CN106651647A - Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method - Google Patents

Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method Download PDF

Info

Publication number
CN106651647A
CN106651647A CN201611074754.7A CN201611074754A CN106651647A CN 106651647 A CN106651647 A CN 106651647A CN 201611074754 A CN201611074754 A CN 201611074754A CN 106651647 A CN106651647 A CN 106651647A
Authority
CN
China
Prior art keywords
peace
preview
arranges
pressing plate
arrange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611074754.7A
Other languages
Chinese (zh)
Inventor
徐晓春
许家焰
汤同峰
王�华
袁宇波
范堃
王涛
牛智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd, State Grid Corp of China SGCC, HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN201611074754.7A priority Critical patent/CN106651647A/en
Publication of CN106651647A publication Critical patent/CN106651647A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method, which comprises the steps of 1, initializing model data, a secondary overhauling safety measure anti-misoperation rule base, a secondary circuit visualization unit and a front-end communication unit of a substation, and constructing an implementation environment; 2, confirming an overhauling operation object on a display interface in the secondary circuit visualization unit according to a secondary overhauling safety measure work task, and recognizing a rehearsed safety measure process type after rehearsal is confirmed to start; 3, starting to rehearse a safety measure item, performing anti-misoperation check diagnosis on the rehearsed safety measure item, if a diagnosis result passes, executing a rehearsal result, if the diagnosis result does not pass, reporting an error and a reason and prohibiting execution of the rehearsal; and 4, judging whether the rehearsal is over or not, if not, returning back to the step 3, if so, performing leak checking, then generating a simulation rehearsal report, storing and printing a safety measure ticket, restoring to the state before the rehearsal, and finally returning to the step 2.

Description

A kind of substation secondary maintenance peace arranges simulation to preview and anti-error check method
Technical field
The present invention relates to substation secondary maintenance field, and in particular to a kind of substation secondary maintenance peace arrange simulation preview and Anti-error check method.
Background technology
As intelligent substation constantly puts into operation, intelligent substation technology brings a series of for the construction of intelligent grid Change and good benefit.Intelligent substation optical fiber instead of secondary cable and save substantial amounts of construction cost, and whole station is based on SCD model files, the secondary terminals of conventional substation and loop become sightless empty terminal and empty loop, by optical fiber structure Original secondary physical return circuit is realized in the GOOSE and SV communication for building process layer.The not only increasing of secondary device and the network switch Plus network structure is complicated, and the physical loop connection of reality becomes empty loop, virtually increases to secondary maintenance Difficulty and potential safety hazard are added.
The many technologies for having adopted at present, such as SCD model visualizations, SCD management and control and Quadratic Imaginary loop visualize, and are all In order to contribute to intelligent substation secondary O&M, ensure that secondary maintenance peace arranges the enforcement of work to a certain extent, but for intelligence The technical support that energy substation secondary maintenance peace is arranged is also still not enough, it is difficult to ensures that the correctness arranged is pacified in secondary maintenance, easily goes out Existing maloperation.
The content of the invention
In order to overcome the shortcomings of above-mentioned prior art, it is an object of the invention to provide a kind of substation secondary maintenance peace arranges mould Intend preview and anti-error check method, be that intelligent substation secondary O&M maintainer carries out secondary maintenance peace and arranges offer technical support And supplementary means, ensure the correctness that secondary maintenance peace is arranged, it is to avoid maloperation occur.
The present invention is achieved through the following technical solutions:
A kind of substation secondary maintenance peace arranges simulation to preview and anti-error check method, comprises the following steps:
Step 1:Initialization transformer station model data, secondary maintenance peace arrange anit-misoperation rules storehouse, secondary circuit visualization and Preposition communication unit, structure realizes environment;
Step 2:Step 1 realization environmentally, task is arranged according to secondary maintenance peace, in secondary circuit visualization Displaying interface confirm inspection operation object, confirmation starts after preview, and identification preview peace arranges procedural type;
Step 3:Start to preview peace and arrange project, according to the rule that secondary maintenance peace arranges anit-misoperation rules storehouse to set, the peace to previewing is arranged Project carries out anti-error check and diagnoses, if diagnostic result passes through, performs preview result, if diagnostic result does not pass through, report is wrong Miss and reason, and forbid performing preview;
Step 4:Judge whether to terminate preview, if the result is negative, then return to step 3, if result is yes, carry out leakage detection check, Then simulation preview report is generated, then is preserved and is printed peace and arrange ticket, and recover to preview front state, finally return to step 2.
The further scheme of the present invention is, in the step 1, the secondary maintenance peace arranges anit-misoperation rules storehouse to include typical case Peace arranges order storehouse and the soft pressing plate criterion storehouses of GOOSE;The all intervals of the secondary circuit visualization visual presentation transformer station Show interface with the secondary circuit graph of all devices, secondary circuit graph shows that interface includes that starting/terminate/recover preview presses The soft pressing plate list of button, secondary circuit graph and defencive function, wherein secondary circuit graph include secondary device, secondary circuit on line, The soft pressing plate of empty terminal, GOOSE, SV receive soft pressing plate, overhaul hard pressing plate, export hard pressing plate, PT/CT in flakes and Optical fiber plug, protect The soft pressing plate information of function that protection device is chosen in secondary circuit graph is shown in the soft pressing plate list of protective function;The preposition communication Unit by the Real-time Collection secondary device status information that communicates with secondary device, keep the soft pressing plates of GOOSE, SV receive soft pressing plate, The real-time status of the soft pressing plate of defencive function and the hard pressing plate of maintenance.
The further scheme of the present invention is, in the step 2, the preview peace is arranged procedural type to include that preview peace is arranged and held Row process and preview peace arrange recovery process, recognize that previewed peace arranges procedural type by the hard pressing plate current state of trouble hunt ing, Hard pressing plate current state is overhauled to be point then that preview peace arranges implementation procedure, current state is then that preview peace arranges recovery process to close, Peace arranges recovery process to arrange implementation procedure contrary with peace, it then follows first carry out rear restoration principles.
The further scheme of the present invention is, in the step 3, the anti-error check arranges procedural type to adopt according to preview peace Anit-misoperation rules strategy is arranged with contrary secondary maintenance peace.
The present invention further scheme be, in the step 4, it is described simulation preview report content include report time, Correct peace arranges project, the peace of maloperation to arrange project and error reason, the peace of omission to arrange project and overall assessment.
Present invention advantage compared with prior art is:
Allow secondary O&M maintainer to pass through simulation preview and be familiar with the action that secondary maintenance peace is arranged, while by anti-error check The secondary maintenance validity arranged of peace and correctness are able to verify that, can effectively aid in secondary maintenance peace to arrange operation, it is to avoid generation maloperation Electric power netting safe running is affected, with immeasurable economic benefit.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
A kind of substation secondary maintenance peace as shown in Figure 1 arranges simulation to preview and anti-error check method, comprises the following steps:
Step 1:Initialization transformer station model data, secondary maintenance peace arrange anit-misoperation rules storehouse, secondary circuit visualization and Preposition communication unit, structure realizes environment;It is to arrange correlation to advise according to secondary maintenance peace that the secondary maintenance peace arranges anit-misoperation rules storehouse Model and require a series of for arranging simulation preview operation to carry out the tactful criterions of anti-error check for secondary maintenance peace, the bag formulated Include typical case's peace and arrange order storehouse and the soft pressing plate criterion storehouses of GOOSE, Programmable Design can be realized;The secondary circuit visualization can Show interface depending on changing the secondary circuit graph for showing all intervals of intelligent substation and all devices, secondary circuit graph shows in interface Including starting/terminating/recovering preview button, secondary circuit graph and the soft pressing plate list of defencive function, wherein starting/terminating/recover Preview button is a function button for carrying out three kinds of status function switchings, and secondary circuit graph includes secondary device, secondary returning Road on line, empty terminal, the soft pressing plates of GOOSE, SV receive soft pressing plate, overhaul hard pressing plate, export hard pressing plate, PT/CT in flakes and optical fiber Plug, shows the soft pressing plate information of function that protection device is chosen in secondary circuit graph in the soft pressing plate list of defencive function;It is described Preposition communication unit keeps the soft pressing plates of GOOSE, SV to receive by the Real-time Collection secondary device status information that communicates with secondary device The real-time status of the soft pressing plate of soft pressing plate, defencive function and the hard pressing plate of maintenance.
Step 2:Step 1 realization environmentally, task is arranged according to secondary maintenance peace, it is single in secondary circuit visualization Inspection operation object is opened in unit(Maintenance interval or device)Displaying interface confirm determine working range, confirmation start preview Afterwards, identification preview peace arranges procedural type;It is extensive that the preview peace arranges procedural type to include that preview peace arranges implementation procedure and preview peace to arrange Multiple process, recognizes that previewed peace arranges procedural type, overhauls hard pressing plate current state by the hard pressing plate current state of trouble hunt ing To be point then that preview peace arranges implementation procedure, current state is then that preview peace arranges recovery process, peace to arrange recovery process to arrange with peace to close Implementation procedure is contrary, it then follows first carry out rear restoration principles;Two kinds of preview peaces arrange procedural type to determine that follow-up anti-error check is adopted Anit-misoperation rules strategy is arranged with contrary secondary maintenance peace.
Step 3:Show that triggering starts to preview button on interface in secondary circuit graph, start to preview peace and arrange project, select one Individual peace arranges the secondary maintenance peace of element preview operation one to arrange content, and it is that secondary maintenance peace arranges operation object that the peace arranges element, bag Include the soft pressing plates of GOOSE, SV to receive soft pressing plate, the soft pressing plate of defencive function, overhaul hard pressing plate, export hard pressing plate, PT/CT in flakes and light Fine plug, according to the rule that secondary maintenance peace arranges anit-misoperation rules storehouse to set, the peace to previewing arranges project to carry out anti-error check diagnosis, If diagnostic result passes through, preview result is performed, if diagnostic result does not pass through, report mistake and reason, and forbid execution pre- Drill;
Step 4:Judge whether to terminate preview, if the result is negative, then return to step 3, if result is yes, pacify according to secondary maintenance Arrange anit-misoperation rules strategy, with reference to maintenance object secondary circuit data leakage detection check is carried out, check for omitting must grasp The peace of work arranges project, then generates simulation preview report, then preserves and prints peace and arrange ticket, and triggers recovery preview button, recovery Peace arranges elementary state before preview, completes whole secondary maintenance peace and arranges simulation preview flow process, finally returns to step 2;The simulation is pre- Drill report content arranges project, the peace of maloperation to arrange project and error reason, the peace of omission to arrange item including report time, correct peace Mesh and overall assessment, overall assessment is to provide the total result that correct peace is arranged or problem peace is arranged for simulation preview process, is existed Problem peace is evaluated as when maloperation and omission operation to arrange, simulation preview report content should save as file is used for Reports Administration, and Support report printing function;Meanwhile, the correct of implementation procedure and the peace of omission can be arranged to arrange project according to secondary maintenance preview peace Peace is arranged specification and the form of requirement to save as peace and arrange and ticket and prints peace and arrange ticket.
In the present embodiment, for cannot by preposition communication unit obtain peace arrange element real-time status when, can manually put Several modes arrange peace arrange element state after again the secondary maintenance peace of simulated preview arrange process.
In the present embodiment, simulation preview report needs are stored as simulation preview report file is used for Reports Administration, file Name format is defined as:Time _ the ID_ that stands intervals ID_ devices ID_ evaluates .simrep, wherein, time format is orientated as:Year(4 Position)Month(2)Day(2)When(2)Point(2)Second(2), device ID is 0 during the maintenance simulation preview of interval, and device ID has tool Body value represents single turnaround of unit simulation preview, evaluates and is arranged with the correct peace of O representatives, represents problem peace with Q and arranges, and file need to be stored in finger Under determining path, file content form is defined as follows shown using XML format.
The present invention is not limited merely in intelligent substation application, carry out being suitably modified in accordance with inventive concept and principle and Adjustment, energy expanded application arranges simulation to preview and anti-error check in the secondary maintenance peace of conventional substation;Meanwhile, the present invention can be answered Use a kind of secondary maintenance peace and arrange in-service monitoring and anti-error system or similar system, as a critical function mould of such system Block.

Claims (5)

1. a kind of substation secondary maintenance peace arranges simulation to preview and anti-error check method, it is characterised in that comprise the following steps:
Step 1:Initialization transformer station model data, secondary maintenance peace arrange anit-misoperation rules storehouse, secondary circuit visualization and Preposition communication unit, structure realizes environment;
Step 2:Step 1 realization environmentally, task is arranged according to secondary maintenance peace, in secondary circuit visualization Displaying interface confirm inspection operation object, confirmation starts after preview, and identification preview peace arranges procedural type;
Step 3:Start to preview peace and arrange project, according to the rule that secondary maintenance peace arranges anit-misoperation rules storehouse to set, the peace to previewing is arranged Project carries out anti-error check and diagnoses, if diagnostic result passes through, performs preview result, if diagnostic result does not pass through, report is wrong Miss and reason, and forbid performing preview;
Step 4:Judge whether to terminate preview, if the result is negative, then return to step 3, if result is yes, carry out leakage detection check, Then simulation preview report is generated, then is preserved and is printed peace and arrange ticket, and recover to preview front state, finally return to step 2.
2. a kind of substation secondary maintenance peace as claimed in claim 1 arranges simulation preview and anti-error check method, its feature to exist In:In the step 1, the secondary maintenance peace arranges anit-misoperation rules storehouse to include that typical case's peace arranges order storehouse and the soft pressing plates of GOOSE to sentence According to storehouse;The secondary circuit graph of all intervals of secondary circuit visualization visual presentation transformer station and all devices shows Interface, secondary circuit graph shows that interface includes starting/terminating/recover preview button, secondary circuit graph and the soft pressure of defencive function Panel table, wherein secondary circuit graph include that secondary device, secondary circuit on line, empty terminal, the soft pressing plates of GOOSE, SV receive soft Pressing plate, overhaul hard pressing plate, export hard pressing plate, PT/CT in flakes and Optical fiber plug, in the soft pressing plate list of defencive function secondary returning is shown The soft pressing plate information of function of protection device is chosen on the figure of road;The preposition communication unit is adopted in real time by communicating with secondary device Collection secondary device status information, keeps the soft pressing plates of GOOSE, SV to receive soft pressing plate, the soft pressing plate of defencive function and overhaul hard pressing plate Real-time status.
3. a kind of substation secondary maintenance peace as claimed in claim 1 arranges simulation preview and anti-error check method, its feature to exist In:In the step 2, the preview peace arranges procedural type to include that preview peace arranges implementation procedure and preview peace to arrange recovery process, Recognize that previewed peace arranges procedural type by the hard pressing plate current state of trouble hunt ing, overhaul hard pressing plate current state point to be then Preview peace arranges implementation procedure, and current state is then that preview peace arranges recovery process to close, and peace arranges recovery process and peace to arrange implementation procedure On the contrary, it then follows first carry out rear restoration principles.
4. a kind of substation secondary maintenance peace as claimed in claim 1 arranges simulation preview and anti-error check method, its feature to exist In:In the step 3, the anti-error check arranges procedural type to arrange anti-error rule using contrary secondary maintenance peace according to preview peace It is then tactful.
5. the secondary maintenance peace of one kind according to claim 1 arranges simulation to preview and anti-error check method, it is characterised in that: In the step 4, the simulation preview report content includes that report time, correct peace arrange project, the peace of maloperation to arrange project And error reason, the peace omitted arrange project and overall assessment.
CN201611074754.7A 2016-11-30 2016-11-30 Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method Pending CN106651647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611074754.7A CN106651647A (en) 2016-11-30 2016-11-30 Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611074754.7A CN106651647A (en) 2016-11-30 2016-11-30 Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method

Publications (1)

Publication Number Publication Date
CN106651647A true CN106651647A (en) 2017-05-10

Family

ID=58813239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611074754.7A Pending CN106651647A (en) 2016-11-30 2016-11-30 Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method

Country Status (1)

Country Link
CN (1) CN106651647A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107546854A (en) * 2017-09-12 2018-01-05 国家电网公司 Transformer station's pressing plate method for preventing misoperation and device
CN108197716A (en) * 2017-12-20 2018-06-22 囯网河北省电力有限公司电力科学研究院 Secondary equipment of intelligent converting station safety measure previews online and anti-error method for early warning
CN110070189A (en) * 2018-01-23 2019-07-30 上海毅昊信息科技股份有限公司 A kind of intelligent substation protection system peace arranges check method
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN110647054A (en) * 2019-09-25 2020-01-03 石一峰 Substation primary equipment state simulation rehearsal system and error-proof checking method
CN112865315A (en) * 2021-01-22 2021-05-28 零代码智能科技(苏州)有限公司 Intelligent substation safety measure operation checking method based on signal simulation
CN113743139A (en) * 2021-08-03 2021-12-03 国网福建省电力有限公司检修分公司 RFID-based overlapping safety measure judging method and terminal

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105914892A (en) * 2016-06-16 2016-08-31 国网福建省电力有限公司 Secondary maintenance safety measure ticket system and realization method thereof
CN106058695A (en) * 2016-06-16 2016-10-26 国网福建省电力有限公司 Relay protection visual overhauling safety measure system based on substation configuration description (SCD) and implementation method thereof
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105914892A (en) * 2016-06-16 2016-08-31 国网福建省电力有限公司 Secondary maintenance safety measure ticket system and realization method thereof
CN106058695A (en) * 2016-06-16 2016-10-26 国网福建省电力有限公司 Relay protection visual overhauling safety measure system based on substation configuration description (SCD) and implementation method thereof
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107546854A (en) * 2017-09-12 2018-01-05 国家电网公司 Transformer station's pressing plate method for preventing misoperation and device
CN107546854B (en) * 2017-09-12 2020-06-05 国家电网公司 Transformer substation pressure plate anti-misoperation method and device
CN108197716A (en) * 2017-12-20 2018-06-22 囯网河北省电力有限公司电力科学研究院 Secondary equipment of intelligent converting station safety measure previews online and anti-error method for early warning
CN110070189A (en) * 2018-01-23 2019-07-30 上海毅昊信息科技股份有限公司 A kind of intelligent substation protection system peace arranges check method
CN110070189B (en) * 2018-01-23 2023-05-23 福建永福数字能源技术有限公司 Intelligent substation protection system safety measure checking method
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN110571929B (en) * 2019-09-09 2021-10-22 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN110647054A (en) * 2019-09-25 2020-01-03 石一峰 Substation primary equipment state simulation rehearsal system and error-proof checking method
CN112865315A (en) * 2021-01-22 2021-05-28 零代码智能科技(苏州)有限公司 Intelligent substation safety measure operation checking method based on signal simulation
CN113743139A (en) * 2021-08-03 2021-12-03 国网福建省电力有限公司检修分公司 RFID-based overlapping safety measure judging method and terminal

Similar Documents

Publication Publication Date Title
CN106651647A (en) Substation secondary overhauling safety measure simulation rehearsal and anti-misoperation checking method
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN106340818B (en) Intelligent substation relay protection device maintenance peace arranges assistant analysis method for early warning
CN103400516B (en) Dispatching automation simulation training system and method
Yoo et al. Smart support system for diagnosing severe accidents in nuclear power plants
CN104680905B (en) A kind of teaching process automatic monitoring system and monitoring method for being applied to experimental teaching
CN105429027A (en) Secondary safety measure support system in operation and maintenance of intelligent substation and construction method
CN107546854B (en) Transformer substation pressure plate anti-misoperation method and device
CN107147214A (en) A kind of secondary peace suitable for intelligent substation arranges monitoring system
CN102497024A (en) Intelligent warning system based on integer programming
CN105958644A (en) Pressing plate information management system for intelligent transformer station
CN103941240A (en) Radar system communication extension detection device and detection methods
CN110231530A (en) A kind of relay protection automatic Verification method
CN104808516A (en) Electrical equipment operation control method and device
CN110277833A (en) The method and terminal device of substation's pressing plate state recognition
CN109001596A (en) A kind of electric network failure diagnosis and transmission line parameter identification system
CN107563520A (en) A kind of intelligent substation secondary safety measure method for visualizing
CN106292499A (en) The safe related function method and device of secondary equipment of intelligent converting station O&M operation object
CN213241152U (en) Relay protection auxiliary terminal
CN101299534A (en) Power system temporary stability and thermal stabilization cooperativeness emergency control method
CN106532690A (en) Online verification and intelligent diagnosis method for state of substation secondary equipment
CN106527229A (en) Method for misoperation-preventing locking of transformer station secondary overhaul remote control operation
CN102073680B (en) Data switching method and system of nuclear simulation platform and configuration management system
CN206058696U (en) Realize the FPGA brassboards of independent debugging checking
CN104391872A (en) Logic consistency calibration method for single line diagrams of PMS (plant management system) and error prevention system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510