CN106617902B - Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method - Google Patents

Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method Download PDF

Info

Publication number
CN106617902B
CN106617902B CN201510494239.3A CN201510494239A CN106617902B CN 106617902 B CN106617902 B CN 106617902B CN 201510494239 A CN201510494239 A CN 201510494239A CN 106617902 B CN106617902 B CN 106617902B
Authority
CN
China
Prior art keywords
steel pipe
frame
guy wire
strung
wooden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510494239.3A
Other languages
Chinese (zh)
Other versions
CN106617902A (en
Inventor
郑牧之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yusheng Culture Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811072061.3A priority Critical patent/CN109008419A/en
Priority to CN201510494239.3A priority patent/CN106617902B/en
Priority to CN201811072062.8A priority patent/CN108851720A/en
Priority to CN201811072058.1A priority patent/CN109008418B/en
Priority to CN201811072063.2A priority patent/CN108903449B/en
Priority to CN201811072059.6A priority patent/CN109124158A/en
Publication of CN106617902A publication Critical patent/CN106617902A/en
Application granted granted Critical
Publication of CN106617902B publication Critical patent/CN106617902B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

The wooden bed frame strung with crisscross coir ropes of Chinese tradition, as long as new, it is very tightly taut, just meet very much the requirement of healthy sleep, but traditional rectangular wooden bed frame strung with crisscross coir ropes needs very sturdy wooden frame to add arch support and oblique support again, could allow coir rope taut enough to tight, and coir rope is directly through in the hole bored on wooden frame, with the passing of time inevitably relaxation, wooden bed frame strung with crisscross coir ropes cannot keep tight, and healthy sleep is just difficult to ensure.Round (attached drawing 1) or oval (attached drawing 2) is made with steel pipe by the present invention or four sides are orthodrome, quadrangle is outline border of the steel pipe frame (1) of the square circular (attached drawing 3) at small arc-shaped or obtuse angle as wooden bed frame strung with crisscross coir ropes bed, instead of rectangular sturdy wooden frame, in the frame of round or ellipse or square circular, the guy wire of different directions can repeal by implication to the pulling force of frame, so light and handy steel pipe frame can bear the pulling force of taut very tight guy wire.The present invention also provides the method fixed guy wire on steel pipe frame He tighten guy wire, the method that guy wire is tightened when including manufacturing wooden bed frame strung with crisscross coir ropes bed of the present invention and wooden bed frame strung with crisscross coir ropes bed make guy wire restore tight method because using with the passing of time guy wire relaxation when wooden bed frame strung with crisscross coir ropes is not able to maintain tight.

Description

Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
Technical field:
The present invention relates to beds and mattress, especially Bed mattress strung with crisscross coirropes.
Background technique: the wooden bed frame strung with crisscross coir ropes of Chinese tradition, as long as new, it stretches tight very tight, just meets very much the requirement of healthy sleep, but Traditional rectangular wooden bed frame strung with crisscross coir ropes needs very sturdy wooden frame to add arch support and oblique support again, could allow coir rope taut enough to tight, and And coir rope is directly through in the hole bored on wooden frame, with the passing of time inevitably relaxation, wooden bed frame strung with crisscross coir ropes cannot keep tight, and healthy sleep is just difficult to protect Card.
Summary of the invention: with steel pipe round (attached drawing 1) or oval (attached drawing 2) is made in the present invention or four sides are orthodrome, and four Angle is outline border of the steel pipe frame (1) of the square circular (attached drawing 3) at small arc-shaped or obtuse angle as wooden bed frame strung with crisscross coir ropes bed, instead of rectangular sturdy wood Frame, in the frame of round or ellipse or square circular, the guy wire of different directions can repeal by implication to the pulling force of frame, so light and handy Steel pipe frame can bear the pulling force of taut very tight guy wire.The present invention also provides fix guy wire on steel pipe frame and tighten guy wire Method, because using with the passing of time guy wire relaxation, wooden bed frame strung with crisscross coir ropes cannot for the method that guy wire is tightened when including manufacturing wooden bed frame strung with crisscross coir ropes bed of the present invention and wooden bed frame strung with crisscross coir ropes bed Guy wire is set to restore tight method when keeping tight.
Detailed description of the invention: attached drawing is schematic diagram
It is oval wooden bed frame strung with crisscross coir ropes bed Fig. 3 be square circular wooden bed frame strung with crisscross coir ropes bed Fig. 4 is 1 tension hook of method that Fig. 1, which is round wooden bed frame strung with crisscross coir ropes bed Fig. 2, Top view
Fig. 5 is tension hook side view
Fig. 6 is that tension hook just puts on guy wire in the small steel pipe of steel pipe frame
Fig. 7 is steel pipe frame regulating mechanism
Fig. 8-Figure 11 is switching tension hook process
Figure 12 is the structure of method 2
Figure 13 is the structure of method 3
Figure 14 is that the guy wire hook of method 3 presses dress method
Figure 15 is the side view of Figure 13
Figure 16 is the guy wire hook two of method 4
Figure 17 is the side view of Figure 16
Figure 18 is guidance folder
Figure 19 is the side view of Figure 18
During Figure 20 is the hole that guy wire hook two is introduced steel pipe frame by finer wire and guidance folder
Figure 21 is in hole of the guy wire hook two just by threading steel pipe frame
Figure 22 be guy wire hook two by install and tail end it is curved hold together
Figure 23 is the side view of Figure 22
Specific embodiment:
Round (attached drawing 1) or oval (attached drawing 2) is made in steel pipe or four sides are orthodrome, and quadrangle is small arc-shaped or obtuse angle Square circular (attached drawing 3) outline border of the steel pipe frame (1) as wooden bed frame strung with crisscross coir ropes bed, be installed with the guy wire intersected in length and breadth on steel pipe frame (1) (2), the tensile strength of guy wire (2) is very strong, and elongation is very low, wears again very tight, wooden bed frame strung with crisscross coir ropes bed can be made strong enough, light and handy steel pipe Why frame (1) can bear the pulling force of taut very tight guy wire (2), we analyze the stress condition of steel pipe frame: for Narration is convenient, and round wooden bed frame strung with crisscross coir ropes bed is divided into the right and left and upper and lower both sides as rectangular wooden bed frame strung with crisscross coir ropes bed by we, when direction When the pulling force of guy wire (2) is applied to the right and left of steel pipe frame (1) and them is made to generate the trend to be furthered, because of steel pipe frame (1) the right and left is each one section of opposite arc, so they generate the trend for being straightened and elongating, steel pipe frame (1) simultaneously Both sides up and down just necessarily lead to and be shortened and push away remote trend, and at this moment both sides are also just being born from another direction up and down The pulling force of guy wire (2) also makes them generate the trend to be furthered, they are also each one section of opposite arc, so they are also same When generate the trend that is straightened and elongates, it is impossible to be shortened and push away it is remote, so the drawing of the guy wire of circle wooden bed frame strung with crisscross coir ropes bed both direction Power is cancelled out each other, and is made light and handy steel pipe frame (1) that can bear the pulling force of taut very tight guy wire, is kept wooden bed frame strung with crisscross coir ropes bed strong enough.In It is that determine the round main production quality of wooden bed frame strung with crisscross coir ropes bed is exactly how guy wire to be worn enough to tight.
Being described below after the method and guy wire for easily guy wire being worn very tight on steel pipe frame (1) with the passing of time relax makes to stretch tight Restore tight method:
Easily the method 1 that guy wire is worn very tight: being connected to and steel pipe in the predetermined wire rope handling spot welding of steel pipe frame (1) inner ring The perpendicular small steel pipe (10) of frame plane is used as guy line pile, and there is one section of internal screw thread (18) in the upper end of small steel pipe (10), wears guy wire When, a tension hook is first screwed in the small steel pipe (10) of each of top and the left side, is paid attention to that bottom cannot be screwed into, to be stayed a circle spiral shell Line surplus.
Tension hook is made of arc section (5) and its extended segment (4) and screw rod (6), the extension of arc section (5) and one end Section (4) is made of the round steel equal with small steel pipe (10) outer diameter, surface polishing, and screw rod (6) cooperates the internal screw thread of small steel pipe (10) (18) it is connected with the other end of arc section (5) at about 100 ° of angles, not being or not to make arc section (5) and extended segment (4) energy at an angle of 90 There is a upper uplifting angle (8).There are one surface is convex at the arc on round and smooth slope for arc section (5) and the recess portion of screw rod (6) junction Platform (7), the interior arc radius of arc boss (7) are slightly larger than the exradius of small steel pipe (10), when screw rod (6) screw in small steel pipe (10) when interior, arc boss (7) understands the suitable for reading of the small steel pipe of covering part (10).
Tension hook as guy line pile, following and the right can also without tension hook, directly using small steel pipe as guy line pile, Whole guy wires are easily put on, does not have to tense energetically when wearing, then a steel pipe (9) is taken to cover on extended segment (4), with screw rod (6) For axle center switching tension hook because there are upper uplifting angle (8), they in switching will not with steel pipe frame (1) interference, by scheming (8) To figure (11) as it can be seen that during tension hook is by switching, guy wire is tightened up and at the same time along arc section (5) to small steel pipe (10) Direction sliding, when tension hook is pulled to position shown in Figure 11, guy wire will slip down to small steel pipe in the guidance of arc boss (7) (10) on, at this moment guy wire (2) oneself through being tauted, so that it may screw out tension hook, then on internal screw thread (18) screw in one it is slim Cheese head screw is as nut cap;Every guy wire (2) are gradually tensed according to above-mentioned steps, pay attention to the guy wire of left and right directions and up and down direction Rotation tension so that steel pipe frame (1) uniform stressed.
With the passing of time still inevitably relaxation, wooden bed frame strung with crisscross coir ropes cannot keep tight to guy wire, and the present invention, which devises, thus makes wooden bed frame strung with crisscross coir ropes bed restore tight Taut method 1:
Upper following and left and right side the intermediate cutting of steel pipe frame (1), in end (11) machining internal thread of cutting, pay attention to One end processes dextrorotation internal screw thread, and end on the other side will process levogyrate inner thread, and cut off for machining internal thread Interlude not have bending, internal screw thread easy to process and assembly;Making 4 centres again is the adjusting spiral shell that two end of nut is screw Silk (13), screw thread is matched with above-mentioned screw thread and one end dextrorotation one end is left-handed;With adjusting screw (13) 4 sections of cutting Steel pipe is assembled into steel pipe frame and makes round wooden bed frame strung with crisscross coir ropes bed;
In this way, when with the passing of time guy wire relaxes, when wooden bed frame strung with crisscross coir ropes is not able to maintain tight, as long as rotating adjusting screw (13) with spanner, The tight degree of wooden bed frame strung with crisscross coir ropes can arbitrarily be adjusted.
The method 2 for easily guy wire being worn very tight:
Prepare the long nut (14) with hexagon socket head and the screw (16) with wire rope handling circle according to guy wire number, long nut (14) Length is equal to steel pipe frame (1) outer diameter and subtracts one layer of thickness of steel pipe, and the reach of screw (16) is slightly longer than the length of long nut (14) Degree;It drills on steel pipe frame (1) according to the arrangement position of guy wire, the direction in hole is parallel with steel pipe frame (1) plane, steel pipe frame (1) The diameter in the hole (15) of periphery is slightly larger than the outer diameter of long nut (14), and the diameter in the hole (17) of steel pipe frame (1) inner circumferential is slightly larger than spiral shell Follow closely the outer diameter of (16);
Long nut (14) and screw (16) respectively from the hole (15) of steel pipe frame (1) periphery and the hole (17) of inner circumferential is inner is inserted into And it is inner that screw (16) is screwed into long nut (14), it should be noted that is only screwed into a bit of screw thread, it is taut as tensing to retain one section of screw thread The surplus of rope;
Using the wire rope handling circle of screw (16) as guy line pile, whole guy wires are easily put on, does not have to tense energetically when wearing, then use Long nut (14) are tightened in spanner rotation, tense guy wire (2) by screw (16);
Gradually tense every guy wire (2), pay attention to the guy wire rotation of left and right directions and up and down direction tension so that steel pipe frame (1) uniform stressed finally again continues to pass through whole wire rope handling circles with a steel wire or rope (30), to prevent guy wire to wire rope handling circle Reverse rotational force drive screw (16) reversion, round wooden bed frame strung with crisscross coir ropes bed just carries out.
Wooden bed frame strung with crisscross coir ropes is set to restore tight method 2:
If there are also abundant surpluses for the screw thread of screw (16), is just rotated one by one with spanner and tighten long nut (14), pass through spiral shell It follows closely (16) and tenses every guy wire (2), round wooden bed frame strung with crisscross coir ropes bed can restore tight;
If the screw thread surplus of screw (16) is insufficient, what we can be inserted into screw (16) with a rod pulls wire rope handling circle Rotation, even if the screw thread of screw (16) does not have surplus at this time, screw (16) can also be rotated together with long nut (14), be allowed Wire rope handling circle takes up with guy wire rotation, since guy wire rotation takes up and can shorten length, that is, has tensed guy wire, certainly also energy Round wooden bed frame strung with crisscross coir ropes bed is set to restore tight;
The above method can be used alone or in combination, and certainly, first release steel wire or rope (30) before pulling wire rope handling circle, entirely Guy wire rotation in portion's puts on steel wire or rope (30) around next again.
The method 3 for easily guy wire being worn very tight: (17) only are drilled by guy wire position in steel pipe frame (1) inner ring;
Again by guy wire quantity production guy wire hook (20), the upper end of guy wire hook (20) has a Duan Yuqi at the tension pile at 80 ° of angles (19), that tension pile (19) is fully inserted into hole (17) is inner, and follow-up of also turning at 80 ° of angles, makes guy wire hook (20) and steel pipe frame (1) inner ring can wear guy wire at 80 ° of angles, guy wire hook (20);
Whole guy wires are easily put on, does not have to tense energetically when wearing, then pulls rotation guy wire hook (20) with spanner or rod Guy wire hook (20) is allowed to take up with guy wire rotation.Length can be shortened by being taken up due to guy wire rotation, that is, tense guy wire, at this time Guy wire hook (20) subjects guy wire rotation around next pulling force and guy wire by postrotational reversed rotating force, tension pile (20) simultaneously Also this two power just are subject simultaneously, tension pile (19) is closely to tie touching with steel pipe frame (1) inner wall at this time, and as steel pipe inner wall Part with the touching of tension pile (19) knot is that longitudinal straight transverse direction is bent upwards, and it is that tension pile (19) is prevented to rotate that this, which is bent upwards, , as long as so allow guy wire hook (20) with guy wire rotation around next longitudinal direction for allowing tension pile (19) to be parked in steel pipe inner wall, it Guy wire can be resisted while resisting tightening force of the guy wire to guy wire hook (20) to the reverse rotational force of guy wire hook (20), to make Round wooden bed frame strung with crisscross coir ropes bed is steadily tight.This guy wire hook (20) production is simple, but pulling force is smaller, so being suitable for the lesser list of stress People's bed and basket cot.
Easily the method 4 that guy wire is worn very tight: be guy wire hook with the main distinction of method 3, we it be referred to as strong There are a pulling force block (23) in guy wire hook, its coupler body (22) upper end, and length and width are both greater than hole (17), with the connection of coupler body upper end Face (25) is made into can match with steel pipe frame (1) inner wall, i.e., longitudinal straight transverse direction is bent upwards.Strong guy wire hook dress is described below Enter the inner method in the hole (17) of steel pipe frame (1): before threading is inner to hole (17), one of steel pipe frame closes up mouth and does not close up first, Coupler body (22) does not also complete, and only carries out two bendings (26) of its upper section, the lower section tail portion to be bent upwards originally (24) it is only made into great circle arc for the time being;In addition a guidance folder (28) is made, it is slightly less than coupler body (22) directly with one section of internal diameter The flexible sheet steel pipe of diameter makes, and splits a seam in its longitudinal direction, one end processes a groove (27), and one end processes one Threading hole (12), inner in threading hole (12) is the moderate finer wire (21) of a hardness;
It is first that guidance folder (28) is inner with finer wire (21) inserting hole (12) when assembly, continue to be sent into finer wire (21) directly It is come out from the mouth that steel pipe frame (1) does not close up to guidance folder (28), the tail portion (24) of strong guy wire hook is clipped with guidance folder (28), slowly Slowly it pulls back out finer wire (21), strong guy wire hook strip will be portalled (17) by guidance folder (28);With pliers or hammer great circle arc Tail portion (24) bending close up, it is inner and make complete that strong guy wire hook just puts into hole (17);Inner load onto of all well (17) is stretched tight by force Rope hook simultaneously makes completely, then the mouth that closes up of steel pipe frame (1) is closed up welding;Guy wire is easily put on, strong guy wire hook is then rotated, Tense guy wire.Length can be shortened by being taken up due to guy wire rotation, that is, tense guy wire, and strong guy wire hook subjects taut simultaneously at this time Around next pulling force and guy wire by postrotational reversed rotating force, pulling force block (23) also just subjects this two simultaneously for rope rotation Power, pulling force block (23) is the office closely tying touching with steel pipe frame (1) inner wall, and touching as steel pipe inner wall and pulling force block (23) knot at this time Portion is that longitudinal straight transverse direction is bent upwards, and it is that pulling force block (23) is prevented to rotate that this, which is bent upwards, as long as so allowing strong guy wire hook Pulling force block (23) is allowed to stop coincideing with steel pipe inner wall around next with guy wire rotation, it can resist guy wire to strong guy wire hook Guy wire is resisted while tightening force to the reverse rotational force of strong guy wire hook, to keep round wooden bed frame strung with crisscross coir ropes bed steadily tight.

