- CN106592956B CN106592956B CN201611084234.4A CN201611084234A CN106592956B CN 106592956 B CN106592956 B CN 106592956B CN 201611084234 A CN201611084234 A CN 201611084234A CN 106592956 B CN106592956 B CN 106592956B
- Authority
- CN
- China
- Prior art keywords
- upright bar
- interior row
- outlet
- wall
- connecting piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to a kind of shiftings of fastener type steel pipe double-pole scaffold to change method, comprising the following steps: the second wall-connecting piece is arranged in outlet upright bar, is fixedly connected with outlet upright bar with exterior walls of buildings;Interior row's cross bar is removed;First wall-connecting piece is removed;Interior row's upright bar is removed from connecting rod, and interior row's upright bar is translated to the direction close to outlet upright bar;Interior row's upright bar is retightened in connecting rod, and installs interior row's cross bar;It is arranged in upright bar inside and resets the first wall-connecting piece, be fixedly connected with interior row's upright bar with exterior walls of buildings;The second wall-connecting piece in outlet upright bar is removed.The invention has the benefit that reducing the workload that frame body is removed and set up again, efficient quick saves duration, save the cost.
Description
Technical field
The present invention relates to technical field of building construction, it particularly relates to which a kind of shifting of fastener type steel pipe double-pole scaffold changes
Method.
Background technique
When constructure body structure is constructed, external scaffolding is generally 25cm-30cm away from main body distance, and external wall plastering, outer
When the subdivisional works such as wall heat preservation, coating, it is desirable that construction scaffolding is away from external wall about 50cm-80cm.Normal practice is to remove original
Set up finishing scaffold after main body scaffold again as required again, required time, expense are larger.
Therefore, it develops double-pole scaffold shifting a kind of at low cost and that workload can be reduced and changes method, become as people in the industry
The problem of scholar's urgent need to resolve.
Summary of the invention
The invention proposes a kind of shiftings of fastener type steel pipe double-pole scaffold to change method, overcomes above-mentioned aspect in existing product
Deficiency.
The purpose of the present invention is achieved through the following technical solutions:
A kind of shifting of fastener type steel pipe double-pole scaffold changes method, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings by the first wall-connecting piece, the button
Part formula steel pipe double-pole scaffold includes outlet upright bar, outlet cross bar, interior row's upright bar, interior row's cross bar and connecting rod, the outlet
Upright bar and interior row's upright bar are fixedly connected in connecting rod, and first wall-connecting piece is fixedly connected in row's upright bar inside;
The second wall-connecting piece is arranged in S1 in outlet upright bar, is fixedly connected with outlet upright bar with exterior walls of buildings;
S2 removes interior row's cross bar;
S3 removes the first wall-connecting piece;
S4 removes interior row's upright bar from connecting rod, and interior row's upright bar is translated to the direction close to outlet upright bar;
S5 retightens interior row's upright bar in connecting rod, and installs interior row's cross bar;
S6 is arranged in upright bar inside and is reset the first wall-connecting piece, is fixedly connected with interior row's upright bar with exterior walls of buildings;
S7 removes the second wall-connecting piece in outlet upright bar.
Further, pass through button between the outlet upright bar and outlet cross bar and between interior row's upright bar and interior row's cross bar
Part is fixedly connected.
Further, pass through fastener fixing between the outlet upright bar and connecting rod and between interior row's upright bar and connecting rod
Connection.
Further, in S1, the spacing of second wall-connecting piece be two steps two across.
Further, in S4, the distance of interior row's upright bar to close outlet upright bar direction translation is 30-40cm.
Further, in S6, the spacing of first wall-connecting piece be two steps two across.
The invention has the benefit that reducing the workload that frame body is removed and set up again, efficient quick saves the duration,
Save the cost.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of fastener type steel pipe double-pole scaffold described in the embodiment of the present invention.
In figure:
1, the first wall-connecting piece;2, exterior walls of buildings;3, outlet upright bar;4, outlet cross bar;5, interior row's upright bar;6, interior row is horizontal
Bar;7, connecting rod.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected
Range.
As shown in Figure 1, a kind of fastener type steel pipe double-pole scaffold shifting changes method according to embodiments of the present invention, it is special
Sign is, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings 2 by the first wall-connecting piece 1, described
Fastener type steel pipe double-pole scaffold includes outlet upright bar 3, outlet cross bar 4, interior row's upright bar 5, interior row's cross bar 6 and connecting rod 7, institute
It states outlet upright bar 3 and interior row's upright bar 5 is fixedly connected in connecting rod 7, first wall-connecting piece 1 is fixedly connected arranges upright bar inside
On 5;
The second wall-connecting piece is arranged in S1 in outlet upright bar 3, is fixedly connected with outlet upright bar 3 with exterior walls of buildings 2;
S2 removes interior row's cross bar 6;
S3 removes the first wall-connecting piece 1;
S4 removes interior row's upright bar 5 from connecting rod 7, and interior row's upright bar 5 is translated to the direction close to outlet upright bar 3;
S5 retightens interior row's upright bar 5 in connecting rod 7, and installs interior row's cross bar 6;
S6 is arranged in upright bar 5 inside and is reset the first wall-connecting piece 1, is fixedly connected with interior row's upright bar 5 with exterior walls of buildings 2;
S7 removes the second wall-connecting piece in outlet upright bar 3.
In one particular embodiment of the present invention, between the outlet upright bar 3 and outlet cross bar 4 and interior row's upright bar 5
It is connect by fastener fixing between interior row's cross bar 6.
In one particular embodiment of the present invention, between the outlet upright bar 3 and connecting rod 7 and interior row's upright bar 5 with
It is connected between connecting rod 7 by fastener fixing.
In one particular embodiment of the present invention, in S1, the spacing of second wall-connecting piece be two steps two across.
In one particular embodiment of the present invention, in S4, interior row's upright bar 5 is put down to close to 3 direction of outlet upright bar
The distance of shifting is 30-40cm.
In one particular embodiment of the present invention, in S6, the spacing of first wall-connecting piece 1 be two steps two across.
In order to facilitate understanding above-mentioned technical proposal of the invention, below by way of in specifically used mode to of the invention above-mentioned
Technical solution is described in detail.
It is heretofore described to be fixedly connected with mode and be replaced with conventional technical means such as reinforcing bar binding, threaded connection, snappings
It changes.
Two arrangements of the step two across the wall-connecting piece for being fastener type steel pipe scaffold, two steps are three cross bar height, and two across being
The distance between three upright bars.
Up and down direction be a step left and right directions be one across.Such as " well ".
Outlet upright bar 3 and the orthogonal setting of outlet cross bar 4, and outlet foot hand is collectively formed by fastener fixing together
Frame, interior row's upright bar 5 and the orthogonal setting of interior row's cross bar 6, and interior row's scaffold is collectively formed by fastener fixing together, outside
Row's scaffold connects into fastener type steel pipe double-pole scaffold, interior row's foot hand by connecting rod 7 and fastener fixing with interior row's scaffold
Interior row's upright bar 5 in frame connects the first wall-connecting piece 1 by fastener fixing, and the first wall-connecting piece 1 is fixed on exterior walls of buildings 2.
When specifically used:
The second interim wall-connecting piece is arranged in S1 in the outlet upright bar 3 of fastener type steel pipe double-pole scaffold, and spacing is two steps
Two across;
S2 removes the fastener between interior row's cross bar 6 and interior row's upright bar 5, and when dismounting will gradually remove, and meets independent remove
Interior 5 condition of row's upright bar;
S3 arranges original first wall-connecting piece 1 in upright bar 5 in removing;
S4 removes the fastener between interior row's upright bar 5 and connecting rod 7, according to finishing scaffold building requirement, by interior row's upright bar 5
Outside sidesway 30-40cm, while to guarantee that the array pitch of interior exterior scaffold meets safety requirements;
S5 is arranged arrange cross bar 6 in upright bar 5 in installation inside, and uses fastener fixing;
S6 is arranged inside in upright bar 5 is arranged the first wall-connecting piece 1 as required, spacing be two steps two across;
S7 removes the second wall-connecting piece interim in outlet upright bar 3.
In conclusion reducing the workload that frame body is removed and set up again, efficiently by above-mentioned technical proposal of the invention
Fast, duration, save the cost are saved.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are various under the inspiration of the present invention
The product of form, however, make any variation in its shape or structure, it is all that there is skill identical or similar to the present application
Art scheme, is within the scope of the present invention.
Claims (6)
1. a kind of fastener type steel pipe double-pole scaffold shifting changes method, comprising the following steps:
Fastener type steel pipe double-pole scaffold described in S0 is fixedly connected on exterior walls of buildings (2) by the first wall-connecting piece (1), described
Fastener type steel pipe double-pole scaffold includes outlet upright bar (3), outlet cross bar (4), interior row's upright bar (5), interior row's cross bar (6) and connects
Extension bar (7), the outlet upright bar (3) and interior row's upright bar (5) are fixedly connected on connecting rod (7), first wall-connecting piece (1)
It is fixedly connected on row upright bar (5) inside;
It is characterized in that, further comprising the steps of:
The second wall-connecting piece is arranged on outlet upright bar (3) in S1, is fixedly connected with outlet upright bar (3) with exterior walls of buildings (2);
S2 removes interior row's cross bar (6);
S3 removes the first wall-connecting piece (1);
S4 removes interior row's upright bar (5) from connecting rod (7), and interior row's upright bar (5) is flat to the direction close to outlet upright bar (3)
It moves;
S5 retightens interior row's upright bar (5) on connecting rod (7), and installs interior row's cross bar (6);
S6 is arranged reset the first wall-connecting piece (1) on upright bar (5) inside, makes interior row's upright bar (5) and exterior walls of buildings (2) fixed company
It connects;
S7 removes the second wall-connecting piece on outlet upright bar (3).
2. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 1 changes method, which is characterized in that the outlet
It is connect by fastener fixing between upright bar (3) and outlet cross bar (4) and between interior row's upright bar (5) and interior row's cross bar (6).
3. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 2 changes method, which is characterized in that the outlet
It is connect between upright bar (3) and connecting rod (7) and between interior row's upright bar (5) and connecting rod (7) by fastener fixing.
4. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 3 changes method, which is characterized in that in S1,
The spacing of second wall-connecting piece be two steps two across.
5. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 4 changes method, which is characterized in that in S4,
The distance of interior row's upright bar (5) to close outlet upright bar (3) direction translation is 30-40cm.
6. a kind of fastener type steel pipe double-pole scaffold shifting according to claim 1 changes method, which is characterized in that in S6,
The spacing of first wall-connecting piece (1) be two steps two across.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611084234.4A CN106592956B (en) | 2016-11-30 | 2016-11-30 | A kind of shifting of fastener type steel pipe double-pole scaffold changes method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611084234.4A CN106592956B (en) | 2016-11-30 | 2016-11-30 | A kind of shifting of fastener type steel pipe double-pole scaffold changes method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592956A CN106592956A (en) | 2017-04-26 |
CN106592956B true CN106592956B (en) | 2019-02-15 |
Family
ID=58594615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611084234.4A Active CN106592956B (en) | 2016-11-30 | 2016-11-30 | A kind of shifting of fastener type steel pipe double-pole scaffold changes method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592956B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612301A (en) * | 2018-04-20 | 2018-10-02 | 江苏建宇建设集团有限公司 | A kind of high security steel wall-connecting piece |
CN110318559B (en) * | 2019-07-29 | 2024-03-19 | 江苏东南特种技术工程有限公司 | Rescue reinforcement device and method for cultural relics and buildings |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5186568A (en) * | 1986-05-01 | 1993-02-16 | Leo Falardeau | Scaffolding double latch locking device |
CN101368442A (en) * | 2008-04-30 | 2009-02-18 | 中建七局第二建筑有限公司 | Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold |
CN101377093A (en) * | 2007-08-27 | 2009-03-04 | 中国棚(集团)有限公司 | Scaffold |
JP2010090617A (en) * | 2008-10-08 | 2010-04-22 | Chuo Build Industry Co Ltd | Slide opening and closing type protective sheet |
CN103206079A (en) * | 2013-05-08 | 2013-07-17 | 朱新伟 | Double-pole scaffold system |
-
2016
- 2016-11-30 CN CN201611084234.4A patent/CN106592956B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5186568A (en) * | 1986-05-01 | 1993-02-16 | Leo Falardeau | Scaffolding double latch locking device |
CN101377093A (en) * | 2007-08-27 | 2009-03-04 | 中国棚(集团)有限公司 | Scaffold |
CN101368442A (en) * | 2008-04-30 | 2009-02-18 | 中建七局第二建筑有限公司 | Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold |
JP2010090617A (en) * | 2008-10-08 | 2010-04-22 | Chuo Build Industry Co Ltd | Slide opening and closing type protective sheet |
CN103206079A (en) * | 2013-05-08 | 2013-07-17 | 朱新伟 | Double-pole scaffold system |
Also Published As
Publication number | Publication date |
---|---|
CN106592956A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592956B (en) | A kind of shifting of fastener type steel pipe double-pole scaffold changes method | |
PH12015500267A1 (en) | A wall assembly and a building structure including the wall assembly | |
KR20170036947A (en) | Curtain wall structure | |
ITMO20080305A1 (en) | BUILDING STRUCTURE PROVIDED WITH VERTICAL WALLS INCLUDING A THERMOPLASTIC POLYMER. | |
ITBA20100007U1 (en) | MOLDING SYSTEM FOR MIXED ALUMINUM-WOOD CLOSURES WITH HIGH INSULATING VALUE | |
JP2010203187A (en) | Unit form | |
CN104319707B (en) | Reinforced cable bridge | |
CN106917463A (en) | Curtain wall construction and building | |
CN102444294A (en) | Method for analyzing and controlling long-term deformation of super-high-rise building structure under gravity load | |
CN208844719U (en) | A kind of super low energy consumption balcony | |
KR101346601B1 (en) | Dry wall system of panel type of building | |
CN214302832U (en) | Building climbing frame stair cushion block | |
JP6184338B2 (en) | Buildings with different top floor frames and lower floor frames | |
JP5852772B2 (en) | Hut truss and building | |
CN210134682U (en) | A aquatic lift platform for swimming pool | |
CN204024110U (en) | A kind of high building structure that shear wall is set in bight | |
CN204826333U (en) | Novel curtain frame | |
CN209244252U (en) | A kind of construction concrete-pouring template | |
CN206635937U (en) | A kind of skyscraper of the basement roof build-in building first floor | |
CN204343502U (en) | Novel external wall support | |
ITVI20100148A1 (en) | MODULAR ELEMENT FOR SUPPORTING PANELS FOR SURFACE COATING | |
WO2012007468A3 (en) | Construction system | |
CN203983884U (en) | A kind of Novel groove type cable bridge supporting walls | |
CN204850042U (en) | Building reinforced concrete structure post contracture device | |
JP6313083B2 (en) | Building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |