CN106592439A - Steel box girder slide traction system and construction method thereof - Google Patents

Steel box girder slide traction system and construction method thereof Download PDF

Info

Publication number
CN106592439A
CN106592439A CN201611239080.1A CN201611239080A CN106592439A CN 106592439 A CN106592439 A CN 106592439A CN 201611239080 A CN201611239080 A CN 201611239080A CN 106592439 A CN106592439 A CN 106592439A
Authority
CN
China
Prior art keywords
steel box
sliding
girder
traction
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611239080.1A
Other languages
Chinese (zh)
Inventor
梁震
刘怀刚
易岳林
高世强
廖顺山
魏超
夏江南
肖向荣
费永忠
赵升辉
檀兴华
张铮
葛纪平
施恩
吴汉文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201611239080.1A priority Critical patent/CN106592439A/en
Publication of CN106592439A publication Critical patent/CN106592439A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a steel box girder slide traction system. The steel box girder slide traction system comprises a slide device for making a steel box girder to slide and a traction device which is used for providing a traction force for the slide of the steel box girder; and the slide device includes two slide channels which are laid along the direction of the axis of a bridge and shifters arranged on the slide channels. According to the traction device, two traction points are arranged on each traction unit, wherein each traction point includes a traction counter-force seat pre-buried in the traction unit, a pull-anchor device arranged on the traction unit, a pull cable hinged to the traction unit, and a jack connected with the pull cable. With the steel box girder slide traction system of the invention adopted, synchronous, continuous and adjustable translation of the steel box girder can be realized, and the security of the steel box girder in the translation process can be improved.

Description

Steel box-girder sliding trailer system and its construction method
Technical field
The present invention relates to technical field of civil engineering, specifically, the present invention relates to a kind of steel box-girder sliding trailer system And its construction method.
Background technology
The steel box-girder of large span stayed-cable bridge is lifted in end bay beam section using large-scale crane ship, and is positioned over temporarily and is deposited beam On frame.End bay beam section is made up of more piece steel box-girder beam section, because the influence of topography is received in the installation of end bay, and deposits boom support restriction Large-scale crane ship to be deposited and hang width when beam is constructed, and so as to cause end bay beam section disposably to be deposited in place with crane ship, is needed Steel box-girder straight skidding is drawn in place.
In prior art, the sliding traction of beam section mostly is rail type traction sliding, and when making traction sliding, steel box-girder is by cunning Bearing is moved in nose girder slide rail along track sliding, is widely used because its principle is simple.But, when rail type traction Gliding method just occurs the situation that beam section shifts in sliding suitable for long range traction sliding, not only affects beam section Being smoothed out for sliding, more can bring great problem to the security of beam section and sliding rail.
The content of the invention
The steel box-girder sliding traction system of the features such as purpose of the present invention aims to provide a kind of achievable synchronous, continuous, adjustable System;
Another object of the present invention aims to provide a kind of construction method of steel box-girder sliding trailer system.
To achieve these goals, the present invention provides technical scheme below:
A kind of first aspect, there is provided steel box-girder sliding trailer system, including for carrying steel box girder segment line slip is entered Slide device and the draw-gear for providing tractive force for the sliding of steel box girder segment;The slide device include along bridge to Two slideways of laying and the shift unit being laid on the slideway;The draw-gear is laid with each traction unit Two towing points, each towing point includes the traction counter-force seat being embedded in traction unit, is laid in the drawing anchor of traction unit Device, the drag-line for being hinged on traction unit and the jack being connected with the drag-line.
Wherein, the slideway adopts section steel manufacture, and the shaped steel top surface to be placed in parallel laid inside and have the channel-section steel of steel plate.
Wherein, the shift unit is each on two slideways lays two.
Further, the shift unit is crawler type heavy body transporting unit.
Further, the crawler type heavy body transporting unit includes panel, two pieces be fixed on below the panel mutually Parallel riser, the raceway plate being fixed between the riser and the cylindrical roller rolled around the raceway plate;The rolling Guidance tape two ends are curved;Carrier bar is hinged between two cylindrical rollers of the arbitrary neighborhood, the carrier bar is end to end to be centered around On the raceway plate.
Preferably, it is provided with directive wheel before and after each riser;The directive wheel wheel direction of principal axis and the cylindrical roller Wheel direction of principal axis is vertical.
Further, the drawing anchor device includes fixator and p-type anchorage;Fixator includes clamping by the rubber of fixing component Offset plate and the filling rubber slab and the steel plate by the gap between fixing component;The rubber slab is offered along vertical bridge to direction For the through hole of the drag-line insertion;The p-type anchorage is arranged on the rubber slab and clamps the side phase by fixing component To another side on, with fixation penetrate the rubber slab drag-line end.
Wherein, the drag-line is steel strand wires.
A kind of second aspect, there is provided construction method of steel box-girder sliding trailer system, the sliding trailer system is using such as Steel box-girder sliding trailer system described in first aspect, the construction method of the sliding trailer system is comprised the following steps:
A installs the slide device, and the shift unit is laid in into sliding starting point;
B with bank to closure section direction lift at least one steel box girder segment to the shift unit;
C installs the draw-gear with the single steel box girder segment as traction unit;
D starts jack to drive the steel box girder segment to move to bank, and institute is unloaded afterwards in place in steel box girder segment sliding State shift unit and draw-gear;
The shift unit for unloading is laid in sliding starting point, repeat step b to d by e again, until completing all steel box-girders The sliding of sections.
Wherein, step a, in sliding starting point four shift units are averagely laid.
Wherein, side crane steel loading box girder segment of the crane barge from the slide device is adopted in step b.
Wherein, the step of unloading shift unit in step d be:All shift units that come off simultaneously make the load of steel box girder segment Lotus is transferred on fixed support bracket.
Compared to existing technology, the solution of the present invention has advantages below:
The sliding trailer system of the present invention is made up of slide device with draw-gear.The traction sliding of steel box girder segment, with Sliding trolley (heavy body transporting unit) is applied on traction counter-force seat by jack and is realized, fitted as slip medium, traction power Sliding is drawn for over distance, and is capable of achieving synchronous, continuous, adjustable traction sliding, while also dependent on live feelings Condition, is adjusted using the one side of jack pair beam section.More preferably, the present invention is arranged before and after the riser of sliding trolley and is oriented to Wheel, prevents sliding trolley from driving steel box girder segment to wander off in slipping, improves security and the construction of beam section sliding Efficiency.
The additional aspect of the present invention and advantage will be set forth in part in the description, and these will become from the following description Obtain substantially, or recognized by the practice of the present invention.
Description of the drawings
The above-mentioned and/or additional aspect of the present invention and advantage will become from the following description of the accompanying drawings of embodiments It is substantially and easy to understand, wherein:
Fig. 1 is that the draw-gear and its direction of motion of steel box-girder sliding trailer system in one embodiment of the invention are illustrated Figure.
Fig. 2 is the drawing anchor device installation position schematic diagram of steel box-girder sliding trailer system in one embodiment of the invention.
Fig. 3 is to put corresponding to the drawing anchor device construction of the steel box-girder sliding trailer system of A in Fig. 2 in one embodiment of the invention Big figure.
Fig. 4 is the heavy body transporting unit structural map of steel box-girder sliding trailer system in one embodiment of the invention.
Specific embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from start to finish Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not construed as limiting the claims.
The present embodiment provides a kind of steel box-girder sliding trailer system, and it includes slide device and draw-gear.Refering to attached Figure, will carry out detailed narration to the present invention below:
The slide device enters line slip for carrying steel box-girder, and it includes two slideways and shift unit.
Wherein, the slideway is laid immediately on end slipway beam using shaped steel and is made, and the model of the shaped steel is excellent Elect 2I45 as;Further, channel-section steel is placed in parallel on shaped steel top surface, plays a part of stopper slot, limiting the shift unit can Mobile position and the shift phenomenon occurred in slipping is reduced, the preferred 28a channel-section steels of the channel-section steel;Further, it is Increase the rigidity of sliding rail, steel plate is laid in channel-section steel, the thickness of the laying steel plate is 2cm, and the preferably steel plate of 16Mn Laid;Another security and steadiness in view of steel box-girder slipping, the installation of the slideway must ensure that top surface is put down Whole, its flatness should be controlled within 2mm.
Wherein, the shift unit is each on two slideways lays two, i.e., in the present embodiment, preferably four displacements Sliding medium of the device as steel box-girder.Further, the shift unit be crawler type heavy body transporting unit 4 (such as Fig. 4), the weight Body transporting unit 4 includes panel 41, riser 42, raceway plate 43, several cylindrical rollers 44 and carrier bar 45;Wherein, the riser 42 Including two pieces be parallel to each other, the lower section of the panel 41 is both secured to;The raceway plate 43 is fixed on two pieces and is parallel to each other Between the riser 42, the preferably transition on raceway plate 43 of the cylindrical roller 44 is easy in the curved design in its two ends;It is described Cylindrical roller 44 is rolled around the raceway plate 43, and carrier bar 45 is hinged between two cylindrical rollers 44 of arbitrary neighborhood, described Carrier bar 45 is end to end to be centered around on the raceway plate 43.Further, the heavy body transporting unit 4 also includes directive wheel 46, The directive wheel 46 is arranged and vertical (the i.e. directive wheel 46 of its wheel direction of principal axis and the cylindrical roller 44 wheel direction of principal axis before and after riser The direction of wheel shaft is parallel with slideway), each heavy body transporting unit 4 has four directive wheels 46, and the laying of the directive wheel 46 is favourable It is parallel before and after it to be provided with beneficial to before holding steel box-girder sliding in preventing body transporting unit from driving steel box-girder to wander off in slipping Capable direction.Preferably, the load-bearing of the heavy body transporting unit 4 is 200T.
The draw-gear is used to provide tractive force for the sliding of steel box-girder, and it is in each traction unit (in the present embodiment It is middle traction unit be steel box girder segment) on be laid with two towing points, mainly serve for ensuring the balance of traction, each towing point is equal Including traction counter-force seat 14, jack 11, draw anchor device 13 and drag-line 12.
The traction counter-force seat 14 is embedded in traction unit, for increasing the lifting surface area in distraction procedure, reduces steel The generation of the problem that the steadiness that box girder segment is caused due to being towed device traction is reduced.
The jack 11 is hydraulic jack, is calculated by engineering practice, and one thousand is laid in each towing point Jin top 11, and the jack 11 is horizontal synchronization continuous jack, if it is capable of achieving steel box girder segment occurring in sliding partially During shifting, the one side (i.e. one of towing point) of steel box girder segment is adjusted, the entirety for realizing steel box girder segment sliding is put down OK.It is by unilateral adjustment, reducing the time used that adjust when shifting, it is not necessary in carrying out to steel box girder segment The adjustment of line alignment, further increases the efficiency of construction, reduces human cost.
The drawing anchor device 13 is laid on steel box girder segment, preferably the vertical and horizontal diaphragm junction (such as Fig. 2) of beam section, its bag Include fixator 131 and p-type anchorage 132;The fixator 131 constitutes (such as Fig. 3) by 5 veneer structures, laying from top to down Respectively rubber slab 1313, steel plate 1312, by fixing component 1311, steel plate 1312, rubber slab 1313;Wherein, the rubber slab 1313 are used for clamping by fixing component 1312, and offer the through hole for the insertion of the drag-line 12 to direction along vertical bridge;The steel Plate 1312 is used to fill the rubber slab 1313 and by the gap between fixing component 1311.The p-type anchorage 132 is arranged on institute State on the another side relative with the side by fixing component 1311 is clamped of rubber slab 1313, for fixed the rubber is run through The end of the drag-line 12 of offset plate 1313.
The drag-line 12 connects jack 11 and draws anchor device 13, is mainly and the p-type anchorage with the connection of anchor device 13 is drawn 132 afterbodys for being hinged on steel box girder segment;Further, the drag-line 12 is steel strand wires, is preferably used in the present embodiment straight Footpath is 15.24mm, and normal intensity is the steel strand wires of 1860Mpa.
Specifically, in the present embodiment, there is provided the example of the draw-gear used in actual condition, it is as follows:, it is known that monolithic Beam (i.e. one section steel box girder segment) most weight is 400.1t, and the friction system for entering line slip using weight shift unit is 0.02 (because of reality Border needs and there is systematic error, is calculated using 0.05 pair of follow-up operating mode), need tractive force 20t;With reference to known work Condition condition, is the balance for ensureing beam section traction, two front haulage points need to be arranged in beam section so that the tractive force of single towing point For 10t, while connect section using the horizontal continuity jack pair single-unit of two 100t being drawn so that the traction of beam section single is slided The stroke of 25cm is realized in shifting.
It is adapted to above-mentioned steel box-girder sliding trailer system, the embodiment of the present invention provides a kind of steel box-girder sliding trailer system Construction method, specifically includes following steps:
A installs the slide device, and the shift unit is laid in into sliding starting point;
Specifically, due to being designed with two slideways in the embodiment of the present invention, the shift unit is adapted to the slideway and has Four;The cloth of the shift unit be set to sliding starting point averagely lay four shift units (will shift unit be divided to two slideways Individually it is preset on the relevant position for supporting steel box girder segment, corresponding to a slideway two shift units, the shift unit is preset That what is laid is smaller than the length of the vertical bridge of steel box girder segment to direction);
B with bank to closure section direction lift at least one steel box girder segment to the shift unit;
Specifically, in this step, steel box girder segment is lifted one by one to shifting from the side of the slide device using crane barge On the device of position, by the load transfer of steel box girder segment to shift unit.
Specifically, the shift unit includes panel, and welding hole is preferably offered on panel, when carrying out to steel box girder segment After lifting, in addition it is also necessary to further carry out being fixedly connected between shift unit to the steel box girder segment using welding hole, it is ensured that Security and steadiness of the steel box girder segment in slipping.
C installs the draw-gear with the single steel box girder segment as traction unit;
D starts jack to drive the steel box girder segment to move to bank, and institute is unloaded afterwards in place in steel box girder segment sliding State shift unit and draw-gear;
Specifically, before the startup jack sliding steel box girder segment, also including step:Debugging slide device and inspection Look into each link position of the sliding trailer system, it is ensured that the construction safety of sliding traction;It is described to be the step of unload shift unit All shift units that come off simultaneously make the load transfer of steel box girder segment on fixed support bracket.
The shift unit for unloading is laid in sliding starting point, repeat step b to d by e again, until completing all steel box-girders The sliding of sections.
In sum, master-plan of the invention is that the cunning for completing steel box-girder translation is made up of slide device and draw-gear Trailer system is moved, slide device includes two slideways and four shift units, steel box-girder is lifted to slide device, adopts thousand Jin top provides tractive force, counter-force seat and drag-line, draws anchor device tractive force to be acted on steel box-girder for sliding, makes steel box-girder longitudinal direction Translation.The tractive force of the present invention is applied on counter-force seat by jack and is realized, is applied within single hour over distance sliding, and Synchronous, continuous traction is capable of achieving, while according to actual slip situation, can be by single towing point in steel box-girder slipping Skew be adjusted.
Only it is some embodiments of the present invention described in upper, it is noted that for those skilled in the art For, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should be regarded For protection scope of the present invention.

Claims (12)

1. a kind of steel box-girder sliding trailer system, it is characterised in that include for carrying the sliding that steel box girder segment enters line slip Device and the draw-gear for providing tractive force for the sliding of steel box girder segment;
The slide device is included along bridge to two slideways of laying and the shift unit being laid on the slideway;
The draw-gear is laid with two towing points in each traction unit, and each towing point includes being embedded in traction list Traction counter-force seat on position, it is laid in drawing anchor device, being hinged on the drag-line of traction unit and connect with the drag-line for traction unit The jack for connecing.
2. steel box-girder sliding trailer system according to claim 1, it is characterised in that the slideway adopts section steel manufacture, And the shaped steel top surface is placed in parallel laid inside and has the channel-section steel of steel plate.
3. steel box-girder sliding trailer system according to claim 1, it is characterised in that the shift unit is in two cunnings It is each on road to lay two.
4. steel box-girder sliding trailer system according to claim 1, it is characterised in that the shift unit is crawler type weight Body transporting unit.
5. steel box-girder sliding trailer system according to claim 4, it is characterised in that the crawler type heavy body transporting unit bag Include panel, two pieces of risers being parallel to each other being fixed on below the panel, the raceway plate being fixed between the riser and Around the cylindrical roller that the raceway plate is rolled;The raceway plate two ends are curved;Two cylindrical rollers of the arbitrary neighborhood it Between be hinged with carrier bar, the carrier bar is end to end to be centered around on the raceway plate.
6. steel box-girder sliding trailer system according to claim 5, it is characterised in that be provided with before and after each riser Directive wheel;The directive wheel wheel direction of principal axis is vertical with the cylindrical roller wheel direction of principal axis.
7. steel box-girder sliding trailer system according to claim 1, it is characterised in that the drawing anchor device include fixator with And p-type anchorage;Fixator includes clamping by the rubber slab of fixing component and fills the rubber slab and by between fixing component The steel plate in gap;The rubber slab offers the through hole for the drag-line insertion along vertical bridge to direction;The p-type anchorage is arranged on On the rubber slab another side relative with the side by fixing component is clamped, the rubber slab is penetrated with fixation The end of drag-line.
8. steel box-girder sliding trailer system according to claim 1, it is characterised in that the drag-line is steel strand wires.
9. a kind of construction method of steel box-girder sliding trailer system, it is characterised in that the sliding trailer system is using such as right The steel box-girder sliding trailer system described in 1 is required, the construction method of the sliding trailer system is comprised the following steps:
A installs the slide device, and the shift unit is laid in into sliding starting point;
B with bank to closure section direction lift at least one steel box girder segment to the shift unit;
C installs the draw-gear with the single steel box girder segment as traction unit;
D starts jack to drive the steel box girder segment to move to bank, and the shifting is unloaded afterwards in place in steel box girder segment sliding Position device and draw-gear;
The shift unit for unloading is laid in sliding starting point, repeat step b to d by e again, until completing all steel box girder segments Sliding.
10. the construction method of steel box-girder sliding trailer system according to claim 9, it is characterised in that step a In, averagely lay four shift units in sliding starting point.
The construction method of 11. steel box-girder sliding trailer systems according to claim 9, it is characterised in that adopt in step b Side crane steel loading box girder segment of the crane barge from the slide device.
The construction method of 12. steel box-girder sliding trailer systems according to claim 9, it is characterised in that unload in step d The step of shift unit is:All shift units that come off simultaneously make the load transfer of steel box girder segment to fixed support bracket On.
CN201611239080.1A 2016-12-28 2016-12-28 Steel box girder slide traction system and construction method thereof Pending CN106592439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611239080.1A CN106592439A (en) 2016-12-28 2016-12-28 Steel box girder slide traction system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611239080.1A CN106592439A (en) 2016-12-28 2016-12-28 Steel box girder slide traction system and construction method thereof

Publications (1)

Publication Number Publication Date
CN106592439A true CN106592439A (en) 2017-04-26

Family

ID=58604886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611239080.1A Pending CN106592439A (en) 2016-12-28 2016-12-28 Steel box girder slide traction system and construction method thereof

Country Status (1)

Country Link
CN (1) CN106592439A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886246A (en) * 2019-12-18 2020-03-17 无锡圣丰建筑新材料有限公司 Hole site deviation replacing device for shock insulation support
CN111926715A (en) * 2020-08-20 2020-11-13 中交路桥华南工程有限公司 Installation method of steel box girder bridge
CN113065183A (en) * 2021-03-01 2021-07-02 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463589A (en) * 2008-12-25 2009-06-24 路桥华南工程有限公司 Adjustable slipper block for jacking complicated vertical camber beam and method for producing the same
CN101736699A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Accurate positioning method of sliding of full-support frame steel box girder
CN101818481A (en) * 2010-06-04 2010-09-01 北京城建道桥建设集团有限公司 Device for performing incremental launching construction on bridge by using multi-roller sliding ways and construction method thereof
KR20120071232A (en) * 2010-12-22 2012-07-02 진승영 Construction method for bridge using temporary binder
KR20130141276A (en) * 2012-06-15 2013-12-26 주식회사 서영엔지니어링 Incremental launching apparatus for launching concrete slab for composite bridge using form of buried type
CN103498420A (en) * 2013-10-18 2014-01-08 中交一公局厦门工程有限公司 Large-scale steel box beam ashore construction method
CN203498755U (en) * 2013-08-12 2014-03-26 中交第二航务工程局有限公司 Longitudinal sliding, traction and support device for steel box girder placed on bracket
CN103669216A (en) * 2013-11-21 2014-03-26 中建三局建设工程股份有限公司 Steel box girder scattered-splicing sliding device and installation method
CN204199186U (en) * 2014-09-05 2015-03-11 中铁建大桥工程局集团第一工程有限公司 Beam body draws anchor device
CN204676433U (en) * 2015-05-22 2015-09-30 福建省工业设备安装有限公司 The Hydraulic Deviation-correcting Device of steel box-girder traction slippage
CN206319261U (en) * 2016-12-28 2017-07-11 中交路桥华南工程有限公司 Steel box-girder slides trailer system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463589A (en) * 2008-12-25 2009-06-24 路桥华南工程有限公司 Adjustable slipper block for jacking complicated vertical camber beam and method for producing the same
CN101736699A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Accurate positioning method of sliding of full-support frame steel box girder
CN101818481A (en) * 2010-06-04 2010-09-01 北京城建道桥建设集团有限公司 Device for performing incremental launching construction on bridge by using multi-roller sliding ways and construction method thereof
KR20120071232A (en) * 2010-12-22 2012-07-02 진승영 Construction method for bridge using temporary binder
KR20130141276A (en) * 2012-06-15 2013-12-26 주식회사 서영엔지니어링 Incremental launching apparatus for launching concrete slab for composite bridge using form of buried type
CN203498755U (en) * 2013-08-12 2014-03-26 中交第二航务工程局有限公司 Longitudinal sliding, traction and support device for steel box girder placed on bracket
CN103498420A (en) * 2013-10-18 2014-01-08 中交一公局厦门工程有限公司 Large-scale steel box beam ashore construction method
CN103669216A (en) * 2013-11-21 2014-03-26 中建三局建设工程股份有限公司 Steel box girder scattered-splicing sliding device and installation method
CN204199186U (en) * 2014-09-05 2015-03-11 中铁建大桥工程局集团第一工程有限公司 Beam body draws anchor device
CN204676433U (en) * 2015-05-22 2015-09-30 福建省工业设备安装有限公司 The Hydraulic Deviation-correcting Device of steel box-girder traction slippage
CN206319261U (en) * 2016-12-28 2017-07-11 中交路桥华南工程有限公司 Steel box-girder slides trailer system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886246A (en) * 2019-12-18 2020-03-17 无锡圣丰建筑新材料有限公司 Hole site deviation replacing device for shock insulation support
CN110886246B (en) * 2019-12-18 2024-04-26 无锡圣丰建筑新材料有限公司 Hole position deviation device is changed to shock insulation support
CN111926715A (en) * 2020-08-20 2020-11-13 中交路桥华南工程有限公司 Installation method of steel box girder bridge
CN111926715B (en) * 2020-08-20 2022-04-08 中交路桥华南工程有限公司 Installation method of steel box girder bridge
CN113065183A (en) * 2021-03-01 2021-07-02 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme
CN113065183B (en) * 2021-03-01 2022-05-17 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme

Similar Documents

Publication Publication Date Title
CN105274942B (en) Large-span continuous steel truss girder Multipoint synchronous automatic cycle replaces piston shoes pushing tow system and its construction method
CN106592439A (en) Steel box girder slide traction system and construction method thereof
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN106592441A (en) Mounting method of stayed cable of cable-stayed bridge
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN107842648A (en) A kind of long distance pipeline steep slope region stringing mechanism
CN105780660A (en) Segmental assembling box girder construction technology
CN102367650A (en) Construction method of steel pipe arch bridge
CN101446066A (en) Erection method of stiffening girder of suspension bridge and device thereof
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN106400693B (en) A kind of ramp steel box-girder beam car and fortune beam method
CN207554961U (en) A kind of long distance pipeline steep slope region stringing mechanism
CN102587293B (en) System and method for cradle cantilever construction of variable-width section concrete girder
CN102849470A (en) Shipping method for steel box girder section
CN206319261U (en) Steel box-girder slides trailer system
CN207987749U (en) Ride cable-styled erection crane
CN102071641B (en) Cement beam packs bridge machine cloth supporting leg type integration of transporting and building Bridge Erector and bridge formation engineering method thereof
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN108004930A (en) The construction method of vertical shift bowstring arch bridge
CN108086168A (en) Ride cable-styled erection crane
CN117552831A (en) Transport trolley, steel pipe transport system in inclined shaft tunnel and construction method
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN103061262B (en) A kind of deck erection gantry and application process thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426