Claims (1)

1. a kind of manufacturing method of circle wooden bed frame strung with crisscross coir ropes bed, it is characterized in that: round or ellipse or square circular steel is made in steel pipe Outline border of the pipe frame (1) as wooden bed frame strung with crisscross coir ropes bed;
Easily the method 1 that guy wire is worn very tight: being connected to and steel pipe frame plane in the predetermined wire rope handling spot welding of steel pipe frame (1) inner ring Perpendicular small steel pipe (10) is used as guy line pile, and there is one section of internal screw thread (18) in the upper end of small steel pipe (10), when wearing guy wire, first upper A tension hook is screwed in the small steel pipe (10) of each of side and the left side, is paid attention to that bottom cannot be screwed into, to be stayed a circle screw thread surplus;
Tension hook is made of arc section (5) and its extended segment (4) and screw rod (6), the extended segment (4) of arc section (5) and one end It being made of the round steel equal with small steel pipe (10) outer diameter, surface polishing, screw rod (6) cooperates the internal screw thread (18) of small steel pipe (10), It is connected with the other end of arc section (5) at 100 ° of angles, not being or not have arc section (5) and extended segment (4) can on one at an angle of 90 There are one arc boss (7) of the surface at round and smooth slope, arcs for the recess portion of rake angle (8), arc section (5) and screw rod (6) junction The interior arc radius of shape boss (7) is slightly larger than the exradius of small steel pipe (10), when the small steel pipe (10) of screw rod (6) screw-in is interior, arc Shape boss (7) understands the suitable for reading of the small steel pipe of covering part (10).
CN201510494239.3A 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method Active CN106617902B (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN201811072061.3A CN109008419A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201510494239.3A CN106617902B (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072062.8A CN108851720A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072058.1A CN109008418B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof
CN201811072063.2A CN108903449B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof
CN201811072059.6A CN109124158A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510494239.3A CN106617902B (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method

Related Child Applications (5)

Application Number Title Priority Date Filing Date
CN201811072063.2A Division CN108903449B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof
CN201811072059.6A Division CN109124158A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072061.3A Division CN109008419A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072058.1A Division CN109008418B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof
CN201811072062.8A Division CN108851720A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method

Publications (2)

Publication Number Publication Date
CN106617902A CN106617902A (en) 2017-05-10
CN106617902B true CN106617902B (en) 2019-03-29

Family

ID=58815112

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201811072061.3A Withdrawn CN109008419A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072063.2A Active CN108903449B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof
CN201510494239.3A Active CN106617902B (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072059.6A Withdrawn CN109124158A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072062.8A Pending CN108851720A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072058.1A Active CN109008418B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201811072061.3A Withdrawn CN109008419A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072063.2A Active CN108903449B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201811072059.6A Withdrawn CN109124158A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072062.8A Pending CN108851720A (en) 2015-08-13 2015-08-13 Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
CN201811072058.1A Active CN109008418B (en) 2015-08-13 2015-08-13 Round palm-shaped trampoline and manufacturing method thereof

Country Status (1)

Country Link
CN (6) CN109008419A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85201784U (en) * 1985-05-07 1986-03-05 昆明钢结构家具厂 Bed bracket with steel structure and spiral springs
CN2213152Y (en) * 1994-12-29 1995-11-22 石华祥 Mattress
CN2391502Y (en) * 1999-09-02 2000-08-16 廖志亮 Trampoline like bed
CN2897047Y (en) * 2006-04-07 2007-05-09 谭杰明 Rope-awning rack mattress

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB972051A (en) * 1962-05-15 1964-10-07 Vitafoam Ltd Improvements in or relating to cushion supports
DE2208866A1 (en) * 1972-02-25 1973-09-13 Josef Feische NET-LIKE COVERING OF SEAT OR Lounger furniture
US4566695A (en) * 1983-03-17 1986-01-28 Melby Phillip J Game racket having adjustable string mounts
GB8705089D0 (en) * 1987-03-05 1987-04-08 Linder E Furniture trim
CN2095592U (en) * 1991-07-16 1992-02-12 庞赞寿 Adjustable elastic weaving soft mattress
CN2143076Y (en) * 1992-06-13 1993-10-06 刘少林 Adjustable bed
CN2216780Y (en) * 1993-04-07 1996-01-10 李振东 Spring mattress with spring tension-adjustable function
CN2202452Y (en) * 1993-08-03 1995-07-05 李振东 Spring-adjustable mattress
CN2192224Y (en) * 1994-02-22 1995-03-22 闵建军 Strung bed with coir rope as clip tighten structure
CN2265126Y (en) * 1996-09-18 1997-10-22 李振东 Tightness adjustable mattress
JP3553346B2 (en) * 1997-10-30 2004-08-11 ドリームベッド株式会社 Pocket coil structure made of morning glory spring
CN2362373Y (en) * 1998-10-26 2000-02-09 徐勇 Rope mattress
CN2404413Y (en) * 1999-12-17 2000-11-08 李振东 Bed mattress with adjustable tension
CN2424060Y (en) * 2000-05-26 2001-03-21 黄汉卿 Concealed rope fastening hook
FR2828797B1 (en) * 2001-08-24 2004-04-16 Parisot Sieges Internat SEAT IN PLASTIC MATERIAL WITH SEAT SUPPLY
CN2521983Y (en) * 2001-10-30 2002-11-27 葛群增 Health-care jumping bed
CN1504145A (en) * 2002-12-01 2004-06-16 闵建军 Adjustable elastic net mattress
CN1504146A (en) * 2002-12-01 2004-06-16 闵建军 Adjustable elastic net mattress
CN2693461Y (en) * 2003-11-13 2005-04-20 北京市金图像印刷技术有限公司 Net stretch device
CN2678476Y (en) * 2004-02-20 2005-02-16 邹明生 Mattress having regulatable tension
CN2778099Y (en) * 2005-03-11 2006-05-10 王少华 Adjustable mattress
CN101049203A (en) * 2006-04-07 2007-10-10 谭杰明 Mattress of rope bound net rack
CN200997501Y (en) * 2006-08-17 2007-12-26 邱福来 Threading wire, threading head and binder structure for distributing pipe
CN200995786Y (en) * 2006-10-08 2007-12-26 陶王芳 Strainer
CN201125907Y (en) * 2007-04-09 2008-10-01 朱希龙 Jumping bed five joint connecting component and connecting structure
CN201277400Y (en) * 2008-06-26 2009-07-22 王嘉贤 Hose clamping apparatus
CN201856207U (en) * 2010-10-15 2011-06-08 王思畅 Labor-saving screwdriver
CN202151251U (en) * 2011-06-15 2012-02-29 冷定刚 Adjustable mosquito net frame structure device
CN202892817U (en) * 2012-04-26 2013-04-24 王之仪 Climbing device enabling climbing to be achieved easily
CN103615458B (en) * 2013-11-21 2016-01-20 同济大学 A kind of eccentric rotation-type unilateral bolt fastener
CN204174934U (en) * 2014-10-13 2015-02-25 上海大学 The quick attachment fastener of a kind of round bar through walls

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85201784U (en) * 1985-05-07 1986-03-05 昆明钢结构家具厂 Bed bracket with steel structure and spiral springs
CN2213152Y (en) * 1994-12-29 1995-11-22 石华祥 Mattress
CN2391502Y (en) * 1999-09-02 2000-08-16 廖志亮 Trampoline like bed
CN2897047Y (en) * 2006-04-07 2007-05-09 谭杰明 Rope-awning rack mattress

Also Published As

Publication number Publication date
CN106617902A (en) 2017-05-10
CN109008418B (en) 2021-01-05
CN109124158A (en) 2019-01-04
CN108851720A (en) 2018-11-23
CN109008419A (en) 2018-12-18
CN108903449A (en) 2018-11-30
CN109008418A (en) 2018-12-18
CN108903449B (en) 2020-11-17

Similar Documents

Publication Publication Date Title
US20150224355A1 (en) Adjustable length jump rope
JP2016500527A5 (en)
BR102013024495A2 (en) LOOP BINDING SYSTEM IMPROVED FOR A BALKER
CN204353994U (en) A kind of clamping positioning tool of restraining external member
CN106617902B (en) Round wooden bed frame strung with crisscross coir ropes bed and its manufacturing method
WO2011103937A3 (en) Reinforcing and/or anchoring screw
CN208623237U (en) A kind of aluminium armor tape winding tool
CN105402314A (en) Two-way tensioning bolt
CN206908193U (en) A kind of electrification in high voltage stringing protector
CN105299140B (en) I-shaped Rope connector
CN106272205A (en) Screwdriver
CN108808562A (en) A kind of aluminium armor tape winding tool
CN207005035U (en) A kind of screw with screwdriver function
CN206202767U (en) A kind of pilot hole ratchet-type steel-wire fastener
TWM484496U (en) Clamping and positioning tool for tube bundle kit
CN205724766U (en) Power construction wedge clamp winding device
CN201866161U (en) Steel wire adjuster of return tractor
CN105527160A (en) Strength experiment clamp with double-head stud convenient to replace
CN106168066B (en) A kind of rapid tensioning device of building template
CN104989784B (en) Steel wire rope knotting splicer
US1733148A (en) Combined wire stretching and twisting device
CN208358809U (en) A kind of closed loop connection pre-tightening mechanism
ATE474145T1 (en) TAMING SCREW
CN203021754U (en) Thread-taking up assembly
CN206455580U (en) Band connecting rod positioning fixture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200102

Address after: No. 6049, floor 6, building a, small and micro entrepreneurship and Innovation Industrial Park, No. 288, Yansan Road, Jiuguan Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee after: Li Qiannan

Address before: 315040 room, room 59, Lane 595, Shuguang Road, Jiangdong District, Ningbo, Zhejiang, China

Patentee before: Zheng Muzhi

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: No.36 Baima Town Industrial Park, Gaogang District, Taizhou City, Jiangsu Province 225300

Patentee after: Li Qiannan

Address before: Room 6049, 6 / F, block a, small and micro entrepreneurship and Innovation Industrial Park, No. 288, Yansan Road, Jiuguan Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee before: Li Qiannan

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211029

Address after: 274000 Yusheng cultural and creative industry base, Jiangbei V Valley, No. 2978, Zhonghua West Road, high tech Zone, Heze City, Shandong Province

Patentee after: Shandong Yusheng Culture Co.,Ltd.

Address before: No.36 Baima Town Industrial Park, Gaogang District, Taizhou City, Jiangsu Province 225300

Patentee before: Li Qiannan

TR01 Transfer of patent right