Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused
Technical field
The present invention relates to a kind of spiral soil compactions to be perfused concrete pile making method, and more particularly to a kind of spiral soil compaction follows up into hole sleeve
Concrete pile making method is perfused.
Background technology
According to spiral extrusion soil filling pile technical regulation J12203-2012, spiral extrusion soil filling pile includes bidirectional screw soil compaction
Stake and the general name of screw rod pile.Spiral Squeezing Soil Pile is a kind of by large torque power head drive drilling tool rotation soil compaction or half soil compaction pore-forming
Pressure concrete injecting, a kind of construction technology of rear slotting steel reinforcement cage pile.The advantages of this construction technology is:Bearing capacity of single pile is high, can save
Substantial amounts of construction material, speed of application is fast, can save the duration, extrusion soil filling pile, and without mud, the dregs amount of discharge is also very
It is few, it is more environmentally friendly.But this construction technology has the following disadvantages in application process:First, pressure concrete injecting retaining wall pile anti-plug steel
The technological requirement concrete of muscle cage must be filled into ground, otherwise steel reinforcement cage just can not normal mounting in place.Thus there is basement
Engineering, stake top absolute altitude will result in substantial amounts of concrete waste in construction, and can also increase clear chisel in the deeper stake of below ground
The expense of pile crown;Although the 2nd, highly developed at present using the technique of vibrator anti-plug steel reinforcement cage, collapsed by the concrete of construction site
The influence of the unfavorable factors such as degree of falling, steel reinforcement cage verticality and rigidity, the operation level of worker, still unavoidable indivedual steel reinforcement cages
Install not in place, and there also have part steel reinforcement cage that can generate installation in an installation to be not placed in the middle, the phenomenon that protective layer is insufficient.
The content of the invention
It follows up it is an object of the present invention to provide a kind of spiral soil compaction into hole sleeve and concrete pile making method is perfused, spiral can not only be kept
The advantages of extrusion soil filling pile, and the deficiency of spiral extrusion soil filling pile can be solved.
To achieve these goals, the present invention uses following technical scheme:
A kind of spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and comprises the following steps:
(1)Other set hollow structure power head II is installed on spiral extrusion soil filling pile machine, power head II is located at spiral
I lower section of power head of extrusion soil filling pile machine, and power head II is hollow structure, and median pore diameter is bored more than spiral extrusion soil filling pile
The maximum gauge of tool;
(2)Power head II connects the casing with reverse acting spiral below, and quick coupling is used between power head II and casing
Connection, and its lower end is installed with brill tooth, the drilling tool that power head I connects can be passed through from power head II and casing;
(3)Spiral extrusion soil filling pile machine starts power head I and rotates in the forward direction and be drilled down into pore-forming afterwards in place, then starts power
First II reversely rotates follow-up casing downwards, until after the drilling tool of power head I and the casing drilling of power head II have arrived projected depth
Stop drilling;
(4)The concrete that primer liner is connected on power head I, which pumps the pumping concrete into hole and starts power head I simultaneously, to be rotated and upward
Promoted, until the pump output of concrete reaches at certain distance position more than its lower end, stop pumping concrete, power head I continue to
Upper promotion, while power head II is separated with casing, power head II is lifted up to certain altitude, until I drilling tool of power head is complete
It is proposed casing;
(5)The steel reinforcement cage of pre-production is seated to downwards design height along casing axis, casing can ensure steel reinforcement cage
It installs between two parties and protective layer meets design requirement;
(6)Mobile drilling tool alignment sleeve axis, and the pumping concrete into casing again, until reaching design stake top absolute altitude;
(7)After stopping pumping concrete, mobile power head II and casing connection start power head II and rotate and be lifted up, directly
Soil layer is all left to casing can pile;
(8)It constructs displaced spirals extrusion soil filling pile machine to next position.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and according to the design needs when casing is extracted, uses
It reversely rotates and is formed and the isodiametric cylindrical pile body of sleeve external thread.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, when casing is extracted using the positive rotation of simultaneous techniques
Turn, casing is made to exit to form the pile body that surface carries shallow thread along spiral.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and according to the design needs, when casing is extracted, first adopts
It is rotated in the forward direction with simultaneous techniques, extracts certain distance and then reverse rotation, after extracting casing, formed lower part and carry shallow thread
Top is cylindrical pile body.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and needs creeping into according to geological condition and design
When, after casing stops drilling, power head I drives drilling tool to continue after being drilled down into certain depth, then stops creeping into, then into hole
Concrete is perfused, lower part and the same diameter of drilling tool can be formed, top is with casing with the diameter-variable pile of diameter.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and needs to bore in drilling tool according to geological condition and design
When being deeply more than casing, when concrete formation diameter-variable pile being perfused into hole, when casing is extracted positive simultaneous techniques is first used to be exited along spiral
After certain distance, then after reversely rotating and proposing ground, lower part and the same diameter of drilling tool can be formed, middle part is with shallow thread, top
With sleeve external thread with the diameter-variable pile of diameter.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, according to the design needs, when casing is extracted, according to
Geological condition constantly adjusts direction of rotation, and multiple diameter-variable pile can be formed after extracting casing.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, according to the design needs, when casing is extracted, according to
Geological condition constantly adjusts direction of rotation, can be formed after extraction casing and replace variation with cylinder with diameter and shallow thread with casing
Stake.
Above-mentioned spiral soil compaction follows up into hole sleeve is perfused concrete pile making method, and concrete is perfused into hole when boring deeply more than casing for drilling tool
When forming diameter-variable pile, according to the variation of geological condition when casing is extracted, constantly change direction of rotation, lower part and drilling tool can be formed
Same diameter, top are to replace the multiple diameter-variable pile changed with cylinder with diameter and shallow thread with casing.
The beneficial effects of the invention are as follows:Power head I coordinates with power head II, and adjustment casing is extracted and direction of rotation is formed not
The stake of similar shape, the advantages of spiral extrusion soil filling pile can not only be kept, and the deficiency of spiral extrusion soil filling pile can be solved;Cause
For the setting of casing, concrete need not be filled into ground.
Description of the drawings
Fig. 1 is the structure diagram of spiral extrusion soil filling pile mechanomotive force part;
Fig. 2 is the structure diagram of cylindrical pile body;
Fig. 3 is the pile body structure schematic diagram that surface carries shallow thread;
Fig. 4 lower parts are cylindrical pile body structure schematic diagram with shallow thread top
Fig. 5 is for lower part with the same diameter of drilling tool, top and casing with diameter diameter-variable pile structure diagram;
Fig. 6 is lower part and the same diameter of drilling tool, and middle part carries shallow thread, and top is with sleeve external thread with the diameter-variable pile knot of diameter
Structure schematic diagram;
Fig. 7 is the stake schematic diagram that shallow thread replaces variation with cylinder;
Fig. 8 is lower part and the same diameter of drilling tool, and top is to replace the more of variation with cylinder with diameter and shallow thread with casing
Secondary diameter-variable pile schematic diagram.
1. power head I in figure, 2. power heads II, 3. drilling tools, 4. casings, 5. reverse acting spirals.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, develop simultaneously embodiment referring to the drawings, right
The present invention is further described.
A kind of spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and comprises the following steps:
(1)With reference to figure 1, other set hollow structure power head II 2, power head II are installed on spiral extrusion soil filling pile machine
2 are located at I 1 lower section of power head of spiral extrusion soil filling pile machine, and power head II 2 is hollow structure, and median pore diameter is more than spiral
The maximum gauge of extrusion soil filling pile drilling tool 3;
(2)Power head II 2 connects the casing 4 with reverse acting spiral 5 below, using quick between power head II 2 and casing 4
Connector connects, and its lower end is installed with brill tooth, to ensure that casing can effectively cut soil and rock, the drilling tool that power head I 1 connects
3 can pass through from power head II 2 and casing 4;
(3)Spiral extrusion soil filling pile machine starts power head I 1 and rotates in the forward direction and be drilled down into pore-forming afterwards in place, then starts dynamic
Power first II 2 reversely rotates follow-up casing 4 downwards, until the casing 4 of the drilling tool 3 of power head I 1 and power head II 2 drilling is to setting
Stop drilling after counting depth;
(4)The concrete that primer liner is connected on power head I 1 pump the pumping concrete into hole start simultaneously power head I 1 rotation and to
Upper promotion until the pump output of concrete reaches at certain distance position more than 4 lower end of casing, stops pumping concrete, stops pumping concrete
Position should specifically be determined according to geology and groundwater condition, the pressure of concrete should be made to be enough I 1 drilling tool 3 of power head is kept to generate
Soil compaction effect, ensure that underground water cannot be poured into casing 4 again, power head I 1 continues up promotions, while power head II 2 and
Casing 4 separates, and power head II 2 is lifted up to certain altitude, until I 1 drilling tool 3 of power head proposes casing 4 completely;
(5)The steel reinforcement cage of pre-production is seated to downwards design height along 4 axis of casing, casing 4 can ensure reinforcing bar
Cage is installed between two parties and protective layer meets design requirement;
(6)Mobile 4 axis of alignment sleeve, and the pumping concrete into casing 4 again of drilling tool 3, until reach design stake top absolute altitude,
The pump output of concrete to calculate enough filling volumes with ensure casing 4 propose after concrete top mark up to design and code requirement;
(7)After stopping pumping concrete, mobile power head II 2 is connected with casing 4, is started power head II 2 and is rotated and be lifted up,
Leaving soil layer up to 4 whole of casing can pile;
(8)It constructs displaced spirals extrusion soil filling pile machine to next position.
Embodiment 1
With reference to figure 2, according to the design needs when casing 4 is extracted, formed and 4 external screw thread equal diameter of casing using reversely rotating
Cylindrical pile body.
Embodiment 2
With reference to figure 3, rotated in the forward direction according to the design needs when casing 4 is extracted using simultaneous techniques, casing 4 is made to be moved back along spiral
Go out to be formed surface with shallow thread diameter and the pile body with drilling tool 3 with diameter.
Embodiment 3
It with reference to figure 4, according to the design needs, when casing 4 is extracted, is first rotated in the forward direction using simultaneous techniques, extracts a spacing
From and then reversely rotate, extract casing 4 after, is formed lower part with shallow thread top for cylinder pile body.
Embodiment 4
With reference to figure 5, according to geological condition and design needs, after casing 4 stops drilling, power head I 1 drive drilling tool 3 after
Continue after being drilled down into certain depth, then stop creeping into, concrete is then perfused into hole, top and 4 same diameter of casing, lower part can be formed
With drilling tool 3 with the diameter-variable pile of diameter.
Embodiment 5
It with reference to figure 6, is needed according to geological condition and design when it is more than deeply casing 4 that drilling tool 3, which bores, concrete, which is perfused, into hole forms
During diameter-variable pile, after first exiting certain distance along spiral using positive simultaneous techniques when casing 4 is extracted, then reversely rotate and propose ground
Afterwards, lower part and 3 same diameter of drilling tool can be formed, middle part carries shallow thread, and top is with 4 external screw thread of casing with the diameter-variable pile of diameter.
Embodiment 6
As shown in Figure 7 according to the design needs, when casing 4 is extracted, direction of rotation is constantly adjusted according to geological condition, extracted
It can be formed after casing 4 and replace the stake changed with cylinder with diameter and shallow thread with casing 4.
Embodiment 7
Such as Fig. 8, when concrete formation diameter-variable pile is perfused into hole when it is more than deeply casing that drilling tool, which bores, base area when casing 4 is extracted
The variation of matter situation, constantly changes direction of rotation, can form lower part and the same diameter of drilling tool, top be with casing 4 with diameter and
Shallow thread replaces the multiple diameter-variable pile of variation with cylinder.
Above-mentioned specific embodiment is only the specific case of the present invention, is not that the invention has other forms of limitations,
Any person skilled in the art is changed or is modified as equivalent variations possibly also with the technology contents of the disclosure above
Equivalent implementations.But on the premise of every principle without departing from the technology of the present invention, technical spirit according to the invention is to more than
Any simple modification, equivalent variations and the remodeling that embodiment is made should all fall into the scope of patent protection of the present invention.