CN106569101B - Three-phase IT system insulation performance online test method - Google Patents

Three-phase IT system insulation performance online test method Download PDF

Info

Publication number
CN106569101B
CN106569101B CN201610891868.4A CN201610891868A CN106569101B CN 106569101 B CN106569101 B CN 106569101B CN 201610891868 A CN201610891868 A CN 201610891868A CN 106569101 B CN106569101 B CN 106569101B
Authority
CN
China
Prior art keywords
phase line
ground
burst pulse
pulse voltage
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610891868.4A
Other languages
Chinese (zh)
Other versions
CN106569101A (en
Inventor
凌云
肖伸平
王兵
文定都
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baise Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Hunan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Technology filed Critical Hunan University of Technology
Priority to CN201610891868.4A priority Critical patent/CN106569101B/en
Publication of CN106569101A publication Critical patent/CN106569101A/en
Application granted granted Critical
Publication of CN106569101B publication Critical patent/CN106569101B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

A kind of three-phase IT system insulation performance online test method, by the device realization for including controller unit, insulating signal sampling unit, voltage sampling unit.Voltage sampling unit, insulating signal sampling unit are respectively used to obtain monitoring burst pulse voltage signal, over the ground burst pulse voltage signal and send to controller unit;Insulating signal sampling unit has the first sample of signal branch including the first electronic switch, the second signal sampling slip including the second electronic switch, third sample of signal branch and sample resistance including third electronic switch;Burst pulse voltage signal controls the first electronic switch, the second electronic switch, third electronic switch by controller unit and opens acquisition over the ground.The insulation performance on-line monitoring to three-phase three-wire system exchange IT system can be realized without injecting additional independent signal in the method;The respective insulation against ground resistance value of 3 buses can be accurately calculated, in addition to it can monitor short trouble, additionally it is possible to judge the degree of bus insulation deterioration.

