CN106651198A - Power grid accident auxiliary processing method and system - Google Patents

Power grid accident auxiliary processing method and system Download PDF

Info

Publication number
CN106651198A
CN106651198A CN201611246105.0A CN201611246105A CN106651198A CN 106651198 A CN106651198 A CN 106651198A CN 201611246105 A CN201611246105 A CN 201611246105A CN 106651198 A CN106651198 A CN 106651198A
Authority
CN
China
Prior art keywords
accident
information
power grid
management module
history
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611246105.0A
Other languages
Chinese (zh)
Other versions
CN106651198B (en
Inventor
刘桂霜
李建文
李世涛
马召鼎
余林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611246105.0A priority Critical patent/CN106651198B/en
Publication of CN106651198A publication Critical patent/CN106651198A/en
Application granted granted Critical
Publication of CN106651198B publication Critical patent/CN106651198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power grid accident auxiliary processing method and system and relates to the technical field of power system accident processing. On the basis of a D5000 smart power grid dispatching control platform, after an accident occurs, accident information and related parameter information are searched; process guidance and analysis processing are carried out on the accident through a standard processing process preset in a process management module; and moreover, a case report file is generated according to the whole processing process and the case report file stored. Through application of the method and the system, the daily working intensity of power dispatchers is mitigated, the complicated power grid accident processing process is standardized, the power grid accident processing capability of a dispatching center is improved, and the power grid accident processing accuracy and speed are ensured.

Description

A kind of power grid accident aid in treatment method and its system
Technical field
The present invention relates to power system accident processing technology field, more particularly to a kind of power grid accident aid in treatment method And its system.
Background technology
Regulation and control center is the organ of electric network accident management, and when electrical network occurs accident, dispatcher should immediately according to electricity Net the current method of operation, abnormal signal and phenomenon etc. rapidly to judge accident, and processed according to standardization flow process, power Strive user is restored electricity within the most short time, to reduce the impact that accident is caused;At present, electric company generally builds application D5000 intelligent grid scheduling controlling platforms, the platform is the intelligent grid supporting system technology basic platform of a new generation, The requirement of Pyatyi scheduling controlling system in State Grid Corporation of China's " big operation " system is adapted to, has been realized and " is remotely had access to, alerts directly The function of biography, lateral direction penetrating, vertical management ";Each item datas such as operation plan, water situation, meteorological change are all merged one Rise, can be analyzed comprehensively.
In practical application, each department have each been put into effect different due to the difference of actual conditions《Dispatching of power netwoks control management Code》, have different regulations to corresponding troubleshooting process.Therefore, D5000 systems can not be supplied at present power scheduling Member is instructed and flow process guiding with clear and definite accident treatment, especially when there is bus-bar fault, loss of voltage failure, Accident of Transformer Or during the 110 complicated failure such as KV failure, power dispatcher cannot find out thing from substantial amounts of system information rapidly Therefore point, also without concrete case with reference to flow processing is standardized, so as to the accident treatment time can be delayed, affect power supply extensive It is multiple, cause unnecessary economic loss.
The content of the invention
The technical problem to be solved in the present invention is for above-mentioned the deficiencies in the prior art, there is provided at a kind of power grid accident auxiliary Reason method and its system, based on D5000 intelligent grid scheduling controlling platforms, for power dispatcher a kind of convenient intuitively thing are provided Therefore guiding is processed, and the working strength of power dispatcher is alleviated, the electric network accident management process standard of complexity is made, larger carries Rise regulation and control Central Grid capability in handling accident, it is ensured that the accuracy of electric network accident management and swiftness.
To solve above-mentioned technical problem, the technical solution used in the present invention is:
A kind of power grid accident aid in treatment method, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that including following Step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step (4)According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset correspondence The number of incident classification;And whole processing procedure record generates history accident file and is stored.
Based on said method, the present invention provides a kind of power grid accident secondary treatment system, including information search module, flow process Management module, SMS transmission module, history Incident Management module, database and terminal workstation, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid Dispatching Control Systems are provided Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported Row is in the terminal workstation.
Preferably, the workflow management module at least includes bus-bar fault and loss of voltage failure disposal process, transformer Accident handling flow process and 110 KV fault trip disposal process.
Preferably, the workflow management module includes edit cell, for carrying out to preset accident criterion handling process Increase, delete or change.
Preferably, under different disposal state, the block diagram color of the workflow management module is different.
Preferably, the process status color is defined as red representative and does not complete, and green is represented and completed.
Preferably, the history Incident Management module includes lead-out unit, for history accident record file to be exported as Case form.
Preferably, the history Incident Management module includes retrieval unit, and input keyword can be inquired to be gone through accordingly Historical event event log file.
It is using the beneficial effect produced by above-mentioned technical proposal:
The present invention is based on existing D5000 intelligent grids scheduling controlling platform, after accident occurs, collects accident information and related ginseng Number information, by the preset standardization flow process of workflow management module process and flow process guiding are analyzed to accident, and Whole processing procedure can be formed case file storage, alleviate the working strength of power dispatcher, make the electrical network thing of complexity Therefore handling process is standardized, larger improves regulation and control Central Grid capability in handling accident, it is ensured that the standard of electric network accident management True property and swiftness.
Also, the preset standardization flow process of workflow management module can at any time be increased, deleted or be changed, with Different situations and regulation of each department to accident treatment are adapted to, it is easy to use beneficial to popularization.
Description of the drawings
Fig. 1 is method of the present invention flow chart;
Fig. 2 is the system module structure chart of the present invention;
Fig. 3 is the embodiment of 110kV line fault tripping fault standardization flow processs.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is further detailed explanation.
As shown in figure 1, be the inventive method schematic flow sheet, based on D5000 intelligent grid scheduling controlling platforms, including with Lower step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step (4)According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset correspondence The number of incident classification;And whole processing procedure record generates history accident file and is stored.
As shown in Fig. 2 be the system module structure chart of the present invention, including information search module, workflow management module, note Sending module, history Incident Management module, database and terminal workstation, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid scheduling controlling platforms are provided Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported Row is in the terminal workstation;
System adopts LabVIEW Measurement index, simple interface, clear logic, easy left-hand seat, workable, can The accident treatment flow process of convenient pre-set criteria, can also be increased normal process by edit cell, deleted or repaiied Change.
It is described in detail as an embodiment with the accident treatment after the generation of 35kV #2 buses emergency stop valve trip below, 35kV After #2 bus emergency stop valve trips accident occurs, dispatcher selects bus-bar fault handling process in terminal workstation, then occur such as FB(flow block) interface shown in Fig. 3, each block diagram is a processing links, clicks on accident information collection analysis block diagram, system Information search module collects the accident information and parameter letter related to the faulty equipment from D5000 intelligent grid scheduling controllings platform Breath, including bus protection operating state, each switch failure separating brake working condition;After the completion of the accident information collection analysis block diagram face Discoloration is green, can carry out next step, clicks on major event and judges that system is according to incident classification decision rule pair set in advance The data are judged, if major accident then reports province's tune, if ordinary accident then notifies relevant unit, report advice method It is that accident information is sent by SMS module;Respective block diagram discoloration, proceeds next step and tentatively disposes after the completion of report, according to FB(flow block) is guided, and successively completes each step process up to troubleshooting, and final step is filed to report, then by result Predetermined number is sent to, whole processing procedure record storage is history accident file.
The history Incident Management module contains lead-out unit, processed accident histories record can be exported as into case Example form, is applied to the training to new employee, also includes search unit, and input keyword quickly can find from database Corresponding history accident file.
Normal process in workflow management module contain bus-bar fault and loss of voltage failure, Accident of Transformer and The flow process of the complicated process steps such as 110 KV fault trips, according to standard process flow《Dispatching of power netwoks control management rule Journey》And expertise optimization summary show that standard process flow can easily be modified, edits, increases newly and deleted Deng operation, it is adaptable to the different process regulation in different regions.
After above-mentioned technical proposal, specification accident handling process reduces human factor to electric network accident management Affect, even if the young dispatcher of experiences of power accidents disposal shortcoming can also accomplish without any confusion, to process when power grid accident is processed It is proper;So as to alleviate dispatcher's routine work intensity, Dispatch Safety operation and management level is improved, improve electric network accident management Accuracy, rapidity, to the reliable operation of power grid security, improve the accuracy of accident treatment and swiftness show with great Sincere justice.
Presently preferred embodiments of the present invention is the foregoing is only, not to limit the present invention, all essences in the present invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of power grid accident aid in treatment method, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that include with Lower step:
(1)After electrical network generation accident, accident information and relevant parameter letter are collected by D5000 intelligent grid scheduling controllings platform Breath;
(2)Preset standard process flow corresponding with occurred accident is selected, by accident information and relevant parameter Data Enter;
(3)Incident classification is judged according to accident information and relevant parameter information, is sent to the number of preset corresponding incident classification Accident note;
(4)Accident point position and processing method are judged according to accident information and parameter information, notifies that corresponding personnel carry out accident sound Should;
(5)The response results information of corresponding personnel is received, accident treatment completeness is judged, is such as processed and is not completed, then return to step 4 According to response results information determination processing again, such as process and complete, then send accident treatment result note to preset corresponding thing Therefore the number of grade, and entirely processing procedure record generates history accident file and is stored.
2. a kind of power grid accident secondary treatment system, based on D5000 intelligent grid scheduling controlling platforms, it is characterised in that:This is System includes information search module, workflow management module, SMS transmission module, history Incident Management module, database and terminal Work station, wherein:
Described information collects module to be used to collect accident information and the parameter letter that D5000 intelligent grid Dispatching Control Systems are provided Breath, incident response information;
The workflow management module is the accident criterion handling process of preset visualization structure of block diagram, and the flow process meets electrical network tune Degree control rule of management, each FB(flow block) one processing links of correspondence, with the pattern definition that multiple links are advanced successively, only Next link can be proceeded after the completion of current link;
The history Incident Management module is used to carry out the accident that process is completed information system management operation, history of forming accident text Part, and be stored in the database;
The terminal workstation provides the user display interface and information input interface;
The SMS transmission module is preset for the generation of accident, processing procedure and result to be sent in the form of note Number;
Described information collection module, workflow management module, SMS transmission module, history Incident Management module and database are transported Row is in the terminal workstation.
3. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the workflow management module At least include bus-bar fault and loss of voltage failure disposal process, Accident of Transformer disposal process and 110 KV failures Tripping operation disposal process.
4. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the workflow management module Including edit cell, for preset accident criterion handling process to be increased, deleted or is changed.
5. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that under different disposal state, institute The block diagram color for stating workflow management module is different.
6. a kind of power grid accident secondary treatment system according to claim 5, it is characterised in that the process status color It is defined as red representative not completing, green is represented and completed.
7. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the history Incident Management Module includes lead-out unit, for history accident record file to be exported as into case form.
8. a kind of power grid accident secondary treatment system according to claim 2, it is characterised in that the history Incident Management Module includes retrieval unit, and input keyword can inquire corresponding history accident record file.
CN201611246105.0A 2016-12-29 2016-12-29 Power grid accident auxiliary processing method and system Active CN106651198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611246105.0A CN106651198B (en) 2016-12-29 2016-12-29 Power grid accident auxiliary processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611246105.0A CN106651198B (en) 2016-12-29 2016-12-29 Power grid accident auxiliary processing method and system

Publications (2)

Publication Number Publication Date
CN106651198A true CN106651198A (en) 2017-05-10
CN106651198B CN106651198B (en) 2020-08-28

Family

ID=58836100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611246105.0A Active CN106651198B (en) 2016-12-29 2016-12-29 Power grid accident auxiliary processing method and system

Country Status (1)

Country Link
CN (1) CN106651198B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108694491A (en) * 2018-03-31 2018-10-23 南京北冶机电设备有限公司 A kind of thermal power plant scheduling system
CN109086983A (en) * 2018-07-19 2018-12-25 国网辽宁省电力有限公司盘锦供电公司 Dispatching of power netwoks accident treatment householder method and system
CN113285427A (en) * 2021-05-12 2021-08-20 国网江苏省电力有限公司南通供电分公司 Distribution network line accident trip alarm method based on automatic time sequence graph deduction
CN113964946A (en) * 2021-11-08 2022-01-21 国网山东省电力公司胶州市供电公司 Power grid fault information rapid reporting system and method
CN115130864A (en) * 2022-06-30 2022-09-30 国网山东省电力公司济南市历城区供电公司 Management method and system for power grid regulation and control operation workflow
US11481581B2 (en) 2018-08-23 2022-10-25 Florida Power & Light Company Proactive power outage impact adjustments via machine learning

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN104977870A (en) * 2015-07-27 2015-10-14 中国科学院自动化研究所 Auxiliary treating system for workshop equipment accidents and method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN104977870A (en) * 2015-07-27 2015-10-14 中国科学院自动化研究所 Auxiliary treating system for workshop equipment accidents and method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108694491A (en) * 2018-03-31 2018-10-23 南京北冶机电设备有限公司 A kind of thermal power plant scheduling system
CN109086983A (en) * 2018-07-19 2018-12-25 国网辽宁省电力有限公司盘锦供电公司 Dispatching of power netwoks accident treatment householder method and system
US11481581B2 (en) 2018-08-23 2022-10-25 Florida Power & Light Company Proactive power outage impact adjustments via machine learning
CN113285427A (en) * 2021-05-12 2021-08-20 国网江苏省电力有限公司南通供电分公司 Distribution network line accident trip alarm method based on automatic time sequence graph deduction
CN113964946A (en) * 2021-11-08 2022-01-21 国网山东省电力公司胶州市供电公司 Power grid fault information rapid reporting system and method
CN115130864A (en) * 2022-06-30 2022-09-30 国网山东省电力公司济南市历城区供电公司 Management method and system for power grid regulation and control operation workflow

Also Published As

Publication number Publication date
CN106651198B (en) 2020-08-28

Similar Documents

Publication Publication Date Title
CN106651198A (en) Power grid accident auxiliary processing method and system
CN102638100B (en) District power network equipment abnormal alarm signal association analysis and diagnosis method
CN110674189B (en) Method for monitoring secondary state and positioning fault of intelligent substation
CN103903075B (en) Protection device constant value automatic management method based on fuzzy matching
CN105245185A (en) Regional distributed photovoltaic fault diagnosis system and method for access power distribution network
CN107846011A (en) A kind of distribution network failure restoration methods based on main distribution Collaborative Control
CN108537433B (en) Regional power grid risk early warning method based on multidimensional evaluation indexes
CN109639477B (en) Secondary equipment online monitoring and analyzing system and method
CN108233536A (en) A kind of intelligent program remote handling system
CN109787356B (en) Transformer substation remote control anti-misoperation method and system based on IEC61850 protocol
CN107798395A (en) A kind of power grid accident signal automatic diagnosis method and system
CN101833324B (en) Intelligent fault diagnosis system in tread extrusion process and diagnosis method thereof
CN103326467A (en) Protection action report implementation method based on information protection main station device recorded information
CN108494089B (en) Rapid, safe and reliable batch remote control method for limited-circuit pull circuits
CN110348690B (en) Tree search based result query menu grid accident auxiliary decision making system and method
CN109062993A (en) Method and device for generating offline power grid fault handling plan
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN111768076A (en) Monitoring alarm signal clustering method taking power grid event as center
CN104091243A (en) Intelligent switching operation ticket mechanism designing and achieving method
CN105245001A (en) Event-driven intelligent alarm processing method and device for transformer station accidents
CN113409162A (en) Centralized control station equipment monitoring system and control method based on intelligent event processing
CN108629526A (en) A kind of accident presentation method based on automation system for the power network dispatching
CN108090674A (en) The risk assessment of the area power grid method of operation and aid decision-making method and system
CN112769231A (en) Main distribution integrated alarm pushing method and device of intelligent power grid dispatching control system
CN115693951A (en) Second-level intelligent operation sequence control method based on power grid OCS (online charging system)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant