Power grid accident auxiliary processing method and system Download PDFInfo
- Publication number
- CN106651198A CN106651198A CN201611246105.0A CN201611246105A CN106651198A CN 106651198 A CN106651198 A CN 106651198A CN 201611246105 A CN201611246105 A CN 201611246105A CN 106651198 A CN106651198 A CN 106651198A
- Authority
- CN
- China
- Prior art keywords
- accident
- information
- power grid
- management module
- history
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 5
- 238000000034 method Methods 0.000 claims abstract description 72
- 230000008569 process Effects 0.000 claims abstract description 52
- 238000012545 processing Methods 0.000 claims abstract description 23
- 230000001276 controlling effect Effects 0.000 claims description 13
- 238000010586 diagram Methods 0.000 claims description 9
- 230000004044 response Effects 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000012800 visualization Methods 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 35
- 230000008859 change Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000002845 discoloration Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000013024 troubleshooting Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 241001269238 Data Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 238000005111 flow chemistry technique Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a power grid accident auxiliary processing method and system and relates to the technical field of power system accident processing. On the basis of a D5000 smart power grid dispatching control platform, after an accident occurs, accident information and related parameter information are searched; process guidance and analysis processing are carried out on the accident through a standard processing process preset in a process management module; and moreover, a case report file is generated according to the whole processing process and the case report file stored. Through application of the method and the system, the daily working intensity of power dispatchers is mitigated, the complicated power grid accident processing process is standardized, the power grid accident processing capability of a dispatching center is improved, and the power grid accident processing accuracy and speed are ensured.
Description
Technical field
The present invention relates to power system accident processing technology field, more particularly to a kind of power grid accident aid in treatment method
And its system.
Background technology
Regulation and control center is the organ of electric network accident management, and when electrical network occurs accident, dispatcher should immediately according to electricity
Net the current method of operation, abnormal signal and phenomenon etc. rapidly to judge accident, and processed according to standardization flow process, power
Strive user is restored electricity within the most short time, to reduce the impact that accident is caused;At present, electric company generally builds application
D5000 intelligent grid scheduling controlling platforms, the platform is the intelligent grid supporting system technology basic platform of a new generation,
The requirement of Pyatyi scheduling controlling system in State Grid Corporation of China's " big operation " system is adapted to, has been realized and " is remotely had access to, alerts directly
The function of biography, lateral direction penetrating, vertical management ";Each item datas such as operation plan, water situation, meteorological change are all merged one
Rise, can be analyzed comprehensively.
In practical application, each department have each been put into effect different due to the difference of actual conditions《Dispatching of power netwoks control management
Code》, have different regulations to corresponding troubleshooting process.Therefore, D5000 systems can not be supplied at present power scheduling
Member is instructed and flow process guiding with clear and definite accident treatment, especially when there is bus-bar fault, loss of voltage failure, Accident of Transformer
Or during the 110 complicated failure such as KV failure, power dispatcher cannot find out thing from substantial amounts of system information rapidly
Therefore point, also without concrete case with reference to flow processing is standardized, so as to the accident treatment time can be delayed, affect power supply extensive
It is multiple, cause unnecessary economic loss.
The content of the invention
The technical problem to be solved in the present invention is for above-mentioned the deficiencies in the prior art, there is provided at a kind of power grid accident auxiliary
Reason method and its system, based on D5000 intelligent grid scheduling controlling platforms, for power dispatcher a kind of convenient intuitively thing are provided
Therefore guiding is processed, and the working strength of power dispatcher is alleviated, the electric network accident management process standard of complexity is made, larger carries
Rise regulation and control Central Grid capability in handling accident, it is ensured that the accuracy of electric network accident management and swiftness.
To solve above-mentioned technical problem, the technical solution used in the present invention is:
A kind of power grid accident aid in treatment method, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that including following
Step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform
Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification
Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound
Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step
(4)According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset correspondence
The number of incident classification;And whole processing procedure record generates history accident file and is stored.
Based on said method, the present invention provides a kind of power grid accident secondary treatment system, including information search module, flow process
Management module, SMS transmission module, history Incident Management module, database and terminal workstation, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid Dispatching Control Systems are provided
Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune
Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only
Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text
Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note
Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported
Row is in the terminal workstation.
Preferably, the workflow management module at least includes bus-bar fault and loss of voltage failure disposal process, transformer
Accident handling flow process and 110 KV fault trip disposal process.
Preferably, the workflow management module includes edit cell, for carrying out to preset accident criterion handling process
Increase, delete or change.
Preferably, under different disposal state, the block diagram color of the workflow management module is different.
Preferably, the process status color is defined as red representative and does not complete, and green is represented and completed.
Preferably, the history Incident Management module includes lead-out unit, for history accident record file to be exported as
Case form.
Preferably, the history Incident Management module includes retrieval unit, and input keyword can be inquired to be gone through accordingly
Historical event event log file.
It is using the beneficial effect produced by above-mentioned technical proposal:
The present invention is based on existing D5000 intelligent grids scheduling controlling platform, after accident occurs, collects accident information and related ginseng
Number information, by the preset standardization flow process of workflow management module process and flow process guiding are analyzed to accident, and
Whole processing procedure can be formed case file storage, alleviate the working strength of power dispatcher, make the electrical network thing of complexity
Therefore handling process is standardized, larger improves regulation and control Central Grid capability in handling accident, it is ensured that the standard of electric network accident management
True property and swiftness.
Also, the preset standardization flow process of workflow management module can at any time be increased, deleted or be changed, with
Different situations and regulation of each department to accident treatment are adapted to, it is easy to use beneficial to popularization.
Description of the drawings
Fig. 1 is method of the present invention flow chart;
Fig. 2 is the system module structure chart of the present invention;
Fig. 3 is the embodiment of 110kV line fault tripping fault standardization flow processs.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is further detailed explanation.
As shown in figure 1, be the inventive method schematic flow sheet, based on D5000 intelligent grid scheduling controlling platforms, including with
Lower step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform
Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification
Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound
Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step
(4)According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset correspondence
The number of incident classification;And whole processing procedure record generates history accident file and is stored.
As shown in Fig. 2 be the system module structure chart of the present invention, including information search module, workflow management module, note
Sending module, history Incident Management module, database and terminal workstation, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid scheduling controlling platforms are provided
Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune
Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only
Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text
Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note
Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported
Row is in the terminal workstation;
System adopts LabVIEW Measurement index, simple interface, clear logic, easy left-hand seat, workable, can
The accident treatment flow process of convenient pre-set criteria, can also be increased normal process by edit cell, deleted or repaiied
Change.
It is described in detail as an embodiment with the accident treatment after the generation of 35kV #2 buses emergency stop valve trip below, 35kV
After #2 bus emergency stop valve trips accident occurs, dispatcher selects bus-bar fault handling process in terminal workstation, then occur such as
FB(flow block) interface shown in Fig. 3, each block diagram is a processing links, clicks on accident information collection analysis block diagram, system
Information search module collects the accident information and parameter letter related to the faulty equipment from D5000 intelligent grid scheduling controllings platform
Breath, including bus protection operating state, each switch failure separating brake working condition;After the completion of the accident information collection analysis block diagram face
Discoloration is green, can carry out next step, clicks on major event and judges that system is according to incident classification decision rule pair set in advance
The data are judged, if major accident then reports province's tune, if ordinary accident then notifies relevant unit, report advice method
It is that accident information is sent by SMS module;Respective block diagram discoloration, proceeds next step and tentatively disposes after the completion of report, according to
FB(flow block) is guided, and successively completes each step process up to troubleshooting, and final step is filed to report, then by result
Predetermined number is sent to, whole processing procedure record storage is history accident file.
The history Incident Management module contains lead-out unit, processed accident histories record can be exported as into case
Example form, is applied to the training to new employee, also includes search unit, and input keyword quickly can find from database
Corresponding history accident file.
Normal process in workflow management module contain bus-bar fault and loss of voltage failure, Accident of Transformer and
The flow process of the complicated process steps such as 110 KV fault trips, according to standard process flow《Dispatching of power netwoks control management rule
Journey》And expertise optimization summary show that standard process flow can easily be modified, edits, increases newly and deleted
Deng operation, it is adaptable to the different process regulation in different regions.
After above-mentioned technical proposal, specification accident handling process reduces human factor to electric network accident management
Affect, even if the young dispatcher of experiences of power accidents disposal shortcoming can also accomplish without any confusion, to process when power grid accident is processed
It is proper;So as to alleviate dispatcher's routine work intensity, Dispatch Safety operation and management level is improved, improve electric network accident management
Accuracy, rapidity, to the reliable operation of power grid security, improve the accuracy of accident treatment and swiftness show with great
Sincere justice.
Presently preferred embodiments of the present invention is the foregoing is only, not to limit the present invention, all essences in the present invention
Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.
Claims (8)
1. a kind of power grid accident aid in treatment method, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that include with
Lower step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform
Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification
Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound
Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step 4
According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset corresponding thing
Therefore the number of grade, and entirely processing procedure record generates history accident file and is stored.
2. a kind of power grid accident secondary treatment system, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that:This is
System includes information search module, workflow management module, SMS transmission module, history Incident Management module, database and terminal
Work station, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid Dispatching Control Systems are provided
Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune
Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only
Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text
Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note
Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported
Row is in the terminal workstation.
3. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the workflow management module
At least include bus-bar fault and loss of voltage failure disposal process, Accident of Transformer disposal process and 110 KV failures
Tripping operation disposal process.
4. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the workflow management module
Including edit cell, for preset accident criterion handling process to be increased, deleted or is changed.
5. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that under different disposal state, institute
The block diagram color for stating workflow management module is different.
6. a kind of power grid accident secondary treatment system according to claim 5, it is characterised in that the process status color
It is defined as red representative not completing, green is represented and completed.
7. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the history Incident Management
Module includes lead-out unit, for history accident record file to be exported as into case form.
8. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the history Incident Management
Module includes retrieval unit, and input keyword can inquire corresponding history accident record file.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611246105.0A CN106651198B (en) | 2016-12-29 | 2016-12-29 | Power grid accident auxiliary processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611246105.0A CN106651198B (en) | 2016-12-29 | 2016-12-29 | Power grid accident auxiliary processing method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106651198A true CN106651198A (en) | 2017-05-10 |
CN106651198B CN106651198B (en) | 2020-08-28 |
Family
ID=58836100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611246105.0A Active CN106651198B (en) | 2016-12-29 | 2016-12-29 | Power grid accident auxiliary processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106651198B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108694491A (en) * | 2018-03-31 | 2018-10-23 | 南京北冶机电设备有限公司 | A kind of thermal power plant scheduling system |
CN109086983A (en) * | 2018-07-19 | 2018-12-25 | 国网辽宁省电力有限公司盘锦供电公司 | Dispatching of power netwoks accident treatment householder method and system |
CN113285427A (en) * | 2021-05-12 | 2021-08-20 | 国网江苏省电力有限公司南通供电分公司 | Distribution network line accident trip alarm method based on automatic time sequence graph deduction |
CN113964946A (en) * | 2021-11-08 | 2022-01-21 | 国网山东省电力公司胶州市供电公司 | Power grid fault information rapid reporting system and method |
CN115130864A (en) * | 2022-06-30 | 2022-09-30 | 国网山东省电力公司济南市历城区供电公司 | Management method and system for power grid regulation and control operation workflow |
US11481581B2 (en) | 2018-08-23 | 2022-10-25 | Florida Power & Light Company | Proactive power outage impact adjustments via machine learning |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104036374A (en) * | 2014-07-08 | 2014-09-10 | 国网辽宁省电力有限公司 | Method for assisting in disposing operating accidents of power grid |
CN104753178A (en) * | 2015-04-16 | 2015-07-01 | 河南行知专利服务有限公司 | Power grid fault handling system |
CN104977870A (en) * | 2015-07-27 | 2015-10-14 | 中国科学院自动化研究所 | Auxiliary treating system for workshop equipment accidents and method thereof |
-
2016
- 2016-12-29 CN CN201611246105.0A patent/CN106651198B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104036374A (en) * | 2014-07-08 | 2014-09-10 | 国网辽宁省电力有限公司 | Method for assisting in disposing operating accidents of power grid |
CN104753178A (en) * | 2015-04-16 | 2015-07-01 | 河南行知专利服务有限公司 | Power grid fault handling system |
CN104977870A (en) * | 2015-07-27 | 2015-10-14 | 中国科学院自动化研究所 | Auxiliary treating system for workshop equipment accidents and method thereof |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108694491A (en) * | 2018-03-31 | 2018-10-23 | 南京北冶机电设备有限公司 | A kind of thermal power plant scheduling system |
CN109086983A (en) * | 2018-07-19 | 2018-12-25 | 国网辽宁省电力有限公司盘锦供电公司 | Dispatching of power netwoks accident treatment householder method and system |
US11481581B2 (en) | 2018-08-23 | 2022-10-25 | Florida Power & Light Company | Proactive power outage impact adjustments via machine learning |
CN113285427A (en) * | 2021-05-12 | 2021-08-20 | 国网江苏省电力有限公司南通供电分公司 | Distribution network line accident trip alarm method based on automatic time sequence graph deduction |
CN113964946A (en) * | 2021-11-08 | 2022-01-21 | 国网山东省电力公司胶州市供电公司 | Power grid fault information rapid reporting system and method |
CN115130864A (en) * | 2022-06-30 | 2022-09-30 | 国网山东省电力公司济南市历城区供电公司 | Management method and system for power grid regulation and control operation workflow |
Also Published As
Publication number | Publication date |
---|---|
CN106651198B (en) | 2020-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106651198A (en) | Power grid accident auxiliary processing method and system | |
CN102638100B (en) | District power network equipment abnormal alarm signal association analysis and diagnosis method | |
CN110674189B (en) | Method for monitoring secondary state and positioning fault of intelligent substation | |
CN103903075B (en) | Protection device constant value automatic management method based on fuzzy matching | |
CN105245185A (en) | Regional distributed photovoltaic fault diagnosis system and method for access power distribution network | |
CN107846011A (en) | A kind of distribution network failure restoration methods based on main distribution Collaborative Control | |
CN108537433B (en) | Regional power grid risk early warning method based on multidimensional evaluation indexes | |
CN109639477B (en) | Secondary equipment online monitoring and analyzing system and method | |
CN108233536A (en) | A kind of intelligent program remote handling system | |
CN109787356B (en) | Transformer substation remote control anti-misoperation method and system based on IEC61850 protocol | |
CN107798395A (en) | A kind of power grid accident signal automatic diagnosis method and system | |
CN101833324B (en) | Intelligent fault diagnosis system in tread extrusion process and diagnosis method thereof | |
CN103326467A (en) | Protection action report implementation method based on information protection main station device recorded information | |
CN108494089B (en) | Rapid, safe and reliable batch remote control method for limited-circuit pull circuits | |
CN110348690B (en) | Tree search based result query menu grid accident auxiliary decision making system and method | |
CN109062993A (en) | Method and device for generating offline power grid fault handling plan | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN111768076A (en) | Monitoring alarm signal clustering method taking power grid event as center | |
CN104091243A (en) | Intelligent switching operation ticket mechanism designing and achieving method | |
CN105245001A (en) | Event-driven intelligent alarm processing method and device for transformer station accidents | |
CN113409162A (en) | Centralized control station equipment monitoring system and control method based on intelligent event processing | |
CN108629526A (en) | A kind of accident presentation method based on automation system for the power network dispatching | |
CN108090674A (en) | The risk assessment of the area power grid method of operation and aid decision-making method and system | |
CN112769231A (en) | Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system | |
CN115693951A (en) | Second-level intelligent operation sequence control method based on power grid OCS (online charging system) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |