CN106597848B - 一种光伏逆变器电势参数辨识误差波动系数预测方法 - Google Patents
一种光伏逆变器电势参数辨识误差波动系数预测方法 Download PDFInfo
- Publication number
- CN106597848B CN106597848B CN201611124002.7A CN201611124002A CN106597848B CN 106597848 B CN106597848 B CN 106597848B CN 201611124002 A CN201611124002 A CN 201611124002A CN 106597848 B CN106597848 B CN 106597848B
- Authority
- CN
- China
- Prior art keywords
- photovoltaic inverter
- photovoltaic
- parameter identification
- potential
- fluctuation coefficient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000011156 evaluation Methods 0.000 claims abstract description 18
- 239000011159 matrix material Substances 0.000 claims description 13
- 238000005259 measurement Methods 0.000 claims description 12
- 238000010206 sensitivity analysis Methods 0.000 claims description 9
- 238000005286 illumination Methods 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 claims description 6
- 238000003491 array Methods 0.000 claims description 4
- 238000009529 body temperature measurement Methods 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 230000008859 change Effects 0.000 claims description 2
- 230000002452 interceptive effect Effects 0.000 claims description 2
- 230000009897 systematic effect Effects 0.000 claims description 2
- 238000010248 power generation Methods 0.000 abstract description 10
- 230000003993 interaction Effects 0.000 abstract description 5
- 238000001514 detection method Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000001914 filtration Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000026676 system process Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/042—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Photovoltaic Devices (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611124002.7A CN106597848B (zh) | 2016-12-08 | 2016-12-08 | 一种光伏逆变器电势参数辨识误差波动系数预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611124002.7A CN106597848B (zh) | 2016-12-08 | 2016-12-08 | 一种光伏逆变器电势参数辨识误差波动系数预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106597848A CN106597848A (zh) | 2017-04-26 |
CN106597848B true CN106597848B (zh) | 2020-02-04 |
Family
ID=58597619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611124002.7A Active CN106597848B (zh) | 2016-12-08 | 2016-12-08 | 一种光伏逆变器电势参数辨识误差波动系数预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106597848B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111723529B (zh) * | 2020-07-27 | 2024-06-14 | 国网山东省电力公司经济技术研究院 | 基于全局灵敏度分析的负荷模型简化辨识方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913426A (zh) * | 2012-10-09 | 2013-02-06 | 江苏大学 | 一种高效全自动光伏水泵***及其控制方法 |
CN104037816B (zh) * | 2014-06-19 | 2016-04-06 | 清华大学 | 多源发电联合运行方式下风光发电出力最大化的计算方法 |
CN104836256B (zh) * | 2015-05-29 | 2016-11-30 | 国家电网公司 | 一种配电网光伏消纳能力计算的方法及*** |
CN104882897B (zh) * | 2015-06-18 | 2018-01-19 | 中国电力科学研究院 | 一种平抑光伏功率波动的有功功率优化调度方法 |
CN105203883A (zh) * | 2015-09-23 | 2015-12-30 | 国网青海省电力公司 | 基于双密度小波网络的无偏估计光伏逆变器参数辨识方法 |
CN105354635A (zh) * | 2015-10-30 | 2016-02-24 | 国家电网公司 | 一种配电网不平衡谐波负荷指数预测方法 |
CN105356500B (zh) * | 2015-10-30 | 2017-11-10 | 国家电网公司 | 一种多光伏区域电网电压稳定性裕度预测方法 |
CN105186585A (zh) * | 2015-11-10 | 2015-12-23 | 国家电网公司 | 一种多源智能微网在多模式下的能量协调*** |
CN106202914A (zh) * | 2016-07-07 | 2016-12-07 | 国网青海省电力公司 | 基于改进粒子群算法的光伏电池参数辨识方法 |
-
2016
- 2016-12-08 CN CN201611124002.7A patent/CN106597848B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106597848A (zh) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ni et al. | An ensemble prediction intervals approach for short-term PV power forecasting | |
US20220045509A1 (en) | Method and system of predicting electric system load based on wavelet noise reduction and emd-arima | |
CN102594215B (zh) | 一种光伏电站模型参数辨识方法 | |
Nichiforov et al. | Deep learning techniques for load forecasting in large commercial buildings | |
AU2012370020A1 (en) | Maximum power point tracking (MPPT) | |
Gao et al. | A three-layer hybrid model for wind power prediction | |
Scholz et al. | A cyclic time-dependent Markov process to model daily patterns in wind turbine power production | |
Kaplan et al. | A novel method based on Weibull distribution for short-term wind speed prediction | |
Hosoda et al. | Short-term photovoltaic prediction by using H∞ filtering and clustering | |
CN109447512B (zh) | 基于均匀设计的大电网可靠性评估方法 | |
CN106597848B (zh) | 一种光伏逆变器电势参数辨识误差波动系数预测方法 | |
CN112580844A (zh) | 气象数据处理方法、装置、设备及计算机可读存储介质 | |
JP2019091335A (ja) | 発電量予測装置、発電量予測システム、発電量予測方法及び発電量予測プログラム | |
CN110969238A (zh) | 一种校准用电数据的方法及装置 | |
Yan et al. | Prediction error adjusted gaussian process for short-term wind power forecasting | |
CN110598956B (zh) | 一种光伏电站的发电功率预测方法及装置 | |
Wei et al. | Ultra-short-term/short-term wind power continuous prediction based on fuzzy clustering analysis | |
Pravilovic et al. | Wind power forecasting using time series cluster analysis | |
CN106655183A (zh) | 一种光伏发电***逆变器集群谐波汇集指数预测方法 | |
Joubert et al. | A categorisation wind power forecasting methodologies, highlighting emerging short-term forecasting methods | |
CN107528312B (zh) | 一种电力***状态估计方法 | |
CN107506949B (zh) | 光伏数据聚类方法、光伏功率预测方法、存储介质和设备 | |
van der Meer et al. | Probabilistic clear-sky index forecasts using Gaussian process ensembles | |
Lyu et al. | Multivariate-aided Power-consumption Prediction Based on LSTM-Kalman Filter | |
CN106527138B (zh) | 一种光伏逆变器直流侧电阻参数波动系数预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200107 Address after: 518000 room 605, building 2, oceanwide city square, Qianhai Road, Nanshan street, Nanshan District, Shenzhen City, Guangdong Province Applicant after: SHENZHEN BOSHI INTELLECTUAL PROPERTY OPERATION CO., LTD. Applicant after: Lin Xia Address before: The victory road 810000 in Qinghai province Xining City West District No. 89 Applicant before: State Grid Qinghai Electric Power Company Applicant before: Electric Power Research Institute of State Grid Qinghai Electric Power Company Applicant before: Shenyang University of Technology |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201230 Address after: 225700 Chen Bao town industrial concentration area, Xinghua City, Taizhou, Jiangsu Patentee after: Taizhou Durun composite new material Co., Ltd Address before: 518000 room 605, building 2, Oceanwide City Plaza, Qianhai Road, Nanshan street, Nanshan District, Shenzhen City, Guangdong Province Patentee before: SHENZHEN BOSHI INTELLECTUAL PROPERTY OPERATION Co.,Ltd. Patentee before: Lin Xia |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210120 Address after: 321000 No.39, Shangcun, Qianwu village, Huaqiao Township, Pujiang County, Jinhua City, Zhejiang Province Patentee after: Huang Jiacheng Address before: 225700 Chen Bao town industrial concentration area, Xinghua City, Taizhou, Jiangsu Patentee before: Taizhou Durun composite new material Co., Ltd |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220208 Address after: 518000 2 4C, Zhongli yuan, Nanshan District, Shenzhen, Guangdong. Patentee after: Yang Jieru Address before: 321000 No.39, Shangcun, Qianwu village, Huaqiao Township, Pujiang County, Jinhua City, Zhejiang Province Patentee before: Huang Jiacheng |