CN106639924A - Oil tube jacking device and method of using same to operate - Google Patents

Oil tube jacking device and method of using same to operate Download PDF

Info

Publication number
CN106639924A
CN106639924A CN201710006018.6A CN201710006018A CN106639924A CN 106639924 A CN106639924 A CN 106639924A CN 201710006018 A CN201710006018 A CN 201710006018A CN 106639924 A CN106639924 A CN 106639924A
Authority
CN
China
Prior art keywords
bracket
oil pipe
jacking device
make
gripper shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710006018.6A
Other languages
Chinese (zh)
Other versions
CN106639924B (en
Inventor
吴立中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710006018.6A priority Critical patent/CN106639924B/en
Publication of CN106639924A publication Critical patent/CN106639924A/en
Application granted granted Critical
Publication of CN106639924B publication Critical patent/CN106639924B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/16Connecting or disconnecting pipe couplings or joints
    • E21B19/161Connecting or disconnecting pipe couplings or joints using a wrench or a spinner adapted to engage a circular section of pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Supports For Pipes And Cables (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to an oil tube jacking device and a method of using the same to operate. The oil tube jacking device comprises a first bracket, a second bracket and a supporting leg; the first bracket is connected to the second bracket through a main hydraulic rod and an auxiliary hydraulic rod; the second bracket is supported on the first bracket through the main hydraulic rod, and the main hydraulic rod is supported on the first bracket through the auxiliary hydraulic rod; a third bracket is further arranged in the second bracket, a fourth bracket is arranged on the third bracket, one side of the fourth bracket is hinged to one side of the third bracket, two supporting plates are arranged on the upper portion of the fourth bracket, and the two supporting plates are arranged in a reversed splay shape. With adoption of the oil tube jacking device provided by the invention, a limited operating space in the field can be utilized to the maximum extent, and no boom hoist is used, so that the cost is greatly lowered and the operating safety is improved. By virtue of an oil tube connecting method provided by the invention, a butt joint can be prevented from being damaged in an oil tube connecting process, and the connecting strength and the sealing property of the oil tube are improved.

Description

Oil pipe jacking device and the method for carrying out operation using it
Technical field
The present invention relates to a kind of oil pipe jacking device and the method for carrying out operation using it, it is adaptable to the technology neck of petroleum works Domain.
Background technology
Oil pipe is used to insert in oil well from storage oil reservoir to extract crude oil out.Length per Oil-saving pipe is generally arrived at more than ten meters Tens meters, therefore need to couple together in oil pipe during field operation to use.Two ends per Oil-saving pipe are respectively set to public access Head and the form of female joint, male joint refers to outer wall of the screw thread positioned at oil pipe that spin, and female joint refers to the screw thread that spins positioned at oil pipe Inwall.When two Oil-saving pipes connect, the male joint of an oil pipe is inserted in the female joint of another oil pipe and screwed.Due to oil Connection is needed to use between pipe, therefore the length of single-unit oil pipe can not possibly be too short, can otherwise increase connection number of times.The joint of oil pipe It is to be easiest to where generation leakage and corrosion, this is because joint location can occur inevitably to collide and receive in connection To damage, and the content of carbon dioxide and hydrogen sulfide is larger in oil well.Once damage location is exposed in Korrosionsmedium, will Accelerate it to corrode, gently then reduce the service life of oil pipe, it is heavy then scrap whole oil pipe, cause great economic loss.
The method that Fig. 6 shows connected pipes in prior art.As illustrated, general in prior art risen using arm extending type Loop wheel machine 4 slings in upper oil pipe 51, by its with align already inserted into the lower oil pipe 52 maintained in oil well and by chucking device 53, Then both are spun.This kind of form of construction work has two significant deficiencies:
Firstly, since the restriction of Active workings, lifting machine is generally required and maintained a certain distance with oil well.When oil pipe is up to When more than ten meters, the Hydraulic jip that can cause lifting machine is up to tens meters.So not only cause the big discounting of security of job site Button, but also operating cost can be caused to be substantially increased.
Secondly, upper oil pipe and lower oil pipe are not had into any ancillary method when aliging, thus can cause oil pipe and Frequently collide between lower oil pipe, will certainly cause to damage in the male joint of oil pipe and female joint so as to intensity and sealing Property is affected by serious, it is most likely that so that whole oil pipe is scrapped, so as to cause great economic loss.
Therefore, a kind of restriction that can reduce working space is needed in prior art, is avoided using arm extending type lifting machine simultaneously The oil pipe construction technology damaged at oil connection can as far as possible be reduced.
The content of the invention
The invention provides a kind of oil pipe jacking device and the method for carrying out operation using it, it can reduce working space Limit, avoid using arm extending type lifting machine and can reduce damage at oil connection, drastically increase the safety of oil pipe operation Property, convenience and sealing.
A first aspect of the present invention is related to a kind of oil pipe jacking device, including the first bracket, the second bracket and leg, the first support It is connected with each other by master hydraulic bar and secondary hydraulic stem between frame and the second bracket;Second bracket is supported on first by master hydraulic bar On bracket, master hydraulic bar is supported on the first bracket by secondary hydraulic stem;
The track for the 3rd bracket being additionally provided with second bracket and being slided for the 3rd bracket;Under folded state, the 3rd bracket holds It is contained in the inside of the second bracket;During work, the 3rd bracket can slide along the track on the second bracket and stretch out;
3rd bracket is provided with the 4th bracket, and side and the side of the 3rd bracket of the 4th bracket are hinged so that the 4th support Frame can surround the side of the 3rd bracket and rotate;The top of the 4th bracket is provided with two panels gripper shoe, and two panels gripper shoe is in eight word Shape arranges that oil pipe is placed in inverse Ba type space;
4th bracket is provided with puopulsion equipment, for after oil pipe is placed on the 4th bracket, oil pipe being promoted forward, So that oil pipe stretches out from the 4th bracket.
Preferably, the length of the 3rd bracket and the 4th bracket can be with equal;Puopulsion equipment can be arranged on the 4th bracket In the middle of the two panels gripper shoe in portion, and from stretching out between two panels gripper shoe;The opposite side of the 4th bracket can ride upon the 3rd bracket Opposite side on;The track slided for the 3rd bracket can be located at the inner side of the lateral frame of the second bracket.
Preferably, under folded state, master hydraulic bar and secondary hydraulic stem are packed up, and the second bracket is contained in the space of the first bracket It is interior;Under jacking state, master hydraulic bar is holded up by the second bracket jack-up and to be supported on the first bracket, secondary hydraulic stem Auxiliary support Master hydraulic bar.
A second aspect of the present invention is related to a kind of method for carrying out oil pipe operation using above-mentioned oil pipe jacking device, and its feature exists In comprising the following steps:
(1) start machine, manipulates the 4th bracket so as to rotate around the side of the 3rd bracket, oil pipe is put into the 4th support In the gripper shoe of frame, the 4th bracket is rotated back into horizontal level is in place oil pipe;
(2) controlling master hydraulic bar and secondary hydraulic stem makes it upright and is increased to specified altitude assignment;
(3) slide the 3rd bracket so as to stretches out from the second bracket;
(4) puopulsion equipment being arranged on the 4th bracket is manipulated, makes oil pipe stretch out the 4th bracket;
(5) oil pipe is sling, while installing make-up device in the upper end of lower oil pipe;
(6) lower end of upper oil pipe is alignd with the upper end open of make-up device so as in being properly inserted lower oil pipe, starts hydraulic pressure Clamp is tightly gone up oil pipe and is rotated so as to which bottom spins with the upper end of lower oil pipe;
(7) contrary operation jacking device, reduces its height, and unclamps hydraulic tongs, into next work cycle.
Preferably, make-up device is cylindrical, and upper end open is more than lower ending opening;Lower ending opening for cylindric, itself and oil pipe The size of female joint is corresponding;Upper end open is round table-like, and the top surface of round platform is with diameter greater than basal diameter;
During operation, make-up device is placed on lower oil pipe so that in the lower ending opening of the top insertion make-up device of lower oil pipe; After the lower end of oil pipe of slinging is put into the upper end open of make-up device, because the inwall of upper end open is obliquely installed so that upper oil pipe On male joint can be automatically inserted into the female joint of lower oil pipe realize alignment.
Using the oil pipe jack of the present invention, the limited working space in scene can be maximally utilised, it is to avoid adopt Arm extending type lifting machine, has greatly saved cost and has improve operational security.Using the oil pipe method of attachment of the present invention, moreover it is possible to Butt joint position in oil pipe connection procedure is enough avoided to cause to damage, so as to drastically increase bonding strength and the sealing of oil pipe Property.
Description of the drawings
Fig. 1 is the schematic diagram after the jacking device of the present invention is folded.
Fig. 2 is the partial enlarged drawing after the jacking device of the present invention is folded.
Fig. 3 is the partial enlarged drawing after the jacking device of the present invention is folded.
Fig. 4 is the schematic diagram of the jacking device working condition of the present invention.
Fig. 5 is the rearview under the jacking device working condition of the present invention.
Fig. 6 is the schematic diagram of the method for connected pipes in prior art.
Fig. 7 is the schematic diagram of the method for the jacking device connected pipes using the present invention.
Fig. 8 is a kind of sectional view of make-up device of the present invention.
Fig. 9 is a kind of top view of make-up device of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention become more apparent, below in conjunction with accompanying drawing to the present invention Embodiment be described in detail.It should be noted that in the case where not conflicting, in the embodiment and embodiment in the application Feature can mutually be combined.
As Figure 1-3, which show the schematic diagram of (i.e. not job state) after the jacking device folding of the present invention.As schemed Shown, jacking device includes the first bracket 1, the second bracket 2 and leg 9, and main hydraulic pressure is passed through between the first bracket 1 and the second bracket 2 Bar 11 and secondary hydraulic stem 12 are connected with each other.Second bracket 2 is supported on the first bracket 1 by master hydraulic bar 11, master hydraulic bar 11 It is supported on the first bracket 1 by secondary hydraulic stem 12.Leg 9 is used to for jacking device to be firmly supported at ground.Folded state Under, master hydraulic bar 11 is packed up with secondary hydraulic stem 12, and the second bracket 2 is contained in the space of the first bracket 1.It is main under jacking state Hydraulic stem 11 is holded up by the jack-up of the second bracket 2 and to be supported on the first bracket 1, the Auxiliary support master hydraulic bar of secondary hydraulic stem 12 11。
As in Figure 3-5, it is additionally provided with the 3rd bracket 3 in the second bracket 2.Under folded state, the 3rd bracket 3 is contained in second The inside of bracket 2, the second bracket 2 is provided with the track slided for the 3rd bracket 3.Preferably, the track for sliding for the 3rd bracket 3 The inner side of the lateral frame of the second bracket 2 can be located at.During work, the 3rd bracket 3 can slide along the track on the second bracket 2 Stretch out.3rd bracket 3 is provided with the 4th bracket 31, and side and the side of the 3rd bracket 3 of the 4th bracket 31 are hinged, the 4th bracket 31 opposite side is ridden upon on the opposite side of the 3rd bracket 3, and the 4th bracket 31 can surround the side of the 3rd bracket 3 and rotate.It is excellent Selection of land, when the opposite side of the 4th bracket 31 is ridden upon on the opposite side of the 3rd bracket 3, can also temporarily be fixed by fixing device On the 3rd bracket 3.
As shown in figure 3, the top of the 4th bracket 31 is provided with two panels gripper shoe, two panels gripper shoe is arranged in inverted eight like, oil Pipe is placed in inverse Ba type space.The side that 4th bracket 31 is arranged to surround the 3rd bracket 3 is rotated, can be prevented Impact damage is caused to it when oil pipe is placed on the 4th bracket.Illustrate by taking Fig. 3 as an example, oil pipe is being placed into When on four brackets 31, the 4th bracket 31 can shorten oil pipe and the 4th bracket upper surface after the right side rotation of the 3rd bracket 3 Between shock distance, so as to reduce the damage caused to oil pipe.After oil pipe is placed on postrotational 4th bracket, then 4th bracket is rotated back into horizontal level, you can be in place in oil pipe.Preferably, the length of the 3rd bracket and the 4th bracket Can be with equal.
As shown in figure 3, puopulsion equipment 32 is additionally provided with the 4th bracket 31, for oil pipe to be placed on into the 4th bracket 31 After, oil pipe is promoted forward, so that oil pipe stretches out from the 3rd bracket 3 and the 4th bracket 31.Preferably, puopulsion equipment 32 can be with It is arranged in the middle of the two panels gripper shoe on the 4th bracket top, and from stretching out between two panels gripper shoe.
As shown in Figures 4 and 5, the 3rd bracket 3 therein can stretch out from the second bracket 2, for example 4-8 rice, be placed on The oil pipe in face can stretch out from the 4th bracket 31, for example 2-4 rice.The distance stretched out from operation end face equivalent to oil pipe is 6-12 Rice, alleviates the restriction of oil pipe working space significantly.
Fig. 7 is shown oil pipe jacking to be connected to specified altitude assignment using the jacking device of the present invention, then with lower oil pipe Align and spin.As illustrated, the course of work of the jacking device of the present invention is:
(1) start machine, manipulates the 4th bracket so as to which the side around the 3rd bracket rotates a certain angle, and for example may be used To be 60-80 degree, concrete angle can be determined according to the size of the gripper shoe of the 4th bracket.Oil pipe is put into the 4th bracket Gripper shoe on, the 4th bracket is rotated back into horizontal level is in place oil pipe;
(2) controlling master hydraulic bar 11 and secondary hydraulic stem 12 makes it upright and is increased to specified altitude assignment;
(3) slide the 3rd bracket so as to stretches out from the second bracket, the distance stretched out for example can be 4-8 rice;
(4) puopulsion equipment being arranged on the 4th bracket is manipulated, makes oil pipe stretch out the 4th bracket, the distance stretched out for example may be used Being 2-4 rice;
(5) oil pipe is sling, while installing make-up device 6 in the upper end of lower oil pipe;
(6) lower end of upper oil pipe is alignd with the upper end open of make-up device so as in being properly inserted lower oil pipe, starts hydraulic pressure Clamp is tightly gone up oil pipe and is rotated so as to which bottom spins with the upper end of lower oil pipe;
(7) contrary operation jacking device, reduces its height, and unclamps hydraulic tongs, into next work cycle.
As shown in FIG. 8 and 9, which show a kind of schematic diagram of make-up device of the invention.As illustrated, make-up device 6 is cylindrical, and upper end open is more than lower ending opening.Lower ending opening is cylindric, and it is corresponding with the size of oil pipe female joint;On End opening is round table-like, and the top surface of round platform is with diameter greater than basal diameter.During operation, directly make-up device is placed on lower oil pipe, So that in the lower ending opening of the top insertion make-up device of lower oil pipe.When the lower end of oil pipe of slinging (that is, upper oil pipe) is put into make-up device Upper end open after, because the inwall of upper end open is obliquely installed so that the male joint on upper oil pipe can be automatically inserted into lower oil In the female joint of pipe realize alignment, so as to avoid alignment procedures in occur upper oil pipe and lower oil pipe between collsion damage.
Preferably, make-up device of the invention is made using the elastomeric material of advantage of lower cost, and its preparation process is:
(1) plasticate
By COPP multi stage mastication on a mill, while add plasticizer to accelerate to plasticate, the use of plasticizer Measure the 12-14% (mass ratio) for COPP.It is different by Qian Hou roller relative velocity between two rotating drums of mill Produced shearing force makes rubber macromolecule rupture, so as to reach the purpose of plasticising.Plasticating temperature is controlled at 30 ± 1 DEG C, in front and back The speed of roller is than control 1:1.29, roll spacing is 1.3mm.
A kind of preferred embodiment of plasticizer of the invention is as follows:
Plasticizer is by diethylene glycol dibenzoate, epoxidized soybean oil, deionized water, hydrogen peroxide, chloroform according to matter Amount is than being 1:0.2-0.3:0.1-0.15:0.1-0.12:0.05-0.07 is mixed, and its preparation method is by diethylene glycol two Benzoic ether, epoxidized soybean oil and hydrogen peroxide are placed in closed container and are heated to 70-75 DEG C and sealing 2 hours makes it fully mix Close, be subsequently adding deionized water and stir and make its temperature be maintained at 50-52 DEG C, chloroform is put into after standing 1 hour, mixing is equal It is even.
It is highly preferred that plasticizer can by diethylene glycol dibenzoate, epoxidized soybean oil, deionized water, hydrogen peroxide, three Chloromethanes is 1 according to mass ratio:0.24:0.12:0.12:0.05 is mixed.
(2) knead
The water temperature of mill is controlled at 70-75 DEG C, the sizing material plasticated is placed in mill and is kneaded, and successively Plasticizer, age resistor and vulcanizing agent are added, it is repeatedly thin logical (that is, two rollers for making rubber very unfertile land pass through mill), finally Slice is stand-by.Wherein, the mass ratio of the sizing material of addition, plasticizer (composition is ibid), age resistor and vulcanizing agent is (hypothesis sizing material Mass fraction is 1) 1:0.08-0.12:0.06-0.08:0.12-0.15.
A kind of preferred embodiment of age resistor of the invention is as follows:
Age resistor is by 4,4'- bis- (α-methylbenzyl) diphenylamines, 6-ethyoxyl-2,2,4-trimethyl-1,2-dihydro quinoline Quinoline, carbon black, alundum (Al2O3) and silica are 1 according to mass ratio:0.6-0.8:0.3-0.35:0.12-0.14:0.1-0.15 It is well mixed and makes.
It is highly preferred that age resistor is by 4,4'- bis- (α-methylbenzyl) diphenylamines, 6-ethyoxyl-2,2,4-trimethyl-1,2- Dihyaroquinoline, carbon black, alundum (Al2O3) and silica are 1 according to mass ratio:0.62:0.32:0.12:0.15 is well mixed Make.
A kind of preferred embodiment of vulcanizing agent of the invention is as follows:
Vulcanizing agent is by Cosan, phenolic resin, zinc oxide, dimorpholinyl disulfide and dibenzothiazyl disulfide according to quality Than for 1:0.3-0.5:0.1-0.14:0.5-0.7:0.12-0.16 is well mixed and makes.Preferably, vulcanizing agent is by Cosan, phenol Urea formaldehyde, zinc oxide, dimorpholinyl disulfide and dibenzothiazyl disulfide are 1 according to mass ratio:0.38:0.12:0.7:0.15 It is well mixed and makes.
(3) gluing
Metal grill is cleaned out, is molded according to size ruling, by adhesive uniform application in its surface-ready.Gluing Agent will select the adhesive for being applied to bonding COPP.
A kind of preferred embodiment of adhesive is as follows:
Adhesive is made up of the component of following parts by weight:
Epoxy resin 10-15 parts,
Polybutene alcohol 12-14 parts,
Modified polyurethane 10-12 parts,
Methyl methacrylate 15-18 parts,
Starch 3-5 parts,
Talcum powder 6-9 parts,
Carbon fiber 10-15 parts.
Its preparation process is:Epoxy resin is heated into 120-130 DEG C, to activate its activity, then insulation stands 2 hours Modified polyurethane and methymethacrylate are added, 150-156 DEG C is stirred and be heated to, being subsequently adding polybutene alcohol makes it Fully react and be well mixed, after being cooled to room temperature, add starch, talcum powder and carbon fiber.
(4) blanking
After by the bin aging 2 days after mixing, according to the shape and size blanking of product.
(5) vulcanize
The metal grill for coating adhesive and the sizing material for cutting layering are put into mould, locking die is vulcanized. The thrust of mould is 25-27MPa in sulfidation, and temperature is maintained at 175-180 DEG C, and the compression time is 5-6 hours.Vulcanize Into mould is opened later, product is taken out.
(6) prune, inspection
After product takes out, shaping is pruned in time.
Using the oil pipe jack of the present invention, the limited working space in scene can be maximally utilised, it is to avoid adopt Arm extending type lifting machine, has greatly saved cost and has improve operational security.Using the oil pipe method of attachment of the present invention, moreover it is possible to Butt joint position in oil pipe connection procedure is enough avoided to cause to damage, so as to drastically increase bonding strength and the sealing of oil pipe Property.
Although disclosed herein embodiment as above, described content is only to facilitate understanding the present invention and adopting Embodiment, is not limited to the present invention.Technical staff in any the technical field of the invention, without departing from this On the premise of the disclosed spirit and scope of invention, any modification and change can be made in the formal and details implemented, But the scope of patent protection of the present invention, still must be defined by the scope of which is defined in the appended claims.

Claims (8)

1. a kind of oil pipe jacking device, it is characterised in that including the first bracket, the second bracket and leg, the first bracket and the second support It is connected with each other by master hydraulic bar and secondary hydraulic stem between frame;Second bracket is supported on the first bracket by master hydraulic bar, main Hydraulic stem is supported on the first bracket by secondary hydraulic stem;
The track for the 3rd bracket being additionally provided with second bracket and being slided for the 3rd bracket;Under folded state, the 3rd bracket is contained in The inside of the second bracket;During work, the 3rd bracket can slide along the track on the second bracket and stretch out;
3rd bracket is provided with the 4th bracket, and side and the side of the 3rd bracket of the 4th bracket are hinged so that the 4th bracket energy Enough rotate around the side of the 3rd bracket;The top of the 4th bracket is provided with two panels gripper shoe, and two panels gripper shoe is in inverted eight like cloth Put, oil pipe is placed in inverse Ba type space;
4th bracket is provided with puopulsion equipment, for after oil pipe is placed on the 4th bracket, oil pipe being promoted forward, so that Oil pipe stretches out from the 4th bracket.
2. oil pipe jacking device according to claim 1, it is characterised in that the equal length of the 3rd bracket and the 4th bracket.
3. oil pipe jacking device according to claim 1 and 2, it is characterised in that puopulsion equipment is arranged on the 4th bracket top Two panels gripper shoe in the middle of, and from stretching out between two panels gripper shoe.
4. oil pipe jacking device according to claim 1 and 2, it is characterised in that the opposite side of the 4th bracket rides upon the 3rd On the opposite side of bracket.
5. oil pipe jacking device according to claim 1 and 2, it is characterised in that the track slided for the 3rd bracket is located at the The inner side of the lateral frame of two brackets.
6. the oil pipe jacking device according to claim 1 or 2 or 3, it is characterised in that under folded state, master hydraulic bar and pair Hydraulic stem is packed up, and the second bracket is contained in the space of the first bracket;Under jacking state, master hydraulic bar is holded up with by the second bracket Jack-up is simultaneously supported on the first bracket, secondary hydraulic stem Auxiliary support master hydraulic bar.
7. the method for carrying out oil pipe operation using the oil pipe jacking device according to any one of claim 1-6, its feature exists In comprising the following steps:
(1) start machine, manipulates the 4th bracket so as to rotate around the side of the 3rd bracket, oil pipe is put into the 4th bracket In gripper shoe, the 4th bracket is rotated back into horizontal level is in place oil pipe;
(2) controlling master hydraulic bar and secondary hydraulic stem makes it upright and is increased to specified altitude assignment;
(3) slide the 3rd bracket so as to stretches out from the second bracket;
(4) puopulsion equipment being arranged on the 4th bracket is manipulated, makes oil pipe stretch out the 4th bracket;
(5) oil pipe is sling, while installing make-up device in the upper end of lower oil pipe;
(6) lower end of upper oil pipe is alignd with the upper end open of make-up device so as in being properly inserted lower oil pipe, starts hydraulic pressure clamp Tight upper oil pipe simultaneously rotates so as to which bottom spins with the upper end of lower oil pipe;
(7) contrary operation jacking device, reduces its height, and unclamps hydraulic tongs, into next work cycle.
8. the method for carrying out oil pipe operation according to claim 7, it is characterised in that the make-up device is cylindrical, on End opening is more than lower ending opening;Lower ending opening is cylindric, and it is corresponding with the size of oil pipe female joint;Upper end open is round platform Shape, the top surface of round platform is with diameter greater than basal diameter;
During operation, make-up device is placed on lower oil pipe so that in the lower ending opening of the top insertion make-up device of lower oil pipe;When hanging The lower end for playing oil pipe is put into after the upper end open of make-up device, because the inwall of upper end open is obliquely installed so that on upper oil pipe Male joint can be automatically inserted into the female joint of lower oil pipe realizes alignment.
CN201710006018.6A 2017-01-05 2017-01-05 Oil pipe jacking device and the method for carrying out operation using it Active CN106639924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710006018.6A CN106639924B (en) 2017-01-05 2017-01-05 Oil pipe jacking device and the method for carrying out operation using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710006018.6A CN106639924B (en) 2017-01-05 2017-01-05 Oil pipe jacking device and the method for carrying out operation using it

