CN106567380B - Recyclable cross steel plate baffle device - Google Patents

Recyclable cross steel plate baffle device Download PDF

Info

Publication number
CN106567380B
CN106567380B CN201610974704.8A CN201610974704A CN106567380B CN 106567380 B CN106567380 B CN 106567380B CN 201610974704 A CN201610974704 A CN 201610974704A CN 106567380 B CN106567380 B CN 106567380B
Authority
CN
China
Prior art keywords
steel plate
cross
baffle
cross steel
plate baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610974704.8A
Other languages
Chinese (zh)
Other versions
CN106567380A (en
Inventor
韩泽亮
杨陆
张祎男
李红贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201610974704.8A priority Critical patent/CN106567380B/en
Publication of CN106567380A publication Critical patent/CN106567380A/en
Application granted granted Critical
Publication of CN106567380B publication Critical patent/CN106567380B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/06Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a recyclable cross steel plate inserting plate type baffle device which comprises a cross steel plate baffle, an inserting plate and a fixing piece, wherein the cross steel plate baffle is composed of main steel plates, the horizontal width of the cross steel plate baffle is reduced by 10-20 mm from the left side to the right side of a guide wall groove section, and the cross steel plate baffle is used for preventing concrete slurry from flowing outwards; the vertical length of the cross steel plate baffle is at least half of that of the wall ring beam, and the cross steel plate baffle is used for reducing the workload of chiseling off the concrete ring beam in the subsequent process; the end part of the cross steel plate baffle is provided with at least two hoisting points, so that the hoisting is convenient, and the cross steel plate baffle can be fixed with a main reinforcement of a reinforcement cage to play a role in preventing overturning; at least two sets of inserting plates are arranged at the bottom of the cross steel plate baffle and used for accurately butting the cross steel plate of the reinforcement cage and the end part of the cross steel plate baffle. The method is applied to the enclosure construction stage of the underground continuous wall; the steel plate can be recycled, the steel plate material and the manufacturing cost are saved, and the difficulty in chiseling and cutting the cross steel plate for the ring beam at the later stage can be reduced.

