CN106646624B - Asymmetric electrical method sounding method - Google Patents

Asymmetric electrical method sounding method Download PDF

Info

Publication number
CN106646624B
CN106646624B CN201611213671.1A CN201611213671A CN106646624B CN 106646624 B CN106646624 B CN 106646624B CN 201611213671 A CN201611213671 A CN 201611213671A CN 106646624 B CN106646624 B CN 106646624B
Authority
CN
China
Prior art keywords
exploration
supply terminals
electrical method
measurement
asymmetric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611213671.1A
Other languages
Chinese (zh)
Other versions
CN106646624A (en
Inventor
刘春明
龙西亭
赵于前
柳卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201611213671.1A priority Critical patent/CN106646624B/en
Publication of CN106646624A publication Critical patent/CN106646624A/en
Application granted granted Critical
Publication of CN106646624B publication Critical patent/CN106646624B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
    • G01V3/08Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation operating with magnetic or electric fields produced or modified by objects or geological structures or by detecting devices

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

Asymmetric electrical method sounding method, the present invention is by design only with respect to a series of symmetrical equidistant supply terminals of a certain fixed point, using electrical prospecting transmitter by powering relative to symmetrical two supply terminals of the fixed point to underground, electric field signal in all measurement points of exploration line is received using electrical prospecting receiver simultaneously, asks for the apparent resistivity and parameters of electrical induction of each measurement point during every a pair of of symmetrical powering point power supply.The present invention substantially reduces the workload of arrangement supply terminals, and can realize that multichannel electrical prospecting apparatus or more electrical prospecting apparatus carry out depth measurement to multiple depth measurement points simultaneously, so as to improve the exploration efficiency of two dimension or three-dimensional electrical method depth measurement.In three-dimensional asymmetric electrical method depth measurement pattern, due to using three-dimensional electrical method depth measurement pattern, not only improving exploration efficiency, but also exploration effects can be improved.

