CN106638580B - Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused - Google Patents

Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused Download PDF

Info

Publication number
CN106638580B
CN106638580B CN201610993130.9A CN201610993130A CN106638580B CN 106638580 B CN106638580 B CN 106638580B CN 201610993130 A CN201610993130 A CN 201610993130A CN 106638580 B CN106638580 B CN 106638580B
Authority
CN
China
Prior art keywords
casing
power head
concrete
pile
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610993130.9A
Other languages
Chinese (zh)
Other versions
CN106638580A (en
Inventor
刘心怡
邢占东
岳霞
邢腾文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wei Jian Ground Science And Technology Ltd
Original Assignee
Shandong Wei Jian Ground Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Wei Jian Ground Science And Technology Ltd filed Critical Shandong Wei Jian Ground Science And Technology Ltd
Priority to CN201610993130.9A priority Critical patent/CN106638580B/en
Publication of CN106638580A publication Critical patent/CN106638580A/en
Application granted granted Critical
Publication of CN106638580B publication Critical patent/CN106638580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention provides a kind of spiral soil compaction and follows up perfusion concrete pile making method into hole sleeve, and the advantages of keeping spiral extrusion soil filling pile simultaneously solves the deficiency of spiral extrusion soil filling pile.It comprises the following steps:Other set hollow structure power head II is installed on spiral extrusion soil filling pile machine, power head II is hollow structure, and casing of the connection with reverse acting spiral below;Startup power head I, which rotates in the forward direction, is drilled down into pore-forming, then starts power head II, until the drilling tool of power head I and the casing drilling of power head II stop drilling after having arrived projected depth;Start concrete and pump the pumping concrete into hole, power head I is rotated and is lifted up, until the pump output of concrete reaches at certain distance position, stops pumping concrete, power head II is separated with casing, is lifted up power head II to certain altitude;Steel reinforcement cage is seated to downwards design height;The pumping concrete into casing;Stop pumping concrete after, start power head II rotate and be lifted up, until casing all leave soil layer can pile.

Description

Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused
Technical field
The present invention relates to a kind of spiral soil compactions to be perfused concrete pile making method, and more particularly to a kind of spiral soil compaction follows up into hole sleeve Concrete pile making method is perfused.
Background technology
According to spiral extrusion soil filling pile technical regulation J12203-2012, spiral extrusion soil filling pile includes bidirectional screw soil compaction Stake and the general name of screw rod pile.Spiral Squeezing Soil Pile is a kind of by large torque power head drive drilling tool rotation soil compaction or half soil compaction pore-forming Pressure concrete injecting, a kind of construction technology of rear slotting steel reinforcement cage pile.The advantages of this construction technology is:Bearing capacity of single pile is high, can save Substantial amounts of construction material, speed of application is fast, can save the duration, extrusion soil filling pile, and without mud, the dregs amount of discharge is also very It is few, it is more environmentally friendly.But this construction technology has the following disadvantages in application process:First, pressure concrete injecting retaining wall pile anti-plug steel The technological requirement concrete of muscle cage must be filled into ground, otherwise steel reinforcement cage just can not normal mounting in place.Thus there is basement Engineering, stake top absolute altitude will result in substantial amounts of concrete waste in construction, and can also increase clear chisel in the deeper stake of below ground The expense of pile crown;Although the 2nd, highly developed at present using the technique of vibrator anti-plug steel reinforcement cage, collapsed by the concrete of construction site The influence of the unfavorable factors such as degree of falling, steel reinforcement cage verticality and rigidity, the operation level of worker, still unavoidable indivedual steel reinforcement cages Install not in place, and there also have part steel reinforcement cage that can generate installation in an installation to be not placed in the middle, the phenomenon that protective layer is insufficient.
The content of the invention
It follows up it is an object of the present invention to provide a kind of spiral soil compaction into hole sleeve and concrete pile making method is perfused, spiral can not only be kept The advantages of extrusion soil filling pile, and the deficiency of spiral extrusion soil filling pile can be solved.
To achieve these goals, the present invention uses following technical scheme:
A kind of spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and comprises the following steps:
(1)Other set hollow structure power head II is installed on spiral extrusion soil filling pile machine, power head II is located at spiral I lower section of power head of extrusion soil filling pile machine, and power head II is hollow structure, and median pore diameter is bored more than spiral extrusion soil filling pile The maximum gauge of tool;
(2)Power head II connects the casing with reverse acting spiral below, and quick coupling is used between power head II and casing Connection, and its lower end is installed with brill tooth, the drilling tool that power head I connects can be passed through from power head II and casing;
(3)Spiral extrusion soil filling pile machine starts power head I and rotates in the forward direction and be drilled down into pore-forming afterwards in place, then starts power First II reversely rotates follow-up casing downwards, until after the drilling tool of power head I and the casing drilling of power head II have arrived projected depth Stop drilling;
(4)The concrete that primer liner is connected on power head I, which pumps the pumping concrete into hole and starts power head I simultaneously, to be rotated and upward Promoted, until the pump output of concrete reaches at certain distance position more than its lower end, stop pumping concrete, power head I continue to Upper promotion, while power head II is separated with casing, power head II is lifted up to certain altitude, until I drilling tool of power head is complete It is proposed casing;
(5)The steel reinforcement cage of pre-production is seated to downwards design height along casing axis, casing can ensure steel reinforcement cage It installs between two parties and protective layer meets design requirement;
(6)Mobile drilling tool alignment sleeve axis, and the pumping concrete into casing again, until reaching design stake top absolute altitude;
(7)After stopping pumping concrete, mobile power head II and casing connection start power head II and rotate and be lifted up, directly Soil layer is all left to casing can pile;
(8)It constructs displaced spirals extrusion soil filling pile machine to next position.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and according to the design needs when casing is extracted, uses It reversely rotates and is formed and the isodiametric cylindrical pile body of sleeve external thread.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, when casing is extracted using the positive rotation of simultaneous techniques Turn, casing is made to exit to form the pile body that surface carries shallow thread along spiral.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and according to the design needs, when casing is extracted, first adopts It is rotated in the forward direction with simultaneous techniques, extracts certain distance and then reverse rotation, after extracting casing, formed lower part and carry shallow thread Top is cylindrical pile body.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and needs creeping into according to geological condition and design When, after casing stops drilling, power head I drives drilling tool to continue after being drilled down into certain depth, then stops creeping into, then into hole Concrete is perfused, lower part and the same diameter of drilling tool can be formed, top is with casing with the diameter-variable pile of diameter.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and needs to bore in drilling tool according to geological condition and design When being deeply more than casing, when concrete formation diameter-variable pile being perfused into hole, when casing is extracted positive simultaneous techniques is first used to be exited along spiral After certain distance, then after reversely rotating and proposing ground, lower part and the same diameter of drilling tool can be formed, middle part is with shallow thread, top With sleeve external thread with the diameter-variable pile of diameter.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, according to the design needs, when casing is extracted, according to Geological condition constantly adjusts direction of rotation, and multiple diameter-variable pile can be formed after extracting casing.
Above-mentioned spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, according to the design needs, when casing is extracted, according to Geological condition constantly adjusts direction of rotation, can be formed after extraction casing and replace variation with cylinder with diameter and shallow thread with casing Stake.
Above-mentioned spiral soil compaction follows up into hole sleeve is perfused concrete pile making method, and concrete is perfused into hole when boring deeply more than casing for drilling tool When forming diameter-variable pile, according to the variation of geological condition when casing is extracted, constantly change direction of rotation, lower part and drilling tool can be formed Same diameter, top are to replace the multiple diameter-variable pile changed with cylinder with diameter and shallow thread with casing.