Description

Recyclable cross steel plate baffle device
Technical Field
The invention relates to a recyclable cross steel plate inserting plate type baffle plate device for an underground continuous wall top.
Background
Along with the continuous development of cities, the development and utilization of underground spaces are more and more emphasized by people. The adoption of underground continuous walls for enclosing is more and more accepted by most enterprises, and the cross steel plate joint of the underground continuous walls is the most common, but a plurality of problems exist, such as: the material and processing cost for processing the cross steel plate at the early stage are high; the ring beam is inconvenient to chisel; the cutting of the cross steel plate in the ring beam chiseling construction is troublesome; therefore, it is necessary to develop a recyclable cross steel plate baffle device.
Disclosure of Invention
The invention provides a recyclable cross steel plate inserting plate type baffle device for an underground diaphragm wall, which can be recycled and is convenient to clean and pull out; and the quality of the ground wall is not influenced, and the requirement of ground wall slurry return can be met.
In order to achieve the purpose, the invention adopts the technical scheme that: a recyclable cross steel plate inserting plate type baffle device comprises a cross steel plate baffle and an inserting plate, wherein the cross steel plate baffle and the inserting plate are formed by main steel plates, and the horizontal width of the cross steel plate baffle is reduced by 10-20 mm respectively from the left side to the right side of a guide wall groove section, so that concrete slurry is prevented from flowing outwards; the vertical length of the cross steel plate baffle is at least half of that of the wall ring beam, and the cross steel plate baffle is used for reducing the workload of chiseling off the concrete ring beam in the subsequent process; the end part of the cross steel plate baffle is provided with at least two hoisting points, so that the hoisting is convenient, and the cross steel plate baffle can be fixed with a main reinforcement of a reinforcement cage to play a role in preventing overturning; at least two sets of inserting plates are arranged at the bottom of the cross-shaped steel plate baffle and used for accurately butting the cross-shaped steel plate 6 and the end part of the cross-shaped steel plate baffle.
Notches are formed in two sides of the upper portion of the cross-shaped steel plate baffle, the size of each notch is 10-20 mm, and therefore backflow of slurry is facilitated when concrete is poured.
The hoisting lifting point is connected with the main rib of the underground wall through a fixing piece and used for fixing the cross-shaped steel plate baffle and resisting lateral force.
Each set of plug board consists of two plug boards, the two plug boards are symmetrically welded on two sides of the lower end of the cross-shaped steel plate baffle plate and are beneficial to being inserted into the cross-shaped steel plate of the ground wall, and the depth of the plug boards inserted into the cross-shaped steel plate is more than or equal to 50 mm.
The invention has the beneficial effects that: the method is applied to the enclosure construction stage of the underground continuous wall; the steel plate can be recycled, the steel plate material and the manufacturing cost are saved, and the difficulty in chiseling and cutting the cross steel plate for the ring beam at the later stage can be reduced.
Drawings
FIG. 1 is a plan view of a recyclable cross steel plate picture plate baffle assembly of the present invention;
FIG. 2 is a view taken along section A-A of FIG. 1;
FIG. 3 is a schematic view of the fixing of the cross steel plate baffle device and the reinforcement cage of the underground continuous wall.
Detailed Description
The invention will be further illustrated with reference to the following specific examples.
As shown in fig. 1 to 3, a cross steel plate baffle device for a ground wall top and capable of being recycled comprises a main steel plate 1, a notch 2, a hoisting lifting point 3, an inserting plate 4 and a fixing piece 5. The main steel plate 1 forms a cross-shaped steel plate baffle, notches 2 are formed in two sides of the middle of the cross-shaped steel plate baffle, and the size h of each notch 2 is 10-20 mm (10-20 mm is reduced inwards); the purpose is to facilitate the backflow of slurry when concrete is poured; at least two hoisting hanging points 3 are arranged at the end part of the cross-shaped steel plate baffle, and the cross-shaped steel plate baffle can be conveniently hoisted through the hoisting hanging points 3 and is conveniently fixed with a main reinforcement 7 of the steel reinforcement cage; the inserting plate 4 is used for enabling the cross-shaped steel plate 6 to be accurately butted with the recyclable cross-shaped steel plate baffle plate device at the end part; at least two inserting plates 4 are arranged according to different groove sections, each inserting plate 4 consists of two inserting plates 4, the two inserting plates 4 are symmetrically welded on two sides of the main steel plate 1, the inserting into the cross-shaped steel plate of the ground wall is facilitated, and the inserting depth of the inserting plates 4 is not less than 50 mm; the fixing piece 5 is a temporary measure for fixing the cross steel plate baffle of the reinforcement cage; the hoisting point 3 is connected with a steel reinforcement cage main reinforcement 7 of the underground diaphragm wall through a fixing piece 5 and used for fixing the cross-shaped steel plate baffle and resisting lateral force. The horizontal width of the cross steel plate baffle is reduced by 10-20 mm for the left and the right of the guide wall groove section respectively, and the cross steel plate baffle is used for preventing concrete slurry from flowing outwards; the vertical length of the cross steel plate baffle is at least half of that of the wall ring beam, and the cross steel plate baffle is used for reducing the workload of chiseling the concrete ring beam in the subsequent process.
This embodiment takes the construction of putting as the example with cooperation underground continuous wall steel reinforcement cage is hung:
after the steel reinforcement cage is completely hoisted into the groove, a hoisting point 3 of the cross-shaped steel plate baffle is hoisted into the groove section by a crane, so that the inserting plate 4 is butted with a cross-shaped steel plate 6 of the steel reinforcement cage, and then the baffle device is fixed with an underground wall main rib 7 by using a fixing piece 5 with certain rigidity, so that the stability of the baffle is ensured; after the concrete is poured and before the final setting time, it is pulled out, and the crane is flushed clean from the ground for reuse.

Claims (1)

1. The utility model provides a but cyclic utilization cross steel sheet picture peg formula baffle device, includes cross steel sheet baffle, picture peg (4) that constitute by main steel sheet (1), its characterized in that: the horizontal width of the cross steel plate baffle is reduced by 10-20 mm from the left side to the right side of the guide wall groove section respectively, and the cross steel plate baffle is used for preventing concrete slurry from flowing outwards; the vertical length of the cross steel plate baffle is at least half of that of the wall ring beam, and the cross steel plate baffle is used for reducing the workload of chiseling off the concrete ring beam in the subsequent process; at least two hoisting hanging points (3) are arranged at the end part of the cross steel plate baffle, so that the hoisting is facilitated, the cross steel plate baffle is conveniently fixed with a main reinforcement of a reinforcement cage, and the function of preventing overturning is achieved; the hoisting lifting point (3) is connected with an underground wall steel reinforcement cage main rib (7) through a fixing piece (5) and used for fixing a cross-shaped steel plate baffle to resist lateral force; at least two sets of inserting plates (4) are arranged at the bottom of the cross steel plate baffle and are used for accurately butting the cross steel plate (6) of the reinforcement cage with the end part of the cross steel plate baffle; notches (2) are formed in two sides of the upper portion of the cross-shaped steel plate baffle, the size h of each notch (2) is 10-20 mm, and the notches are used for facilitating backflow of slurry when concrete is poured; each set of inserting plate (4) consists of two inserting plates (4), the two inserting plates (4) are symmetrically welded on two sides of the lower end of the cross-shaped steel plate baffle plate and are beneficial to being inserted into the ground wall cross-shaped steel plate (6), and the depth of the inserting plates (4) inserted into the cross-shaped steel plate (6) is more than or equal to 50 mm.
CN201610974704.8A 2016-11-03 2016-11-03 Recyclable cross steel plate baffle device Active CN106567380B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610974704.8A CN106567380B (en) 2016-11-03 2016-11-03 Recyclable cross steel plate baffle device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610974704.8A CN106567380B (en) 2016-11-03 2016-11-03 Recyclable cross steel plate baffle device

Publications (2)

Publication Number Publication Date
CN106567380A CN106567380A (en) 2017-04-19
CN106567380B true CN106567380B (en) 2021-07-30

Family

ID=58541573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610974704.8A Active CN106567380B (en) 2016-11-03 2016-11-03 Recyclable cross steel plate baffle device

Country Status (1)

Country Link
CN (1) CN106567380B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN103225318A (en) * 2013-05-08 2013-07-31 董宏波 Anti-seepage and leaking-stoppage device for underground consecutive wall groove section joint point and construction method thereof
CN103981904A (en) * 2014-05-26 2014-08-13 上海市机械施工集团有限公司 Joint structure between ground and wall and sandy soil layer foundation pit construction method
CN203924136U (en) * 2014-05-15 2014-11-05 中国建筑第六工程局有限公司 A kind of ground-connecting-wall lap guard flow pattern steel joint
CN205171502U (en) * 2015-10-27 2016-04-20 中国一冶集团有限公司 Device is flowed in lap guard of underground continuous wall flexible rubber hose formula
CN205444168U (en) * 2016-01-07 2016-08-10 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall I -steel connects lap guard and flows component

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4821713B2 (en) * 2007-06-25 2011-11-24 Jfeスチール株式会社 Synthetic wall structure and method for constructing synthetic wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN103225318A (en) * 2013-05-08 2013-07-31 董宏波 Anti-seepage and leaking-stoppage device for underground consecutive wall groove section joint point and construction method thereof
CN203924136U (en) * 2014-05-15 2014-11-05 中国建筑第六工程局有限公司 A kind of ground-connecting-wall lap guard flow pattern steel joint
CN103981904A (en) * 2014-05-26 2014-08-13 上海市机械施工集团有限公司 Joint structure between ground and wall and sandy soil layer foundation pit construction method
CN205171502U (en) * 2015-10-27 2016-04-20 中国一冶集团有限公司 Device is flowed in lap guard of underground continuous wall flexible rubber hose formula
CN205444168U (en) * 2016-01-07 2016-08-10 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall I -steel connects lap guard and flows component

Also Published As

Publication number Publication date
CN106567380A (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN105569376B (en) The Demolition Construction method of construction wall
CN104631706B (en) One kind exempts from form removal concrete column and its construction method
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN212295160U (en) Prefabricated assembled concrete shear force wall
CN105569333A (en) Construction formwork of cantilever layer outer wall preformed hole, and construction method
CN207092076U (en) A kind of guider of steel pile casting
CN203878995U (en) Side wall stair formwork
CN205296799U (en) Construction of elevator well and protection platform
CN106567380B (en) Recyclable cross steel plate baffle device
CN204059953U (en) Hang mould prefab form
CN206681359U (en) One kind cheats new formwork system in hole
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN205857707U (en) Stair step constructing device
CN204571289U (en) A kind of construction formwork of overhang layer exterior wall preformed hole
CN203049588U (en) Pit-in-pit cylindrical mould
CN211439831U (en) Multipurpose auxiliary drilling device
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN202745044U (en) Purpose-made rigid support body construction structure strengthening rigidity of reinforcement cage
CN204571265U (en) A kind of reusable pre-buried anchor ring
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN205976492U (en) Stair concrete placement template device
CN206034912U (en) Mould reinforcement member is hung to building
CN204225480U (en) Building frame construction post beam boundary section pulls and pushes plate device
CN206034874U (en) Elevartor shaft combination formula integrally lift up operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant