CN106592956B - A kind of shifting of fastener type steel pipe double-pole scaffold changes method - Google Patents

A kind of shifting of fastener type steel pipe double-pole scaffold changes method Download PDF

Info

Publication number
CN106592956B
CN106592956B CN201611084234.4A CN201611084234A CN106592956B CN 106592956 B CN106592956 B CN 106592956B CN 201611084234 A CN201611084234 A CN 201611084234A CN 106592956 B CN106592956 B CN 106592956B
Authority
CN
China
Prior art keywords
upright bar
interior row
outlet
wall
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611084234.4A
Other languages
Chinese (zh)
Other versions
CN106592956A (en
Inventor
杨恩泽
李锐
梁怀刚
刘强
张乐
王东华
郝伟
黄晓宇
秦晋
李之铭
樊建伟
蔡建桢
赵洋洋
路赞赞
侯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201611084234.4A priority Critical patent/CN106592956B/en
Publication of CN106592956A publication Critical patent/CN106592956A/en
Application granted granted Critical
Publication of CN106592956B publication Critical patent/CN106592956B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Movable Scaffolding (AREA)

Abstract

The present invention relates to a kind of shiftings of fastener type steel pipe double-pole scaffold to change method, comprising the following steps: the second wall-connecting piece is arranged in outlet upright bar, is fixedly connected with outlet upright bar with exterior walls of buildings;Interior row's cross bar is removed;First wall-connecting piece is removed;Interior row's upright bar is removed from connecting rod, and interior row's upright bar is translated to the direction close to outlet upright bar;Interior row's upright bar is retightened in connecting rod, and installs interior row's cross bar;It is arranged in upright bar inside and resets the first wall-connecting piece, be fixedly connected with interior row's upright bar with exterior walls of buildings;The second wall-connecting piece in outlet upright bar is removed.The invention has the benefit that reducing the workload that frame body is removed and set up again, efficient quick saves duration, save the cost.

Description

A kind of shifting of fastener type steel pipe double-pole scaffold changes method
Technical field
The present invention relates to technical field of building construction, it particularly relates to which a kind of shifting of fastener type steel pipe double-pole scaffold changes Method.
Background technique
When constructure body structure is constructed, external scaffolding is generally 25cm-30cm away from main body distance, and external wall plastering, outer When the subdivisional works such as wall heat preservation, coating, it is desirable that construction scaffolding is away from external wall about 50cm-80cm.Normal practice is to remove original Set up finishing scaffold after main body scaffold again as required again, required time, expense are larger.
Therefore, it develops double-pole scaffold shifting a kind of at low cost and that workload can be reduced and changes method, become as people in the industry The problem of scholar's urgent need to resolve.
Summary of the invention
The invention proposes a kind of shiftings of fastener type steel pipe double-pole scaffold to change method, overcomes above-mentioned aspect in existing product Deficiency.
The purpose of the present invention is achieved through the following technical solutions:
A kind of shifting of fastener type steel pipe double-pole scaffold changes method, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings by the first wall-connecting piece, the button Part formula steel pipe double-pole scaffold includes outlet upright bar, outlet cross bar, interior row's upright bar, interior row's cross bar and connecting rod, the outlet Upright bar and interior row's upright bar are fixedly connected in connecting rod, and first wall-connecting piece is fixedly connected in row's upright bar inside;
The second wall-connecting piece is arranged in S1 in outlet upright bar, is fixedly connected with outlet upright bar with exterior walls of buildings;
S2 removes interior row's cross bar;
S3 removes the first wall-connecting piece;
S4 removes interior row's upright bar from connecting rod, and interior row's upright bar is translated to the direction close to outlet upright bar;
S5 retightens interior row's upright bar in connecting rod, and installs interior row's cross bar;
S6 is arranged in upright bar inside and is reset the first wall-connecting piece, is fixedly connected with interior row's upright bar with exterior walls of buildings;
S7 removes the second wall-connecting piece in outlet upright bar.
Further, pass through button between the outlet upright bar and outlet cross bar and between interior row's upright bar and interior row's cross bar Part is fixedly connected.
Further, pass through fastener fixing between the outlet upright bar and connecting rod and between interior row's upright bar and connecting rod Connection.
Further, in S1, the spacing of second wall-connecting piece be two steps two across.
Further, in S4, the distance of interior row's upright bar to close outlet upright bar direction translation is 30-40cm.
Further, in S6, the spacing of first wall-connecting piece be two steps two across.
The invention has the benefit that reducing the workload that frame body is removed and set up again, efficient quick saves the duration, Save the cost.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of fastener type steel pipe double-pole scaffold described in the embodiment of the present invention.
In figure:
1, the first wall-connecting piece;2, exterior walls of buildings;3, outlet upright bar;4, outlet cross bar;5, interior row's upright bar;6, interior row is horizontal Bar;7, connecting rod.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
As shown in Figure 1, a kind of fastener type steel pipe double-pole scaffold shifting changes method according to embodiments of the present invention, it is special Sign is, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings 2 by the first wall-connecting piece 1, described Fastener type steel pipe double-pole scaffold includes outlet upright bar 3, outlet cross bar 4, interior row's upright bar 5, interior row's cross bar 6 and connecting rod 7, institute It states outlet upright bar 3 and interior row's upright bar 5 is fixedly connected in connecting rod 7, first wall-connecting piece 1 is fixedly connected arranges upright bar inside On 5;
The second wall-connecting piece is arranged in S1 in outlet upright bar 3, is fixedly connected with outlet upright bar 3 with exterior walls of buildings 2;
S2 removes interior row's cross bar 6;
S3 removes the first wall-connecting piece 1;
S4 removes interior row's upright bar 5 from connecting rod 7, and interior row's upright bar 5 is translated to the direction close to outlet upright bar 3;
S5 retightens interior row's upright bar 5 in connecting rod 7, and installs interior row's cross bar 6;
S6 is arranged in upright bar 5 inside and is reset the first wall-connecting piece 1, is fixedly connected with interior row's upright bar 5 with exterior walls of buildings 2;
S7 removes the second wall-connecting piece in outlet upright bar 3.
In one particular embodiment of the present invention, between the outlet upright bar 3 and outlet cross bar 4 and interior row's upright bar 5 It is connect by fastener fixing between interior row's cross bar 6.
In one particular embodiment of the present invention, between the outlet upright bar 3 and connecting rod 7 and interior row's upright bar 5 with It is connected between connecting rod 7 by fastener fixing.
In one particular embodiment of the present invention, in S1, the spacing of second wall-connecting piece be two steps two across.
In one particular embodiment of the present invention, in S4, interior row's upright bar 5 is put down to close to 3 direction of outlet upright bar The distance of shifting is 30-40cm.
In one particular embodiment of the present invention, in S6, the spacing of first wall-connecting piece 1 be two steps two across.
In order to facilitate understanding above-mentioned technical proposal of the invention, below by way of in specifically used mode to of the invention above-mentioned Technical solution is described in detail.
It is heretofore described to be fixedly connected with mode and be replaced with conventional technical means such as reinforcing bar binding, threaded connection, snappings It changes.
Two arrangements of the step two across the wall-connecting piece for being fastener type steel pipe scaffold, two steps are three cross bar height, and two across being The distance between three upright bars.
Up and down direction be a step left and right directions be one across.Such as " well ".
Outlet upright bar 3 and the orthogonal setting of outlet cross bar 4, and outlet foot hand is collectively formed by fastener fixing together Frame, interior row's upright bar 5 and the orthogonal setting of interior row's cross bar 6, and interior row's scaffold is collectively formed by fastener fixing together, outside Row's scaffold connects into fastener type steel pipe double-pole scaffold, interior row's foot hand by connecting rod 7 and fastener fixing with interior row's scaffold Interior row's upright bar 5 in frame connects the first wall-connecting piece 1 by fastener fixing, and the first wall-connecting piece 1 is fixed on exterior walls of buildings 2.
When specifically used:
The second interim wall-connecting piece is arranged in S1 in the outlet upright bar 3 of fastener type steel pipe double-pole scaffold, and spacing is two steps Two across;
S2 removes the fastener between interior row's cross bar 6 and interior row's upright bar 5, and when dismounting will gradually remove, and meets independent remove Interior 5 condition of row's upright bar;
S3 arranges original first wall-connecting piece 1 in upright bar 5 in removing;
S4 removes the fastener between interior row's upright bar 5 and connecting rod 7, according to finishing scaffold building requirement, by interior row's upright bar 5 Outside sidesway 30-40cm, while to guarantee that the array pitch of interior exterior scaffold meets safety requirements;
S5 is arranged arrange cross bar 6 in upright bar 5 in installation inside, and uses fastener fixing;
S6 is arranged inside in upright bar 5 is arranged the first wall-connecting piece 1 as required, spacing be two steps two across;
S7 removes the second wall-connecting piece interim in outlet upright bar 3.
In conclusion reducing the workload that frame body is removed and set up again, efficiently by above-mentioned technical proposal of the invention Fast, duration, save the cost are saved.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are various under the inspiration of the present invention The product of form, however, make any variation in its shape or structure, it is all that there is skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (6)

1. a kind of fastener type steel pipe double-pole scaffold shifting changes method, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings (2) by the first wall-connecting piece (1), described Fastener type steel pipe double-pole scaffold includes outlet upright bar (3), outlet cross bar (4), interior row's upright bar (5), interior row's cross bar (6) and connects Extension bar (7), the outlet upright bar (3) and interior row's upright bar (5) are fixedly connected on connecting rod (7), first wall-connecting piece (1) It is fixedly connected on row upright bar (5) inside;
It is characterized in that, further comprising the steps of:
The second wall-connecting piece is arranged on outlet upright bar (3) in S1, is fixedly connected with outlet upright bar (3) with exterior walls of buildings (2);
S2 removes interior row's cross bar (6);
S3 removes the first wall-connecting piece (1);
S4 removes interior row's upright bar (5) from connecting rod (7), and interior row's upright bar (5) is flat to the direction close to outlet upright bar (3) It moves;
S5 retightens interior row's upright bar (5) on connecting rod (7), and installs interior row's cross bar (6);
S6 is arranged reset the first wall-connecting piece (1) on upright bar (5) inside, makes interior row's upright bar (5) and exterior walls of buildings (2) fixed company It connects;
S7 removes the second wall-connecting piece on outlet upright bar (3).
2. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 1 changes method, which is characterized in that the outlet It is connect by fastener fixing between upright bar (3) and outlet cross bar (4) and between interior row's upright bar (5) and interior row's cross bar (6).
3. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 2 changes method, which is characterized in that the outlet It is connect between upright bar (3) and connecting rod (7) and between interior row's upright bar (5) and connecting rod (7) by fastener fixing.
4. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 3 changes method, which is characterized in that in S1, The spacing of second wall-connecting piece be two steps two across.
5. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 4 changes method, which is characterized in that in S4, The distance of interior row's upright bar (5) to close outlet upright bar (3) direction translation is 30-40cm.
6. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 1 changes method, which is characterized in that in S6, The spacing of first wall-connecting piece (1) be two steps two across.
CN201611084234.4A 2016-11-30 2016-11-30 A kind of shifting of fastener type steel pipe double-pole scaffold changes method Active CN106592956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611084234.4A CN106592956B (en) 2016-11-30 2016-11-30 A kind of shifting of fastener type steel pipe double-pole scaffold changes method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611084234.4A CN106592956B (en) 2016-11-30 2016-11-30 A kind of shifting of fastener type steel pipe double-pole scaffold changes method

Publications (2)

Publication Number Publication Date
CN106592956A CN106592956A (en) 2017-04-26
CN106592956B true CN106592956B (en) 2019-02-15

Family

ID=58594615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611084234.4A Active CN106592956B (en) 2016-11-30 2016-11-30 A kind of shifting of fastener type steel pipe double-pole scaffold changes method

Country Status (1)

Country Link
CN (1) CN106592956B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612301A (en) * 2018-04-20 2018-10-02 江苏建宇建设集团有限公司 A kind of high security steel wall-connecting piece
CN110318559B (en) * 2019-07-29 2024-03-19 江苏东南特种技术工程有限公司 Rescue reinforcement device and method for cultural relics and buildings

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5186568A (en) * 1986-05-01 1993-02-16 Leo Falardeau Scaffolding double latch locking device
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
CN101377093A (en) * 2007-08-27 2009-03-04 中国棚(集团)有限公司 Scaffold
JP2010090617A (en) * 2008-10-08 2010-04-22 Chuo Build Industry Co Ltd Slide opening and closing type protective sheet
CN103206079A (en) * 2013-05-08 2013-07-17 朱新伟 Double-pole scaffold system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5186568A (en) * 1986-05-01 1993-02-16 Leo Falardeau Scaffolding double latch locking device
CN101377093A (en) * 2007-08-27 2009-03-04 中国棚(集团)有限公司 Scaffold
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
JP2010090617A (en) * 2008-10-08 2010-04-22 Chuo Build Industry Co Ltd Slide opening and closing type protective sheet
CN103206079A (en) * 2013-05-08 2013-07-17 朱新伟 Double-pole scaffold system

Also Published As

Publication number Publication date
CN106592956A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106592956B (en) A kind of shifting of fastener type steel pipe double-pole scaffold changes method
PH12015500267A1 (en) A wall assembly and a building structure including the wall assembly
KR20170036947A (en) Curtain wall structure
ITMO20080305A1 (en) BUILDING STRUCTURE PROVIDED WITH VERTICAL WALLS INCLUDING A THERMOPLASTIC POLYMER.
ITBA20100007U1 (en) MOLDING SYSTEM FOR MIXED ALUMINUM-WOOD CLOSURES WITH HIGH INSULATING VALUE
JP2010203187A (en) Unit form
CN104319707B (en) Reinforced cable bridge
CN106917463A (en) Curtain wall construction and building
CN102444294A (en) Method for analyzing and controlling long-term deformation of super-high-rise building structure under gravity load
CN208844719U (en) A kind of super low energy consumption balcony
KR101346601B1 (en) Dry wall system of panel type of building
CN214302832U (en) Building climbing frame stair cushion block
JP6184338B2 (en) Buildings with different top floor frames and lower floor frames
JP5852772B2 (en) Hut truss and building
CN210134682U (en) A aquatic lift platform for swimming pool
CN204024110U (en) A kind of high building structure that shear wall is set in bight
CN204826333U (en) Novel curtain frame
CN209244252U (en) A kind of construction concrete-pouring template
CN206635937U (en) A kind of skyscraper of the basement roof build-in building first floor
CN204343502U (en) Novel external wall support
ITVI20100148A1 (en) MODULAR ELEMENT FOR SUPPORTING PANELS FOR SURFACE COATING
WO2012007468A3 (en) Construction system
CN203983884U (en) A kind of Novel groove type cable bridge supporting walls
CN204850042U (en) Building reinforced concrete structure post contracture device
JP6313083B2 (en) Building structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant