CN106638530A - Process for lifting offshore booster station jacket in shallow water - Google Patents

Process for lifting offshore booster station jacket in shallow water Download PDF

Info

Publication number
CN106638530A
CN106638530A CN201611270866.XA CN201611270866A CN106638530A CN 106638530 A CN106638530 A CN 106638530A CN 201611270866 A CN201611270866 A CN 201611270866A CN 106638530 A CN106638530 A CN 106638530A
Authority
CN
China
Prior art keywords
jacket
lifting
leveling
ship
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611270866.XA
Other languages
Chinese (zh)
Inventor
高宏飙
王健
郑则旺
罗雯雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longyuan Offshore Wind Power Co Ltd
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority to CN201611270866.XA priority Critical patent/CN106638530A/en
Publication of CN106638530A publication Critical patent/CN106638530A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/95Mounting on supporting structures or systems offshore
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a process for lifting an offshore booster station jacket in shallow water; the process comprises the steps of (1) positioning when a lifting ship is in floating state; (2) pre-leveling; (3) numbering; (4) lifting a jacket; (5) leveling the jacket, welding, and grouting. An offshore booster station of a marine wind farm can be well installed in shallow water, the large-scale marine wind powder is guided, and the process has high popularization value.

Description

A kind of phytal zone offshore boosting station jacket hoisting
Technical field
The present invention relates to offshore booster station structure mounting technique field, more particularly to a kind of phytal zone offshore boosting station conduit Frame hoisting.
Background technology
Huge consumption and the severe contamination of environment with fossil energy, regenerative resource is more and more subject to the world each The concern of state, wind energy becomes most one of new forms of energy of competitiveness.Land wind-powered electricity generation is compared, offshore wind farm is not only not take up soil money Source, and energy enrich, stable, utilization rate of exerting oneself it is high, it has also become the new direction of world's Wind Power Development.From the sea of current planning From the point of view of Wind Power Project, wind energy turbine set offshore distance all in more than 10km, need build offshore boosting station, by voltage lifting after, pass through High-voltage undersea cable is delivered to continental Grid.
But marine wind electric field booster stations need to install jacket as supporting construction, and traditional method is pacified using large-scale floating crane Dress, but large-scale floating crane drinking water is deep, it is impossible to ' s operation in shallow water is entered, thus is difficult to that marine liter is installed in phytal zone using conventional method Pressure station jacket, need to for shallow sea water the characteristics of, using shallower draft can the pontoon barge on seat beach installed.But marine operating mode Badly, condition is poor, very high to pontoon barge installation requirement,
Accordingly, it is desirable to provide a kind of phytal zone offshore boosting station jacket hoisting is solving the above problems.
The content of the invention
In order to solve the problem, the invention discloses a kind of phytal zone offshore boosting station jacket hoisting, its mesh Be exploitation offshore boosting station jacket installation new technology, in phytal zone pontoon barge at sea complete booster stations jacket peace Dress, the solution booster stations phytal zone depth of water is shallower, and the drinking water of large-tonnage crane barge ship is deep to be cannot be introduced into, and by the little crane barge of shallow draft peace is completed Dress, install convenient, simple, efficiency high, expense are low, operational security is good.A kind of phytal zone offshore boosting station jacket slinger Skill, the technique comprises the steps:(1) -- (2) pre-leveling -- (3) number -- (4) jacket is positioned when lifting method of ship floating condition Lifting -- (5) jacket leveling, welding and grouting;
(1) position when lifting method of ship floating condition:Position during lifting method of ship floating condition, lift when sitting beach, jacket cargo ship is in place In lift-on and lift-off ship side;
(2) pre-leveling:Steel pipe pile bracket pad pre-leveling;
(3) number:Pile sinking figure is numbered with field conduit frame;
(4) jacket lifting:Hoisting rig is got out, and checks its integrity, two strands are arranged on lifting machine platform Car, as cable wind system during lifting, after hanging up properly hoisting rig, removes all colligation frocks on deck, leaves in jacket During more than ship board face 4m, lift-on and lift-off ship plays large arm and returns and goes to seat in the plane center top, slowly puts into jacket On foundation pile;
(5) jacket leveling, welding and grouting:After the completion of jacket lifting, level is adopted in jacket temporary platform Instrument measures each column elevation of jacket and levelness whether in the range of design code.Then carried out using hydraulic jack micro- Leveling, flatness meets the welding that limit plate is carried out after requirement, finally carries out grouting process, carries out after intensity meets requirement The lifting of portion's chunk.
Beneficial effects of the present invention are:
The present invention solves install marine wind electric field offshore type booster stations in phytal zone very well, is that offshore wind farm is built on a large scale If guidance is provided, with stronger promotional value.
With reference to advantages and features of the invention described further below.
Description of the drawings
Fig. 1 is hoisting schematic diagram of the present invention.
Wherein:1 steel-pipe pile;2. jacket stull;3. jacket diagonal brace
Specific embodiment
In the following description, a large amount of concrete details are given to provide more thorough understanding of the invention.So And, it will be apparent to one skilled in the art that the present invention can be able to without the need for one or more of these details Implement.In other examples, in order to avoid obscuring with the present invention, for some technical characteristics well known in the art do not enter Row description.
In order to thoroughly understand the present invention, detailed structure will be proposed in following description.Obviously, execution of the invention is simultaneously It is not limited to the specific details that those skilled in the art is familiar with.Presently preferred embodiments of the present invention is described in detail as follows, but In addition to these detailed descriptions, the present invention can also have other embodiment.
Embodiments of the invention are described in detail below.
With reference to Fig. 1, a kind of phytal zone offshore boosting station jacket hoisting, the technique comprises the steps:(1) hang -- (2) pre-leveling -- -- lifting of (4) jacket -- (5) the jacket leveling of (3) numbering, welding and filling are positioned during dress method of ship floating condition Slurry;
(1) position when lifting method of ship floating condition:Position during lifting method of ship floating condition, lift when sitting beach, jacket cargo ship is in place In lift-on and lift-off ship side;
(2) pre-leveling:Steel pipe pile bracket pad pre-leveling;
(3) number:Pile sinking figure is numbered with field conduit frame;
(4) jacket lifting:Hoisting rig is got out, and checks its integrity, two strands are arranged on lifting machine platform Car, as cable wind system during lifting, after hanging up properly hoisting rig, removes all colligation frocks on deck, leaves in jacket During more than ship board face 4m, lift-on and lift-off ship plays large arm and returns and goes to seat in the plane center top, slowly puts into jacket On foundation pile;
(5) jacket leveling, welding and grouting:After the completion of jacket lifting, level is adopted in jacket temporary platform Instrument measures each column elevation of jacket and levelness whether in the range of design code.Then carried out using hydraulic jack micro- Leveling, flatness meets the welding that limit plate is carried out after requirement, finally carries out grouting process, carries out after intensity meets requirement The lifting of portion's chunk.
The present embodiment has the beneficial effect that:
The present embodiment is solved very well installs marine wind electric field offshore type booster stations in phytal zone, is that offshore wind farm is extensive Build and guidance is provided, with stronger promotional value.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment is only intended to Citing and descriptive purpose, and be not intended to limit the invention in described scope of embodiments.In addition people in the art Member is it is understood that the invention is not limited in above-described embodiment, teaching of the invention can also be made more kinds of Variants and modifications, these variants and modifications are all fallen within scope of the present invention.Protection scope of the present invention by The appended claims and its equivalent scope are defined.

Claims (1)

1. a kind of phytal zone offshore boosting station jacket hoisting, it is characterised in that:The technique comprises the steps:(1) -- (2) pre-leveling -- -- lifting of (4) jacket -- (5) the jacket leveling of (3) numbering, welding and filling are positioned during lifting method of ship floating condition Slurry;
(1) position when lifting method of ship floating condition:Position during lifting method of ship floating condition, lift when sitting beach, jacket cargo ship is located in and hangs Shipment side;
(2) pre-leveling:Steel pipe pile bracket pad pre-leveling;
(3) number:Pile sinking figure is numbered with field conduit frame;
(4) jacket lifting:Hoisting rig is got out, and checks its integrity, two winches are arranged on lifting machine platform, used Cable wind system when lifting, after hanging up properly hoisting rig, removes all colligation frocks on deck, and in jacket cargo ship is left During more than deck plane 4m, lift-on and lift-off ship plays large arm and returns and goes to seat in the plane center top, slowly puts jacket into foundation pile On;
(5) jacket leveling, welding and grouting:After the completion of jacket lifting, surveyed using spirit level in jacket temporary platform Whether amount each column elevation of jacket and levelness are in the range of design code.Then it is finely adjusted using hydraulic jack Flat, flatness meets the welding that limit plate is carried out after requirement, finally carries out grouting process, and after intensity meets requirement top is carried out The lifting of chunk.
CN201611270866.XA 2016-12-29 2016-12-29 Process for lifting offshore booster station jacket in shallow water Withdrawn CN106638530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611270866.XA CN106638530A (en) 2016-12-29 2016-12-29 Process for lifting offshore booster station jacket in shallow water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611270866.XA CN106638530A (en) 2016-12-29 2016-12-29 Process for lifting offshore booster station jacket in shallow water

Publications (1)

Publication Number Publication Date
CN106638530A true CN106638530A (en) 2017-05-10

Family

ID=58838223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611270866.XA Withdrawn CN106638530A (en) 2016-12-29 2016-12-29 Process for lifting offshore booster station jacket in shallow water

Country Status (1)

Country Link
CN (1) CN106638530A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326887A (en) * 2017-06-22 2017-11-07 广东华尔辰海上风电工程有限责任公司 Offshore wind farm elder generation pile leader frame construction method of installation
CN107938699A (en) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 A kind of construction method on booster stations basis
CN110790122A (en) * 2019-11-15 2020-02-14 南通泰胜蓝岛海洋工程有限公司 Main lifting lug for booster station project and construction process of main lifting lug
CN111099389A (en) * 2019-12-13 2020-05-05 南通泰胜蓝岛海洋工程有限公司 Ship loading device and method for offshore booster station
CN115467365A (en) * 2022-09-30 2022-12-13 华电重工股份有限公司 Installation method of overwater booster station foundation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538844A (en) * 2009-04-21 2009-09-23 江苏东电新能源科技工程有限公司 Construction method for building large-scale offshore wind farm with depth more than 2m

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538844A (en) * 2009-04-21 2009-09-23 江苏东电新能源科技工程有限公司 Construction method for building large-scale offshore wind farm with depth more than 2m

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326887A (en) * 2017-06-22 2017-11-07 广东华尔辰海上风电工程有限责任公司 Offshore wind farm elder generation pile leader frame construction method of installation
CN107326887B (en) * 2017-06-22 2019-06-18 广东华尔辰海上风电工程有限责任公司 Offshore wind farm elder generation pile leader frame construction method of installation
CN107938699A (en) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 A kind of construction method on booster stations basis
CN110790122A (en) * 2019-11-15 2020-02-14 南通泰胜蓝岛海洋工程有限公司 Main lifting lug for booster station project and construction process of main lifting lug
CN111099389A (en) * 2019-12-13 2020-05-05 南通泰胜蓝岛海洋工程有限公司 Ship loading device and method for offshore booster station
CN115467365A (en) * 2022-09-30 2022-12-13 华电重工股份有限公司 Installation method of overwater booster station foundation

Similar Documents

Publication Publication Date Title
CN106638530A (en) Process for lifting offshore booster station jacket in shallow water
KR101013789B1 (en) Method of establishing Sea wind power generator and apparatus thereof
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
KR20100016370A (en) A method of installing a hydroelectric turbine
CN102936888B (en) Self-installation type offshore booster station structure and installation method thereof
CN103205980A (en) Large-diameter mono-pile foundation of offshore wind turbine and construction method of large-diameter mono-pile foundation
CN102390495A (en) Offshore combined floating wind power generation platform
CN103015445A (en) Transition-section-free single-pile foundation construction and fan equipment installation process for shallow sea area wind farm
CN205917719U (en) Marine anemometer tower of multi -bucket negative -pressure barrel formula
CN102116017A (en) Foam platform for drilling on waterways
CN103243732A (en) Installing method of marine anemometer tower base structure
CN202023182U (en) Waterborne drilling foam platform
CN201713827U (en) Fan base structure of offshore wind power station
CN206141788U (en) Utilize platform that solar energy and ocean current can generate electricity
CN107218179B (en) The construction method of offshore wind generating partial installation
CN203238654U (en) Self-lifting tidal current energy generating base structure
CN106930900A (en) It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment
CN204803907U (en) Marine wind power steel constructs gravity type fan basis
CN207062916U (en) A kind of partial installation formula booster stations
CN207261176U (en) A kind of offshore wind power platform pitching pile fixing device
CN202966598U (en) Novel bottom-supported marine wind turbine mounting barge
CN204456044U (en) Mixing floating offshore booster station structure
CN108750014A (en) The support anchor structure and construction method of a kind of floating on water photovoltaic plant suitable for high water-level amplitude
CN105443311A (en) Tidal current energy generating device fixed to water bottom

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170510

WW01 Invention patent application withdrawn after publication