Publications (2)

Publication Number Publication Date
CN106639924A true CN106639924A (en) 2017-05-10
CN106639924B CN106639924B (en) 2018-12-11

Family

ID=58844154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710006018.6A Active CN106639924B (en) 2017-01-05 2017-01-05 Oil pipe jacking device and the method for carrying out operation using it

Country Status (1)

Country Link
CN (1) CN106639924B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2047711U (en) * 1988-10-18 1989-11-15 郭仲堃 Fixing device for drilling rods
CN102561960A (en) * 2012-02-13 2012-07-11 济南金力液压机械有限公司 Oilfield drill stem conveying device
CN202832293U (en) * 2012-07-24 2013-03-27 胜利油田胜利动力机械集团有限公司 Well repair operation pipe rod conveyor
US20130336748A1 (en) * 2012-06-14 2013-12-19 Thomas Dale Hilton Pipe Handling Apparatus and Method
WO2014172770A1 (en) * 2013-04-25 2014-10-30 Custom Pipe Handlers Canada Inc. Pipe handling apparatus and method
CN203939463U (en) * 2014-06-15 2014-11-12 武汉市元博智能控制技术研究设计院(有限合伙) A kind of novel hydraulic dynamic catwalk
CN104420842A (en) * 2013-09-11 2015-03-18 四川宏华石油设备有限公司 Catwalk
CN104818955A (en) * 2015-03-11 2015-08-05 常州大学 Power pipe push advancing device
CN104863528A (en) * 2015-04-09 2015-08-26 山东科瑞机械制造有限公司 Drilling tool-lifting and height-adjustable power catwalk
CN205117239U (en) * 2015-11-09 2016-03-30 中国海洋石油总公司 Tubing hanger make -up device
CN106285516A (en) * 2016-10-08 2017-01-04 四川宏华石油设备有限公司 Multifunctional cat road

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2047711U (en) * 1988-10-18 1989-11-15 郭仲堃 Fixing device for drilling rods
CN102561960A (en) * 2012-02-13 2012-07-11 济南金力液压机械有限公司 Oilfield drill stem conveying device
US20130336748A1 (en) * 2012-06-14 2013-12-19 Thomas Dale Hilton Pipe Handling Apparatus and Method
CN202832293U (en) * 2012-07-24 2013-03-27 胜利油田胜利动力机械集团有限公司 Well repair operation pipe rod conveyor
WO2014172770A1 (en) * 2013-04-25 2014-10-30 Custom Pipe Handlers Canada Inc. Pipe handling apparatus and method
CN104420842A (en) * 2013-09-11 2015-03-18 四川宏华石油设备有限公司 Catwalk
CN203939463U (en) * 2014-06-15 2014-11-12 武汉市元博智能控制技术研究设计院(有限合伙) A kind of novel hydraulic dynamic catwalk
CN104818955A (en) * 2015-03-11 2015-08-05 常州大学 Power pipe push advancing device
CN104863528A (en) * 2015-04-09 2015-08-26 山东科瑞机械制造有限公司 Drilling tool-lifting and height-adjustable power catwalk
CN205117239U (en) * 2015-11-09 2016-03-30 中国海洋石油总公司 Tubing hanger make -up device
CN106285516A (en) * 2016-10-08 2017-01-04 四川宏华石油设备有限公司 Multifunctional cat road

Also Published As

Publication number Publication date
CN106639924B (en) 2018-12-11

Similar Documents

Publication Publication Date Title
CN113001048B (en) Valve welding and air tightness detection integrated device
CN109253337B (en) Quick-mounting pipe joint device and construction method of advanced small guide pipe
CN206707734U (en) A kind of tunnel double-lining compounded rubber lifts locking plug template
CN208997552U (en) A kind of foaming plugging device
CN106639924A (en) Oil tube jacking device and method of using same to operate
CN109465927A (en) A kind of timber soaking device
CN201720172U (en) Automatic viscosity control system of vertical glueing machine
CN206223417U (en) A kind of Detecting data device for detecting swivel joint
CN108868822B (en) Intelligent grouting hole device for tunnel lining trolley
CN110094593A (en) The quick slip casting bellows plugging technology of oil pipeline
CN110280699A (en) Steel reinforcement cage tie hoop rotates producing device automatically
CN204603692U (en) For repairing the maintenance means for correcting of all steel cord roller spindle nose distortion
CN214116709U (en) Light-cured lining repairing and curing device for inspection well and similar structures
CN204944762U (en) PCCP steel cylinder sealing hydrostatic test machine
CN106761492B (en) A method of optimizing oil pipe operation using torque wrench moment and break-out torque
CN209214846U (en) Steel pipe hydraulic pressure testing device
CN208290513U (en) A kind of trim panel shores tooling
CN207109182U (en) A kind of used in spinning machine finished product yarn retracting device
CN206694046U (en) Tunnel double-lining compounded rubber baffle plate and tunnel double-lining compounded rubber lifting locking plug template
CN207211699U (en) A kind of scaffold attachment arrangement
CN209612839U (en) A kind of concrete production additive material feed system
CN206085585U (en) Novel tool tries water
CN106869825B (en) A kind of air spider
CN211315087U (en) Big hole shutoff instrument of retractable type jar body
CN220080886U (en) Be used for harmless injecting glue device of concrete crack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Lizhong

Inventor after: Lu Ye

Inventor after: Wang Xiaohong

Inventor after: Zhang Jianping

Inventor before: Wu Lizhong

GR01 Patent grant
GR01 Patent grant