CN106592584A - Anti-deviation structure for engineering pile on soft soil foundation and construction process - Google Patents

Anti-deviation structure for engineering pile on soft soil foundation and construction process Download PDF

Info

Publication number
CN106592584A
CN106592584A CN201611061982.0A CN201611061982A CN106592584A CN 106592584 A CN106592584 A CN 106592584A CN 201611061982 A CN201611061982 A CN 201611061982A CN 106592584 A CN106592584 A CN 106592584A
Authority
CN
China
Prior art keywords
steel pipe
hole
cement mixing
mixing method
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611061982.0A
Other languages
Chinese (zh)
Other versions
CN106592584B (en
Inventor
林清辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
Taizhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Vocational and Technical College filed Critical Taizhou Vocational and Technical College
Priority to CN201611061982.0A priority Critical patent/CN106592584B/en
Priority to CN201810309852.7A priority patent/CN108265709A/en
Publication of CN106592584A publication Critical patent/CN106592584A/en
Application granted granted Critical
Publication of CN106592584B publication Critical patent/CN106592584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an anti-deviation structure for an engineering pile on a soft soil foundation and construction process, pertaining to the building field. Therefore, the existing problem of a deviation structure such as poor impact resistance is solved. In the anti-deviation structure for the engineering pile and the construction process, the anti-deviation structure comprises multiple cement soil mixing piles. Two adjacent cement soil mixing piles are partially overlapped. The overlapped part at each position is provided with a rectangular buffer hole, in which a steel pipe is vertically fixed. An elastic column made by plastic material is vertically fixed in each steel pipe. Inner and outer side walls of each steel pipe are attached to the side wall of each elastic column and the hole wall of each buffer hole. The construction process comprises following steps: A, making steel pipes; B, assembling the steel pipes and plastic blocks; C, installing elastic columns; D, locating cement soil mixing pile positions; E, making the cement soil mixing piles; F, machining buffer holes; G, inserting combination bodies obtained by the C step to the buffer holes. The anti-deviation structure for the engineering pile on the soft soil foundation and the construction process have the advantage in that impact resistance of the anti-deviation structure is improved.

Description

A kind of project pile deflection prevention structure used on soft soil foundation and construction technology
Technical field
The invention belongs to building field, is related to a kind of project pile deflection prevention structure used on soft soil foundation and construction technology.
Background technology
Coastal area soft soil foundation is typically based on mud or muck soil, and such native liquidity index is big, in stream modeling shape State, shearing strength is low, compressibility is higher, permeability is less.Practice have shown that, the construction quality and off normal of general ground engineering pile are It is easier what is controlled.But in soft soil foundation, the engineering pile of construction usually occurs off normal construction quality problem, i.e. pile sinking When position it is errorless, and the intermediate acceptance before pile follower also has no problem, but part engineering pile position off normal is had been found that after being excavated, Sometimes even large-area off normal.
For above-mentioned problem, it has been realized that deficiency, and improved, as disclosed in Chinese patent storehouse one Plant project pile deflection prevention structure used on soft soil foundation and method for pretreating [application number:201010168018.4;Application publication number CN 102235008 A], ruggedized construction is set around engineering pile, described ruggedized construction include it is multiple around cushion cap be in grid The continuously arranged cement mixing method of structure, the stake top absolute altitude of the mixing pile is concordant with foundation ditch bottom absolute altitude, the depth of mixing pile For 1.2-1.4 times of foundation depth, and described ruggedized construction is located at the 2/3-3/4 foundation ditches centered on foundation ditch central authorities In the range of;Described mixing pile is arranged by well head of cushion cap in substantially " well " font structure;The cushion cap is in triangle substantially, Described engineering pile has three, is arranged at each corner location of the cushion cap, is additionally provided with each engineering pile between each engineering pile Two two mixing piles spaced apart;Or described cushion cap is square, described engineering pile has four, is arranged at the cushion cap Each corner location, the mixing pile for being spaced apart both is provided between adjoining engineering pile;Or described cushion cap is in rectangular Shape, engineering pile has two, is arranged on two side positions of the cushion cap.
Because this pile deviation structure is used in coastal area, when violent typhoon is run into or engineering machinery is not collided, Because the part that cement mixing method exposes weak soil is separately provided, this part is caused to be easy to forced breakage, then shadow The use of the whole pile deviation structure of sound.
The content of the invention
The purpose of the present invention is there are the problems referred to above for existing technology, it is proposed that a kind of soft soil foundation preventing engineering stake is inclined Bit architecture, the technical problem of solution is how to improve the impact resistance of ruggedized construction.
Another object of the present invention is:A kind of construction of project pile deflection prevention structure used on soft soil foundation easy to make is provided Technique.
First purpose of the present invention can be realized by following technical proposal:A kind of soft soil foundation preventing engineering pile deviation knot Structure, including the ruggedized construction around the engineering pile, ruggedized construction includes cement mixing method, cement mixing method have it is multiple simultaneously Cushion cap for placing engineering pile is well head in substantially " well " font structure continuous arrangement, two adjoining Soil-cements Stake part overlaps, it is characterised in that the part for often locating to overlap is axially arranged with the buffering in strip along cement mixing method Hole, and cushion hole is blind hole, the aperture of described cushion hole is located on the roof of cement mixing method, and the diapire position of cushion hole The steel pipe in straight tube-like, both steel pipe and cushion hole are vertically fixed in the bottom of cement mixing method, each cushion hole Length it is identical and lower end of steel pipe offsets with the diapire of cushion hole, be vertically fixed in described steel pipe and be made up of plastic material Post, and post is in solid shape, the inside and outside two side of steel pipe respectively with the side wall and the hole wall phase of cushion hole of post Recline.
In steel pipe and under the collective effect of post by made by plastic material, make at the overlapping of two cement mixing methods both With rigidity, and with toughness, so as to effectively increase the anti-buffer capacity of lamination portion, so just can effective inhibition power Toward the transmission of next stage cement mixing method direction, effectively reduce being delivered to the active force of next stage cement mixing method then Amount, to reduce the probability of cement mixing method forced breakage, so as to effectively increase the impact resistance of whole ruggedized construction.
In above-mentioned project pile deflection prevention structure used on soft soil foundation, the lateral wall of described steel pipe sets along the radial direction of the steel pipe Limited location hole, spacing hole has multiple and gathers on the side wall of steel pipe, is embedded with and spacing hole phase in the spacing hole described in each The unit of plastic of matching.
Using above-mentioned design, the toughness of steel pipe can be both improved, steel pipe can be made to possess certain elasticity again, so just Deformation extent during steel pipe stress can be reduced, so as to further reduce above-mentioned active force next stage cement mixing method is delivered to On amount, the purpose that the impact resistance of raising ruggedized construction is made then more stably realizes.
In above-mentioned project pile deflection prevention structure used on soft soil foundation, described spacing hole is blind hole, the front portion of the spacing hole Tapered and its diameter is gradually reduced by the direction in steel pipe extroversion steel pipe, and the middle part and rear portion of spacing hole be rounded and aperture It is identical with the anterior minimum-value aperture of spacing hole.
That is the shape of unit of plastic is also forward taper, postmedian circle.Design tapered by the front portion by unit of plastic, can To increase the lifting surface area of unit of plastic;Secondly, design circular by the postmedian by unit of plastic, the front portion of unit of plastic is played Preferably supporting role, so that whole unit of plastic preferably plays shock-absorbing capacity, makes the impact resistance of raising ruggedized construction Purpose more stably realize.
In above-mentioned project pile deflection prevention structure used on soft soil foundation, the upper end of described steel pipe is blind end, and post Both ends of the surface offset with the inner roof wall of cushion hole diapire and steel pipe respectively.
Mutually recline with the hole wall of cushion hole the collective effect of both in the upper end closed of steel pipe and the lateral wall of steel pipe Under, the probability that post is contacted with external environment condition can be effectively reduced, to delay the speed of the elastic aging of column, make post all the time Stronger shock-absorbing capacity, the purpose for making the impact resistance of raising ruggedized construction is kept more stably to realize.
In above-mentioned project pile deflection prevention structure used on soft soil foundation, described steel pipe by friction tight mode with it is described Cement mixing method is mutually fixed;Described post is mutually fixed by friction tight mode with described steel pipe.
I.e. the connection of steel pipe and cement mixing method and steel pipe need not be by other zero with the connection of post Part, had so both facilitated installation, and the cost of four installations above is reduced again.Secondly, using above-mentioned structure, steel pipe can be made The hole wall of lateral wall and cushion hole is more closely contacted to form more structurally sound sealing, so as to avoid post and external environment condition Contact, to substantially reduce the speed of the elastic aging of column, the purpose for making the impact resistance of raising ruggedized construction is more stably realized.
The technical scheme for reaching another object of the present invention is:A kind of construction work of project pile deflection prevention structure used on soft soil foundation Skill, comprises the following steps:
A, making steel pipe:Meet the pipeline section of length under cutting from raw material tubing, after pipeline section is clipped on lathe, by boring Head gets out blind round hole on the lateral wall of pipeline section, then that the front end of blind round hole is hinged into into taper by taper reamer is spacing to be formed Hole;
B, assembling steel pipe and unit of plastic:Plastic grain is inserted in spacing hole, heating steel pipe makes plastic grain be fused into liquid Body simultaneously fills up whole spacing hole, and after steel pipe natural cooling, above-mentioned liquid curing is bonded together into unit of plastic and with steel pipe Blank is formed, then sanding and polishing is carried out to the outer surface of blank by sanding and polishing machine;
C, installation post:One end of feed material plastics post is inserted in steel pipe until the inner face with the blind end of steel pipe Stop insertion when offseting, then feed material plastics post is blocked by cutter;
D, positioning cement mixing method position:Slag packing course of delaying when cutting out engineering sunk pile, 2/ centered on foundation ditch central authorities Cement mixing method position is determined in the range of 3-3/4 foundation ditches, multiple cement mixing method positions are centered around around cushion cap and are with cushion cap Well head is in substantially " well " font structure continuous arrangement;
E, making cement mixing method:The cement mixing method position that cement mixing pile machine centering is specified, in foundation depth Start to record cement mixing method at 1.2-1.4 times of position, and the stake top absolute altitude of cement mixing method is put down with foundation ditch bottom absolute altitude Together, above-mentioned step is repeated, until all cement mixing method positions are recorded finishing;
F, processing buffer hole:Drilled downwards to process buffering from the roof of cement mixing method by concrete coring machine Hole;
G, the assembly that step C is obtained is inserted in cushion hole.
Wherein, the positioning being related in step D and step E and the method for making cement mixing method are existing, tools Body may be referred to a kind of project pile deflection prevention structure used on soft soil foundation disclosed in Chinese patent storehouse and method for pretreating [application number: 201010168018.4;The A of application publication number CN 102235008].
In the construction technology of above-mentioned project pile deflection prevention structure used on soft soil foundation, in step A, thick taper reamer is first passed through The front end of blind round hole is slightly cut with scissors, then the front end of blind round hole is finish reamed by smart taper reamer.
The molding of blind round hole front end is made by thick hinge, then is polished blind round hole front end specified to reach by finish reaming Size.
Together thick hinge was first carried out before finish reaming, the cutting force of bottoming reamer can be reduced, with guarantee molding precision and Reduce the difficulty of processing.
In the construction technology of above-mentioned project pile deflection prevention structure used on soft soil foundation, described cement mixing method is Φ The cement mixing piles of 700@600, cement mixing content is 10%-20%, and the volume of outer-penetrating agent gypsum powder is the 2.0% of cement mixing content, It is 8% that sky stirs part of cement volume, and the ratio of mud is 0.5-0.6.
Compared with prior art, this project pile deflection prevention structure used on soft soil foundation and construction technology have advantages below:
1st, in steel pipe and by made by plastic material under the collective effect of post, make at the overlapping of two cement mixing methods Both there is rigidity, and with toughness, so as to effectively increase the anti-buffer capacity of lamination portion, so just can effective inhibition Power is transmitted toward next stage cement mixing method direction, effectively reduces being delivered to the active force of next stage cement mixing method then Amount, to reduce the probability of cement mixing method forced breakage, so as to effectively increase the impact resistance of whole ruggedized construction.
2nd, by being embedded in unit of plastic on the side wall of steel pipe, the toughness of steel pipe can be both improved, steel pipe can again possesses Certain elasticity, so just can reduce deformation extent during steel pipe stress, so as to the active force for further reducing above-mentioned is delivered to Amount on next stage cement mixing method, the purpose that the impact resistance of raising ruggedized construction is made then is more stably realized.
3rd, design tapered by the front portion by unit of plastic, the lifting surface area of unit of plastic can be increased;Secondly, by moulding The postmedian design of material block is circular, and to the front portion of unit of plastic preferable supporting role is played, so that whole unit of plastic is preferable Ground plays shock-absorbing capacity, and the purpose for making the impact resistance of raising ruggedized construction is more stably realized.
4th, the upper end closed of steel pipe and the lateral wall of steel pipe and cushion hole hole wall closely against the common of both Under effect, the probability that post is contacted with external environment condition can be effectively reduced, to delay the speed of the elastic aging of column, make post Stronger shock-absorbing capacity is remained, the purpose for making the impact resistance of raising ruggedized construction is more stably realized.
Description of the drawings
Fig. 1 is the structural representation of this project pile deflection prevention structure used on soft soil foundation.
Fig. 2 is cross section structure diagrams of the Fig. 1 on A-A directions.
Fig. 3 is the cross section structure diagram of steel pipe.
In figure, 1, cement mixing method;2nd, engineering pile;3rd, cushion cap;4th, steel pipe;4a, spacing hole;5th, post;6th, plastics Block.
Specific embodiment
The following is the specific embodiment of the present invention and combine accompanying drawing, technical scheme is further described, But the present invention is not limited to these embodiments.
Embodiment one
As shown in figure 1, this project pile deflection prevention structure used on soft soil foundation includes the ruggedized construction around engineering pile 2, tool For body, ruggedized construction is located in the range of the 2/3-3/4 foundation ditches centered on foundation ditch central authorities.The ruggedized construction is by many cement Native mixing pile 1 is constituted, and many cement mixing methods 1 are that well head is tied in substantially " well " font for the cushion cap 3 for placing engineering pile 2 Structure continuous arrangement, and adjoining two parts of cement mixing method 1 overlapping.
Wherein, the depth of cement mixing method 1 is 1.2 times of foundation depth, and the stake top absolute altitude of cement mixing method 1 with Foundation ditch bottom absolute altitude is concordant.The shape of cushion cap 3 can be square or rectangular again or general triangular, in the present embodiment, It is preferred that cushion cap 3 is introduced for rectangle;Engineering pile 2 is arranged on the corner of cushion cap 3.
The part for often locating to overlap is axially arranged with the cushion hole in strip along cement mixing method 1, and cushion hole is Blind hole.As shown in figure 1, the aperture of cushion hole is located on the roof of cement mixing method 1, i.e., now, the aperture of cushion hole is upward; The diapire of cushion hole is located at the bottom of cement mixing method 1, and the diapire of the cushion hole is plane.
The steel pipe 4 in straight tube-like is vertically fixed in each cushion hole, and in the present embodiment, preferred steel pipe 4 is in circle Tubulose, cushion hole is rounded, and steel pipe 4 is fixed by friction tight mode with cement mixing method 1, so not only can ensure that steel Pipe 4 and the stability of the connection of cement mixing method 1, and form the lateral wall of steel pipe 4 and the hole wall tight abutment of cushion hole Sealing.Further illustrate, the upper end of steel pipe 4 is blind end;Steel pipe 4 is identical with the length of both cushion holes, and the lower end of steel pipe 4 Offset with the diapire of cushion hole, to play preferable supporting role to cushion hole.
As shown in Fig. 2 being vertically fixed the post 5 in solid shape, and post 5 by plastics material in every steel pipe 4 Material is made.In the present embodiment, preferred post 5 is cylindrical, and post 5 is fixed by friction tight mode with steel pipe 4, i.e., Now, the side wall of post 5 and the medial wall of steel pipe 4 closely against.Further illustrate, the both ends of the surface of post 5 respectively with it is slow The inner roof wall of punching diapire and steel pipe 4 offsets.
As shown in Figures 2 and 3, the lateral wall of steel pipe 4 is radially provided with spacing hole 4a along the steel pipe 4, and spacing hole 4a has many It is individual and gather on the side wall of steel pipe 4, is embedded with the unit of plastic 6 matched with spacing hole 4a in each spacing hole 4a.Further Illustrate, spacing hole 4a is blind hole, anterior tapered and its diameter of spacing hole 4a by the direction in the extroversion steel pipe 4 of steel pipe 4 by Decrescence little, the middle part and rear portion of spacing hole 4a be rounded and the anterior minimum-value aperture of aperture and spacing hole 4a is identical.Mould The shape of material block 6 is also forward taper, postmedian circle.Design tapered by the front portion by unit of plastic 6, plastics can be increased The lifting surface area of block 6;Secondly, design circular by the postmedian by unit of plastic 6, the front portion of unit of plastic 6 is played preferably Supporting role, so that whole unit of plastic 6 preferably plays shock-absorbing capacity, makes the purpose of the impact resistance of raising ruggedized construction More stably realize.
A kind of construction technology of project pile deflection prevention structure used on soft soil foundation, comprises the following steps:
A, making steel pipe 4:Meet the pipeline section of length under cutting from raw material tubing, after pipeline section is clipped on lathe, pass through Drill bit gets out blind round hole on the lateral wall of pipeline section, then the front end of blind round hole is slightly cut with scissors by thick taper reamer, then The front end of blind round hole is finish reamed by smart taper reamer form spacing hole 4a.
B, assembling steel pipe 4 and unit of plastic 6:Plastic grain is inserted in spacing hole 4a, heating steel pipe 4 melts plastic grain Into liquid and whole spacing hole 4a is filled up, after the natural cooling of steel pipe 4, above-mentioned liquid curing is into unit of plastic 6 and viscous with steel pipe 4 It is combined to form blank, then sanding and polishing is carried out to the outer surface of blank by sanding and polishing machine.
C, installation post 5:By one end of feed material plastics post be inserted in steel pipe 4 until with the blind end of steel pipe 4 in Stop insertion when end face offsets, then feed material plastics post is blocked by cutter.
D, positioning cement mixing method 1:Slag packing course of delaying when cutting out 2 pile sinking of engineering pile, centered on foundation ditch central authorities Cement mixing method 1 is determined in the range of 2/3-3/4 foundation ditches, multiple cement mixing methods 1 are centered around around cushion cap 3 and to hold Platform 3 is well head in substantially " well " font structure continuous arrangement.
E, making cement mixing method 1:The cement mixing method that cement mixing pile machine centering is specified 1, in foundation depth Start to record cement mixing method 1 at 1.2 times of position, and the stake top absolute altitude of cement mixing method 1 is concordant with foundation ditch bottom absolute altitude, The above-mentioned step of repetition, until all cement mixing methods 1 are recorded finishing.
F, processing buffer hole:Drilled downwards from the roof of cement mixing method 1 by concrete coring machine slow to process Punching.
G, the assembly that step C is obtained is inserted in cushion hole.
In above-mentioned step, the positioning being related in step D and step E and the method for making cement mixing method 1 are equal It is existing, specifically may be referred to a kind of off-set construction of soft soil foundation preventing engineering stake 2 and method for pretreating disclosed in Chinese patent storehouse [application number:201010168018.4;The A of application publication number CN 102235008];Cement mixing method 1 is the cement of 700@of Φ 600 Mixing pile, cement mixing content is 10%-20%, and the volume of outer-penetrating agent gypsum powder is the 2.0% of cement mixing content, and sky stirs part of cement Volume is 8%, and the ratio of mud is 0.5-0.6.
Embodiment two
The present embodiment two is essentially identical with the structure and principle of embodiment one, and different place is:Soil-cement The depth of stake 1 is 1.3 times of foundation depth.
A kind of construction technology of project pile deflection prevention structure used on soft soil foundation, comprises the following steps:
A, making steel pipe 4:Meet the pipeline section of length under cutting from raw material tubing, after pipeline section is clipped on lathe, pass through Drill bit gets out blind round hole on the lateral wall of pipeline section, then the front end of blind round hole is slightly cut with scissors by thick taper reamer, then The front end of blind round hole is finish reamed by smart taper reamer form spacing hole 4a.
B, assembling steel pipe 4 and unit of plastic 6:Plastic grain is inserted in spacing hole 4a, heating steel pipe 4 melts plastic grain Into liquid and whole spacing hole 4a is filled up, after the natural cooling of steel pipe 4, above-mentioned liquid curing is into unit of plastic 6 and viscous with steel pipe 4 It is combined to form blank, then sanding and polishing is carried out to the outer surface of blank by sanding and polishing machine.
C, installation post 5:By one end of feed material plastics post be inserted in steel pipe 4 until with the blind end of steel pipe 4 in Stop insertion when end face offsets, then feed material plastics post is blocked by cutter.
D, positioning cement mixing method 1:Slag packing course of delaying when cutting out 2 pile sinking of engineering pile, centered on foundation ditch central authorities Cement mixing method 1 is determined in the range of 2/3-3/4 foundation ditches, multiple cement mixing methods 1 are centered around around cushion cap 3 and to hold Platform 3 is well head in substantially " well " font structure continuous arrangement.
E, making cement mixing method 1:The cement mixing method that cement mixing pile machine centering is specified 1, in foundation depth Start to record cement mixing method 1 at 1.3 times of position, and the stake top absolute altitude of cement mixing method 1 is concordant with foundation ditch bottom absolute altitude, The above-mentioned step of repetition, until all cement mixing methods 1 are recorded finishing.
F, processing buffer hole:Drilled downwards from the roof of cement mixing method 1 by concrete coring machine slow to process Punching.
G, the assembly that step C is obtained is inserted in cushion hole.
Embodiment three
The present embodiment three is essentially identical with the structure and principle of embodiment one, and different place is:
The depth of cement mixing method 1 is 1.4 times of foundation depth.
A kind of construction technology of project pile deflection prevention structure used on soft soil foundation, comprises the following steps:
A, making steel pipe 4:Meet the pipeline section of length under cutting from raw material tubing, after pipeline section is clipped on lathe, pass through Drill bit gets out blind round hole on the lateral wall of pipeline section, then the front end of blind round hole is slightly cut with scissors by thick taper reamer, then The front end of blind round hole is finish reamed by smart taper reamer form spacing hole 4a.
B, assembling steel pipe 4 and unit of plastic 6:Plastic grain is inserted in spacing hole 4a, heating steel pipe 4 melts plastic grain Into liquid and whole spacing hole 4a is filled up, after the natural cooling of steel pipe 4, above-mentioned liquid curing is into unit of plastic 6 and viscous with steel pipe 4 It is combined to form blank, then sanding and polishing is carried out to the outer surface of blank by sanding and polishing machine.
C, installation post 5:By one end of feed material plastics post be inserted in steel pipe 4 until with the blind end of steel pipe 4 in Stop insertion when end face offsets, then feed material plastics post is blocked by cutter.
D, positioning cement mixing method 1:Slag packing course of delaying when cutting out 2 pile sinking of engineering pile, centered on foundation ditch central authorities Cement mixing method 1 is determined in the range of 2/3-3/4 foundation ditches, multiple cement mixing methods 1 are centered around around cushion cap 3 and to hold Platform 3 is well head in substantially " well " font structure continuous arrangement.
E, making cement mixing method 1:The cement mixing method that cement mixing pile machine centering is specified 1, in foundation depth Start to record cement mixing method 1 at 1.4 times of position, and the stake top absolute altitude of cement mixing method 1 is concordant with foundation ditch bottom absolute altitude, The above-mentioned step of repetition, until all cement mixing methods 1 are recorded finishing.
F, processing buffer hole:Drilled downwards from the roof of cement mixing method 1 by concrete coring machine slow to process Punching.
G, the assembly that step C is obtained is inserted in cushion hole.
Specific embodiment described herein is only explanation for example spiritual to the present invention.Technology neck belonging to of the invention The technical staff in domain can be made various modifications to described specific embodiment or supplement or replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.

Claims (8)

1. a kind of project pile deflection prevention structure used on soft soil foundation, including the ruggedized construction around engineering pile, ruggedized construction includes Cement mixing method, it is that well head is tied in substantially " well " font that cement mixing method has multiple and for placing engineering pile cushion cap Structure continuous arrangement, adjoining two cement mixing method parts overlapping, it is characterised in that often locate the part for overlapping along cement Native mixing pile is axially arranged with the cushion hole in strip, and cushion hole is blind hole, and the aperture of described cushion hole is located at cement On the roof of native mixing pile, and the diapire of cushion hole is located in the bottom of cement mixing method, each cushion hole and vertically fixes There is a steel pipe in straight tube-like, the length of both steel pipe and cushion hole is identical and lower end of steel pipe offsets with the diapire of cushion hole, institute The post by made by plastic material, and post are vertically fixed in the steel pipe stated in solid shape, the inside and outside two side of steel pipe Mutually recline with the side wall of post and the hole wall of cushion hole respectively.
2. project pile deflection prevention structure used on soft soil foundation according to claim 1, it is characterised in that the outside of described steel pipe Along the spacing hole that is radially provided with of the steel pipe, spacing hole has multiple and gathers on the side wall of steel pipe wall, the spacing hole described in each Inside it is embedded with the unit of plastic matched with spacing hole.
3. project pile deflection prevention structure used on soft soil foundation according to claim 2, it is characterised in that described spacing hole is blind Hole, anterior tapered and its diameter of the spacing hole is gradually reduced by the direction in steel pipe extroversion steel pipe, the middle part of spacing hole and Rear portion is rounded and the anterior minimum-value aperture of aperture and spacing hole is identical.
4. the project pile deflection prevention structure used on soft soil foundation according to claim 1 or 2 or 3, it is characterised in that described steel pipe Upper end be blind end, and the both ends of the surface of post offset respectively with the inner roof wall of cushion hole diapire and steel pipe.
5. project pile deflection prevention structure used on soft soil foundation according to claim 4, it is characterised in that described steel pipe is by tight The mode of cooperation is mutually fixed with described cement mixing method;Described post is by friction tight mode and described steel pipe It is mutually fixed.
6. a kind of construction technology of project pile deflection prevention structure used on soft soil foundation, comprises the following steps:
A, making steel pipe:Meet the pipeline section of length under cutting from raw material tubing, after pipeline section is clipped on lathe, existed by drill bit Blind round hole is got out on the lateral wall of pipeline section, then the front end of blind round hole is hinged into form spacing hole by taper by taper reamer;
B, assembling steel pipe and unit of plastic:Plastic grain is inserted in spacing hole, heating steel pipe makes plastic grain be fused into liquid simultaneously Whole spacing hole is filled up, after steel pipe natural cooling, above-mentioned liquid curing is adhesively-bonded together to form into unit of plastic and with steel pipe Blank, then sanding and polishing is carried out to the outer surface of blank by sanding and polishing machine;
C, installation post:One end of feed material plastics post is inserted in steel pipe until the inner face of the blind end with steel pipe offsets When stop insertion, then feed material plastics post is blocked by cutter;
D, positioning cement mixing method position:Slag packing course of delaying when cutting out engineering sunk pile, the 2/3-3/4 centered on foundation ditch central authorities Cement mixing method position is determined in the range of foundation ditch, multiple cement mixing method positions are centered around around cushion cap and are in by well head of cushion cap Substantially " well " font structure continuous arrangement;
E, making cement mixing method:The cement mixing method position that cement mixing pile machine centering is specified, in foundation depth 1.2-1.4 Start to record cement mixing method at position again, and the stake top absolute altitude of cement mixing method is concordant with foundation ditch bottom absolute altitude, repeats Above-mentioned step, until all cement mixing method positions are recorded finishing;
F, processing buffer hole:Drilled downwards to process cushion hole from the roof of cement mixing method by concrete coring machine;
G, the assembly that step C is obtained is inserted in cushion hole.
7. the construction technology of project pile deflection prevention structure used on soft soil foundation according to claim 6, it is characterised in that in A steps In rapid, first pass through thick taper reamer and the front end of blind round hole is slightly cut with scissors, then the front end of blind round hole is entered by smart taper reamer Row is finish reamed.
8. the construction technology of project pile deflection prevention structure used on soft soil foundation according to claim 6, it is characterised in that described Cement mixing method is the cement mixing piles of 700@of Φ 600, and cement mixing content is 10%-20%, and the volume of outer-penetrating agent gypsum powder is The 2.0% of cement mixing content, it is 8% that sky stirs part of cement volume, and the ratio of mud is 0.5-0.6.
CN201611061982.0A 2016-11-28 2016-11-28 A kind of project pile deflection prevention structure used on soft soil foundation and construction technology Active CN106592584B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201611061982.0A CN106592584B (en) 2016-11-28 2016-11-28 A kind of project pile deflection prevention structure used on soft soil foundation and construction technology
CN201810309852.7A CN108265709A (en) 2016-11-28 2016-11-28 A kind of construction technology of project pile deflection prevention structure used on soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611061982.0A CN106592584B (en) 2016-11-28 2016-11-28 A kind of project pile deflection prevention structure used on soft soil foundation and construction technology

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201810309852.7A Division CN108265709A (en) 2016-11-28 2016-11-28 A kind of construction technology of project pile deflection prevention structure used on soft soil foundation

Publications (2)

Publication Number Publication Date
CN106592584A true CN106592584A (en) 2017-04-26
CN106592584B CN106592584B (en) 2018-12-04

Family

ID=58593489

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810309852.7A Pending CN108265709A (en) 2016-11-28 2016-11-28 A kind of construction technology of project pile deflection prevention structure used on soft soil foundation
CN201611061982.0A Active CN106592584B (en) 2016-11-28 2016-11-28 A kind of project pile deflection prevention structure used on soft soil foundation and construction technology

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810309852.7A Pending CN108265709A (en) 2016-11-28 2016-11-28 A kind of construction technology of project pile deflection prevention structure used on soft soil foundation

Country Status (1)

Country Link
CN (2) CN108265709A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1103522A (en) * 1966-01-21 1968-02-14 Gino Wey Method of producing a continuous wall of piles
CN201330403Y (en) * 2008-10-06 2009-10-21 吴保全 Composite foundation with lateral confinement structure
CN102235008A (en) * 2010-05-07 2011-11-09 浙江海洋学院 Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN202543945U (en) * 2012-03-22 2012-11-21 中建七局第二建筑有限公司 Mixing pile structure
CN103205974A (en) * 2013-04-17 2013-07-17 杨众 Supporting structure with combination of preheated groove-shaped piles and mixing piles
CN204401602U (en) * 2015-02-25 2015-06-17 武汉高铁桩工科技有限公司 A kind of rigid-flexible composite support water stop RCP stake
CN104895059A (en) * 2015-03-31 2015-09-09 中铁时代建筑设计院有限公司 Freezing cement mixing pile and construction method thereof
CN206396747U (en) * 2016-11-28 2017-08-11 林清辉 A kind of project pile deflection prevention structure used on soft soil foundation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2111422U (en) * 1991-11-27 1992-07-29 江苏省南通市防腐管道厂 Metal skeleton plastic pipe
JP4475845B2 (en) * 2001-06-12 2010-06-09 株式会社テノックス Pile construction method
CN203905297U (en) * 2014-04-18 2014-10-29 中南大学 Steel pipe regenerated plastic concrete pillar
CN104032731A (en) * 2014-04-29 2014-09-10 周兆弟 Plum-blossom-shaped cement soil mixing pile and forming method thereof
CN104196016A (en) * 2014-04-29 2014-12-10 周兆弟 Quincunx cement soil mixing high-strength bearing pile and forming method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1103522A (en) * 1966-01-21 1968-02-14 Gino Wey Method of producing a continuous wall of piles
CN201330403Y (en) * 2008-10-06 2009-10-21 吴保全 Composite foundation with lateral confinement structure
CN102235008A (en) * 2010-05-07 2011-11-09 浙江海洋学院 Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN202543945U (en) * 2012-03-22 2012-11-21 中建七局第二建筑有限公司 Mixing pile structure
CN103205974A (en) * 2013-04-17 2013-07-17 杨众 Supporting structure with combination of preheated groove-shaped piles and mixing piles
CN204401602U (en) * 2015-02-25 2015-06-17 武汉高铁桩工科技有限公司 A kind of rigid-flexible composite support water stop RCP stake
CN104895059A (en) * 2015-03-31 2015-09-09 中铁时代建筑设计院有限公司 Freezing cement mixing pile and construction method thereof
CN206396747U (en) * 2016-11-28 2017-08-11 林清辉 A kind of project pile deflection prevention structure used on soft soil foundation

Also Published As

Publication number Publication date
CN106592584B (en) 2018-12-04
CN108265709A (en) 2018-07-10

Similar Documents

Publication Publication Date Title
CN103074898B (en) Multi-row pile foundation pit support structure and construction method thereof
CN205907679U (en) Cast -in -place strength core stirring stake
CN100595391C (en) Synchronous soil lifting grouting rectangular filling pile apparatus and method
CN103821141A (en) Thread pile construction process
CN105735289A (en) Circular arc inserting and buckling quincuncial pile forming facility
CN105862751A (en) Arc inserting quincuncial pile forming facility
CN103883260A (en) Triaxial triangular cement mixing drill stem and construction method
CN104088285A (en) Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN206396747U (en) A kind of project pile deflection prevention structure used on soft soil foundation
CN107023306B (en) Spiral assembled tunnel structure and construction method thereof
CN106592584A (en) Anti-deviation structure for engineering pile on soft soil foundation and construction process
CN103114602B (en) Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method
CN201943067U (en) Glaze retaining wall structure of artificially digging pile hole
CN201614938U (en) Shield cave-in and out reinforced structure for rapid construction in special stratum
CN109882222A (en) The method that small size double circular hole drilling tool and roadway grouting reinforce country rock
JP2019019447A (en) Tunnel construction method
CN108316312B (en) Shallow-buried inclined bedrock biased tunnel reinforcing structure and construction method thereof
CN204570676U (en) A kind of convex tooth pile tube
CN107780408A (en) Concrete tubular pile device and its construction method
CN208039237U (en) A kind of tube filling pedestal pile construction equipment
CN208934599U (en) Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile
CN205975582U (en) Improve device of hollow pile bearing capacity
CN205955649U (en) What complete hard rock was got to brill digs drilling tool soon
CN205776299U (en) The churning controlling structure sedimentation supports stake

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190717

Address after: 317100 Room 1104, Block B, 19 Wutong Road, Haiyou Street, Sanmen County, Taizhou City, Zhejiang Province

Patentee after: TAIZHOU YONGXING TRADING Co.,Ltd.

Address before: 318000 Xueyuan Road, Jiaojiang, Zhejiang, No. 788,

Co-patentee before: Taizhou Vocational & Technical College

Patentee before: Lin Qinghui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190903

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 317100 Room 1104, Block B, 19 Wutong Road, Haiyou Street, Sanmen County, Taizhou City, Zhejiang Province

Patentee before: TAIZHOU YONGXING TRADING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230808

Address after: Room 289, No. 333 Jiufo Jianshe Road, Zhongxin Guangzhou Knowledge City, Guangzhou, Guangdong Province, 510700 (self declared)

Patentee after: China Construction Eighth Engineering Bureau South China Construction Co.,Ltd.

Address before: Room 1260, building 5, No. 495, Yuejin South Road, Xinhai Town, Chongming District, Shanghai 202172

Patentee before: Advocating Creation (Shanghai) Consulting Management Firm

TR01 Transfer of patent right