Description

Asymmetric electrical method sounding method
Technical field
The present invention relates to a kind of electrical method sounding methods in Key words exploration geophysics field.
Background technology
There are symmetrical four-pole sounding, dipole-dipole depth measurement and middle terraced section bathymetry etc. in two-dimentional electrical prospecting at present.
Symmetrical four-pole sounding method arranges that approximate log is powered at equal intervals away from the two-dimentional electrical method of realization using each measurement point Explore depth measurement, the advantages of this method is symmetrical powering pole of each measurement point arrangement relative to measurement point, and measuring electrode away from From control less than 1/3 polar distance of supplying power, realize that level field trend is presented in measurement point measuring signal, GEOLOGICAL INTERPRETATION is simple.But due to Each measurement point is required to arrange a series of supply terminals, often arranges a series of supply terminals, is only capable of measuring single measurement point, therefore works Efficiency is too low.Assuming that a certain exploration line arranges n symmetrical quadrupole measurement point, according to the single measurement of symmetrical quadrupole shown in table 1 Point polar distance of supplying power and measuring electrode are arranged away from parameter list, then in order to complete the depth measurement of all measurement points work, need arrangement 16 × 2 × n supply terminals, workload is excessive, therefore in practical investigation and prospecting, the quantity of symmetrical quadrupole measurement point can be reduced to the greatest extent, to subtract Few exploration cost, but the reduction of exploration effects can be caused.
The single measurement point polar distance of supplying power of 1 symmetrical quadrupole of table and measuring electrode are away from parameter list
Dipole-dipole bathymetry is using short polar distance of supplying power and measures pole span, can realize the high efficiency of electrical method depth measurement.For reality The depth measurement in existing deep, using interval coefficient is increased, with the increase of interval coefficient, and electric field signal attenuation is quickly, in order to realize The depth of exploration of bigger is only realized by increasing the power of electric power system, and will cause electric power system heavy in this way, is reduced Exploration efficiency.
The pattern of terraced section during middle ladder section bathymetry borrows realizes depth measurement by the size of polar distance of supplying power terraced in change Purpose, this method terraced depth measurement pattern in measuring the work of the depth measurement other than point range and using for supply terminals, can realize exploration effect The raising of rate, but this method uses the symmetrical quadrupole of small pole span to each for depth measurement work of the supply terminals in the range of measurement point The electric signal of measurement point measures, so as to cause the electrical prospecting needed to two methods of each measurement point development, although energy The depth measurement workload of big pole span is reduced, but increases the workload of small pole span.
Invention content
The purpose of the present invention is, only with respect to a series of symmetrical equidistant supply terminals of a certain fixed point, utilized by design Electrical prospecting transmitter relative to symmetrical two supply terminals of the fixed point to underground by powering, using electrical prospecting receiver The electric field signal in all measurement points of exploration line is received simultaneously, and each measurement point regards when asking for every a pair of of symmetrical powering point power supply Resistivity swashs the parameters such as electricity, and that reduces electrical method depth measurement supply terminals moves number, realizes and carries out asymmetric electrical method to all measurement points Depth measurement improves electrical prospecting efficiency and exploration effects.
Deficiency based on symmetrical quadrupole and the methods of middle terraced section depth measurement, asymmetric electrical method depth measurement side proposed by the present invention Method, by choose on certain survey line development in need measurement point centre position, arrangement a series of is symmetrical among this The equidistant symmetrical powering point of position, while carry out the asymmetric electrical method depth measurement to all measurement points of exploration line and explore.
This method the specific steps are:
(1) Geological Achievements early period of look-ahead analysis exploration area infer the distribution situation of main geologic anomalous body in area, setting The exploration line direction of asymmetric electrical method depth measurement;
(2) it is required according to exploration, determines the length and quantity of exploration line, and according to corresponding spacing, determine that exploration area is joined Number (m, n, t), wherein m are the measurement point quantity of every exploration line, and n is supply terminals quantity, and t is exploration line quantity;
(3) the exploration targets body characteristics based on exploration area, topography and geomorphology relief feature, using the survey of asymmetric electrical method depth measurement Amount point and power supply point coordinates layout rules, determine the coordinate of all measurement points and supply terminals, and arrange measurement point and supply terminals;
(4) selection is powered relative to symmetrical two supply terminals of coordinate origin using electrical prospecting transmitter every time, Electrical method data measurement points in all exploration lines carry out electrical method data acquisition using electrical prospecting receiver, get each power supply When all electrical method data measurement points electrical method data;
(5) and then change is relative to the position of symmetrical two supply terminals of coordinate origin, ensures two supply terminals still phase For the symmetrical relationship of coordinate origin, above power supply and data acquisition session are repeated, gets the Asymmetric Electric of entire exploration area Method depth measurement data;
(6) above-mentioned data are combined as Asymmetric Electric method depth measurement data, using electrical prospecting data process and interpretation software, Follow-up data processing and explanation are carried out, obtains the asymmetric electrical method depth measurement achievement of entire exploration area.
The rule of exploration area parameter (m, n, t) is determined in the step of asymmetric electrical method sounding method proposed by the present invention (2) It is divided into two kinds of situations:The first situation is the asymmetric electrical method depth measurement of two dimension;The second situation is three-dimensional asymmetric electrical method depth measurement.
A) if carrying out the asymmetric electrical method depth measurement of two dimension, the asymmetric electrical method depth measurement exploration line direction of exploration area two dimension is set For X-direction, wherein X-direction is horizontal direction;Exploration line length is L, and each interval of measuring points distance is a, maximum depth of exploration For h, then the measurement point quantity m of the exploration line is
Supply terminals quantity n is
Exploration line quantity t=1.
B) if carrying out three-dimensional asymmetric electrical prospecting, exploration area three-dimensional asymmetric electrical prospecting line direction is set as X-direction, X-direction exploration line length is L, and the total spacing of Y-direction exploration line is Q, and wherein X-direction is vertical with Y-direction, and is horizontal direction; Each interval of measuring points are a, and exploration line spacing is b, and maximum depth of exploration is h, then the measurement point quantity m of every exploration line is
Supply terminals quantity n is:
Entirely exploration area exploration line quantity t is:
In the step of asymmetric electrical method sounding method proposed by the present invention (3) using the measurement point of asymmetric electrical method depth measurement and Power supply point coordinates layout rules are also classified into two kinds of situations:The first situation is the asymmetric electrical method depth measurement of two dimension;The second situation For three-dimensional asymmetric electrical method depth measurement.
A) if carrying out the asymmetric electrical method sounding method of two dimension, point coordinates x is measuredpiWith A poles supply terminals power supply point coordinates xAi, B poles power supply point coordinates xBiLayout rules are as follows:
The centre position for choosing the exploration line is coordinate origin, then two-dimentional all electrical method DATA REASONINGs of asymmetric electrical method depth measurement The coordinate x of pointpiFor:
The coordinate of the asymmetric electrical method depth measurement supply terminals of all two dimensions of the exploration line is divided into two kinds of situations, sets X negative direction cloth A poles supply terminals is put, X positive directions arrange B poles supply terminals, then the coordinate x of A poles supply terminalsAiFor:
The coordinate x of B poles supply terminalsBiFor:
B) if carrying out three-dimensional asymmetric electrical method sounding method, point coordinates (x is measuredpi,ypj) and the power supply of A poles supply terminals Point coordinates (xAi,yAi), B poles power supply point coordinates (xBi,yBi) layout rules are as follows:
The central point for choosing the exploration rectangle region is coordinate origin, then all electrical method data of three-dimensional asymmetric electrical method depth measurement are surveyed Measure the coordinate (x of pointpi,ypj) be:
The coordinate of all three-dimensional asymmetric electrical method depth measurement supply terminals in the exploration area is divided into two kinds of situations, sets X negative directions as A Pole supply terminals, X positive directions are the coordinate (x of B poles supply terminals, then A poles supply terminalsAi,yAi) be:
Then coordinate (the x of B poles supply terminalsBi,yBi) be:
Monopole may be used in electrical method data measurement unit in this method or dipole measuring device is carried out, so as to segment For:Two dimension or three-dimensional asymmetric electrical method depth measurement monopole or dipole measuring device.
The method that the invention proposes only needs to arrange a series of symmetrical supply terminals of opposite Mr. Yu's fixed points, supply terminals spacing It equal to measurement point spacing, powers every time to a pair of symmetrical current electrode, and acquires all measurements in all exploration lines simultaneously Point electric field signal, due to supply terminals only with respect to certain fixation point symmetry, differing to be set to for measurement point is arranged symmetrically, Therefore this method is named as asymmetric electrical method sounding method.
Since above-mentioned asymmetric electrical method sounding method is a series of relative to each survey without picture symmetrical four-pole sounding method arrangement The supply terminals of point symmetry is measured, middle terraced depth measurement but also arrangement measurement point model outside measurement point had not only been arranged without section bathymetry terraced as in Interior small pole span symmetrical four-pole sounding is enclosed, therefore method proposed by the present invention substantially reduces the workload of arrangement supply terminals, so as to Improve two dimension or three-dimensional electrical prospecting efficiency.In three-dimensional asymmetric electrical method depth measurement pattern, due to using three-dimensional electrical method depth measurement Pattern not only improves exploration efficiency, but also can improve exploration effects.
Description of the drawings
Fig. 1 is the asymmetric electrical prospecting monopole measuring device figure of two dimension;
Fig. 2 is three-dimensional asymmetric electrical prospecting monopole measuring device figure;
Fig. 3 is the asymmetric electrical prospecting dipole measuring device figure of two dimension;
Fig. 4 is three-dimensional asymmetric electrical prospecting dipole measuring device figure.
Specific embodiment
Below in conjunction with Fig. 1, Fig. 2 and embodiment, the present invention will be further described.
The completely compatible existing electrical exploration equipment at present of electric power system and electrical method data measurin system energy of this method, and Electrical method data measurin system can use multichannel electrical method data measurin system or more set electrical method data measurin systems.
Embodiment 1
1 in figure is electrical prospecting transmitter, and 2 be A poles supply lines, and 3 be B poles supply lines, and 4 signified circle symbols are electricity Field signal measuring electrode point, 5 signified hollow cross symbols are A poles supply terminals, and 6 signified solid cruciform symbols are B poles Supply terminals, 7 be electric field signal measure traverse line, 8 be electrical prospecting receiver, 9 be electric field signal infinity measure traverse line and electrode, A and dotted arrow represent that A poles supply terminals runs extreme direction, and B and dotted arrow represent that B poles supply terminals runs extreme direction.
The specific embodiment of this method is divided into the asymmetric electrical method depth measurement monopole measuring device of two dimension and three-dimensional asymmetric electricity Method depth measurement monopole two kinds of situations of measuring device are illustrated respectively.
1st, the first situation, the asymmetric electrical method depth measurement monopole measuring device embodiment of two dimension
1) it is required based on exploration, selecting certain needs to carry out the two-dimentional exploration line X-direction of electrical prospecting and length L, measurement point Spacing distance a, maximum depth of exploration h, according to formula (1)
Determine the asymmetric electrical method depth measurement measurement point quantity m of two dimension;
2) according to formula (2)
Determine the asymmetric all supply terminals quantity n of electrical prospecting of exploration line two dimension;
3) according to formula (3)
Determine the coordinate x of the asymmetric all measurement points of electrical prospecting of exploration line two dimensionpi
4) according to formula (4) and (5)
Determine the coordinate x of the asymmetric all A poles supply terminals of electrical prospecting of exploration line two dimensionAiWith the coordinate of B poles supply terminals xBiCoordinate;
5) it according to all parameters asked for above, is determined in exploration line in the wild and arranges supply terminals, measurement point;
6) electrical prospecting transmitter 1 is arranged according to Fig. 1;Arrange A poles supply lines 2, and with 5 (such as Fig. 1 of A poles supply terminals Shown A1) connection;B poles supply lines 3 is arranged, and is connect with B poles supply terminals 6 (B1 as shown in Figure 1);By 7, conducting wire All measuring electrode points 4 are connect with electrical prospecting receiver 8;Arrange electric field signal acquisition infinity measure traverse line and electrode 9, and It is connect with electrical prospecting receiver 8;
7) electrical prospecting transmitter 1 is (as shown in Figure 1 by A poles supply terminals 5 (A1 as shown in Figure 1) and B poles supply terminals 6 B1) two electrode power supplies;
8) electrical prospecting receiver 8 carries out electrical method DATA REASONING to all measuring electrode points 4, obtains corresponding asymmetric two Tie up electrical prospecting data;
9) mobile A poles supply lines 2 and A poles supply terminals 5,6 two supply terminals of B poles supply lines 3 and B poles supply terminals and electric wire arrive Other positions (A2 and B2 as shown in Figure 1) repeat the 8th step, until A poles supply terminals 5 and 6 two supply terminals of B poles supply terminals Position reach An/2 and Bn/2 supply terminals position, so as to obtain the asymmetric electrical method depth measurement data of two dimension of whole exploration line;
10) data process and interpretation is carried out to above-mentioned all asymmetric electrical method depth measurement data of two dimension, obtains whole exploration line The asymmetric electrical method depth measurement achievement of two dimension.
If the L=400 rice in above-mentioned specific embodiment, a=40 meters, h=300 meters, then measurement point m=11, power supply It counts n=40, it may be determined that asymmetric electrical method depth measurement A, B the power supply pole coordinate parameter table of two dimension and the asymmetric electrical method depth measurement of two dimension Measuring electrode coordinate parameters table is respectively as shown in the following table 2 and 3.Depth measurement work for 11 measurement points for completing above-mentioned exploration line, It needs to lay 40 (20 pairs) symmetrical powering points, farthest AB length is 1560 meters.
Asymmetric electrical method depth measurement A, B power supply the pole coordinate parameter table of 2 two dimension of table
The 3 asymmetric electrical method depth measurement measuring electrode coordinate parameters table of two dimension of table
Serial number Measuring electrode coordinate
1 -200
2 -160
3 -120
4 -80
5 -40
6 0
7 40
8 80
9 120
10 160
11 200
2nd, the second situation, three-dimensional asymmetric electrical method depth measurement monopole measuring device embodiment:
1) it is required based on exploration, selectes exploration area X, Y-direction and corresponding length L, Q for needing to carry out three-dimensional electrical prospecting;
2) the interval of measuring points distance a of exploration area and exploration line spacing b, maximum depth of exploration h are determined, according to formula (6)
Determine the measurement point quantity m of three-dimensional asymmetric electrical method every exploration line of depth measurement;
3) according to formula (7)
Determine three-dimensional asymmetric electrical method depth measurement supply terminals quantity n;
4) according to formula (8)
Determine three-dimensional asymmetric electrical method depth measurement exploration line quantity t;
5) according to formula (9)
Determine the coordinate (x of all measurement points of the exploration area three-dimensional asymmetric electrical method depth measurementpi,ypj);
6) according to formula (10) and (11)
Determine the coordinate (x of the A poles supply terminals of all three-dimensional asymmetric electrical method depth measurements in the exploration areaAi,yAi) and the power supply of B poles Coordinate (the x of pointBi,yBi) coordinate;
7) it according to all parameters asked for above, is determined in exploration area and arranges supply terminals, measurement point;
8) electrical prospecting transmitter 1 is arranged according to Fig. 2;Arrange A poles supply lines 2, and with 5 (such as Fig. 2 of A poles supply terminals Shown A1) connection;B poles supply lines 3 is arranged, and is connect with B poles supply terminals 6 (B1 as shown in Figure 2);By 7, conducting wire All measuring electrode points 4 are connect with electrical prospecting receiver 8;Arrange electric field signal acquisition infinity measure traverse line and electrode 9, and It is connect with electrical prospecting receiver 8;
9) electrical prospecting transmitter 1 is (as shown in Figure 2 by A poles supply terminals 5 (A1 as shown in Figure 2) and B poles supply terminals 6 B1) two electrode power supplies;
10) electrical prospecting receiver 8 carries out electrical method DATA REASONING to all measuring electrode points 4, obtains corresponding asymmetric Three-dimensional electrical prospecting data;
11) mobile A poles supply lines 2 and A poles supply terminals 5,6 two supply terminals of B poles supply lines 3 and B poles supply terminals and electric wire To other positions (A as shown in Figure 22And B2), the 8th step is repeated, until A poles supply terminals 5 and 6 two supply terminals of B poles supply terminals Position reach An/2And Bn/2Supply terminals position, so as to obtain the three-dimensional asymmetric electrical method depth measurement data of entire exploration area;
12) data process and interpretation is carried out to above-mentioned all three-dimensional asymmetric electrical method depth measurement data, obtains entire exploration area Three-dimensional asymmetric electrical method depth measurement achievement.
Exploration efficiency contrast experiment
For the asymmetric electrical method depth measurement of comparison two dimension and the exploration efficiency of symmetrical four-pole sounding, it is assumed that certain exploration area has long 400 The exploration line of rice needs to carry out two-dimentional electrical method depth measurement, 40 meters of measurement point spacing, and maximum depth of exploration is 300 meters.It is wanted according to above It asks, sharing 11 measurement points needs to carry out two-dimentional electrical method depth measurement.
If carrying out symmetrical four-pole soundings to 11 measurement points, symmetrical quadrupole measurement point polar distance of supplying power according to table 1 and For measuring electrode away from parameter list, each measurement point needs 15 pairs of arrangement relative to the symmetrical supply terminals of each measurement point, 11 measurements Point needs to arrange 165 pairs of supply terminals altogether.
And if 11 measurement points are carried out with the asymmetric electrical method depth measurements of two dimension, the asymmetric electrical method of two dimension according to table 2 The asymmetric electrical method depth measurement measuring electrode coordinate parameters table of two dimension shown in depth measurement A, B power supply pole coordinate parameter table and table 3 is provided Parameter, 11 measurement points only lay 20 and (40) are supplied about the symmetrical asymmetric electrical method depth measurement of two dimension of exploration line intermediate point in total It is electric, with regard to the asymmetric electrical method depth measurement of two dimension of 11 measurement points can be completed.
The quantity that both the above method lays supply terminals is compared, it can be found that supply terminals is laid in the asymmetric electrical method depth measurement of two dimension Workload be considerably less than symmetrical quadrupole electrical method depth measurement, therefore the former exploration efficiency is higher than the latter.
Since the acquisition of electrical method data is simultaneously carried out 11 measurement points in the asymmetric electrical method depth measurement of two dimension, therefore may be used mostly logical Road or more set electrical method receivers, realize and carry out data acquisition to multiple measurement points simultaneously, to improve whole exploration efficiency.It is and right Quadrupole depth measurement is claimed to be only capable of carrying out a measurement point acquisition of electrical method data every time, then multichannel or more set electrical methods can not be used to receive Machine, so as to which its exploration efficiency is low.
If exploration area has a plurality of parallel exploration line to need to carry out two-dimentional electrical method depth measurement, if the survey of three-dimensional asymmetric electrical method can be carried out Deep, then the raising of its exploration efficiency can become apparent from for symmetrical quadrupole electrical method depth measurement, and due to using three-dimensional electricity Method is explored, and exploration effects are better than the two-dimentional achievement of symmetrical quadrupole electrical method depth measurement.

Claims (3)

1. asymmetric electrical method sounding method, it is characterised in that:It is symmetrically a series of etc. only with respect to a certain fixed point by design Spacing supply terminals using electrical prospecting transmitter by powering relative to symmetrical two supply terminals of the fixed point to underground, is adopted The electric field signal in all measurement points of exploration line is received simultaneously with electrical prospecting receiver, asks for every a pair of of symmetrical powering point power supply When each measurement point apparent resistivity and parameters of electrical induction, realize and asymmetric electrical method depth measurement carried out to all measurement points simultaneously;Specifically Step is:
(1) Geological Achievements early period of look-ahead analysis exploration area, infer the distribution situation of main geologic anomalous body in area, and setting is non-right Claim the exploration line direction of electrical method depth measurement;
(2) required according to exploration, determine the length and quantity of exploration line, and according to corresponding spacing, determine exploration area parameter (m, n、t);Wherein, m is the measurement point quantity of every exploration line, and n is supply terminals quantity, and t is exploration line quantity;
(3) the exploration targets body characteristics based on exploration area, topography and geomorphology relief feature, using the measurement point of asymmetric electrical method depth measurement With power supply point coordinates layout rules, the coordinate of all measurement points and supply terminals is determined, and arrange measurement point and supply terminals;
(4) selection is powered relative to symmetrical two supply terminals of coordinate origin using electrical prospecting transmitter every time, is owned Electrical method data measurement points in exploration line carry out electrical method data acquisition using electrical prospecting receiver, when getting each power supply The electrical method data of all electrical method data measurement points;
(5) then change relative to symmetrical two supply terminals of coordinate origin position, ensure two supply terminals still in relation to Coordinate origin is symmetrical, repeats above power supply and data acquisition, gets the asymmetric electrical method depth measurement data of entire exploration area;
(6) above-mentioned data are combined as Asymmetric Electric method depth measurement data, using electrical prospecting data process and interpretation software, carried out Follow-up data processing and analysis obtain the asymmetric electrical method depth measurement achievement of entire exploration area.
2. asymmetric electrical method sounding method as described in claim 1, it is characterised in that:The step of asymmetric electrical method sounding method (2) rule of determining exploration area parameter (m, n, t) is in:
When A) carrying out two-dimentional asymmetric electrical method depth measurement, then the asymmetric electrical method depth measurement exploration line direction of exploration area two dimension is set as X Direction, wherein X-direction are horizontal direction;Exploration line length is L, and each interval of measuring points distance is a, and maximum depth of exploration is h, Then the measurement point quantity m of the exploration line is
Supply terminals quantity n is
Exploration line quantity t=1;
When B) carrying out three-dimensional asymmetric electrical prospecting, then exploration area three-dimensional asymmetric electrical prospecting line direction is set as X-direction, X side It is L to exploration line length, the total spacing of Y-direction exploration line is Q, and wherein X-direction is vertical with Y-direction, and is horizontal direction;Each Interval of measuring points distance is a, and exploration line spacing is b, and maximum depth of exploration is the measurement point quantity of h, then every exploration line of X-direction M is
Supply terminals quantity n is:
Entirely exploration area exploration line quantity t is:
3. asymmetric electrical method sounding method as claimed in claim 2, it is characterised in that:The step of asymmetric electrical method sounding method (3) using the measurement point of asymmetric electrical method depth measurement and power supply point coordinates layout rules in:
When A) carrying out two-dimentional asymmetric electrical method sounding method, then it measures point coordinates xpiWith A poles power supply point coordinates xAi, B poles power supply Point coordinates xBiLayout rules are as follows:The centre position for choosing the exploration line is coordinate origin, then two-dimentional asymmetric electrical method depth measurement institute There is the coordinate x of electrical method data measurement pointspiFor:
The wherein integer (6) of i ∈ [1, m]
The coordinate of the asymmetric electrical method depth measurement supply terminals of all two dimensions of the exploration line is divided into two kinds of situations, setting X negative direction arrangement A poles Supply terminals, X positive directions arrange B poles supply terminals, then the coordinate x of A poles supply terminalsAiFor:
The wherein integer (7) of i ∈ [1, n/2]
The coordinate x of B poles supply terminalsBiFor:
The wherein integer (8) of i ∈ [1, n/2]
When B) carrying out three-dimensional asymmetric electrical method sounding method, then it measures point coordinates (xpi,ypj) and A poles power supply point coordinates (xAi, yAi), B poles power supply point coordinates (xBi,yBi) layout rules are as follows:The center of the exploration rectangle region is chosen as coordinate origin, three Tie up the coordinate (x of all electrical method data measurement points of asymmetric electrical method depth measurementpi,ypj) be:
The wherein integer of i ∈ [1, m], the integer (9) of j ∈ [1, t]
The coordinate of all three-dimensional asymmetric electrical method depth measurement supply terminals in the exploration area is divided into two kinds of situations, sets X negative directions and is supplied as A poles Electric, X positive directions are the coordinate (x of B poles supply terminals, then A poles supply terminalsAi,yAi) be:
The wherein integer (10) of i ∈ [1, n/2]
Then coordinate (the x of B poles supply terminalsBi,yBi) be:
The wherein integer (11) of i ∈ [1, n/2].
CN201611213671.1A 2016-12-25 2016-12-25 Asymmetric electrical method sounding method Expired - Fee Related CN106646624B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611213671.1A CN106646624B (en) 2016-12-25 2016-12-25 Asymmetric electrical method sounding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611213671.1A CN106646624B (en) 2016-12-25 2016-12-25 Asymmetric electrical method sounding method

Publications (2)

Publication Number Publication Date
CN106646624A CN106646624A (en) 2017-05-10
CN106646624B true CN106646624B (en) 2018-06-12

Family

ID=58827808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611213671.1A Expired - Fee Related CN106646624B (en) 2016-12-25 2016-12-25 Asymmetric electrical method sounding method

Country Status (1)

Country Link
CN (1) CN106646624B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239835A (en) * 2020-01-29 2020-06-05 中南大学 Orthogonal conduction electrical sounding method suitable for long and narrow landforms
CN111427092B (en) * 2020-05-13 2022-12-27 天津华北地质勘查总院 Method for improving geophysical prospecting electrical sounding deep field construction efficiency
CN111856589B (en) * 2020-06-18 2021-07-06 山东大学 Three-dimensional imaging method and system for ground surface comprehensive geophysical prospecting
CN113093291B (en) * 2021-04-06 2023-10-27 湖南省地质调查院(湖南省地质矿产勘查开发局油气资源调查中心) Differential electrical prospecting method for pollutant leakage detection
CN114152989B (en) * 2021-12-01 2022-08-12 中南大学 Method for calculating coordinates of pseudo-section diagram of two-dimensional asymmetric quadrupole electrical method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1912656A (en) * 2005-04-22 2007-02-14 普拉德研究及开发股份有限公司 Anti-symmetrized electromagnetic measurements
RU2434251C1 (en) * 2010-04-30 2011-11-20 Общество с ограниченной ответственностью "Научно-Техническая Компания ЗаВеТ-ГЕО" Method for marine electrical exploration and device for realising said method
CN103955000A (en) * 2014-04-02 2014-07-30 中国冶金地质总局山东正元地质勘查院 Three-dimensional electrical sounding method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1912656A (en) * 2005-04-22 2007-02-14 普拉德研究及开发股份有限公司 Anti-symmetrized electromagnetic measurements
RU2434251C1 (en) * 2010-04-30 2011-11-20 Общество с ограниченной ответственностью "Научно-Техническая Компания ЗаВеТ-ГЕО" Method for marine electrical exploration and device for realising said method
CN103955000A (en) * 2014-04-02 2014-07-30 中国冶金地质总局山东正元地质勘查院 Three-dimensional electrical sounding method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
RESISTIVITY SURVEYING AND ELECTROMAGNETIC METHODS;Gylfi Páll Hersir;《Short Course VII on Surface Exploration for Geothermal Resources》;20150322;第1-13页 *
双侧轴向单极-偶极激电测深在勘查铅锌等多金属矿中的应用;雒志锋等;《物探与化探》;20091031;第33卷(第5期);第501-505页 *
时域激电单极~偶极测深数据转换为偶极~偶极测深数据及其二维反演对比;徐锦山等;《物探化探计算技术》;20101130;第32卷(第6期);第621-628页 *

Also Published As

Publication number Publication date
CN106646624A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106646624B (en) Asymmetric electrical method sounding method
EP3819676B1 (en) Three-dimensional high-density resistivity measurement method based on electrode random distribution and exploration system
CN107742015B (en) DC induced polarization method three-dimensional numerical simulation method based on arbitrary dipole-dipole device
CN203531883U (en) Well logging equipment
CN103955000B (en) Three-dimensional electrical sounding method
US20230273336A1 (en) Data acquisition method of three-dimensional high-density resistivity based on arbitrary electrode distribution
CN107748395A (en) A kind of multifrequency electric resistivity exploration method
CN102707323B (en) Controllable source audio-frequency magnetic field sounding method for geological exploration
CN103018781B (en) 2D/3D nuclear magnetic resonance and transient electromagnetic combined instrument and outdoor operation method
CN105301663A (en) Time-frequency electromagnetic exploration data air acquisition device and system
CN106125143A (en) DC fields fixed power supply exploitation method
CN106772620B (en) Cross three-dimensional electrical prospecting method
CN108873073B (en) A kind of across hole resistivity tomography method of three-dimensional based on electrical method of network concurrency
WO2015043320A1 (en) Multifunctional two-way high-density cable and application thereof
CN103235344A (en) Double-lane multi-electrode electric perspective detection system
CN102767366A (en) High-resolution orientation resistivity side direction logging instrument and logging method
CN112630842B (en) Dipole differential device and method applied to direct-current resistivity method exploration
CN103499838A (en) Transient electromagnetic measuring device and recognizing method for anomalous body orientation recognition
CN205139386U (en) Time frequently aerial collection system of electromagnetic survey data and system
CN107192889A (en) A kind of method that utilization principle of stacking calculates mutual inductance between grounded screen and coil
CN106646622B (en) Groined type three-dimensional electrical prospecting method
CN106842332B (en) A kind of comprehensive electrical prospecting method
CN104820247B (en) Mine Distributed Three-dimensional electrical prospecting apparatus and observation procedure thereof
EA009117B1 (en) Method for survey design
CN1229876A (en) Whole three-dimentional resistivity logging method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

CF01 Termination of patent right due to non-payment of annual fee