CN106640153B - A kind of railway tunnel basement rock working face processing method - Google Patents

A kind of railway tunnel basement rock working face processing method Download PDF

Info

Publication number
CN106640153B
CN106640153B CN201710005728.7A CN201710005728A CN106640153B CN 106640153 B CN106640153 B CN 106640153B CN 201710005728 A CN201710005728 A CN 201710005728A CN 106640153 B CN106640153 B CN 106640153B
Authority
CN
China
Prior art keywords
railway tunnel
water
working face
basal plane
surrounding rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710005728.7A
Other languages
Chinese (zh)
Other versions
CN106640153A (en
Inventor
彭斌
赵勇
倪光斌
林传年
魏峰
吕刚
陈学峰
刘建友
陈志广
王杨
于鹤然
刘方
张矿三
张延�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing China Railway Chengye Engineering Construction Supervision Co., Ltd
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201710005728.7A priority Critical patent/CN106640153B/en
Publication of CN106640153A publication Critical patent/CN106640153A/en
Application granted granted Critical
Publication of CN106640153B publication Critical patent/CN106640153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of railway tunnel basement rock working face processing methods comprising following steps: S1, blocking Railway Tunnel Surrounding Rock basal plane EXIT POINT;S2, the ponding of the Railway Tunnel Surrounding Rock basal plane and empty quarrel are cleaned out;S3, water-absorbent material is paved on the Railway Tunnel Surrounding Rock basal plane to adsorb residual ponding and keep drying;S4, pave the dry working face for gathering materials, forming drying and hardening on the water-absorbent material.The present invention paves water-absorbent material on Railway Tunnel Surrounding Rock basal plane, such as quick lime adsorbs residual ponding and keeps drying;Further pave on the water-absorbent material the dry working face for gathering materials, forming drying and hardening, and thus solves tunnel bottom bedrock surface in construction personnel's operating process since miriness can't bear generated series of technical.

Description

A kind of railway tunnel basement rock working face processing method
Technical field
The present invention relates to tunnel construction field more particularly to a kind of railway tunnel basement rock working face processing methods.
Background technique
With the continuous reinforcement of national basis Facilities Construction dynamics, various tunnel construction engineering quantities also gradually increase, phase It answers, the quantity, scale and type about tunnel structure disease are also in rising trend.Wherein, railway tunnel structure is main Disease includes: that lining cutting percolating water, Lining cracks and bottom structure damage, ratio account for about the 97% of all diseases, wherein tunnel Bottom structure Damage Types again can there are many, such as shop fixtures is destroyed, is risen soil, lateral sulcus breakage, in order to reduce such disease The probability of generation should first ensure that the quality that performs of concrete structure meets design requirement.
And during the tunneling of region of FuShui, tunnel bedrock surface is easy to appear some EXIT POINTs, even if taking Rational approach still suffers from some residual water and exists, and the operation process of construction personnel mixes residual water with void quarrel, makes bedrock surface Miriness can't bear, and in loess geologic province, this phenomenon is especially serious, not only make troubles to construction operation, and cleaning work is also very It is difficult, it does not do cleaning such as before concrete work or cleaning is not in place, bigger harm will be generated, for example, water on bedrock surface Presence change the ratio of mud of concrete, the increase of the ratio of mud makes to be easy to produce minute crack in course of hardening, micro- Small crack easily extension perforation under train load long duration of action, causes concrete self-waterproof ability defect occur, at tunnel bottom Occur infiltration phenomenon under pressure water action, further results in concrete and carbonization and steel bar corrosion occurs, destroy the entirety of structure Property and durability, generate a large amount of tunnel bottom structure diseases;Construction site working environment is severe, causes to the physical and mental health of construction personnel Damage;Tunnel such as is built in region of FuShui, then country rock EXIT POINT is more, and construction personnel's operation and tunnel haulage transport are to continue Process causes cleaning work large labor intensity and is not easy to carry out.
Therefore, it is necessary to provide a kind of new railway tunnel basement rock working face processing method, it can stablize and effectively protect It is dry to hold tunnel surrounding basal plane, solves the problems, such as that existing tunnel country rock basal plane has residual water and miriness is unbearably brought.
Summary of the invention
The present invention is directed to above-mentioned the technical problems existing in the prior art, provides at a kind of railway tunnel basement rock working face Reason method can keep tunnel surrounding basal plane dry, solve tunnel bottom bedrock surface in construction personnel's operating process due to miriness Unbearably generated series of technical.
Used technical solution is as follows to solve above-mentioned technical problem by the present invention:
A kind of railway tunnel basement rock working face processing method is provided, is included the following steps:
S1, Railway Tunnel Surrounding Rock basal plane EXIT POINT is blocked;
S2, the ponding of the Railway Tunnel Surrounding Rock basal plane and empty quarrel are cleaned out;
S3, water-absorbent material is paved on the Railway Tunnel Surrounding Rock basal plane to adsorb residual ponding and keep drying;
S4, pave the dry working face for gathering materials, forming drying and hardening on the water-absorbent material.
Preferably, further include S5, it is described it is dry gather materials on successively perform preliminary bracing and secondary liner structure.
Preferably, in step S3, the water-absorbent material is quick lime.
Preferably, the quick lime with a thickness of 10-30cm.
Preferably, described dry to gather materials according to parts by weight in step S4, comprising: 20-45 parts of cement, 10-25 parts of rubbles with And 20-30 parts of sand.
Preferably, it is described it is dry gather materials with a thickness of 10-20cm.
Technical effect acquired by technical solution of the present invention is as follows:
(1) technical solution of the present invention is different from the measure passively cleared up in present scheme, and water can be made to become basal plane The advantage of hardening can guarantee the drying of tunnel bottom structure construction work surface, not only provide hardening for construction personnel Working face, it is ensured that the drying of operation side has completely cut off the straight of construction personnel, instrument and haulage vehicle and tunnel bedrock surface Contact thereby ensures that going on smoothly for concreting work;
(2) generation for having prevented operation side miriness phenomenon hence improves the working environment of construction personnel;
(3) cleaning work for reducing bedrock surface reduces the working strength of construction personnel.
(4) use material be easy obtain and it is low in cost;And construction method process is simple and easy to do, to the skill of operator Art Capability Requirement is low.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the flow chart of railway tunnel basement rock working face processing method in the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram of railway tunnel basement rock working face in the embodiment of the present invention one.
Specific embodiment
The present invention is easy to appear ponding for tunnel bedrock surface existing in the prior art, leads to the operation of construction personnel Journey mixes residual water with void quarrel, and bedrock surface miriness is caused to can't bear, and further results in construction operation difficulty, influences concrete structure The problem of quality, provides a kind of railway tunnel basement rock working face processing method, and core concept is: in Railway Tunnel Surrounding Rock Pave water-absorbent material on basal plane, such as quick lime ponding and keeps drying to adsorb residual;Further on the water-absorbent material Pave the dry working face for gathering materials, forming drying and hardening, and thus solves tunnel bottom bedrock surface in construction personnel's operating process The series of technical caused by miriness can't bear.
Embodiment one:
As shown in Figs. 1-2, railway tunnel basement rock working face processing method provided by the invention includes the following steps:
S1, Railway Tunnel Surrounding Rock basal plane EXIT POINT is blocked, prevents EXIT POINT from further generating ponding;
S2, the ponding of the Railway Tunnel Surrounding Rock basal plane and empty quarrel are cleaned out, convenient for keeping basal plane dry, smooth, Convenient for the progress of subsequent construction step;
S3, water-absorbent material is paved on the Railway Tunnel Surrounding Rock basal plane to adsorb residual ponding and keep drying;This reality Apply in example, the water-absorbent material is preferably quick lime, and the quick lime with a thickness of 10-30cm, particularly preferred, the life Lime with a thickness of 20cm;
S4, pave the dry working face for gathering materials, forming drying and hardening on the water-absorbent material;It is described in the present embodiment It is dry to gather materials according to parts by weight, comprising: 20-45 parts of cement, 10-25 rubble and 20-30 parts of sand, it is preferred that include: 35 parts of water Mud, 18 parts of rubbles and 25 parts of sand;And it is described it is dry gather materials with a thickness of 10-20cm, particularly preferred, the dry thickness to gather materials For 15cm;To new EXIT POINT, it is dry gather materials absorption and filtration can be generated to water, meanwhile, when cement and water reconcile, meeting Sand and rubble is cemented together, it is hardened to firm entirety, enables the operation of construction personnel's later period in the work of dry hardening Follow-up work is carried out on face;
Further, further include S5, it is described it is dry gather materials on successively perform preliminary bracing and secondary liner structure, to entire Railway Tunnel Surrounding Rock basal plane plays reinforcing and supporting role.
In conclusion technical solution of the present invention has the following beneficial effects:
(1) technical solution of the present invention is different from the measure passively cleared up in present scheme, and water can be made to become basal plane The advantage of hardening can guarantee the drying of tunnel bottom structure construction work surface, not only provide hardening for construction personnel Working face, it is ensured that the drying of operation side has completely cut off the straight of construction personnel, instrument and haulage vehicle and tunnel bedrock surface Contact thereby ensures that going on smoothly for concreting work;
(2) generation for having prevented operation side miriness phenomenon hence improves the working environment of construction personnel;
(3) cleaning work for reducing bedrock surface reduces the working strength of construction personnel.
(4) use material be easy obtain and it is low in cost;And construction method process is simple and easy to do, to the skill of operator Art Capability Requirement is low.
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only memory, disk or CD etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of railway tunnel basement rock working face processing method, which comprises the steps of:
S1, Railway Tunnel Surrounding Rock basal plane EXIT POINT is blocked;
S2, the ponding of the Railway Tunnel Surrounding Rock basal plane and empty quarrel are cleaned out;
S3, water-absorbent material is paved on the Railway Tunnel Surrounding Rock basal plane to adsorb residual ponding and keep drying;The water suction Material is quick lime;
S4, pave the dry working face for gathering materials, forming drying and hardening on the water-absorbent material;And described dry gather materials by weight Number meter, comprising: 20-45 parts of cement, 10-25 parts of rubbles and 20-30 parts of sand.
2. the method as described in claim 1, which is characterized in that further include S5, it is described it is dry gather materials on successively perform initial stage branch Shield and secondary liner structure.
3. the method as described in claim 1, which is characterized in that the quick lime with a thickness of 10-30cm.
4. the method as described in claim 1, which is characterized in that it is described it is dry gather materials with a thickness of 10-20cm.
CN201710005728.7A 2017-01-05 2017-01-05 A kind of railway tunnel basement rock working face processing method Active CN106640153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710005728.7A CN106640153B (en) 2017-01-05 2017-01-05 A kind of railway tunnel basement rock working face processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710005728.7A CN106640153B (en) 2017-01-05 2017-01-05 A kind of railway tunnel basement rock working face processing method

Publications (2)

Publication Number Publication Date
CN106640153A CN106640153A (en) 2017-05-10
CN106640153B true CN106640153B (en) 2019-02-15

Family

ID=58843110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710005728.7A Active CN106640153B (en) 2017-01-05 2017-01-05 A kind of railway tunnel basement rock working face processing method

Country Status (1)

Country Link
CN (1) CN106640153B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404516B (en) * 2021-06-24 2023-09-22 北京中铁诚业工程建设监理有限公司 Railway tunnel bedrock surface processing method and processing device thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500108A (en) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 Method for treating tunnel base water return point
CN105350988A (en) * 2015-11-30 2016-02-24 中国神华能源股份有限公司 Tunnel base reinforcing method
CN105443141A (en) * 2015-11-30 2016-03-30 中国神华能源股份有限公司 Tunnel base reinforcement method
CN105673025A (en) * 2014-11-19 2016-06-15 山东科技大学 Underground engineering loess tunnel ground surface settlement control construction process
CN105781571A (en) * 2016-03-11 2016-07-20 中交第二公路工程局有限公司 Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN205677668U (en) * 2016-06-14 2016-11-09 中铁隧道勘测设计院有限公司 A kind of single-track railway tunnel substrate guarded drainage strengthening system
CN106089297A (en) * 2016-07-29 2016-11-09 中铁工程设计咨询集团有限公司 Railway tunnel bottom structure drainage device and method to set up thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2545338B2 (en) * 1994-02-07 1996-10-16 株式会社ケー・エフ・シー Tunnel waterproof construction method
JP2011231531A (en) * 2010-04-28 2011-11-17 Kizai Tecto Corp Flow end treatment unit with side ditch having grating for surface headrace construction method in tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673025A (en) * 2014-11-19 2016-06-15 山东科技大学 Underground engineering loess tunnel ground surface settlement control construction process
CN104500108A (en) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 Method for treating tunnel base water return point
CN105350988A (en) * 2015-11-30 2016-02-24 中国神华能源股份有限公司 Tunnel base reinforcing method
CN105443141A (en) * 2015-11-30 2016-03-30 中国神华能源股份有限公司 Tunnel base reinforcement method
CN105781571A (en) * 2016-03-11 2016-07-20 中交第二公路工程局有限公司 Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN205677668U (en) * 2016-06-14 2016-11-09 中铁隧道勘测设计院有限公司 A kind of single-track railway tunnel substrate guarded drainage strengthening system
CN106089297A (en) * 2016-07-29 2016-11-09 中铁工程设计咨询集团有限公司 Railway tunnel bottom structure drainage device and method to set up thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
五洲大道石灰土施工工艺实践与研究;康毅等;《今日科苑》;20100430(第08期);第172页第2.2节至第173页第3节
弁山隧道软弱基底加固处理技术;汪新录等;《铁道标准设计》;20071210;第74页第1节至第7页第2节,图1-2

Also Published As

Publication number Publication date
CN106640153A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN109972609A (en) A kind of railway traffic engineering construction method of underground continuous wall
CN207406349U (en) Tunnel Base reinforcing construction
CN104895581B (en) Structure and its restorative procedure are quickly repaired in a kind of tunnel-liner based on Carbon Fibre Textile
CN106639349A (en) Construction method for partial replacement of concrete column
CN103590836B (en) Method for processing tunnel collapse caused by shallow-buried excavation
CN104989434B (en) A kind of processing method caved in tunnel work face using poling combination arch
CN103541359A (en) Method for repairing and treating quality defect of cast-in-place pile
CN105421254B (en) In-situ repairing method of upper pinner of rail transit bridge support and pinner formwork
CN112901207B (en) Treatment method for collapse in tunnel during arch change of secondary lining in sulfate corrosion section of operation tunnel
CN109611099A (en) A kind of three step of large-section loess tunnel, four step Rapid Excavation method of support construction method
CN105350559A (en) Construction method suitable for emery structural ground of large factory building
CN108396771A (en) Raw earth-retaining wall construction method is planted from embedded reinforcement
CN106640153B (en) A kind of railway tunnel basement rock working face processing method
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN110778328A (en) Loess tunnel entrance section construction method for passing through landslide body
CN206801581U (en) A kind of tunnel lining structure defect reinforcing device
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN107100629A (en) A kind of control method and structure of shield tunnel auger ground plastic deformation
CN108457201A (en) Ultra-high performance concrete lattice ruggedized construction and its method for reinforcing masonry arch bridge
CN111576921A (en) Dismantling and rebuilding construction method for existing foundation building in rail transit protection area
CN108179754A (en) The construction method of long and narrow Extra-Deep Foundation Pit system
CN209621322U (en) A kind of guide table structure missed the stop suitable for rock tunnel(ling) machine
CN207829907U (en) A kind of tunnel bottom structure
CN110905529A (en) Construction method of loess tunnel penetrating through landslide mass
Pellegrini et al. Sao Paulo Metro Project–Control of Settlements in variable soil conditions through EPB pressure and bicomponent backfill grout

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200623

Address after: 100071 East Building 19, Haiying Road Headquarters, Fengtai District, Beijing

Co-patentee after: Beijing China Railway Chengye Engineering Construction Supervision Co., Ltd

Patentee after: CHINA RAILWAY ENGINEERING CONSULTATION GROUP Co.,Ltd.

Address before: 100055 China Railway consulting building, No. 15, Guang'an Road, Beijing, Fengtai District

Patentee before: CHINA RAILWAY ENGINEERING CONSULTATION GROUP Co.,Ltd.

TR01 Transfer of patent right