CN106647689A - Complete machine test system - Google Patents
Complete machine test system Download PDFInfo
- Publication number
- CN106647689A CN106647689A CN201610871463.4A CN201610871463A CN106647689A CN 106647689 A CN106647689 A CN 106647689A CN 201610871463 A CN201610871463 A CN 201610871463A CN 106647689 A CN106647689 A CN 106647689A
- Authority
- CN
- China
- Prior art keywords
- business board
- configuration
- testing
- master control
- control borad
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0213—Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24065—Real time diagnostics
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention provides a complete machine test method and device which are applied to a main control board in frame type equipment. The frame type equipment further comprises a plurality of service boards. The main control board and the plurality of service boards are connected to test control equipment. The complete machine test method can comprise the steps of executing a configuration operation on each service board according to a configuration instruction sent by the test control equipment; and when the configuration operation is completed on any one service board, sending a configuration completion message to the service board so as to enable the service board to execute a test instruction sent by the test control equipment. In the complete machine test system, the test control equipment is connected with the main control board and the plurality of service boards, and the main control board performs a configuration operation on the plurality of service boards so as to enable the plurality of service boards to further execute the test instruction sent by the test control equipment, so that the plurality of service boards can be tested simultaneously in a single test, and the test efficiency for the service board is improved.
Description
Technical field
The application is related to technical field of measurement and test, more particularly to a kind of system test system.
Background technology
When the business board to frame type equipment carries out system test, master control borad must be simultaneously in place with business board, at some
In test event, need to issue master control borad configuration-direct in testing and control equipment, then by master control borad according to configuration-direct to industry
Business plate is performed after configuration operation, and business board can just continue executing with the test instruction that testing and control equipment is issued.
In the prior art, the serial ports of testing and control equipment is first connected with the console ports of master control borad, treats master control borad root
According to the configuration-direct that testing and control equipment is issued, the business board tested needs is performed after configuration operation, then will test control
The serial ports of control equipment is changed to be connected with the console ports of the business board, so that testing and control equipment is under the business board
Test instruction is sent out, and monitors the implementation status of the business board.
But, on the one hand, because method of testing of the prior art only supports a serial ports and of testing and control equipment
Individual master control borad or business board are connected, so individually can only test respectively each business board;On the other hand, in test process
In, need to be connected with the console ports of master control borad and business board respectively by plugging serial ports, so as to greatly reduce test
Efficiency.
The content of the invention
In view of this, the application provides a kind of system test system, can solve individually can only carry out each business board
The problem of test.
For achieving the above object, the application offer technical scheme is as follows:
According to the first aspect of the application, it is proposed that a kind of system test system, including testing and control equipment and frame set
Standby, the testing and control equipment is respectively connecting to master control borad and multiple business boards in the frame type equipment;
The testing and control equipment to the master control borad issues configuration-direct, and issues test respectively to each business board
Instruction;
The master control borad performs configuration operation to each business board by performing the configuration-direct;And,
When the configuration operation is completed to arbitrary business board, the master control borad is complete to arbitrary business board send configuration
Into message;
Each business board respectively after the configuration completion message for itself is received, under performing the testing and control equipment
The test instruction sent out.
According to the second aspect of the application, it is proposed that a kind of whole-machine test method, the master control borad being applied in frame type equipment;
The frame type equipment also includes multiple business boards, and the master control borad and the plurality of business board are respectively connecting to testing and control and set
It is standby;Methods described includes:
According to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to each business board;
When the configuration operation is completed to arbitrary business board, to arbitrary business board send configuration completion message, with
So that arbitrary business board performs the test instruction that the testing and control equipment is issued.
According to the third aspect of the application, it is proposed that a kind of whole-machine test method, multiple business of frame type equipment are applied to
Arbitrary business board in plate, the frame type equipment also includes master control borad, and the master control borad and the plurality of business board connect respectively
It is connected to testing and control equipment;Methods described includes:
The configuration completion message that the master control borad sends is received, the configuration completes the bright master control borad of message table and passes through
The configuration-direct that the testing and control equipment is issued is performed, the configuration to arbitrary business board is completed and is operated;
Perform the test instruction that the testing and control equipment is issued.
According to the fourth aspect of the application, it is proposed that a kind of system test device, the master control borad being applied in frame type equipment;
The frame type equipment also includes multiple business boards, and the master control borad and the plurality of business board are respectively connecting to testing and control and set
It is standby;Described device includes:
Dispensing unit, according to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to each business board;
Transmitting element, it is complete to arbitrary business board send configuration when the configuration operation is completed to arbitrary business board
Into message, so that arbitrary business board performs the test instruction that the testing and control equipment is issued.
According to the 5th aspect of the application, it is proposed that a kind of system test device, multiple business of frame type equipment are applied to
Arbitrary business board in plate, the frame type equipment also includes master control borad, and the master control borad and the plurality of business board connect respectively
It is connected to testing and control equipment;Described device includes:
Receiving unit, receives the configuration completion message that the master control borad sends, and it is bright described that the configuration completes message table
Master control borad completes the configuration to arbitrary business board and grasps by performing the configuration-direct that the testing and control equipment is issued
Make;
Performance element, performs the test instruction that the testing and control equipment is issued.
From above technical scheme, in the system test system of the application, testing and control equipment and a master control borad
And multiple business boards are connected, by the way that in once testing, master control borad carries out configuration operation to multiple business boards respectively so that should
Multiple business boards can further perform the test instruction that testing and control equipment issues, and need not by plug serial ports come
It is connected with the console ports of master control borad and business board respectively, it is achieved thereby that in once testing, can be to multiple business boards
Tested simultaneously, improved the testing efficiency to business board.
Description of the drawings
Fig. 1 is to carry out the schematic diagram of system test to the business board of frame type equipment in correlation technique.
Fig. 2 is a kind of flow chart of whole-machine test method that the exemplary embodiment of the application one is provided.
Fig. 3 is the flow chart of another kind of whole-machine test method that the exemplary embodiment of the application one is provided.
Fig. 4 be the exemplary embodiment of the application one provide system test carried out to multiple business boards in frame type equipment show
It is intended to.
Fig. 5 is the flow chart that the master control borad that the exemplary embodiment of the application one is provided is interacted with multiple business boards.
Fig. 6 is a kind of structural representation of electronic equipment based on master control borad side that the exemplary embodiment of the application one is provided
Figure.
Fig. 7 is a kind of block diagram of system test device that the exemplary embodiment of the application one is provided.
Fig. 8 is a kind of structural representation of electronic equipment based on business board side that the exemplary embodiment of the application one is provided
Figure.
Fig. 9 is the block diagram of another kind of system test device that the exemplary embodiment of the application one is provided.
Specific embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Explained below is related to
During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment
Described in embodiment do not represent all embodiments consistent with the application.Conversely, they be only with it is such as appended
The example of the consistent apparatus and method of some aspects described in detail in claims, the application.
It is, only merely for the purpose of description specific embodiment, and to be not intended to be limiting the application in term used in this application.
" one kind ", " described " and " being somebody's turn to do " of singulative used in the application and appended claims is also intended to include majority
Form, unless context clearly shows that other implications.It is also understood that term "and/or" used herein is referred to and wrapped
Containing one or more associated any or all possible combinations for listing project.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the application
A little information should not necessarily be limited by these terms.These terms are only used for that same type of information is distinguished from each other out.For example, without departing from
In the case of the application scope, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as
One information.Depending on linguistic context, word as used in this " if " can be construed to " ... when " or " when ...
When " or " in response to determining ".
Fig. 1 is to carry out the schematic diagram of system test to the business board of frame type equipment in correlation technique.As shown in figure 1, master control
Plate is inserted into each self-corresponding groove position in machine frame with business board.Testing and control equipment (for example can be PC) only supports a string
Mouthful, when system test is carried out to business board, in some test events, only configuration operation is performed to business board in master control borad
Afterwards, the business board could further perform test instruction.Therefore, the serial ports is first connected with the console ports 0 of master control borad, so
Afterwards to electricity on machine frame, (now give tacit consent to business board also normally to start) after master control borad normally starts, testing and control equipment is to master control
Plate issues configuration-direct, and the master control borad performs configuration operation, control device detection to be tested to business board according to the configuration-direct
Perform after configuration end of operation to master control borad, point out user to disconnect serial ports with master control borad, user's identification goes out after the prompting,
Serial ports is disconnected with master control borad again, and the serial ports is connected on the console ports 1 of business board so that follow-up test
Control device continues to issue business board test instruction, and monitors whether the business board normally performs the test instruction.
It can be seen that, in the related, on the one hand, the serial ports and a master control borad due to only supporting testing and control equipment
Or business board is connected, so individually can only test respectively each business board, as soon as and after each pair business board is tested,
Need that machine frame is carried out to re-power operation (comprising the test to business board start-up course in system test).Also, in test
During, need to be connected with the console ports of master control borad and business board respectively by plugging serial ports, so as to greatly reduce
The efficiency of test;On the other hand, because only in the case where business board normally starts, master control borad is matched somebody with somebody to the business board execution
Put operation just effectively, so, if the business board is without normal startup, the configuration operation is invalid, under follow-up test control device
Send out test instruction traffic plate also cannot normally perform, and due to master control borad to business board perform configuration operation when, serial ports with
The console ports of master control borad are connected, so testing and control equipment can only monitor the situation that master control borad performs associative operation, and not
Whether energy monitoring business plate normally starts, if business board can cause test to be normally carried out without normal startup.
Fig. 2 is a kind of flow process of the whole-machine test method based on master control borad side shown in the exemplary embodiment of the application one
Figure, as shown in Fig. 2 the method is applied to the master control borad in frame type equipment, the frame type equipment also includes multiple business boards, and institute
State master control borad and the plurality of business board is respectively connecting to testing and control equipment;May comprise steps of:
Step 201, according to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to each business board.
In the present embodiment, can be after the first startup completion message that all business boards send be received, according to test
The configuration-direct that control device is issued, configuration operation is performed to each business board;Business board transmission can also often be received
Second starts completion message, and the configuration-direct for just being issued according to the testing and control equipment is completed to sending second startup
The business board execution configuration operation of message, wherein, start comprising transmission described second in the second startup completion message and complete
The identification information of the business board of message.
Step 202, when the configuration operation is completed to arbitrary business board, completes to arbitrary business board send configuration
Message, so that arbitrary business board performs the test instruction that the testing and control equipment is issued.
In the present embodiment, the mode to arbitrary business board send configuration completion message can be to all business boards
Broadcast is sent, the identification information comprising arbitrary business board in the broadcast;Or, to arbitrary business board
Unicast messages are sent, so that arbitrary business board performs the test instruction that the testing and control equipment is issued.
Correspondingly, Fig. 3 is a kind of whole-machine test method based on business board side shown in the exemplary embodiment of the application one
Flow chart, as shown in figure 3, the method is applied to the arbitrary business board in multiple business boards of frame type equipment, the frame sets
It is standby also to include master control borad, and the master control borad and the plurality of business board are respectively connecting to testing and control equipment;Can include with
Lower step:
Step 301, receives the configuration completion message that the master control borad sends, and the configuration completes the bright master of message table
Control plate completes the configuration to arbitrary business board and operates by performing the configuration-direct that the testing and control equipment is issued.
In the present embodiment, arbitrary business board sends the first startup completion message to the master control borad, so that institute
The configuration-direct that master control borad is issued according to the testing and control equipment is stated, configuration operation is performed to arbitrary business board;
Or, send second to the master control borad and start completion message, so that the master control borad is according to the test control
The configuration-direct that control equipment is issued, to arbitrary business board configuration operation is performed, wherein, described second starts in completion message
Comprising the identification information for sending the described second business board for starting completion message.
Step 302, performs the test instruction that the testing and control equipment is issued.
From above technical scheme, in the system test system of the application, on the one hand, testing and control equipment and one
Master control borad and multiple business boards are connected, by the way that in once testing, master control borad carries out configuration operation to multiple business boards respectively,
So that the plurality of business board can further perform the test instruction that testing and control equipment is issued, and need not be by plug
Serial ports to be connected with the console ports of master control borad and business board respectively, it is achieved thereby that in once testing, can be to multiple
Business board is tested simultaneously, improves the testing efficiency to business board;On the other hand, testing and control equipment both can be supervised simultaneously
Control whether multiple business boards normally start, so as to ensure that test process is smoothed out, multiple business boards can be simultaneously monitored again is
The test instruction that no normal execution testing and control equipment is issued.
In order to make it easy to understand, with reference to Fig. 4-5, in system test system between master control borad and multiple business boards
Interaction, is described in detail to the technical scheme of the application.Fig. 4 is referred to, Fig. 4 is the exemplary embodiment of the application one
The schematic diagram of system test is carried out to multiple business boards in frame type equipment.As shown in Figure 4:It is assumed that 5 groove positions are included in machine frame, point
Do not insert 1 master control borad (comprising console ports 0), and business board a (including console ports 1), business board b (bags
Port containing console 2), business board c (include console ports 3), business board d (including console ports 4), testing and control
Equipment (for example can be PC) is connected by multi-serial-port card with above-mentioned master control borad and 4 business boards, wherein, the Multi-serial port
The 1 of testing and control equipment serial ports switching can be 5 by card, it is, of course, also possible to the multi-serial-port card of other specifications is selected, for example
One point eight, will testing and control equipment 1 serial ports switching be 8 serial ports, accordingly, the serial ports can at most connect 1 master
Control plate and 7 business boards, for the specification of the multi-serial-port card for using, as long as the serial ports quantity that the multi-serial-port card is transferred out is not little
In the quantity sum of the master control borad and business board for participating in test, the application is not limited this.
The flow chart that Fig. 5 is interacted for the master control borad of the exemplary embodiment of the application one with multiple business boards, as shown in figure 5,
It is assumed that master control borad is interacted with business board a, business board b, business board c simultaneously, i.e., in once testing, to business board a, business
Plate b, business board c are tested simultaneously.The method may comprise steps of:
Step 501a, business board a sends first and starts completion message to master control borad.
Step 501b, business board b sends first and starts completion message to master control borad.
Step 501c, business board c sends first and starts completion message to master control borad.
In the present embodiment, business board a, business board b, business board c send the suitable of the first startup completion message to master control borad
Sequence depends on the sequencing that each business board completes start-up course, as long as that is, arbitrary business board completes start-up course, Jiu Huixiang
Master control borad sends first and starts completion message.
Step 502, master control borad receives the first startup completion message that business board a, business board b, business board c send.
In the present embodiment, testing and control equipment is by multi-serial-port card and master control borad and business board a, business board b, business
Plate c connects, after to electricity on machine frame, master control board starting, while carrying out initialization behaviour to business board a, business board b, business board c
Make, meanwhile, whether testing and control monitoring of tools master control borad and business board a, business board b, business board c normally start, so as to protect
Card test process is normally carried out, if master control borad or arbitrary business board normally do not start, discriminating test does not pass through.When each industry
After business plate normally starts, first can be sent to master control borad and start completion message;And work as after the normal startup of master control borad, in reception shape
State, receives the first startup completion message that each business board sends.
Step 503a, master control borad performs configuration operation to business board b.
Step 503b, master control borad performs configuration operation to business board a.
Step 503c, master control borad performs configuration operation to business board c.
In the present embodiment, master control borad only needs to count the quantity of the first startup completion message for receiving, when receiving
The first startup completion message quantity and all business boards (business board a, business board b, business board c) quantity it is equal when, i.e.,
Illustrate that master control borad have received the first startup completion message that all business boards send.Master control borad can receive all business
After the first startup completion message that plate sends, further according to the configuration-direct that testing and control equipment is issued, each business board is performed
Configuration operation, wherein, the order that configuration operation is performed to each business board can be the row of the groove position that each business board is inserted
Row order, it is also possible to put in order using other and be used as the order that configuration operation is performed to each business board, certainly, the application
This is not limited.
In the present embodiment, on the one hand, after each business board normally starts, it is also possible to send second to master control borad and start
Completion message, the identification information comprising the business board for sending the second startup completion message in the second startup completion message.And
Each business board also depends on each business board and completes start-up course to the order that master control borad sends the second startup completion message
Sequencing, as long as that is, arbitrary business board completes start-up course, will send second and start completion message to master control borad.The opposing party
Face, as soon as master control borad can start completion message with often receive business board transmission second, issues according to testing and control equipment
Configuration-direct, to sending second business board for starting completion message configuration operation is performed.For example, when master control borad is received
During the second startup completion message that business board a sends, because the mark comprising business board a is believed in the second startup completion message
Breath, so master control borad can determine that business board a has normally completed start-up course, immediately basis by extracting the identification information
The configuration-direct that testing and control equipment is issued, configuration operation is performed to business board a, and without waiting business board b and industry are received
After the second startup completion message of business plate c, then configuration operation is performed to business board a.And in the method shown in Fig. 5, take
Mode is that each business board sends the first startup completion message to master control borad, and certainly, two ways can realize each business
Plate notifies that master control borad completes to start, and master control borad performs the purpose of configuration operation to each business board, and the application is not right
This is limited.
Step 504a, master control borad is to business board b send configuration completion messages.
Step 504b, master control borad is to business board a send configuration completion messages.
Step 504c, master control borad is to business board c send configuration completion messages.
In this embodiment it is assumed that master control borad is to the sequencing that each business board completes to configure operation:Business board b,
Business board a, business board c.
Step 505a, business board b receives configuration completion message.
Step 505b, business board a receives configuration completion message.
Step 505c, business board c receives configuration completion message.
Step 506a, business board b performs the test instruction that testing and control equipment is issued.
Step 506b, business board a performs the test instruction that testing and control equipment is issued.
Step 506c, business board c performs the test instruction that testing and control equipment is issued.
In the present embodiment, when master control borad completes the configuration to arbitrary business board to be operated, can be to all business board (industry
Business plate a, business board b, business board c) send broadcast, the identification information comprising arbitrary business board in the broadcast, use
Operated with showing that master control borad has completed the configuration to arbitrary business board.For example, when master control borad is completed to business board b's
During configuration operation, to all business boards, (business board a, business board b, business board c) send the broadcast (mark comprising business board b
Knowledge information), all business boards can all receive the broadcast, by recognizing the broadcast in identification information, business board a
This broadcast can't be responded with business board c to perform test that testing and control equipment is issued instruction, and only business board b,
The broadcast can be just responded, so as to further perform the test instruction that testing and control equipment is issued.
Or, when master control borad completes the configuration to arbitrary business board to be operated, unicast can be sent to arbitrary business board
Message, the unicast messages are operated to show that master control borad has completed the configuration to arbitrary business board.For example, master control is worked as
When plate completes the configuration operation to business board b, unicast messages are sent to business board b, when business board b receives the unicast messages
Afterwards, the test instruction that testing and control equipment is issued further is performed.And in the method shown in Fig. 5, take the mode of the latter (i.e.
Send unicast messages) send configuration completion message.Certainly, two ways can be realized complete to specific business board send configuration
Into the purpose of message, the application is not limited this.
In the present embodiment, after the completion for the treatment of the test all to all business boards, all business boards are replaced with into next group needs
The business board tested, then machine frame is carried out to re-power operation, as soon as after being tested without each pair business board,
Machine frame is carried out to re-power operation, so as to improve the testing efficiency to business board.
From above technical scheme, in the system test system of the application, on the one hand, testing and control equipment and one
Master control borad and multiple business boards are connected, by the way that in once testing, master control borad carries out configuration operation to multiple business boards respectively,
So that the plurality of business board can further perform the test instruction that testing and control equipment is issued, and need not be by plug
Serial ports to be connected with the console ports of master control borad and business board respectively, it is achieved thereby that in once testing, can be to multiple
Business board is tested simultaneously, improves the testing efficiency to business board;On the other hand, testing and control equipment both can be supervised simultaneously
Control whether multiple business boards normally start, so as to ensure that test process is smoothed out, multiple business boards can be simultaneously monitored again is
The test instruction that no normal execution testing and control equipment is issued.
Fig. 6 shows the schematic construction based on master control borad side electronic equipment of the exemplary embodiment according to the application
Figure.Fig. 6 is refer to, in hardware view, the electronic equipment includes processor 602, internal bus 604, network interface 606, internal memory
608 and nonvolatile memory 610, the hardware being also possible that certainly required for other business.Processor 602 is from non-volatile
Property memory 610 in read corresponding computer program in internal memory 602 then run, system test is formed on logic level
Device.Certainly, in addition to software realization mode, the application is not precluded from other implementations, such as logical device or soft
Mode of combination of hardware etc., that is to say, that the executive agent of following handling process is not limited to each logical block, also may be used
Being hardware or logical device.
Fig. 7 is refer to, in Software Implementation, the system test device can include dispensing unit 701, transmitting element
702.Wherein:
Dispensing unit 701, according to the configuration-direct that the testing and control equipment is issued, configuration behaviour is performed to each business board
Make;
Transmitting element 702, when the configuration operation is completed to arbitrary business board, to arbitrary business board send configuration
Completion message, so that arbitrary business board performs the test instruction that the testing and control equipment is issued.
Optionally, the dispensing unit 701 specifically for:
After the first startup completion message that all business boards send is received, issued according to the testing and control equipment
Configuration-direct, configuration operation is performed to each business board;
Or, as soon as the second startup completion message of business board transmission is often received, according under the testing and control equipment
The configuration-direct sent out, to sending the described second business board for starting completion message configuration operation is performed, wherein, described second starts
Comprising the identification information for sending the described second business board for starting completion message in completion message.
Optionally, the transmitting element 702 specifically for:
Broadcast is sent to all business boards, the identification information comprising arbitrary business board in the broadcast;
Or, unicast messages are sent to arbitrary business board, so that arbitrary business board performs the test control
The test instruction that control equipment is issued.
Fig. 8 shows the schematic construction based on business board side electronic equipment of the exemplary embodiment according to the application
Figure.Fig. 8 is refer to, in hardware view, the electronic equipment includes processor 802, internal bus 804, network interface 806, internal memory
808 and nonvolatile memory 810, the hardware being also possible that certainly required for other business.Processor 802 is from non-volatile
Property memory 810 in read corresponding computer program in internal memory 802 then run, system test is formed on logic level
Device.Certainly, in addition to software realization mode, the application is not precluded from other implementations, such as logical device or soft
Mode of combination of hardware etc., that is to say, that the executive agent of following handling process is not limited to each logical block, also may be used
Being hardware or logical device.
Fig. 9 is refer to, in Software Implementation, the system test device can include receiving unit 901 and perform list
Unit 902.Wherein:
Receiving unit 901, receives the configuration completion message that the master control borad sends, and the configuration completes the bright institute of message table
Master control borad is stated by performing the configuration-direct that the testing and control equipment is issued, the configuration to arbitrary business board is completed and is grasped
Make;
Performance element 902, performs the test instruction that the testing and control equipment is issued.
Optionally, also include:First transmitting element 903 or the second transmitting element 904;
First transmitting element 903, sends first and starts completion message, so that the master control borad to the master control borad
According to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to arbitrary business board;
Second transmitting element 904, sends second and starts completion message, so that the master control borad to the master control borad
According to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to arbitrary business board, wherein, described second
Start in completion message comprising the identification information for sending the described second business board for starting completion message.
The function of unit and effect realizes that process specifically refers in said method correspondence step in said apparatus
Process is realized, be will not be described here.
For device embodiment, because it corresponds essentially to embodiment of the method, so related part is referring to method reality
Apply the part explanation of example.Device embodiment described above is only schematic, wherein described as separating component
The unit of explanation can be or may not be physically separate, can be as the part that unit shows or can also
It is not physical location, you can be located at a place, or can also be distributed on multiple NEs.Can be according to reality
Need the purpose for selecting some or all of module therein to realize application scheme.Those of ordinary skill in the art are not paying
In the case of going out creative work, you can to understand and implement.
The preferred embodiment of the application is the foregoing is only, not to limit the application, all essences in the application
Within god and principle, any modification, equivalent substitution and improvements done etc. should be included within the scope of the application protection.
Claims (11)
1. a kind of system test system, it is characterised in that including testing and control equipment and frame type equipment, the testing and control equipment
The master control borad being respectively connecting in the frame type equipment and multiple business boards;
The testing and control equipment to the master control borad issues configuration-direct, and issues test respectively to each business board and refer to
Order;
The master control borad performs configuration operation to each business board by performing the configuration-direct;And, when to arbitrary business
When plate completes the configuration operation, the master control borad is to arbitrary business board send configuration completion message;
Each business board after the configuration completion message for itself is received, performs what the testing and control equipment was issued respectively
Test instruction.
2. a kind of whole-machine test method, it is characterised in that the master control borad being applied in frame type equipment;The frame type equipment also includes
Multiple business boards, and the master control borad and the plurality of business board are respectively connecting to testing and control equipment;Methods described includes:
According to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to each business board;
When the configuration operation is completed to arbitrary business board, to arbitrary business board send configuration completion message, so that
Arbitrary business board performs the test instruction that the testing and control equipment is issued.
3. method according to claim 2, it is characterised in that the configuration issued according to the testing and control equipment refers to
Order, configuration operation is performed to each business board, including:
After the first startup completion message that all business boards send is received, according to the configuration that the testing and control equipment is issued
Instruction, configuration operation is performed to each business board;
Or, as soon as often receiving the second startup completion message of business board transmission, issued according to the testing and control equipment
Configuration-direct, the described to transmission second business board for starting completion message performs configuration operation, wherein, second startup is completed
Comprising the identification information for sending the described second business board for starting completion message in message.
4. method according to claim 2, it is characterised in that described to complete to disappear to arbitrary business board send configuration
Breath, including:
Broadcast is sent to all business boards, the identification information comprising arbitrary business board in the broadcast;
Or, unicast messages are sent to arbitrary business board, so that arbitrary business board performs the testing and control setting
The standby test instruction for issuing.
5. a kind of whole-machine test method, it is characterised in that the arbitrary business board being applied in multiple business boards of frame type equipment, institute
Stating frame type equipment also includes master control borad, and the master control borad and the plurality of business board are respectively connecting to testing and control equipment;Institute
The method of stating includes:
The configuration completion message that the master control borad sends is received, the configuration completes the bright master control borad of message table by performing
The configuration-direct that the testing and control equipment is issued, completes the configuration to arbitrary business board and operates;
Perform the test instruction that the testing and control equipment is issued.
6. method according to claim 5, it is characterised in that also include:
First is sent to the master control borad and start completion message, so that the master control borad is issued according to the testing and control equipment
Configuration-direct, configuration operation is performed to the arbitrary business board;
Or, send second to the master control borad and start completion message, so that the master control borad sets according to the testing and control
The standby configuration-direct for issuing, to arbitrary business board configuration operation is performed, wherein, include in the second startup completion message
Send the identification information of the described second business board for starting completion message.
7. a kind of system test device, it is characterised in that the master control borad being applied in frame type equipment;The frame type equipment also includes
Multiple business boards, and the master control borad and the plurality of business board are respectively connecting to testing and control equipment;Described device includes:
Dispensing unit, according to the configuration-direct that the testing and control equipment is issued, configuration operation is performed to each business board;
Transmitting element, when arbitrary business board is completed the configuration operation, completes to disappear to arbitrary business board send configuration
Breath, so that arbitrary business board performs the test instruction that the testing and control equipment is issued.
8. device according to claim 7, it is characterised in that the dispensing unit specifically for:
After the first startup completion message that all business boards send is received, according to the configuration that the testing and control equipment is issued
Instruction, configuration operation is performed to each business board;
Or, as soon as often receiving the second startup completion message of business board transmission, issued according to the testing and control equipment
Configuration-direct, the described to transmission second business board for starting completion message performs configuration operation, wherein, second startup is completed
Comprising the identification information for sending the described second business board for starting completion message in message.
9. device according to claim 7, it is characterised in that the transmitting element specifically for:
Broadcast is sent to all business boards, the identification information comprising arbitrary business board in the broadcast;
Or, unicast messages are sent to arbitrary business board, so that arbitrary business board performs the testing and control setting
The standby test instruction for issuing.
10. a kind of system test device, it is characterised in that the arbitrary business board being applied in multiple business boards of frame type equipment,
The frame type equipment also includes master control borad, and the master control borad and the plurality of business board are respectively connecting to testing and control equipment;
Described device includes:
Receiving unit, receives the configuration completion message that the master control borad sends, and the configuration completes the bright master control of message table
Plate completes the configuration to arbitrary business board and operates by performing the configuration-direct that the testing and control equipment is issued;
Performance element, performs the test instruction that the testing and control equipment is issued.
11. devices according to claim 10, it is characterised in that also include:First transmitting element or the second transmitting element;
First transmitting element, sends first and starts completion message, so that the master control borad is according to institute to the master control borad
The configuration-direct that testing and control equipment is issued is stated, configuration operation is performed to arbitrary business board;
Second transmitting element, sends second and starts completion message, so that the master control borad is according to institute to the master control borad
The configuration-direct that testing and control equipment is issued is stated, configuration operation is performed to arbitrary business board, wherein, described second has started
Into in message comprising the identification information for sending the described second business board for starting completion message.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871463.4A CN106647689A (en) | 2016-09-30 | 2016-09-30 | Complete machine test system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871463.4A CN106647689A (en) | 2016-09-30 | 2016-09-30 | Complete machine test system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106647689A true CN106647689A (en) | 2017-05-10 |
Family
ID=58854218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610871463.4A Pending CN106647689A (en) | 2016-09-30 | 2016-09-30 | Complete machine test system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106647689A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109542522A (en) * | 2018-11-02 | 2019-03-29 | 杭州迪普科技股份有限公司 | A kind of FPGA starting method and device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040230399A1 (en) * | 2003-05-15 | 2004-11-18 | Samsung Electronics Co., Ltd. | Method of testing hard disk drive and computer readable medium therefor |
CN1912641A (en) * | 2006-08-24 | 2007-02-14 | 华为技术有限公司 | Method and system for detecting single-plate on position |
CN101252483A (en) * | 2008-04-10 | 2008-08-27 | 北京星网锐捷网络技术有限公司 | System and method for testing switch |
CN101404596A (en) * | 2008-11-17 | 2009-04-08 | 福建星网锐捷网络有限公司 | Multi-topological environmental test method, system and equipment |
CN101593903A (en) * | 2009-06-17 | 2009-12-02 | 中兴通讯股份有限公司 | Testing backboard reaches method for down loading and the method for testing based on this backboard |
CN105740113A (en) * | 2016-02-29 | 2016-07-06 | 迈普通信技术股份有限公司 | Automatic testing method and apparatus for debug port |
-
2016
- 2016-09-30 CN CN201610871463.4A patent/CN106647689A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040230399A1 (en) * | 2003-05-15 | 2004-11-18 | Samsung Electronics Co., Ltd. | Method of testing hard disk drive and computer readable medium therefor |
CN1912641A (en) * | 2006-08-24 | 2007-02-14 | 华为技术有限公司 | Method and system for detecting single-plate on position |
CN101252483A (en) * | 2008-04-10 | 2008-08-27 | 北京星网锐捷网络技术有限公司 | System and method for testing switch |
CN101404596A (en) * | 2008-11-17 | 2009-04-08 | 福建星网锐捷网络有限公司 | Multi-topological environmental test method, system and equipment |
CN101593903A (en) * | 2009-06-17 | 2009-12-02 | 中兴通讯股份有限公司 | Testing backboard reaches method for down loading and the method for testing based on this backboard |
CN105740113A (en) * | 2016-02-29 | 2016-07-06 | 迈普通信技术股份有限公司 | Automatic testing method and apparatus for debug port |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109542522A (en) * | 2018-11-02 | 2019-03-29 | 杭州迪普科技股份有限公司 | A kind of FPGA starting method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104486234B (en) | A kind of method and server that service switch is unloaded to physical network card | |
EP2260611A1 (en) | Automated power topology discovery | |
CN112055096B (en) | Method and device for automatically setting communication address of equipment | |
CN106789363A (en) | A kind of method and device to virtual machine configuration network interface card | |
CN107783829A (en) | Task processing method, device, storage medium and computer equipment | |
CN108683528A (en) | A kind of data transmission method, central server, server and data transmission system | |
CN103164309A (en) | SOL functional test method and system | |
CN109428778B (en) | Mainboard network connectivity test method and device | |
CN105849702A (en) | Cluster system, server device, cluster system management method, and computer-readable recording medium | |
CN111651320A (en) | High-concurrency connection method and system | |
CN108156597A (en) | A kind of bluetooth equipment and its test method | |
CN106647689A (en) | Complete machine test system | |
CN106603303A (en) | Cloud aggregation board card switching method and device | |
CN109558369A (en) | Control method, device, equipment and the system of multi -CPU list serial ports | |
CN111404780B (en) | Function test method and device for remote direct memory access network cluster | |
CN107025131A (en) | A kind of method for scheduling task and device | |
CN108562805A (en) | A kind of interactive mode break-make electric test device, system and method | |
CN110413398A (en) | Method for scheduling task, device, computer equipment and storage medium | |
CN106506265A (en) | Detection fpga chip hangs dead method and device | |
CN106209561A (en) | The sending method of loop detection message and device | |
CN206317552U (en) | Regeneration chip | |
US20230336444A1 (en) | Method and Apparatus for Determining Application Service Dependency and Processor | |
CN105721342B (en) | The method for connecting network and system of multi-process equipment | |
CN106559439B (en) | A kind of method for processing business and equipment | |
WO2017196679A1 (en) | Detection of non-powered device (non-pd) on a power-over-ethernet port based on the data link state information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |