile authorization separation of the train by the first area controller and the second area controller, institute The Vehicle Controller and the first area controller for stating train are attached, to carry out zone controller switching.
Optionally, before the Vehicle Controller of the train is attached with the first area controller, the method Further include:
The Vehicle Controller sends location information to the second area controller in real time.
As shown from the above technical solution, the present invention is provided in a kind of route release method of cross-line overlay region, the first interlocking The total people of route in condominium region is solved the first area control that request is sent to the first interlock device affiliated area by equipment Device;After the first area controller receives the total people's solution request of the route, parking is ensured that request passes through secondth area Domain controller is sent to Vehicle Controller or is sent directly to Vehicle Controller;The first area controller receives described the The parking of two zone controllers or Vehicle Controller feedback ensures confirmation message, and ensures confirmation letter according to the parking Breath determines whether that first interlock device sends the total people of route and solves confirmation message, to be unlocked to route;Wherein, described Parking ensures that confirmation message includes that parking ensures point.In this way, in the present invention at Train Approaching cross-line overlay region, interlock device without The corresponding delay time is needed to wait for, and ensures that the parking in confirmation message ensures that point and mobile authorization terminal are according to the parking of train It can be determined whether to be unlocked route, solve request to the people of quick response overlay region route, effectively shorten people Xie Jinlu Response time greatly improves the efficiency of operation of circuit.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of flow diagram of the route release method for cross-line overlay region that one embodiment of the invention provides;
Fig. 2 is a kind of flow diagram of the route release method for cross-line overlay region that another embodiment of the present invention provides;
Fig. 3 is the schematic diagram of a scenario of the route release for the cross-line overlay region that another embodiment of the present invention provides;
Fig. 4 is a kind of flow diagram of the route release method for cross-line overlay region that another embodiment of the present invention provides;
Fig. 5 is a kind of flow diagram of the route release method for cross-line overlay region that another embodiment of the present invention provides.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is a kind of flow diagram of the route release method of cross-line overlay region in one embodiment of the invention, such as Fig. 1 Shown, described method includes following steps:
S101:First interlock device is total by the route in the condominium region of first area controller and second area controller People solves the first area controller that request is sent to the first interlock device affiliated area.
Specifically, in Train Approaching cross-line overlay region (first area controller and second area adjacent thereto control The condominium region of device) when, if waiting for, released route is located at the overlay region, the route initial endpoint signal machine corresponding first of the route The total people of route is solved the first area controller that request is sent to the first interlock device affiliated area by lock device CI.
S102:After the first area controller receives the total people's solution request of the route, parking is ensured that request passes through The second area controller is sent to Vehicle Controller or is sent directly to Vehicle Controller.
Specifically, after in first area, controller receives the total people's solution request of route, according to the vehicle-mounted control of current train Parking is ensured that request is forwarded to Vehicle Controller by second area controller, or will directly stopped by the specific location of device processed Vehicle ensures that request is sent to Vehicle Controller.
S103:The Vehicle Controller receives the parking and ensures after asking, and parking is ensured that confirmation message is sent to The second area controller or the first area controller;The parking ensure confirmation message include parking ensure point and Mobile authorization terminal.
Wherein, the parking ensures that confirmation message includes that parking ensures point and mobile authorization terminal.
Specifically, the method further includes:
The Vehicle Controller receives the parking and ensures after asking, and the vehicle is calculated according to train status information The parking of set controller ensures point;Wherein, the train status information includes location information, traffic direction and the speed letter of train Breath.
Understandably, due to need to be unlocked to the route of overlay region, then the mobile authorization terminal is to wait for released route Initial endpoint signal machine position.
S104:The first area controller receive the second area controller or the Vehicle Controller feedback Parking ensures confirmation message, and ensures that confirmation message determines whether that first interlock device sends route according to the parking Total people solves confirmation message, to be unlocked to route.
