CN106638920B - A kind of filter tank V-groove and its installation method - Google Patents
A kind of filter tank V-groove and its installation method Download PDFInfo
- Publication number
- CN106638920B CN106638920B CN201611232192.4A CN201611232192A CN106638920B CN 106638920 B CN106638920 B CN 106638920B CN 201611232192 A CN201611232192 A CN 201611232192A CN 106638920 B CN106638920 B CN 106638920B
- Authority
- CN
- China
- Prior art keywords
- groove
- prefabricated board
- filter tank
- cell wall
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of filter tank V-groove, it is characterised in that:Including inclined cell wall and bottom, the thin oblique prefabricated board of cell wall seamless assembled, wherein, the cell wall between adjacent thin tiltedly prefabricated board is provided with concave groove, described matrix trench bottom built-in metal connector;Water distributing pore is additionally provided with close to bottom;The invention also discloses a kind of installation method of filter tank V-groove, using technical scheme, filter tank V-groove cell wall, using the thin oblique prefabricated board of seamless assembled, thin tiltedly prefabricated board is poured for level, and Prefabrication is standardized in engineering, the concrete cast in situs quality and maintenance quality the two key issues for solving the thin swash plate of filter tank V-groove, filter tank total quality is not only ensure that, and can realize that batch production is processed.
Description
Technical field
The invention belongs to water factory's drainage field, it is more particularly related to a kind of filter tank V-groove and its installation side
Method.
Background technology
Filter tank V-groove is the important component of filter tank water distribution system, but because the V-groove wall thickness in filter tank is relatively thin, pre-
Stay water distributing pore is more, reinforcing bar is close, be not easy to maintenance etc. reason, often result in cast in situs V-groove concrete leakiness, dew muscle,
The mass defects such as pitted skin and preformed hole position deviation are larger, concrete strength is inadequate, so as to influence the total quality in filter tank and water distribution
Effect.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of filter tank V-groove for ensureing filter tank total quality.
The invention also discloses a kind of installation method of filter tank V-groove.
To achieve these goals, the technical scheme taken of the present invention is:A kind of filter tank V-groove provided, including incline
Oblique cell wall and bottom, the thin oblique prefabricated board of cell wall seamless assembled, wherein, the cell wall between adjacent thin tiltedly prefabricated board is provided with matrix
Groove, described matrix trench bottom built-in metal connector;Water distributing pore is additionally provided with close to bottom.
A kind of installation method of filter tank V-groove disclosed by the invention, comprises the following steps:
1) cell wall concave groove is set, then matrix trench bottom built-in metal connector;
2) thin oblique prefabricated board is prepared;
3) cleaning matrix trench bottom before installation, checks built-in metal connector;
4) interim support support of the adjustable steel pipe scaffold as the thin tiltedly prefabricated board of V-groove installation is set up;
5) lift, be in place;
6) node connects, and then carries out post-processing to tie point.
A kind of installation method of filter tank V-groove disclosed by the invention, step 1) is middle to set cell wall concave groove, using in wooden model
Plate inwall is followed closely realizes reserved concave groove with the wide template bar for waiting depth of concave groove.
A kind of installation method of filter tank V-groove disclosed by the invention, step 2) is middle to prepare thin oblique prefabricated board, according to cell wall
Gradient makes prefabricated board, and the side of prefabricated board sets suspension ring, prefabricated board single-piece length≤1 meter, concrete label >=C30.
A kind of installation method of filter tank V-groove disclosed by the invention, cleaning matrix trench bottom before the middle installation of step 3), is checked
Built-in metal connector, debris in concave groove is cleared up, check the position of built-in metal connector on cell wall, while installation is controlled
Line is launched and arrives position to be installed.
A kind of installation method of filter tank V-groove disclosed by the invention, step 5) is middle to be lifted, is in place, passes through prefabricated board side
The suspension ring of setting sling prefabricated board, are assembled from V-groove both ends to middle block-by-block, and every four to six pieces are done a zero point school
Just, prefabricated board one end is placed in concave groove, by the screw mandrel set on adjustable steel pipe scaffold, is jacked up prefabricated board, is then pushed into
Installation position.
A kind of installation method of filter tank V-groove disclosed by the invention, the connection of step 6) interior joint, node are connected using spot welding
Connect, node connects the adjacent vertical weld seam of prefabricated board and prefabricated board and uses manual electric arc welding with cell wall built-in metal connector, full
Weldering, weld seam is full, no slag inclusion, stomata, the thickness of weld bead height >=prefabricated board, welded gaps≤2mm between metal connecting piece, produces
Coating clear up in time;Filled and led up at gap using waterproof clay joint filling.
A kind of installation method of filter tank V-groove disclosed by the invention, it is hard that the processing of step 6) middle and later periods also includes waterproof clay
After change, brushing polymer cement-based waterproof layer twice, cement sand plaster.
Using technical scheme, filter tank V-groove cell wall, using the thin oblique prefabricated board of seamless assembled, thin oblique prefabricated board
Poured for level, Prefabrication is standardized in engineering, the concrete cast in situs matter for solving the thin swash plate of filter tank V-groove
Amount and the two key issues of maintenance quality, not only ensure that filter tank total quality, and can realize that batch production is processed.
The invention also discloses a kind of installation method of filter tank V-groove, and V-groove is processed according to filter tank V-groove design feature
Required thin oblique prefabricated board, the thin plate of prior art is directly subjected to vertical pour on cell wall and is changed to carry out using mould in advance
Level is poured, and Prefabrication is standardized in engineering, and cell wall reserves concave groove and built-in metal connector, and scene uses
Weight, welding equipment etc. are installed, and form shaped article, and gusset plate carries out filleting and water-proofing treatment using welding, seam crossing;Have
Effect improves the construction quality of V-groove, and prefabricated to lie down due to V-groove, compact dimensions and maintenance effect are preferable, and can accelerate construction
Progress, shorten plan time, improve construction quality;Effectively solves the concrete cast-in-site leakiness degree of the thin swash plate of V-groove
Problem, concrete dew muscle, cavity, the phenomenon of pitted skin are avoided, so as to improve concrete casting quality and outward appearance;Solves swash plate
The problem of preformed hole is offset, preformed hole deviation qualification rate improve the accuracy of filter tank V-groove water distributing pore, therefore up to 98%
Greatly improve the backwash effect in filter tank;V-groove is equal to cantilever member, and prefabricated V-groove be it is prefabricated in advance, assembled in situ compared with
It hurry up, bottom support body walks process under i.e. dismountable entrance after V-groove installation terminates, and reaches 100% without waiting for concrete strength,
The duration can be shortened 28 days or so;Fabricated construction mechanization degree is high, greatly reduces the labor intensity of worker, and social benefit shows
Write.
Below with reference to drawings and examples, the present invention is described in detail.
Brief description of the drawings
The content expressed by each width accompanying drawing of this specification and the mark in figure are briefly described below:
Fig. 1 is a kind of sectional view of filter tank V-groove of the present invention;
Fig. 2 is a kind of sectional view of the V-groove of the installation method of filter tank V-groove of the invention shown in Fig. 1;
Fig. 3 is a kind of installation method schematic diagram of filter tank V-groove of the invention shown in Fig. 1.
In figure mark for:1st, water distributing pore;2nd, concave groove;3rd, suspension ring;4th, cell wall;5th, metal connecting piece;6th, screw mandrel.
Embodiment
Below against accompanying drawing, by the description to embodiment, each structure for example involved to the embodiment of the present invention
Mutual alignment and annexation, the effect of each several part and operation principle, manufacturing process between the shape of part, construction, each several part
And operate with method etc., be described in further detail, with help those skilled in the art to the present invention inventive concept,
Technical scheme has more complete, accurate and deep understanding.
Fig. 1 is a kind of sectional view of filter tank V-groove of the present invention;A kind of filter tank V-groove of the present invention as depicted, including incline
Oblique cell wall 4 and bottom, the thin oblique prefabricated board of the seamless assembled of cell wall 4, wherein, the cell wall 4 between adjacent thin tiltedly prefabricated board is provided with
Concave groove 2, the bottom built-in metal connector 5 of concave groove 2;Water distributing pore 1 is additionally provided with close to bottom.
Fig. 2 is a kind of sectional view of the V-groove of the installation method of filter tank V-groove of the invention shown in Fig. 1;Fig. 3 is Fig. 1 institutes
A kind of installation method schematic diagram of filter tank V-groove of the invention shown;A kind of installation side of filter tank V-groove of the present invention as depicted
Method, comprise the following steps:
1) concave groove 2 of cell wall 4 is set, then the bottom built-in metal connector 5 of concave groove 2;Followed closely using in plank sheathing inwall
Reserved concave groove 2 is realized with the wide template bar for waiting depth of concave groove 2;
2) thin oblique prefabricated board is prepared;Gradient according to cell wall 4 makes prefabricated board, and the side of prefabricated board sets suspension ring 3, in advance
Making sheet single-piece length≤1 meter, concrete label >=C30;
3) cleaning concave groove 2 bottom before installation, checks built-in metal connector 5;Debris in concave groove 2 is cleared up, checks groove
The position of built-in metal connector 5 on wall 4, while installation control line is launched and arrives position to be installed;
4) interim support support of the adjustable steel pipe scaffold as the thin tiltedly prefabricated board of V-groove installation is set up;
5) lift, be in place;The suspension ring 3 set by prefabricated board side sling prefabricated board, from V-groove both ends to centre by
Block is assembled, and every four to six pieces are done a zero correction, and prefabricated board one end is placed in concave groove, passes through adjustable steel pipe scaffold
The screw mandrel 6 of upper setting, prefabricated board is jacked up, is then pushed into installation position;
6) node connects, and then carries out post-processing to tie point;Node is connected using spot welding, and node connects adjacent pre-
The vertical weld seam of making sheet and prefabricated board use manual electric arc welding with the built-in metal connector 5 of cell wall 4, and full weld, weld seam is full, no folder
Slag, stomata, the thickness of weld bead height >=prefabricated board, 5 welded gaps≤2mm of metal connecting piece, caused coating are cleared up in time;
Filled and led up at gap using waterproof clay joint filling;After post-processing also includes waterproof clay hardening, brushing polymer cement-based waterproof
Layer twice, cement sand plaster.
Using technical scheme, filter tank V-groove cell wall 4, using the thin oblique prefabricated board of seamless assembled, thin oblique prefabricated board
Poured for level, Prefabrication is standardized in engineering, the concrete cast in situs matter for solving the thin swash plate of filter tank V-groove
Amount and the two key issues of maintenance quality, not only ensure that filter tank total quality, and can realize that batch production is processed.
The invention also discloses a kind of installation method of filter tank V-groove, and V-groove is processed according to filter tank V-groove design feature
Required thin oblique prefabricated board, the thin plate of prior art is directly subjected to vertical pour on cell wall 4 and is changed to using mould enter in advance
Water-filling is flat to be poured, and Prefabrication is standardized in engineering, and cell wall 4 reserves concave groove 2 and built-in metal connector 5, scene
Installed using lifting, welding equipment etc., form shaped article, gusset plate carries out filleting and waterproof using welding, seam crossing
Processing;The construction quality of V-groove is effectively improved, prefabricated to lie down due to V-groove, compact dimensions and maintenance effect are preferable, and energy
Accelerating construction progress, shorten plan time, improve construction quality;Effectively solves the concrete cast-in-site of the thin swash plate of V-groove
Leakiness degree problem, concrete dew muscle, cavity, the phenomenon of pitted skin are avoided, so as to improve concrete casting quality and outward appearance;
Solves the problems, such as the skew of swash plate preformed hole, preformed hole deviation qualification rate improves the accurate of filter tank V-groove water distributing pore up to 98%
Property, therefore greatly improve the backwash effect in filter tank;V-groove is equal to cantilever member, and prefabricated V-groove is prefabricated in advance, is showed
Field assembling is very fast, and bottom support body walks process under i.e. dismountable entrance after V-groove installation terminates, and is reached without waiting for concrete strength
To 100%, the duration can be shortened 28 days or so;Fabricated construction mechanization degree is high, greatly reduces the labor intensity of worker, society
Can remarkable benefit.
The present invention is exemplarily described above in conjunction with accompanying drawing, it is clear that present invention specific implementation is not by aforesaid way
Limitation, as long as the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is employed, or without changing
Enter and the design of the present invention and technical scheme are directly applied into other occasions, within protection scope of the present invention.
Claims (7)
- A kind of 1. installation method of filter tank V-groove, it is characterised in that:Comprise the following steps:1) cell wall concave groove is set, then matrix trench bottom built-in metal connector;2) thin oblique prefabricated board is prepared;3) cleaning matrix trench bottom before installation, checks built-in metal connector;4) interim support support of the adjustable steel pipe scaffold as the thin tiltedly prefabricated board of V-groove installation is set up;5) lift, be in place;6) node connects, and then carries out post-processing to tie point.
- 2. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:Set in described step 1) Cell wall concave groove is put, reserved concave groove is realized using in plank sheathing inwall nail and the wide template bar for waiting depth of concave groove.
- 3. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:Made in described step 2) Standby thin oblique prefabricated board, prefabricated board being made according to the gradient of cell wall, the side of prefabricated board sets suspension ring, prefabricated board single-piece length≤ 1 meter, concrete label >=C30.
- 4. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:Pacify in described step 3) Cleaning matrix trench bottom before dress, checks built-in metal connector, clears up debris in concave groove, checks built-in metal connection on cell wall The position of part, while installation control line is launched and arrives position to be installed.
- 5. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:Hung in described step 5) Fill, be in place, the suspension ring set by prefabricated board side sling prefabricated board, are assembled from V-groove both ends to middle block-by-block, often Four to six pieces are done a zero correction, and prefabricated board one end is placed in concave groove, by the screw mandrel set on adjustable steel pipe scaffold, Prefabricated board is jacked up, is then pushed into installation position.
- 6. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:Saved in described step 6) Point connection, node are connected using spot welding, and node connects the adjacent vertical weld seam of prefabricated board and prefabricated board and connected with cell wall built-in metal Fitting uses manual electric arc welding, and full weld, weld seam is full, no slag inclusion, stomata, the thickness of weld bead height >=prefabricated board, metal connection Welded gaps≤2mm between part, caused coating are cleared up in time;Filled and led up at gap using waterproof clay joint filling.
- 7. according to a kind of installation method of filter tank V-groove described in claim 1, it is characterised in that:After in described step 6) After phase processing also includes waterproof clay hardening, brushing polymer cement-based waterproof layer twice, cement sand plaster.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611232192.4A CN106638920B (en) | 2016-12-28 | 2016-12-28 | A kind of filter tank V-groove and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611232192.4A CN106638920B (en) | 2016-12-28 | 2016-12-28 | A kind of filter tank V-groove and its installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638920A CN106638920A (en) | 2017-05-10 |
CN106638920B true CN106638920B (en) | 2018-04-06 |
Family
ID=58833130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611232192.4A Active CN106638920B (en) | 2016-12-28 | 2016-12-28 | A kind of filter tank V-groove and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638920B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1520708A (en) * | 2003-01-27 | 2004-08-18 | 中国科学院华南植物研究所 | Naked rock fast afforestation method |
CN201768407U (en) * | 2010-09-03 | 2011-03-23 | 浙江沃特水处理设备有限公司 | V-shaped groove in V-shaped filter tank |
CN205077603U (en) * | 2015-09-14 | 2016-03-09 | 金剑环保有限公司 | Stainless steel V type groove |
CN205171857U (en) * | 2015-11-26 | 2016-04-20 | 文登蓝岛建筑工程有限公司 | Ramp type structure that cornices |
CN206404395U (en) * | 2016-12-28 | 2017-08-15 | 淮北矿业(集团)工程建设有限责任公司 | A kind of filter tank V-groove |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3991338B2 (en) * | 2003-10-28 | 2007-10-17 | 炭平コーポレーション株式会社 | How to connect U-shaped groove to ridge or side groove |
-
2016
- 2016-12-28 CN CN201611232192.4A patent/CN106638920B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1520708A (en) * | 2003-01-27 | 2004-08-18 | 中国科学院华南植物研究所 | Naked rock fast afforestation method |
CN201768407U (en) * | 2010-09-03 | 2011-03-23 | 浙江沃特水处理设备有限公司 | V-shaped groove in V-shaped filter tank |
CN205077603U (en) * | 2015-09-14 | 2016-03-09 | 金剑环保有限公司 | Stainless steel V type groove |
CN205171857U (en) * | 2015-11-26 | 2016-04-20 | 文登蓝岛建筑工程有限公司 | Ramp type structure that cornices |
CN206404395U (en) * | 2016-12-28 | 2017-08-15 | 淮北矿业(集团)工程建设有限责任公司 | A kind of filter tank V-groove |
Also Published As
Publication number | Publication date |
---|---|
CN106638920A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493603B (en) | Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method | |
CN103850363B (en) | Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall | |
CN103410317A (en) | Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part | |
CN106968381A (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
CN107419802A (en) | A kind of Precast Concrete Frame and construction method | |
CN108708394A (en) | A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support | |
CN110284587A (en) | A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor | |
CN103374923A (en) | Method for prefabricating and mounting underwater pier | |
CN106948504A (en) | Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method | |
CN107653900A (en) | A kind of preparation method of Prefabricated pipe gallery | |
CN108678445A (en) | A kind of structure of workshop | |
CN108678252A (en) | A kind of method of construction of floor | |
CN102409848A (en) | Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor | |
CN207944339U (en) | A kind of prefabricated superposed type anti-collision wall for urban viaduct | |
CN202401667U (en) | Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building | |
CN109881699B (en) | Method for molding and installing concrete tire of assembled tongue-and-groove Miller type universal raft foundation | |
CN106638920B (en) | A kind of filter tank V-groove and its installation method | |
CN108756034B (en) | Overhead structure terrace and construction method thereof | |
CN207419752U (en) | Can assemble anti-bank of precast concrete | |
CN108978699B (en) | Land integral prefabricated bearing platform and production and installation method thereof | |
CN208023601U (en) | A kind of prefabricated pile foundation support table side form of mutual buckle type | |
CN207526118U (en) | For pre-buried and closure unwrapping wire hole unwrapping wire punch die | |
CN206873734U (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
CN213014375U (en) | Basement outer wall post-cast strip enclosed construction | |
CN213625666U (en) | Concrete bearing platform mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A V-shaped filter tank and its installation method Effective date of registration: 20230922 Granted publication date: 20180406 Pledgee: Huaibei Mining Group Finance Co.,Ltd. Pledgor: HUAIBEI MINING (Group) ENGINEERING CONSTRUCTION Co.,Ltd. Registration number: Y2023980058395 |
|