Description

Three-phase IT system insulation performance online test method
Technical field
The present invention relates to a kind of circuit system insulated monitoring method, especially a kind of three-phase IT system insulation performance is examined online Survey method.
Background technique
When the loads such as mine, field medical vehicle, ship are powered, it is desirable that the high reliablity of power supply, safety is good, using IT system System power supply is a kind of selection well.IT system occurs that fault current is small when first time failure, and electrical equipment metal shell will not The contact voltage of risk is generated, therefore can not be cut off the power, continues to run electrical equipment, but need to its power quality And insulation performance carries out on-line monitoring and is informed by warning device, checks eliminate failure in time.
In current IT system insulated on-line monitoring, the detection method based on Injection Signal is widely used, is infused by acquisition When entering signal the voltage of sampling resistor perhaps the electric current in IT system phase line when IT system shorted to earth or insulation degradation, Fault signature in the decline of its insulation against ground resistance, voltage when Injection Signal on sampling resistor or the electric current in IT system phase line Amount increases severely, and can be judged accordingly.When using injecting signal monitoring IT system insulation, what it is regardless of injection is direct current signal, list Frequency AC signal or double frequency AC signal require corresponding independent signal source, system complex;And the electricity in independent signal source It is pressed with valid value and does not allow more than 50V, the judgement and failure line selection positioning belt to fault characteristic value come difficult.
Summary of the invention
In order to solve the problems, such as IT system insulated on-line monitoring, the present invention provides a kind of insulation of three-phase IT system Performance online detection method is realized by insulation performance on-line measuring device.
Described device will monitor burst pulse voltage-drop loading on the circuit between phase line through protecting field formation, be formed corresponding Burst pulse voltage over the ground;Described device measurement simultaneously carries out exhausted according to monitoring burst pulse voltage and corresponding burst pulse voltage over the ground The detection of edge performance online.
The monitoring burst pulse voltage is to load the line voltage of the three-phase IT system with pulse conduction mode to be formed.Institute It states line voltage and realization is opened by electronic switch pulsed with the load of pulse conduction mode.
It is the zero crossing of three-phase IT system line voltage at the time of the electronic switch pulsed is opened.
The monitoring burst pulse voltage and corresponding at least 3 groups of burst pulse voltage over the ground.
The insulation performance on-line measuring device includes controller unit, insulating signal sampling unit, voltage sampling unit; The insulating signal sampling unit include the first sample of signal branch, second signal sampling slip, third sample of signal branch with And sample resistance;First sample of signal branch includes the first electronic switch being connected in series, the first current-limiting resistance, and second signal takes Sample branch includes the second electronic switch being connected in series, the second current-limiting resistance, and third sample of signal branch includes being connected in series Third electronic switch, third current-limiting resistance;One end of first sample of signal branch is connected to the phase line A of three-phase alternating current IT system, One end of second signal sampling slip is connected to the phase line B of three-phase alternating current IT system, one end connection of third sample of signal branch To the phase line C of three-phase alternating current IT system;Other the one of the other end of first sample of signal branch, second signal sampling slip The one end at end, the other end of third sample of signal branch and sample resistance connects, and the other end of sample resistance is connected to guarantor Shield ground.
The voltage of burst pulse over the ground of the three-phase alternating current IT system includes that burst pulse voltage, phase line B are narrow over the ground over the ground by phase line A Pulse voltage, phase line C burst pulse voltage over the ground, the first electronic switch, the second electronic switch, are controlled by controller unit respectively Three electronic switches open acquisition.
The specific steps of the three-phase IT system insulation performance online test method include:
Step 1, sampling obtain phase line A burst pulse voltage and corresponding monitoring burst pulse voltage, phase line B narrow arteries and veins over the ground over the ground Rush voltage and corresponding monitoring burst pulse voltage, phase line C burst pulse voltage and corresponding monitoring burst pulse voltage over the ground;
Step 2, simultaneous phase line A over the ground burst pulse voltage and it is corresponding monitoring burst pulse voltage between relationship expression Formula, phase line B burst pulse voltage and relational expression, phase line C narrow arteries and veins over the ground between corresponding monitoring burst pulse voltage over the ground Rush voltage and relational expression and composition equation group between corresponding monitoring burst pulse voltage;
Step 3, solving equations seek phase line A insulation against ground resistance value, phase line B insulation against ground resistance value, phase line C over the ground Insulating resistance value;
Step 4, result treatment, return to step 1.
Burst pulse voltage may include that burst pulse voltage, phase line A second be over the ground over the ground by phase line A first to the phase line A over the ground Burst pulse voltage, by controller unit control the first electronic switch respectively between phase line B and phase line C line voltage zero passage, phase line A with Acquisition is opened between phase line B when line voltage zero passage;Burst pulse voltage may include the narrow arteries and veins over the ground of phase line B first to the phase line B over the ground Voltage, phase line B second burst pulse voltage over the ground are rushed, the second electronic switch is controlled respectively in phase line C and phase line A by controller unit Between open acquisition when line voltage zero passage between line voltage zero passage, phase line B and phase line C;Burst pulse voltage can wrap the phase line C over the ground Burst pulse voltage, phase line C second the burst pulse voltage over the ground over the ground of phase line C first is included, third electronic cutting is controlled by controller unit Acquisition is opened when line voltage zero passage between line voltage zero passage, phase line C and phase line A between phase line A and phase line B respectively in pass.It is described at this time The specific steps of three-phase IT system insulation performance online test method include:
Step 1: sampling obtains burst pulse voltage signal over the ground and monitoring burst pulse voltage signal;
Step 2: being judged according to burst pulse voltage signal over the ground, if the insulation against ground of phase line A, phase line B, phase line C It is normal, then return to step 1;
Step 3: being judged according to burst pulse voltage signal over the ground, if a phase in phase line A, phase line B, phase line C Line shorted to earth, then arrive step 6;
Step 4: being judged judge whether phase line A, phase line B, phase line C are right respectively according to burst pulse voltage signal over the ground Ground defective insulation;
Step 5: calculate 1 phase line insulation against ground it is bad when the phase line insulation against ground resistance value, or calculate 2 phases 2 phase lines respective insulation against ground resistance value when line insulation against ground is bad, or calculate 3 phase line insulation against ground it is bad when should The respective insulation against ground resistance value of 3 phase lines;
Step 6: result treatment, returns to step 1.
The three-phase alternating current IT system insulation performance on-line measuring device can also include alarm unit, human-computer interaction list Member, a unit or multiple units in verification unit.
The beneficial effects of the present invention are: (1) can be realized without injecting additional independent signal and exchange IT to three-phase three-wire system The insulation performance of system is monitored on-line;(2) monitoring signals are direct current burst pulse voltage, can eliminate phase line direct-to-ground capacitance to insulation The influence of electrical resistance monitoring;(3) the three-phase three-wire system exchange respective insulation against ground resistance of 3 phase lines of IT system can accurately be calculated Value, in addition to it can monitor short trouble, additionally it is possible to judge the degree of phase line insulation degradation.
Detailed description of the invention
Fig. 1 is insulation performance on-line measuring device embodiment composition block diagram;
Fig. 2 is insulating signal sampling unit embodiment circuit diagram;
Fig. 3 is equivalent circuit diagram when the first electronic switch of insulating signal sampling unit embodiment is opened;
Fig. 4 is equivalent circuit diagram when the second electronic switch of insulating signal sampling unit embodiment is opened;
Fig. 5 is equivalent circuit diagram when insulating signal sampling unit embodiment third electronic switch is opened;
Fig. 6 burst pulse voltage signal schematic diagram for phase line alternating voltage waveform and over the ground.
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described.
It is as shown in Figure 1 insulation performance on-line measuring device embodiment composition block diagram.Fig. 1 embodiment includes controller unit 100, insulating signal sampling unit 200, voltage sampling unit 300, verification unit 400, alarm unit 500, man-machine interaction unit 600.A, B, C are respectively the phase line A, phase line B, phase line C of three-phase alternating current IT system, and three-phase alternating current IT system is the not neutral conductor Three-wire system;PE is the protection conductor or protecting field of IT system.
It is illustrated in figure 2 insulating signal sampling unit embodiment circuit diagram, including the first electronic switch M1, the second electricity Sub switch M2, third electronic switch M3, the first current-limiting resistance RE1, the second current-limiting resistance RE2, third current-limiting resistance RE3, sampling electricity Hinder RS, first diode D1, the second diode D2, third diode D3, the 4th diode D4, the 5th diode D5, the six or two Pole pipe D6;First electronic switch M1, the first current-limiting resistance RE1, first diode D1, the 4th diode D4 form the first signal take Sample branch, the second electronic switch M2, the second current-limiting resistance RE2, the second diode D2, the 5th diode D5 composition second signal take Sample branch, third electronic switch M3, third current-limiting resistance RE3, third diode D3, the 6th diode D6 composition third signal take Sample branch.In Fig. 2, RF1、RF2、RF3The insulation against ground resistance of respectively phase line A, phase line B, phase line C;K1, K2, K3 are respectively The control signal of one electronic switch M1, the second electronic switch M2, third electronic switch M3, K1, K2, K3 come from controller unit. First electronic switch, the second electronic switch, third electronic switch are full-control type electronic switch, and in Fig. 2 embodiment, M1, M2, M3 are adopted With triode type photoelectrical coupler.First electronic switch, the second electronic switch, third electronic switch can also with DC solid after Electric appliance or other full-control type electronic switches are replaced.
In Fig. 2 embodiment, the 4th diode D4, the 5th diode D5, the 6th diode D6 are connected in reverse parallel in first respectively Electronic switch M1, the second electronic switch M2, on third electronic switch M3, make it from excessively high backward voltage;When the first electronics Where switch, the second electronic switch, third electronic switch are able to bear when the backward voltage of circuit, the 4th diode, the five or two Pole pipe, the 6th diode are not necessarily.
Described device will monitor burst pulse voltage-drop loading on the circuit between phase line through protecting field formation, and measurement is corresponding Burst pulse voltage over the ground;Insulation performance is carried out according to monitoring burst pulse voltage and corresponding burst pulse voltage over the ground to examine online It surveys;Monitoring burst pulse voltage loads to be formed by one of the line voltage pulsed controlled between three-phase IT system phase line.First electricity Sub switch, the second electronic switch, third electronic switch are the short time, pulsed open-minded, and are only controlled every time therein One is opened and is connected.First electronic switch can control it is open-minded when phase line A current potential is optionally greater than protecting field PE current potential, at this time Electric current on first electronic switch can only flow to protecting field PE from phase line A, or be controlled at phase line A current potential lower than protecting field PE Open-minded when current potential, the electric current on the first electronic switch can only flow to phase line A from protecting field PE at this time;Similarly, the second electronic cutting Pass can control phase line B current potential be higher than protecting field PE current potential when it is open-minded, the electric current on the second electronic switch can only be from phase at this time Line B flows to protecting field PE, or while being controlled at phase line B current potential lower than protecting field PE current potential is open-minded, at this time the second electronic switch On electric current phase line B can only be flowed to from protecting field PE;Third electronic switch, which can control, is higher than protecting field PE electricity in phase line C current potential Position Shi Kaitong, the electric current on third electronic switch can only flow to protecting field PE from phase line C at this time, or be controlled at phase line C electricity Open-minded when position is lower than protecting field PE current potential, the electric current on third electronic switch can only flow to phase line C from protecting field PE at this time.Due to Protecting field PE current potential is related to A, B, C triphasic potential and its insulation against ground, therefore, when certain phase line current potential is greater than in addition When two phase line current potentials, which is optionally greater than protecting field PE current potential certainly;Either be lower than when certain phase line current potential or When equal to other two phase line current potentials, which is lower than certainly equal to protecting field PE current potential.
In Fig. 2 embodiment, first diode D1 makes the electric current of the first electronic switch M1 that can only flow to protecting field from phase line A PE, the second diode D2 make the second electronic switch M2 electric current that can only flow to protecting field PE from phase line B, and third diode D3 makes third Electronic switch M3 electric current can only flow to protecting field PE from phase line C;When the first electronic switch, the second electronic switch, third electronic cutting Closing has one-way conduction performance and when without in parallel 4th diode, the 5th diode, six diodes, first diode, the Two diodes, third diode are not necessarily.
By first diode D1, the second diode D2, third diode D3, the 4th diode D4, in Fig. 2 embodiment Part Opposite direction connection in five diode D5, the 6th diode D6, the first electronic switch M1, the second electronic switch M2, third electricity Part Opposite direction connection in the current direction of sub switch M3, then the electric current of M1, M2, M3 partially can only flow to phase from protecting field PE The slave phase line of line, rest part flows to protecting field PE.When by first diode D1, the second diode D2, in Fig. 2 embodiment Three diode D3, the 4th diode D4, the 5th diode D5, the 6th diode D6 whole Opposite direction connection, the first electronic switch M1, The current direction whole Opposite direction connection of second electronic switch M2, third electronic switch M3, then first diode D1 makes the first electronics The electric current of switch M1 can only flow to phase line A from protecting field PE, and the second diode D2 makes the second electronic switch M2 electric current can only be from guarantor Shield ground PE flows to phase line B, and third diode D3 makes third electronic switch M3 electric current that can only flow to phase line C from protecting field PE.
It is illustrated in figure 3 equivalent circuit diagram when insulating signal sampling unit the first electronic switch of embodiment is opened, phase line A Burst pulse voltage U over the ground1Acquisition is opened by controller unit control M1.When opening M1 in Fig. 3, phase line A current potential should be higher than that protection Ground PE current potential.3 line voltage U of Fig. 3AB、UBC、UACIn only 2 be it is independent, use 2 monitorings burst pulse voltage therein ?.Enable the U in Fig. 3ABFor UAB4, UBCFor UBC4, and enable RE1=RE, there is R4=RE1+RS=RE+RS.Have at this time
It is illustrated in figure 4 equivalent circuit diagram when insulating signal sampling unit the second electronic switch of embodiment is opened, phase line B Burst pulse voltage U over the ground2Acquisition is opened by controller unit control M2.When opening M2 in Fig. 4, phase line B current potential should be higher than that protection Ground PE current potential.3 line voltage U of Fig. 4BC、UCA、UBAIn only 2 be it is independent, use 2 monitorings burst pulse voltage therein ?.Enable the U in Fig. 4BCFor UBC5, UCAFor UCA5, and enable RE2=RE, there is R4=RE2+RS=RE+RS.Have at this time
It is illustrated in figure 5 equivalent circuit diagram when insulating signal sampling unit embodiment third electronic switch is opened, phase line C Burst pulse voltage U over the ground3Acquisition is opened by controller unit control M3.When opening M3 in Fig. 5, phase line C current potential should be higher than that protection Ground PE current potential.3 line voltage U of Fig. 5CA、UAB、UCBIn only 2 be it is independent, use 2 monitorings burst pulse voltage therein ?.Enable the U in Fig. 5CAFor UCA6, UABFor UAB6, and enable RE3=RE, there is R4=RE3+RS=RE+RS.Have at this time
Formula (1), formula (2), in formula (3), only RF1、RF2、RF3For unknown quantity, when measuring the first electronic switch respectively and opening Monitoring burst pulse voltage UAB4、UBC4With phase line A burst pulse voltage U over the ground1, monitoring burst pulse when the second electronic switch is opened Voltage UBC5、UCA5With phase line B burst pulse voltage U over the ground2, monitoring burst pulse voltage U when third electronic switch is openedCA6、UAB6 With phase line C burst pulse voltage U over the ground3, joint type (1), formula (2), formula (3) can calculate RF1、RF2、RF3, the specific step of calculating Suddenly include:
Step 1, sampling obtain phase line A burst pulse voltage and corresponding monitoring burst pulse voltage, phase line B narrow arteries and veins over the ground over the ground Rush voltage and corresponding monitoring burst pulse voltage, phase line C burst pulse voltage and corresponding monitoring burst pulse voltage over the ground;
Step 2, simultaneous phase line A over the ground burst pulse voltage and it is corresponding monitoring burst pulse voltage between relationship expression Formula, phase line B burst pulse voltage and relational expression, phase line C narrow arteries and veins over the ground between corresponding monitoring burst pulse voltage over the ground Rush voltage and relational expression and composition equation group between corresponding monitoring burst pulse voltage;
Step 3, solving equations seek phase line A insulation against ground resistance value, phase line B insulation against ground resistance value, phase line C over the ground Insulating resistance value;
Step 4, display result and alert process, return to step 1.
In formula (1), as selection UBC4=0, the U i.e. in Fig. 3BC=0 either UAB4=0, the U i.e. in Fig. 3ABWhen=0 Opening M1 can simplify expression formula, offer convenience to calculating, UBC=0, UABIt is narrow over the ground that the phase line A that M1 is obtained is opened when=0 respectively Pulse voltage U1It is expressed as the burst pulse voltage U over the ground of phase line A first11, the burst pulse voltage U over the ground of phase line A second12.Formula (2), formula (3) is same, is the zero crossing of three-phase IT system line voltage at the time of electronic switch pulsed is opened, in Fig. 4 UCA=0, UBCPhase line B that M2 is obtained burst pulse voltage U over the ground is opened when=0 respectively2It is narrow over the ground to be expressed as phase line B first Pulse voltage U21, the burst pulse voltage U over the ground of phase line A second22;U in Fig. 5AB=0, UCAOpen what M3 was obtained when=0 respectively Phase line C burst pulse voltage U over the ground3It is expressed as the burst pulse voltage U over the ground of phase line C first31, the burst pulse over the ground of phase line A second Voltage U32
In Fig. 3, the burst pulse voltage U over the ground of phase line A first11By controller unit control M1 in UBCAcquisition is opened when=0, If loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UAB1, i.e. U in Fig. 3AB, U11 For the U in Fig. 3 at this time1;The burst pulse voltage U over the ground of phase line A second12, by controller unit control M1 in UAC=0 or UAB=0 Shi Kaitong is obtained, if loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UAB3Or UBC2, i.e. U in Fig. 3ABOr UBC, U12For the U in Fig. 3 at this time1.Select UBC=0 or UAC=0 or UABThe zero passages such as=0 When point opens M1, the zero crossing phase line A current potential of selection should be higher than that protecting field PE current potential, M1 electric current flow to protecting field PE from phase line A.
In Fig. 4, the burst pulse voltage U over the ground of phase line B first21By controller unit control M2 in UCAAcquisition is opened when=0, If loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UBC1, i.e. U in Fig. 4BC, U21 For the U in Fig. 4 at this time2;The burst pulse voltage U over the ground of phase line B second22, by controller unit control M2 in UBA=0 or UBC=0 Shi Kaitong is obtained, if loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UBC3Or UCA2, i.e. U in Fig. 4BCOr UCA, U22For the U in Fig. 4 at this time2.Select UCA=0 or UBA=0 or UBCThe zero passages such as=0 When point opens M2, the zero crossing phase line B current potential of selection should be higher than that protecting field PE current potential, M2 electric current flow to protecting field PE from phase line B.
In Fig. 5, the burst pulse voltage U over the ground of phase line C first31By controller unit control M3 in UABAcquisition is opened when=0, If loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UCA1, i.e. U in Fig. 5CA, U31 For the U in Fig. 5 at this time3;The burst pulse voltage U over the ground of phase line C second32, by controller unit control M3 in UCB=0 or UCA=0 Shi Kaitong is obtained, if loading the monitoring burst pulse voltage on the circuit formed between phase line, by PE at this time is UCA3Or UAB2, i.e. U in Fig. 5CAOr UAB, U32For the U in Fig. 5 at this time3.Select UAB=0 or UCB=0 or UCAThe zero passages such as=0 When point opens M3, the zero crossing phase line C current potential of selection should be higher than that protecting field PE current potential, M3 electric current flow to protecting field PE from phase line C.
Under the different conditions of system, burst pulse is electric over the ground by the phase line A first that measurement obtains when M1, M2, M3 are opened respectively Press U11, the burst pulse voltage U over the ground of phase line A second12, the burst pulse voltage U over the ground of phase line B first21, the burst pulse over the ground of phase line B second Voltage U22, the burst pulse voltage U over the ground of phase line C first31, the burst pulse voltage U over the ground of phase line C second32It is shown in Table 1.
Table 1
Fig. 6 show phase line alternating voltage waveform and over the ground burst pulse voltage signal schematic diagram.In Fig. 6, UAB、UBC、UCAFor Phase line A, phase line B, the line voltage between phase line C, pulse 1, pulse 2, pulse 3, pulse 4, pulse 5, moment point shown in pulse 6 It Wei not the burst pulse voltage U over the ground of phase line A first11, the burst pulse voltage U over the ground of phase line A second12, the burst pulse over the ground of phase line B first Voltage U21, the burst pulse voltage U over the ground of phase line B second22, the burst pulse voltage U over the ground of phase line C first31, the narrow arteries and veins over the ground of phase line C second Rush voltage U32The measurement moment.
The burst pulse voltage U over the ground of phase line A first11, the burst pulse voltage U over the ground of phase line A second12It is measured when M1 is opened It arrives, in table 1, U11For UBCResulting U is measured when=01Value, U21For UABResulting U is measured when=01Value.
When A, B, C insulation against ground are normal, RF1、RF2、RF3Numerical value it is very big, therefore, either in UBCInstitute is measured when=0 The U obtained11Value, or in UABResulting U is measured when=012Value, is equal to or is close to 0 value.
When A shorted to earth, the current potential of protecting field PE is equal to A phase current potential, therefore, either in UBCGained is measured when=0 U11Value, or in UABResulting U is measured when=012Value, is equal to or is close to 0 value.
When B shorted to earth, the current potential of protecting field PE is equal to B phase current potential, therefore, in UBCU is measured when=01, there is U11≈ UAB1;In UABU is measured when=01, there is U12≈0。
When C shorted to earth, the current potential of protecting field PE is equal to C phase current potential, therefore, in UBCU is measured when=01, there is U11≈ UAB1;In UABU is measured when=01, there is U12≈UBC2
When only A insulation against ground is bad, RF2、RF3Numerical value it is very big, RF1For the undesirable resistance value of A insulation against ground, because This, in UBCResulting U is measured when=011Value is R4With RF1In parallel and RF2With RF3To monitoring burst pulse voltage U after parallel connectionAB1Point Pressure value is close to 0 value;In UABResulting U is measured when=012Value is R4、RF1、RF2After parallel connection and RF3To monitoring burst pulse voltage UBC2Partial pressure value, be close to 0 value.
When only B insulation against ground is bad, RF1、RF3Numerical value it is very big, RF2For the undesirable resistance value of B insulation against ground, because This, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse voltage at this time after parallel connection UAB1Partial pressure value, be close to R4And RF2To U at this timeAB1Partial pressure value;In UABResulting U is measured when=012Value is R4、RF1、RF2 After parallel connection and RF3To monitoring burst pulse voltage U at this timeBC2Partial pressure value, be close to 0 value.
When only C insulation against ground is bad, RF1、RF2Numerical value it is very big, RF3For the undesirable resistance value of C insulation against ground, because This, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse voltage at this time after parallel connection UAB1Partial pressure value, be close to R4And RF3To U at this timeAB1Partial pressure value;In UABResulting U is measured when=012Value is R4、RF1、RF2 After parallel connection and RF3To monitoring burst pulse voltage U at this timeBC2Partial pressure value, be close to R4And RF3To U at this timeBC2Partial pressure value.
When having A, B insulation against ground bad, RF3Numerical value it is very big, RF1、RF2The respectively undesirable resistance of A, B insulation against ground Value, therefore, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse at this time after parallel connection Voltage UAB1Partial pressure value, be close to R4With RF1After parallel connection and RF2To U at this timeAB1Partial pressure value;In UABIt is measured when=0 resulting U12Value is R4、RF1、RF2After parallel connection and RF3To monitoring burst pulse voltage U at this timeBC2Partial pressure value, be close to 0 value.
When having B, C insulation against ground bad, RF1Numerical value it is very big, RF2、RF3The respectively undesirable resistance of B, C insulation against ground Value, therefore, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse at this time after parallel connection Voltage UAB1Partial pressure value, be close to R4And RF2With RF3To U at this time after parallel connectionAB1Partial pressure value;In UABIt is measured when=0 resulting U12Value is R4、RF1、RF2After parallel connection and RF3To monitoring burst pulse voltage U at this timeBC2Partial pressure value, be close to R4With RF2After parallel connection and RF3To U at this timeBC2Partial pressure value.
When having C, A insulation against ground bad, RF2Numerical value it is very big, RF1、RF3The respectively undesirable resistance of A, C insulation against ground Value, therefore, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse at this time after parallel connection Voltage UAB1Partial pressure value, be close to R4With RF1After parallel connection and RF3To U at this timeAB1Partial pressure value;In UABIt is measured when=0 resulting U12Value is R4、RF1、RF2After parallel connection and RF3To monitoring burst pulse voltage U at this timeBC2Partial pressure value, be close to R4、RF1After parallel connection and RF3To U at this timeBC2Partial pressure value.
When the equal insulation against ground of A, B, C is bad, RF1、RF2、RF3The respectively undesirable resistance value of A, B, C insulation against ground, because This, in UBCResulting U is measured when=011Value is R4With RF1After parallel connection and RF2With RF3To monitoring burst pulse voltage at this time after parallel connection UAB1Partial pressure value;In UABResulting U is measured when=012Value is R4、RF1、RF2After parallel connection and RF3To monitoring burst pulse voltage at this time UBC2Partial pressure value.
The burst pulse voltage U over the ground of phase line B first21, the burst pulse voltage U over the ground of phase line B second22It is measured when M2 is opened It arrives, in table 1, U21For UCAResulting U is measured when=02Value, U22For UBCResulting U is measured when=02Value.Phase line C first is narrow over the ground Pulse voltage U31, the burst pulse voltage U over the ground of phase line C second32When M3 is opened, measurement is obtained, in table 1, U31For UABIt is measured when=0 Resulting U3Value, U32For UCAResulting U is measured when=03Value.U21、U22Measurement method and U31、U32Measurement method and U11、U12Measurement method it is identical, measurement result is shown in Table 1.
1 data of table are observed it may be concluded that working as U11、U12、U21、U22、U31、U32When being nearly equal to 0, phase line A, phase line B, the insulation against ground of phase line C is normal;Work as U11≈UAB1、U12When ≈ 0, phase line B shorted to earth;Work as U21≈UBC1、U22When ≈ 0, phase Line C shorted to earth;Work as U31≈UCA、U32When ≈ 0, phase line A shorted to earth.
Work as U11Value be UAB1Partial pressure value, i.e. 0 < U11<UAB1, and U12When ≈ 0, phase line B insulation against ground is bad;Work as U21's Value is UBC1Partial pressure value, i.e. 0 < U21<UBC1, and U22When ≈ 0, phase line C insulation against ground is bad;Work as U31Value be UCA1Partial pressure Value, i.e. 0 < U31<UCA1, and U32When ≈ 0, phase line A insulation against ground is bad.
If above-mentioned condition is not satisfied, the equal insulation against ground of phase line A, B, C is bad.
When only phase line A insulation against ground is bad, arbitrarily measures and calculate U21、U22、U32Appointing in three measured value intrinsic standoff ratios What one or more, for example, measuring and calculating U31Intrinsic standoff ratio, i.e., in UABM3 is open-minded when=0, measures U at this time31And Its corresponding monitoring burst pulse voltage UCA, i.e.,
R can be calculatedF1
When only phase line B insulation against ground is bad, arbitrarily measures and calculate U11、U31、U32Appointing in three measured value intrinsic standoff ratios What one or more, for example, measuring and calculating U11Intrinsic standoff ratio, i.e., in UBCM1 is open-minded when=0, measures U at this time11And Its corresponding monitoring burst pulse voltage UAB1, i.e.,
R can be calculatedF2
When only phase line C insulation against ground is bad, arbitrarily measures and calculate U11、U12、U21Appointing in three measured value intrinsic standoff ratios What one or more, for example, measuring and calculating U21Intrinsic standoff ratio, i.e., in UCAM2 is open-minded when=0, measures U at this time21And Its corresponding monitoring burst pulse voltage UBC1, i.e.,
R can be calculatedF3
When to monitoring burst pulse voltage, burst pulse voltage takes multiple measurements to obtain multiple measured values over the ground, to multiple points Pressure ratio is measured and is calculated, or the same intrinsic standoff ratio, multiple intrinsic standoff ratios are taken multiple measurements and calculated, and is obtained same When the insulating resistance value of phase line has multiple calculated results, it should carry out including seeking arithmetic to multiple measured values, multiple calculated results Average value, median, sliding average, median average value or other modes data processing after surveyed accordingly Magnitude or final calculation result.
When having A, B insulation against ground bad, arbitrarily measures and calculate U11、U12、U21、U22、U31、U32In 2 non-zero value and The intrinsic standoff ratio of nonlinear correlation, i.e., any measurement simultaneously calculate U11Or U32、U21Or U22、U31In 2 intrinsic standoff ratios and with its phase The monitoring burst pulse voltage answered, and the relevant expression formula of simultaneous, can calculate RF1、RF2。U11、U21、U22、U31、U32Deng point Pressure ratio expression formula is respectively
Wherein, formula (4) and formula (8) are linearly related, and formula (5) and formula (6) are linearly related.For example, measuring and calculating U11、U21 Intrinsic standoff ratio, joint type (4) and formula (5) can calculate RF1、RF2
Similarly, it when having B, C insulation against ground bad, arbitrarily measures and calculates U11、U12、U21、U22、U31、U32In 2 The intrinsic standoff ratio of non-zero value and nonlinear correlation, and the relevant expression formula of simultaneous, can calculate RF2、RF3;When having A, C insulation against ground When bad, arbitrarily measure and calculate U11、U12、U21、U22、U31、U32In 2 non-zero value and nonlinear correlation intrinsic standoff ratio, it is in parallel Relevant expression formula is found, R can be calculatedF1、RF3
When the equal insulation against ground of A, B, C is bad, arbitrarily measures and calculate U11、U12、U21、U22、U31、U32In 3 partial pressure Than and its corresponding monitoring burst pulse voltage, and the relevant expression formula of simultaneous, R can be calculatedF1、RF2、RF3.Correlation point The expression formula of pressure ratio is
For example, measuring and calculating U12、U22、U32Its corresponding monitoring burst pulse voltage UBC2、UCA2、UAB2Intrinsic standoff ratio, Joint type (10), formula (12) and formula (14), can calculate RF1、RF2、RF3
When to monitoring burst pulse voltage, burst pulse voltage takes multiple measurements to obtain multiple measured values over the ground;Simultaneous multiple groups Multiple calculated results of same phase line insulating resistance value are calculated in expression formula;Either to the same intrinsic standoff ratio, multiple partial pressures Than taking multiple measurements and calculating, when obtaining the insulating resistance value of same phase line has multiple calculated results, it should to multiple measurements Value, multiple calculated results carry out include ask arithmetic mean of instantaneous value, median, sliding average, median average value or other Corresponding measured value or final calculation result are obtained after the data processing of mode.
The burst pulse voltage U over the ground of phase line A first11, the burst pulse voltage U over the ground of phase line A second12By acquiring the first electronics Switch M1 is respectively in UBC=0, UAB=0 R of sample resistance when openingSOn voltage UC1It obtains, has
Or
The burst pulse voltage U over the ground of phase line B first21, the burst pulse voltage U over the ground of phase line B second22By acquiring the second electronics Switch M2 is respectively in UCA=0, UBC=0 R of sample resistance when openingSOn voltage UC2It obtains, has
Or
The burst pulse voltage U over the ground of phase line C first31, the burst pulse voltage U over the ground of phase line C second32By acquiring third electronics Switch M3 is respectively in UAB=0, UCA=0 R of sample resistance when openingSOn voltage UC3It obtains, has
Or
Phase line A, B, C's is electric over the ground when opening for the first electronic switch of limitation, the second electronic switch, third electronic switch Stream, the first current-limiting resistance RE1, the second current-limiting resistance RE2, third current-limiting resistance RE3Resistance value be preferably greater than 500k Ω, especially Preferably greater than 2M Ω.
First electronic switch, the second electronic switch, the service time of third electronic switch are very short, are loaded at this time in phase line Between, by PE formed circuit on monitoring burst pulse voltage be the equal of direct current burst pulse voltage, over the ground due to phase line Capacitor is small, to sample resistance RSOn voltage when being sampled, the charge and discharge to direct-to-ground capacitance are completed in direct current burst pulse voltage, Insulating monitoring can be impacted to avoid phase line direct-to-ground capacitance.
When burst pulse voltage includes burst pulse voltage, phase line A second burst pulse over the ground over the ground of phase line A first to phase line A over the ground Voltage, burst pulse voltage includes burst pulse voltage, phase line B second the burst pulse voltage over the ground over the ground of phase line B first to phase line B over the ground, Phase line C over the ground burst pulse voltage include phase line C first over the ground burst pulse voltage, phase line C second over the ground burst pulse voltage when, it is described Device realizes that the specific steps of insulation performance on-line checking include:
Step 1: sampling obtains burst pulse voltage signal over the ground and monitoring burst pulse voltage signal;
Step 2: being judged according to burst pulse voltage signal over the ground, if the insulation against ground of phase line A, phase line B, phase line C It is normal, then return to step 1;
Step 3: being judged according to burst pulse voltage signal over the ground, if a phase in phase line A, phase line B, phase line C Line shorted to earth, then arrive step 6;
Step 4: being judged judge whether phase line A, phase line B, phase line C are right respectively according to burst pulse voltage signal over the ground Ground defective insulation;
Step 5: calculate 1 phase line insulation against ground it is bad when the phase line insulation against ground resistance value, or calculate 2 phases 2 phase lines respective insulation against ground resistance value when line insulation against ground is bad, or calculate 3 phase line insulation against ground it is bad when should The respective insulation against ground resistance value of 3 phase lines;
Step 6: as the result is shown and alert process, returning to step 1.
Voltage sampling unit is for obtaining phase line ac voltage signal and sending to controller unit.Phase line ac voltage signal Zero crossing and monitoring burst pulse voltage signal corresponding with zero crossing including A, B, C tri- alternate line voltage, for example, UAB、 UBC、UCAEtc. the zero crossing of line voltages and corresponding monitoring burst pulse voltage signal.The zero crossing of phase line alternating voltage can To use zero cross detection circuit to export, zero-crossing pulse carries out detection and known zero crossing is calculated to obtain, with zero crossing pair The monitoring burst pulse voltage signal answered can divide electricity to phase line alternating voltage at the corresponding moment of monitoring burst pulse voltage signal The output on road carries out sampling acquisition.Phase line ac voltage signal includes the zero crossing of phase line alternating voltage and corresponding with zero crossing Monitoring burst pulse voltage signal can also be analyzed by voltage continuous sampling data of the controller unit to voltage sampling unit It arrives, at this point, controller unit, which needs to control the voltage sampling unit line voltage alternate to A, B, C tri-, carries out continuous sampling.How Design voltage sampling unit is simultaneously realized by controller unit to the progress continuous sampling of phase line ac voltage signal, and to continuous Sampled data is analyzed to obtain the zero crossing of phase line alternating voltage and monitoring burst pulse voltage signal corresponding with zero crossing It is the routine techniques that professional and technical personnel in the field are grasped.
When the insulation against ground of three-phase alternating current IT system deteriorates or has shorted to earth failure, phase line insulation against ground resistance is less than When the threshold resistance of setting, controller unit is alarmed by alarm unit.Man-machine interaction unit sets for realizing threshold resistance Fixed, each phase line insulation against ground resistance value such as shows at the functions.It carries out needed for the designing and Implementing of alarm unit and man-machine interaction unit Function is the routine techniques that professional and technical personnel in the field are grasped.
Verification unit is used for the monitoring to the insulation performance and carries out function check.In embodiment illustrated in fig. 1, verification unit 400 are controlled by man-machine interaction unit by controller unit.Verification unit can also be controlled directly by man-machine interaction unit, Directly controlled by switch, button.Carry out function check when, verification unit between phase line A and protecting field, or Between phase line B and protecting field, or between phase line C and protecting field, or simultaneously at more between phase line and protecting field Whether access verification resistance, observation device can work normally.It is directly controlled by switch, button, or by human-computer interaction list Member is controlled by controller unit, between phase line A and protecting field, or between phase line B and protecting field, either At more, access verifies resistance between phase line and protecting field between phase line C and protecting field, or simultaneously, is this field profession The routine techniques that technical staff is grasped.
Controller unit includes the functional modules such as MCU and A/D converter, signal conditioning circuit and circuit.Voltage sampling The voltage signal of burst pulse over the ground that phase line ac voltage signal, the insulating signal sampling unit of unit output export is through signal condition It is sent after processing of circuit to A/D converter, A/D converter output data transfers to MCU to handle;If packet in phase line ac voltage signal Zero-crossing pulse is included, then zero-crossing pulse is fed directly to MCU.MCU and insulating signal sampling unit, verification unit, alarm unit, people Machine interactive unit etc. has electrical connection, to carry out relevant information transmitting.Control core MCU can choose DSP, ARM, monolithic The microcontrollers such as machine, CPLD, PLC or control equipment.How to select and use A/D converter, and how modelled signal tune Reason circuit makes the signal of voltage sampling unit, the output of insulating signal sampling unit meet the requirement that A/D converter inputs signal, It is the routine techniques that professional and technical personnel in the field are grasped.
Described device further includes having DC power source unit.External power supply can be used in DC power source unit, can also be by three-phase It is obtained after alternating voltage decompression, rectification, filtering, pressure stabilizing.

Claims (7)

1. a kind of three-phase IT system insulation performance online test method, realizes that feature exists by insulation performance on-line measuring device In: described device will monitor burst pulse voltage-drop loading and be returned between phase line and the neutral conductor and between phase line by what protecting field was formed On the road, corresponding burst pulse voltage over the ground is formed;Described device is according to monitoring burst pulse voltage and the corresponding electricity of burst pulse over the ground Pressure carries out insulation performance on-line checking;
The insulation performance on-line measuring device includes controller unit, insulating signal sampling unit, voltage sampling unit;
The insulating signal sampling unit includes the first sample of signal branch, second signal sampling slip, third sample of signal branch Road and sample resistance;First sample of signal branch includes the first electronic switch being connected in series, the first current-limiting resistance, the second letter Number sampling slip includes the second electronic switch being connected in series, the second current-limiting resistance, and third sample of signal branch includes that series connection connects Third electronic switch, the third current-limiting resistance connect;One end of first sample of signal branch is connected to the phase of three-phase alternating current IT system Line A, one end of second signal sampling slip are connected to the phase line B of three-phase alternating current IT system, one end of third sample of signal branch It is connected to the phase line C of three-phase alternating current IT system;The other end of first sample of signal branch, second signal sampling slip are in addition One end of one end, the other end of third sample of signal branch and sample resistance connects, and the other end of sample resistance is connected to Protecting field;
The voltage of burst pulse over the ground of the three-phase alternating current IT system includes phase line A burst pulse voltage, phase line B burst pulse over the ground over the ground Voltage, phase line C burst pulse voltage over the ground are controlled the first electronic switch, the second electronic switch, third electricity by controller unit respectively Sub switch opens acquisition;
The specific steps of the insulation performance online test method include:
Step 1, sampling obtain phase line A, and burst pulse is electric over the ground by burst pulse voltage and corresponding monitoring burst pulse voltage, phase line B over the ground Press and monitor accordingly burst pulse voltage, phase line C burst pulse voltage and corresponding monitoring burst pulse voltage over the ground;
Step 2, simultaneous phase line A over the ground burst pulse voltage and it is corresponding monitoring burst pulse voltage between relational expression, phase Line B burst pulse voltage and relational expression, phase line C burst pulse voltage over the ground between corresponding monitoring burst pulse voltage over the ground And relational expression and composition equation group between corresponding monitoring burst pulse voltage;
Step 3, solving equations seek phase line A insulation against ground resistance value, phase line B insulation against ground resistance value, phase line C insulation against ground Resistance value;
Step 4, result treatment, return to step 1.
2. three-phase IT system insulation performance online test method according to claim 1, it is characterised in that: the monitoring is narrow Pulse voltage is to load the line voltage of the three-phase IT system with pulse conduction mode to be formed.
3. three-phase IT system insulation performance online test method according to claim 2, it is characterised in that: the line voltage Realization is opened by electronic switch pulsed with the load of pulse conduction mode.
4. three-phase IT system insulation performance online test method according to claim 3, it is characterised in that: the electronic cutting Close zero crossing at the time of pulsed is opened for three-phase IT system line voltage.
5. three-phase IT system insulation performance online test method according to claim 2, it is characterised in that: the monitoring is narrow Pulse voltage and corresponding at least 3 groups of burst pulse voltage over the ground.
6. three-phase IT system insulation performance online test method according to any one of claims 1-5, feature exist In: burst pulse voltage includes that burst pulse is electric over the ground by burst pulse voltage, phase line A second over the ground by phase line A first to the phase line A over the ground Pressure controls the first electronic switch respectively between phase line B and phase line C between line voltage zero passage, phase line A and phase line B by controller unit Acquisition is opened when line voltage zero passage;Burst pulse voltage includes phase line B first burst pulse voltage, phase line B over the ground to the phase line B over the ground Second burst pulse voltage over the ground controls the second electronic switch line voltage mistake between phase line C and phase line A respectively by controller unit Zero, acquisition is opened between phase line B and phase line C when line voltage zero passage;Burst pulse voltage includes phase line C first right to the phase line C over the ground Ground burst pulse voltage, phase line C second burst pulse voltage over the ground, by controller unit control third electronic switch respectively in phase line A Acquisition is opened when line voltage zero passage between line voltage zero passage, phase line C and phase line A between phase line B.
7. three-phase IT system insulation performance online test method according to claim 6, it is characterised in that: specific steps Include:
Step 1: sampling obtains burst pulse voltage signal over the ground and monitoring burst pulse voltage signal;
Step 2: being judged according to burst pulse voltage signal over the ground, if the insulation against ground of phase line A, phase line B, phase line C are just Often, then step 1 is returned to;
Step 3: being judged according to burst pulse voltage signal over the ground, if a phase line pair in phase line A, phase line B, phase line C Ground short circuit then arrives step 6;
Step 4: being judged judge whether phase line A, phase line B, phase line C are exhausted over the ground respectively according to burst pulse voltage signal over the ground Edge is bad;
Step 5: calculate 1 phase line insulation against ground it is bad when the phase line insulation against ground resistance value, or calculate 2 phase lines pair 2 phase lines respective insulation against ground resistance value when ground defective insulation, or calculate 3 phase line insulation against ground it is bad when this 3 The respective insulation against ground resistance value of phase line;
Step 6: result treatment, returns to step 1.
CN201610891868.4A 2016-10-13 2016-10-13 Three-phase IT system insulation performance online test method Expired - Fee Related CN106569101B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610891868.4A CN106569101B (en) 2016-10-13 2016-10-13 Three-phase IT system insulation performance online test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610891868.4A CN106569101B (en) 2016-10-13 2016-10-13 Three-phase IT system insulation performance online test method

Publications (2)

Publication Number Publication Date
CN106569101A CN106569101A (en) 2017-04-19
CN106569101B true CN106569101B (en) 2019-03-01

Family

ID=58532911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610891868.4A Expired - Fee Related CN106569101B (en) 2016-10-13 2016-10-13 Three-phase IT system insulation performance online test method

Country Status (1)

Country Link
CN (1) CN106569101B (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915884B (en) * 2010-08-13 2012-05-23 苏州市电通电力电子有限公司 Identification method of ground fault phases in three-phase ungrounded system and identification device thereof

Also Published As

Publication number Publication date
CN106569101A (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN106501639B (en) Three-phase and four-line IT system electric energy quality monitoring and insulation fault line selection and location method
CN105358997B (en) Insulation detector and electronic equipment
CN100403042C (en) Insulating state on-line monitoring method of cross-linked PE cable
CN104702208B (en) Photovoltaic array ground insulation resistance online detecting system for high-power photovoltaic inverter
CN103176049B (en) For circuit, apparatus and method that the insulation against ground of earth-free straight-flow system is monitored
CN111521919A (en) Low-voltage transformer area zero line live fault diagnosis device and diagnosis and positioning method
CN106443382B (en) Three-phase alternating current IT system insulation performance on-line measuring device
CN104145187B (en) The electric energy meter and method of the state of the circuit-breaker of the device of electric energy meter are connected to for detection
CN105842540A (en) Method for detecting DC bus insulation resistance
CN106053946B (en) Photovoltaic DC insulated monitoring method, device and a kind of photovoltaic system
CN104251978B (en) Straight-flow system exchanges the test device that crosstalk and voltage pulsation influence on relay
CN103105557A (en) Method and device of high-tension switch cabinet multi-fault diagnosis
CN106405305A (en) Zero line open-phase detection circuit and method for detecting open phase of zero line
CN109358225A (en) A kind of detection device of detection circuit and trolleybus to the earth insulation performance
RU112525U1 (en) AUTOMATED DIAGNOSTIC AND MONITORING SYSTEM OF POWER CABLE LINES INSULATION
CN106526355B (en) Micro-capacitance sensor three-phase IT system power quality and insulation performance on-line measuring device
CN106569101B (en) Three-phase IT system insulation performance online test method
CN101504429A (en) Portable on-line measurement instrument for electrician electric bridge drain voltage
CN106443383B (en) Three-phase and four-line IT system insulation performance monitoring method
RU2305292C1 (en) METHOD OF DETECTING FAULT IN 6( 10 )-35 kV ELECTRIC CIRCUIT WITH ISOLATED OR COMPENSATED NEUTRAL POINT
CN107478975A (en) A kind of Insulation Inspection System of energy-accumulating power station
CN106896275A (en) A kind of cable distributed capacitance Risk-warning control system
CN106569102B (en) Three-phase and four-line IT system power quality and insulation performance monitoring device
CN106569103B (en) Three-phase and four-line IT system insulation performance monitoring device
CN104049169B (en) Ground detection device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 533012 Baise Power Supply Bureau, Longteng Road, Jiangnan New District, Youjiang District, Baise City, Guangxi Zhuang Autonomous Region

Patentee after: BAISE POWER SUPPLY BUREAU, GUANGXI POWER GRID Co.,Ltd.

Address before: 412007 School of industry, research and production, Hunan University of Technology, 88 West Taishan Road, Zhuzhou, Hunan

Patentee before: Hunan University of Technology

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301

CF01 Termination of patent right due to non-payment of annual fee