Specifically, the first area controller directly receives what second area controller or Vehicle Controller were sent After parking ensures confirmation message, ensure that the parking in confirmation message ensures that point and mobile authorization terminal determine whether according to parking First interlock device sends the total people of route and solves confirmation message, to be unlocked to route.
Specifically, the parking in the parking ensures confirmation message ensures that point is consistent with mobile authorization terminal and arranges When vehicle can come to a complete stop before the mobile authorization terminal, the first area controller to first interlock device send into The total people in road solves confirmation message, to be unlocked to route;It is described parking ensure confirmation message in the parking ensure point with When mobile authorization terminal is inconsistent, i.e., when train can not come to a complete stop before mobile authorization terminal, the first area controller is not The total people of route, which is sent, to first interlock device solves confirmation message, route release failure.
In the present embodiment, the total people of route in condominium region is solved request and is sent to first interlocking by the first interlock device The first area controller of equipment affiliated area;It, will after the first area controller receives the total people's solution request of the route Parking ensures that request is sent to Vehicle Controller by the second area controller or is sent directly to Vehicle Controller;Institute It states first area controller and receives the second area controller or the parking guarantee confirmation letter of Vehicle Controller feedback Breath, and ensure that confirmation message determines whether that first interlock device sends the total people of route and solves confirmation letter according to the parking Breath, to be unlocked to route;Wherein, the parking ensures that confirmation message includes that parking ensures point.In this way, in the present embodiment When Train Approaching cross-line overlay region, interlock device ensures confirmation letter without waiting for the corresponding delay time according to the parking of train Parking in breath ensures that point and mobile authorization terminal can be determined whether to be unlocked route, to quick response overlay region into The people on road solves request, effectively shortens people's Xie Jinlu response times, greatly improves the efficiency of operation of circuit.
In an alternate embodiment of the present invention where, as shown in Fig. 2, the first area controller receives the route After total people solves request, if the Vehicle Controller is in the control area of the second area controller, above-mentioned steps S102 It specifically includes:
S1021:The parking is ensured that request is sent to the second area controller by the first area controller, with Make the second area controller that the parking is ensured that request is sent to the Vehicle Controller.
Further, above-mentioned steps S103 is specifically included:
S1031:The Vehicle Controller receives the parking and ensures after asking, and the parking is ensured confirmation message hair It send to the second area controller, so that the parking ensured that confirmation message is sent to is described for the second area controller First area controls;
Further, above-mentioned steps S104 is specifically included:
S1041:The first area controller receives the parking that the second area controller is sent and ensures confirmation message, And ensure that confirmation message determines whether that first interlock device sends the total people of route and solves confirmation message according to the parking, with Route is unlocked.
For example, as shown in figure 3, waiting for released route for semaphore S1 to semaphore positioned at overlay region in the present embodiment The route of S2 after communication truck enters overlay region, is introduced into and transfers ZC, after the separation of mobile ZC and take over ZC, into connecing The control area of pipe ZC.
Specifically, the flow diagram of the route release method of the cross-line overlay region in the present embodiment is as shown in figure 4, the party Method includes the following steps:
S401:The total people's solution request of route in overlapping region is sent to corresponding ZC and (connect by take over regional interlock equipment (CI) Pipe ZC);
S402:After take over ZC receives the total people's solution request of route of affiliated route, guarantee request of stopping is sent to ZC is transferred;
S403:Transferring VOBCs of the ZC into its control area forwards the parking to ensure request;
In the present embodiment, when take over ZC receives the total people of route and solves request, train is still located at the control area for transferring ZC, because Parking is ensured that request is forwarded to the Vehicle Controller (VOBC) of train by this take over ZC by transferring ZC.
S404:After VOBC receives the parking guarantee application for transferring ZC transmissions, guarantor of stopping is sent to its affiliated ZC (transferring ZC) Demonstrate,prove confirmation message;
S405:It transfers ZC and ensures confirmation message to take over ZC forwarding parkings;
S406:Take over ZC ensures that confirmation message judges whether that sending the total people of route to CI solves confirmation message according to parking, if It is to go to step S407, otherwise terminates the route release flow;
Specifically, it in the present embodiment, transfers the parking that ZC is sent in the parking guarantee confirmation message of take over ZC and ensures Point is consistent with mobile authorization (MA) terminal and can be stopped before parking ensures point with train, then it is total to send route to CI People solves confirmation message, and otherwise route release fails.
In the present embodiment, as shown in figure 3, before sending the total people of route and solving request, the mobile authorization MA of the communication truck is whole Point should be the terminal signaling machine S2 of route, and after sending the total people of route and solving request, which need to be unlocked, then moved MA terminals are authorized to become the initial endpoint signal machine S1 of route.In the present embodiment, specifically ensure point with initial endpoint signal machine S1's parking Position is compared, and whether judgement train can stop before initial endpoint signal machine S1, if then sending the total people of route to CI Confirmation message is solved to be unlocked to route, otherwise route release fails.
S407:Take over ZC sends the total people of route to CI and solves confirmation message.
In the present embodiment, on the basis of fully considering safety and high efficiency, according to the status information of train, calculate The parking of VOBC ensures point, solves request to the people of quick response overlay region route, significantly shortens original into passerby Xie Xiang Between seasonable, the efficiency of operation of circuit is greatly improved.
In an alternate embodiment of the present invention where, as shown in figure 5, the first area controller receives the route After total people solves request, if the Vehicle Controller is in the control area of the first area controller, above-mentioned steps S102 It specifically includes:
S1022:The parking is ensured that request is sent to the Vehicle Controller by the first area controller.
Further, above-mentioned steps S103 includes:
S1032:The Vehicle Controller receives the parking and ensures after asking, and the parking is ensured confirmation message hair It send to the first area controller;
Further, above-mentioned steps S104 includes:
S1042:The first area controller receives the parking that the Vehicle Controller is sent and ensures confirmation message, and root Ensure that confirmation message determines whether that first interlock device sends the total people of route and solves confirmation message according to the parking, with into Road is unlocked.
It is described vehicle-mounted due to when the first area controller, which receives the total people of the route, solves request in the present embodiment Controller is in the control area of the first area controller, therefore first area controller is directly sent to Vehicle Controller Parking ensures that request, the Vehicle Controller receive feedback parking after parking ensures request and ensure confirmation message, Jin Er The parking that one zone controller directly receives Vehicle Controller feedback ensures confirmation message.
Further, the above method further includes following steps:
In mobile authorization separation of the train by the first area controller and the second area controller, institute The Vehicle Controller and the first area controller for stating train are attached, to carry out zone controller switching.
For example, as shown in figure 3, train, which enters overlapping region (the condominium region in Fig. 3), attempts and take over region control Device (ZC) processed establishes connection, and it is MA separations to establish connection opportunity.Train enters ZC switching states at this time.
Further, the step of Vehicle Controller of train described above and the first area controller are attached it Before, the method further includes:
The Vehicle Controller sends location information to the second area controller in real time.
As shown in figure 3, before VOBC establishes connection with take over ZC, VOBC reports position to transfer ZC (current controlled ZC) and believes Breath.
The present embodiment proposes the route release scheme of cross-line overlay region, can on the basis of changing original logical calculated It is run into passerby's solution, the train right way into demands such as passerby's solutions with covering user's train cross-line, the domestic segmentation of adaptation is built, segmentation is opened Logical mainstream subway construction mode, and meet the needs of user is to system automation and growing efficiency of operation.
In the description of the present invention, it should be noted that the orientation or positional relationship of the instructions such as term "upper", "lower" is base It in orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than indicates or imply Signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to this The limitation of invention.Unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " shall be understood in a broad sense, example Such as, it may be fixed connection or may be dismantle connection, or integral connection;It can be mechanical connection, can also be to be electrically connected It connects;It can be directly connected, can also can be indirectly connected through an intermediary the connection inside two elements.For this For the those of ordinary skill in field, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
It should also be noted that, herein, relational terms such as first and second and the like are used merely to one Entity or operation are distinguished with another entity or operation, without necessarily requiring or implying between these entities or operation There are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to contain Lid non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments Invention is explained in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation Technical solution recorded in example is modified or equivalent replacement of some of the technical features;And these modification or It replaces, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.