The beneficial effects of the invention are as follows:Power head I coordinates with power head II, and adjustment casing is extracted and direction of rotation is formed not The stake of similar shape, the advantages of spiral extrusion soil filling pile can not only be kept, and the deficiency of spiral extrusion soil filling pile can be solved;Cause For the setting of casing, concrete need not be filled into ground.
Description of the drawings
Fig. 1 is the structure diagram of spiral extrusion soil filling pile mechanomotive force part;
Fig. 2 is the structure diagram of cylindrical pile body;
Fig. 3 is the pile body structure schematic diagram that surface carries shallow thread;
Fig. 4 lower parts are cylindrical pile body structure schematic diagram with shallow thread top
Fig. 5 is for lower part with the same diameter of drilling tool, top and casing with diameter diameter-variable pile structure diagram;
Fig. 6 is lower part and the same diameter of drilling tool, and middle part carries shallow thread, and top is with sleeve external thread with the diameter-variable pile knot of diameter Structure schematic diagram;
Fig. 7 is the stake schematic diagram that shallow thread replaces variation with cylinder;
Fig. 8 is lower part and the same diameter of drilling tool, and top is to replace the more of variation with cylinder with diameter and shallow thread with casing Secondary diameter-variable pile schematic diagram.
1. power head I in figure, 2. power heads II, 3. drilling tools, 4. casings, 5. reverse acting spirals.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, develop simultaneously embodiment referring to the drawings, right The present invention is further described.
A kind of spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, and comprises the following steps:
(1)With reference to figure 1, other set hollow structure power head II 2, power head II are installed on spiral extrusion soil filling pile machine 2 are located at I 1 lower section of power head of spiral extrusion soil filling pile machine, and power head II 2 is hollow structure, and median pore diameter is more than spiral The maximum gauge of extrusion soil filling pile drilling tool 3;
(2)Power head II 2 connects the casing 4 with reverse acting spiral 5 below, using quick between power head II 2 and casing 4 Connector connects, and its lower end is installed with brill tooth, to ensure that casing can effectively cut soil and rock, the drilling tool that power head I 1 connects 3 can pass through from power head II 2 and casing 4;
(3)Spiral extrusion soil filling pile machine starts power head I 1 and rotates in the forward direction and be drilled down into pore-forming afterwards in place, then starts dynamic Power first II 2 reversely rotates follow-up casing 4 downwards, until the casing 4 of the drilling tool 3 of power head I 1 and power head II 2 drilling is to setting Stop drilling after counting depth;
(4)The concrete that primer liner is connected on power head I 1 pump the pumping concrete into hole start simultaneously power head I 1 rotation and to Upper promotion until the pump output of concrete reaches at certain distance position more than 4 lower end of casing, stops pumping concrete, stops pumping concrete Position should specifically be determined according to geology and groundwater condition, the pressure of concrete should be made to be enough I 1 drilling tool 3 of power head is kept to generate Soil compaction effect, ensure that underground water cannot be poured into casing 4 again, power head I 1 continues up promotions, while power head II 2 and Casing 4 separates, and power head II 2 is lifted up to certain altitude, until I 1 drilling tool 3 of power head proposes casing 4 completely;
(5)The steel reinforcement cage of pre-production is seated to downwards design height along 4 axis of casing, casing 4 can ensure reinforcing bar Cage is installed between two parties and protective layer meets design requirement;
(6)Mobile 4 axis of alignment sleeve, and the pumping concrete into casing 4 again of drilling tool 3, until reach design stake top absolute altitude, The pump output of concrete to calculate enough filling volumes with ensure casing 4 propose after concrete top mark up to design and code requirement;
(7)After stopping pumping concrete, mobile power head II 2 is connected with casing 4, is started power head II 2 and is rotated and be lifted up, Leaving soil layer up to 4 whole of casing can pile;
(8)It constructs displaced spirals extrusion soil filling pile machine to next position.
Embodiment 1
With reference to figure 2, according to the design needs when casing 4 is extracted, formed and 4 external screw thread equal diameter of casing using reversely rotating Cylindrical pile body.
Embodiment 2
With reference to figure 3, rotated in the forward direction according to the design needs when casing 4 is extracted using simultaneous techniques, casing 4 is made to be moved back along spiral Go out to be formed surface with shallow thread diameter and the pile body with drilling tool 3 with diameter.
Embodiment 3
It with reference to figure 4, according to the design needs, when casing 4 is extracted, is first rotated in the forward direction using simultaneous techniques, extracts a spacing From and then reversely rotate, extract casing 4 after, is formed lower part with shallow thread top for cylinder pile body.
Embodiment 4
With reference to figure 5, according to geological condition and design needs, after casing 4 stops drilling, power head I 1 drive drilling tool 3 after Continue after being drilled down into certain depth, then stop creeping into, concrete is then perfused into hole, top and 4 same diameter of casing, lower part can be formed With drilling tool 3 with the diameter-variable pile of diameter.
Embodiment 5
It with reference to figure 6, is needed according to geological condition and design when it is more than deeply casing 4 that drilling tool 3, which bores, concrete, which is perfused, into hole forms During diameter-variable pile, after first exiting certain distance along spiral using positive simultaneous techniques when casing 4 is extracted, then reversely rotate and propose ground Afterwards, lower part and 3 same diameter of drilling tool can be formed, middle part carries shallow thread, and top is with 4 external screw thread of casing with the diameter-variable pile of diameter.
Embodiment 6
As shown in Figure 7 according to the design needs, when casing 4 is extracted, direction of rotation is constantly adjusted according to geological condition, extracted It can be formed after casing 4 and replace the stake changed with cylinder with diameter and shallow thread with casing 4.
Embodiment 7
Such as Fig. 8, when concrete formation diameter-variable pile is perfused into hole when it is more than deeply casing that drilling tool, which bores, base area when casing 4 is extracted The variation of matter situation, constantly changes direction of rotation, can form lower part and the same diameter of drilling tool, top be with casing 4 with diameter and Shallow thread replaces the multiple diameter-variable pile of variation with cylinder.
Above-mentioned specific embodiment is only the specific case of the present invention, is not that the invention has other forms of limitations, Any person skilled in the art is changed or is modified as equivalent variations possibly also with the technology contents of the disclosure above Equivalent implementations.But on the premise of every principle without departing from the technology of the present invention, technical spirit according to the invention is to more than Any simple modification, equivalent variations and the remodeling that embodiment is made should all fall into the scope of patent protection of the present invention.

Claims (8)

1. a kind of spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:Comprise the following steps
(1)Other set hollow structure power head II is installed on spiral extrusion soil filling pile machine, power head II is located at spiral soil compaction I lower section of power head of pile-filling machine, and power head II is hollow structure, and median pore diameter is more than spiral extrusion soil filling pile drilling tool Maximum gauge;
(2)Power head II connects the casing with reverse acting spiral below, is connected between power head II and casing using quick coupling, And its lower end is installed with brill tooth, the drilling tool that power head I connects can be passed through from power head II and casing;
(3)Spiral extrusion soil filling pile machine starts power head I and rotates in the forward direction and be drilled down into pore-forming afterwards in place, then starts power head II Follow-up casing downwards is reversely rotated, until the drilling tool of power head I and the casing drilling of power head II stop after having arrived projected depth Drilling;
(4)The concrete that primer liner is connected on power head I, which pumps the pumping concrete into hole and starts power head I simultaneously, to be rotated and carries upwards It rises, until the pump output of concrete reaches at certain distance position more than its lower end, stops pumping concrete, power head I continues up It is promoted, while power head II is separated with casing, power head II is lifted up to certain altitude, until I drilling tool of power head carries completely Go out casing;
(5)The steel reinforcement cage of pre-production is seated to downwards design height along casing axis, casing can ensure the guarantor of steel reinforcement cage Sheath meets design requirement;
(6)Mobile drilling tool alignment sleeve axis, and the pumping concrete into casing again, until reaching design stake top absolute altitude;
(7)After stopping pumping concrete, mobile power head II and casing connection start power head II and rotate and be lifted up, until set Pipe all leaves soil layer can pile;
(8)It constructs displaced spirals extrusion soil filling pile machine to next position.
2. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to design need It to be formed and the isodiametric cylindrical pile body of sleeve external thread when casing is extracted using reversely rotating.
3. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to design need It to be rotated in the forward direction when casing is extracted using simultaneous techniques, casing is made to exit to form the pile body that surface carries shallow thread along spiral.
4. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to design need Will, it when casing is extracted, is first rotated in the forward direction using simultaneous techniques, extracts certain distance and then reverse rotation, extract casing Afterwards, it is cylindrical pile body to form lower part with shallow thread top.
5. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to geology feelings Condition and design are needed in drilling, and after casing stops drilling, power head I drives drilling tool to continue after being drilled down into certain depth, then Stop drilling, concrete is then perfused into hole, lower part and the same diameter of drilling tool can be formed, top is with casing with the diameter-variable pile of diameter.
6. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to geology feelings Condition and design needs when concrete formation diameter-variable pile being perfused into hole, first use just when it is more than deeply casing that drilling tool, which bores, when casing is extracted After simultaneous techniques exits certain distance along spiral, then reversely rotate propose ground after, lower part and the same diameter of drilling tool can be formed, Middle part carries shallow thread, and top is with sleeve external thread with the diameter-variable pile of diameter.
7. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:According to design need Will, when casing is extracted, direction of rotation is constantly adjusted according to geological condition, can be formed after extraction casing with casing with diameter and shallow Screw thread replaces the stake of variation with cylinder.
8. spiral soil compaction as described in claim 1 follows up into hole sleeve and concrete pile making method is perfused, it is characterised in that:Drilling tool bores deep super When perfusion concrete forms diameter-variable pile into hole when crossing casing, according to the variation of geological condition when casing is extracted, constantly change rotation side To, can form lower part and the same diameter of drilling tool, top be with casing with diameter and shallow thread with it is cylindrical replace change it is multiple Diameter-variable pile.
CN201610993130.9A 2016-11-11 2016-11-11 Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused Active CN106638580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610993130.9A CN106638580B (en) 2016-11-11 2016-11-11 Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610993130.9A CN106638580B (en) 2016-11-11 2016-11-11 Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused

Publications (2)

Publication Number Publication Date
CN106638580A CN106638580A (en) 2017-05-10
CN106638580B true CN106638580B (en) 2018-06-01

Family

ID=58806271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610993130.9A Active CN106638580B (en) 2016-11-11 2016-11-11 Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused

Country Status (1)

Country Link
CN (1) CN106638580B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113566A (en) * 2017-06-23 2019-01-01 刘淼 The structure-improved and full-sleeve screw cast-in-place pile construction method of full-sleeve twist bit
CN108049401A (en) * 2018-01-26 2018-05-18 刘淼 A kind of screw thread rammed bulb pile and its construction method
CN110130834B (en) * 2019-06-27 2024-06-04 李广信 Screw-thread-fit type multi-power composite drilling tool, preparation method and pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60246918A (en) * 1984-05-23 1985-12-06 Takenaka Komuten Co Ltd Method of removing negative friction force of cast-in-place concrete pile
CN100357527C (en) * 2005-01-05 2007-12-26 贺德新 Device for knobby pushing and expanding spiral immersed tube stake and its engineering method
CN100402759C (en) * 2006-04-26 2008-07-16 万军 Screw-thread bored concrete pile piling method
CN201650154U (en) * 2010-05-14 2010-11-24 中冶建筑研究总院有限公司 Adjustable multi-stage helical extruding type drilling tool
CN104563104B (en) * 2015-01-19 2016-05-11 浙江坤德创新岩土工程有限公司 Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method
CN104763345A (en) * 2015-04-09 2015-07-08 王继忠 Construction device and method for building foundation

Also Published As

Publication number Publication date
CN106638580A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN105113986B (en) A kind of barrette pore-forming equipment
CN106638580B (en) Spiral soil compaction follows up into hole sleeve and concrete pile making method is perfused
CN203808822U (en) Full-hydraulic double power head device of rotary drilling rig
CN207296871U (en) The structure-improved of full-sleeve twist bit
CN109113566A (en) The structure-improved and full-sleeve screw cast-in-place pile construction method of full-sleeve twist bit
CN106246099A (en) Spiral soil compaction down-the-hole embedding rock device and pile making method
CN103835287B (en) A kind of construction method of compacted diameter-variable pile
CN104947652B (en) Long auger drilling cement mortar retaining wall type implanted pile tube construction device and construction method
CN103556628B (en) Spiral conical soil compaction pile construction method
CN105649073A (en) Static root drilling type construction method for planting piles
CN203891016U (en) Self-propelled anchor cable and construction device thereof
RU2327007C1 (en) Method of drill-injection stilt formation
CN104763348B (en) The brill of the bionical nozzle of a kind of build-in expands integral type drilling tool and bores expanding method
CN108397128A (en) A kind of bridge construction perforating device and its drilling method
CN108301769A (en) A kind of RW types horizontal well construction method and its drilling tool used
CN103321222A (en) Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method
CN102767332B (en) Screw pile machine and cast-in place pile construction method
CN202688987U (en) Spiral pile machine
CN209339143U (en) A kind of concrete pipe pile construction equipment
CN101245597A (en) Breast wall type cast-in-situ bored pile construction method and pile machine
CN206267795U (en) Spiral cylinder soil compaction drill bit
CN205776195U (en) High-pressure rotary-spray cone body anchor pole
CN105221076B (en) A kind of enlarged footing fourth type screw cast-in-place pile pile making method and double dynamical casing reamer drilling tool
CN106836228A (en) Filling type stake hollow drill
CN203847000U (en) High-pressure jet grouting anchor rod pore broadening device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Xinyi

Inventor after: Xing Zhandong

Inventor after: Yue Xia

Inventor after: Xing Tengwen

Inventor before: Xing Zhandong

Inventor before: Yue Xia

Inventor before: Xing Tengwen

GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170510

Assignee: Shandong Zhuoli Piling Machine Co., Ltd.

Assignor: Shandong Wei Jian ground Science and Technology Ltd.

Contract record no.: X2019370000017

Denomination of invention: Method for forming pile by forming hole through spiral soil squeezing and following up poured concrete through sleeve

Granted publication date: 20180601

License type: Common License

Record date: 20191115