Claims (7)

1. a kind of route release method of cross-line overlay region, which is characterized in that the method includes:
The total people of route in the condominium region of first area controller and second area controller is solved request by the first interlock device It is sent to the first area controller of the first interlock device affiliated area;
After the first area controller receives the total people's solution request of the route, parking is ensured that request passes through secondth area Domain controller is sent to Vehicle Controller or is sent directly to Vehicle Controller;
The Vehicle Controller receives the parking and ensures after asking, and parking is ensured that confirmation message is sent to secondth area Domain controller or the first area controller;Wherein, the Vehicle Controller receives the parking and ensures after asking, will Parking ensures that confirmation message is sent to the second area controller or the first area controller, including, if the vehicle Set controller is in the control area of the second area controller, and the parking is ensured confirmation message by the Vehicle Controller It is sent to the second area controller, so that the parking is ensured that confirmation message is sent to institute by the second area controller State first area control;If the Vehicle Controller is in the control area of the first area controller, the vehicle-mounted control The parking is ensured that confirmation message is sent to the first area controller by device;The parking ensures that confirmation message includes parking Ensure point and mobile authorization terminal;
The first area controller receives the second area controller or the parking of Vehicle Controller feedback ensures Confirmation message, and ensure that confirmation message determines whether that first interlock device sends the total people of route and solves really according to the parking Information is recognized, to be unlocked to route.
2. route release method according to claim 1, which is characterized in that described to ensure request by described the parking Two zone controllers are sent to Vehicle Controller or are sent directly to Vehicle Controller, including:
If the Vehicle Controller is in the control area of the second area controller, the first area controller will be described Parking ensures that request is sent to the second area controller, so that the parking is ensured to ask by the second area controller It is sent to the Vehicle Controller;
If the Vehicle Controller is in the control area of the first area controller, the first area controller will be described Parking ensures that request is sent to the Vehicle Controller.
3. route release method according to claim 2, which is characterized in that the first area controller receives described the The parking of two zone controllers or Vehicle Controller feedback ensures confirmation message, including:
If the Vehicle Controller is in the control area of the second area controller, the first area controller receives The parking that the second area controller is sent ensures confirmation message;
If the Vehicle Controller is in the control area of the first area controller, the first area controller receives The parking that the Vehicle Controller is sent ensures confirmation message.
4. route release method according to any one of claim 1-3, which is characterized in that the method further includes:
The Vehicle Controller receives the parking and ensures after asking, and the vehicle-mounted control is calculated according to train status information The parking of device processed ensures point;
Wherein, the train status information includes the location information, traffic direction and velocity information of train.
5. route release method according to any one of claim 1-3, which is characterized in that described to be protected according to the parking Card confirmation message determines whether that first interlock device sends the total people of route and solves confirmation message, including:
It is described parking ensure confirmation message in the parking ensure point with mobile authorization terminal consistent and train in the shifting When can come to a complete stop before dynamic mandate terminal, the first area controller is true to the total people's solution of first interlock device transmission route Information is recognized, to be unlocked to route.
6. route release method according to any one of claim 1-3, which is characterized in that the method further includes:
In mobile authorization separation of the train by the first area controller and the second area controller, the row The Vehicle Controller of vehicle is attached with the first area controller, to carry out zone controller switching.
7. route release method according to claim 6, which is characterized in that the Vehicle Controller of the train and described the Before one zone controller is attached, the method further includes:
The Vehicle Controller sends location information to the second area controller in real time.
CN201611153336.7A 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region Active CN106672023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611153336.7A CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611153336.7A CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Publications (2)

Publication Number Publication Date
CN106672023A CN106672023A (en) 2017-05-17
CN106672023B true CN106672023B (en) 2018-09-04

Family

ID=58867958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611153336.7A Active CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Country Status (1)

Country Link
CN (1) CN106672023B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444432B (en) * 2017-08-14 2021-03-16 北京全路通信信号研究设计院集团有限公司 Control method for improving train cross-line route access efficiency
CN107499336B (en) * 2017-08-14 2020-10-23 北京全路通信信号研究设计院集团有限公司 Control method
CN107933619B (en) * 2017-11-23 2020-02-14 交控科技股份有限公司 Method for processing section occupation information by urban rail transit area controller
CN108683656B (en) * 2018-05-10 2021-01-19 中国铁路总公司 Method for detecting man-in-the-middle attack in urban rail transit train control system
CN110329322B (en) * 2019-08-07 2021-10-15 湖南中车时代通信信号有限公司 Safety processing method for collaboratively shortening driving permission
CN110834651B (en) * 2019-11-11 2020-12-01 通号城市轨道交通技术有限公司 Unlocking method and system for route protection section
CN112874577B (en) * 2019-11-29 2022-05-13 比亚迪股份有限公司 Train management method and system
CN111645728A (en) * 2020-04-22 2020-09-11 浙江众合科技股份有限公司 Interconnection-based urban rail transit train handover method
CN111874042B (en) * 2020-06-28 2022-03-11 通号城市轨道交通技术有限公司 Train information processing method and system based on overlapping administration areas

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066228A (en) * 1976-10-07 1978-01-03 Westinghouse Air Brake Company Route control system for railroad interlockings
CN101927775A (en) * 2010-08-18 2010-12-29 北京交通大学 Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN102556120A (en) * 2011-12-22 2012-07-11 北京交控科技有限公司 Interlock access control method
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
CN104512439A (en) * 2013-09-27 2015-04-15 北京南车时代信息技术有限公司 Route unlocking method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066228A (en) * 1976-10-07 1978-01-03 Westinghouse Air Brake Company Route control system for railroad interlockings
CN101927775A (en) * 2010-08-18 2010-12-29 北京交通大学 Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN102556120A (en) * 2011-12-22 2012-07-11 北京交控科技有限公司 Interlock access control method
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
CN104512439A (en) * 2013-09-27 2015-04-15 北京南车时代信息技术有限公司 Route unlocking method and device

Also Published As

Publication number Publication date
CN106672023A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN106672023B (en) A kind of route release method of cross-line overlay region
CN105096618B (en) Method for controlling priority and system that a kind of tramcar passes through crossing
CN106741013B (en) The control method of onboard system, CBTC control system and the switching of CTCS control system
CN104859683B (en) A kind of ground installation of high speed train control system
CN102381342B (en) Computer interlock system and method for controlling urban rail transit signals thereof
CN101927775B (en) Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN110920694A (en) Switching method for interconnection and intercommunication of CBTC (communication based train control) system and CTCS (China train control System)
CN113335350A (en) Train autonomous operation system for interconnection, intercommunication, collinear operation and overline operation
CN103723168B (en) A kind of CBTC train number window takies the system that display is Tong Bu with track section
CN109677461A (en) Truck traffic train control system based on block chain technology
TW201731712A (en) Vehicle control system, traveling management device, resource management device, vehicle control method, and program
CN111806484A (en) Train door and platform door fault isolation control method, device and system
CN111645728A (en) Interconnection-based urban rail transit train handover method
CN112124358A (en) System and method for realizing switching from automatic inter-station block to mobile block
CN113320574A (en) TACS and CTCS fused signal system
CN106672017A (en) Rail transit turnout remote control system based on mobile terminal and method
CN104309652A (en) Intelligent tramcar signal system
CN114179872B (en) Remote RM switching method for full-automatic running train
CN114454918A (en) Method and system for improving vehicle receiving and dispatching efficiency in station
CN211844457U (en) Full-automatic unmanned system for inter-city railway
CN105882689B (en) Expanding element in inter-city passenger rail autonomy-oriented row control vehicle-mounted system
CN103303343A (en) Train network control method of automatic stop announcement of PIS
CN116176662B (en) Train control system and method for CTCS and CBTC line crossing operation
JP2011246015A (en) Radio railroad crossing control system
CN109649450A (en) It is a kind of heavy duty movable block under Automatic inter-station block control method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant