CN106557040A - A kind of high-building construction monitoring system and monitoring method - Google Patents

A kind of high-building construction monitoring system and monitoring method Download PDF

Info

Publication number
CN106557040A
CN106557040A CN201510631021.8A CN201510631021A CN106557040A CN 106557040 A CN106557040 A CN 106557040A CN 201510631021 A CN201510631021 A CN 201510631021A CN 106557040 A CN106557040 A CN 106557040A
Authority
CN
China
Prior art keywords
monitoring
module
website
data acquisition
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510631021.8A
Other languages
Chinese (zh)
Other versions
CN106557040B (en
Inventor
刘阳
马星桥
靳峰
刘洪亮
南锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201510631021.8A priority Critical patent/CN106557040B/en
Publication of CN106557040A publication Critical patent/CN106557040A/en
Application granted granted Critical
Publication of CN106557040B publication Critical patent/CN106557040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to construction.A kind of high-building construction monitoring system, including project management department's central control module, work progress performance state computing module, data acquisition module, communication module and monitoring information sharing module;The early warning value that the purpose of wherein work progress performance state computing module is easy for overall performance index setting area monitoring's index;Structure general image is shown using BIM and numerical value simulation calculation and local performance state carries out Construction Course Analysis, and arrange picture/text message module carries out the process of effective information, and the cellphone subscriber of project management department personnel is sent to by GSM;According to plane domain, symmetry, floor, tower crane position etc. using data acquisition plane distribution website, data acquisition floor website, data-collecting sub-station three-level monitoring point arrangement.Present invention achieves the purpose of information sharing and information management;Install and operate simple and feasible, good stability, low cost, efficiency high.

Description

A kind of high-building construction monitoring system and monitoring method
Technical field
The present invention relates to construction, more particularly to a kind of construction monitoring system.
Background technology
In order to understand construction situation in time, Construction Schedule is grasped, a set of monitoring system is set in construction site generally,
As landmark is continued to bring out, structure develops to the bigger direction of superelevation, span, and construction speed is constantly accelerated, and brings new problem to construction safety and shaping structures.High-building construction process monitoring work is to ensure that the important process content of high-building construction safety and quality, and every observation data information of monitoring provides Data safeguard for the correctness and guiding construction of Construction of High-rise structural analyses.Current construction monitoring is less for the construction monitoring of high-rise building, in addition it is also necessary to carry out rational modification with reference to the development of modern technologies.
The existing monitoring technology patent closely related with this patent mainly has:(1) construction monitoring system by with lower unit constitute including:The sensor unit of target monitoring floor is laid in, if be made up of dry temperature sensor and some strain transducers, for measuring temperature load and the strain of fabric structure;The vertical displacement measuring unit of target monitoring floor is laid in, for measuring the overall vertical displacement size of fabric structure;The some collecting units of target monitoring floor are laid in, are connected with the sensor unit and the vertical displacement measuring unit, for gathering the measurement data of the sensor unit and the vertical displacement measuring unit;Main frame, for exporting the measurement data (referring in detail to 102607644 A of patent No. CN) of the collecting unit collection;(2) a kind of remote automation construction monitoring system, which includes:Located at multiple sensors of job site, and the multiple measure and control devices being connected corresponding with sensor, sensor is used for detecting required different pieces of information, data acquisition module, microcontroller and the remote communication module being sequentially connected is provided with measure and control device, data acquisition module is connected with corresponding sensor;Central controller, is connected with the remote communication module in each measure and control device;User terminal, is connected with central controller by network;Data that data collecting module collected sensor is detected simultaneously are transferred to microcontroller, and data are transferred to central controller (referring in detail to 202886960 U of patent No. CN) by remote communication module by microcontroller.
For skyscraper, there is following some deficiency in existing construction monitoring mode:
Firstth, the high-rise status safety for being particularly the construction equipment facilities such as super-high building structure form complexity, some tower cranes, creeping formwork counts for much, therefore Monitoring Data key point is more, the arrangement of optimization and focal point position is needed, and structure overall security evaluation is carried out in model monitoring evaluation;Secondth, monitor and extract data using manually of fixed place and time, its Contents for Monitoring and monitoring efficiency cannot in time, comprehensively obtain the response message in structure construction procedure and feed back to project management department supervisory engineering staff and site construction management personnel, in time Construction State cannot be controlled, have impact on the efficiency of decision-making;3rd, prior art cannot visual pattern will calculate analysis, field measurement, management decision-making, information sharing and Construction control and combine, really realize the systemic and scientific of construction monitoring.
The content of the invention
It is contemplated that overcoming the defect of prior art, there is provided a kind of high-building construction monitoring system.Present invention achieves the purpose of information sharing and information management;Install and operate simple and feasible, good stability, low cost, efficiency high.
In order to solve above-mentioned technical problem, a kind of high-building construction monitoring system, it is characterised in that including project management department's central control module, work progress performance state computing module, data acquisition module, communication module and monitoring information sharing module;
Project management department's central control module is the command console of whole monitoring system, it is made up of signal receiver and project management system, is connected with work progress performance state computing module, data acquisition module, communication module, monitoring information sharing module in the form of network connection;
The work progress performance state computing module includes configuration state performance instruction input, numerical simulation calculating, BIM, simulation and measured data comparison information, " focus " processing information, image display;
The data acquisition module is made up of monitoring site, data acquisition plane distribution website, data acquisition floor website, data-collecting sub-station,
Wherein monitoring site is mainly the laying of the monitoring site of concrete component level, including the test of stress strain gauge, wind speed/Pressure testing sensor, floor perpendicularity, vertical displacement measurement and horizontal displacement measurement;The data acquisition plane distribution website refers to that the laying of the planar point position on a certain floor divides collection point position according to plane domain;
Data acquisition floor website refers to the laying website of concrete floor;Data-collecting sub-station refers to the collection website divided by floor section;The monitoring site is connected with data acquisition plane distribution website by wired, and the data acquisition plane distribution website is adopted with data acquisition floor website and is wirelessly connected;
With data-collecting sub-station using being wirelessly connected, wherein data acquisition plane distribution website also can divide website according to Core Walls Structure and framework to the data acquisition floor website;
The communication module is made up of data-collecting sub-station, terminal and transmitting information communications tower;The data-collecting sub-station includes acquisition module, controller and wireless router composition;The terminal has information transfer and emission function, for overcoming signal shielding;The transmitting communication tower is installed on tower crane with terminal and passes to project management department's central control module with transmission signal;
Simple, intuitive, internal memory little effective information is sent to the management personnel relevant with project construction monitoring and technical staff by gsm module in the form of note and wechat by the image display and warning module in project management system by picture/text message by the monitoring information sharing module, realizes the purpose of safe early warning and information sharing.
A kind of monitoring method of the high-building construction monitoring system described in basis, it includes:
Numerical simulation first in using work progress performance state computing module is calculated and carries out construction simulation analysis, and the calculating key takeaway of the step includes:Key member such as frame column, semi-girder truss, diagonal brace, waist truss ess-strain peak point;Core Walls Structure body of wall, the vertical displacement peak value of frame column and correlation displacement peak point.Core Walls Structure answers selective analysiss sedimentation compression difference between the two with outside framework as the material for using is different.Due to the relation of semi-girder truss installa-tion sequential, need concern that sequential and the relation between structural behaviour state, additional stress three are installed.Integrally-built main performance index can be input in configuration state performance instruction input 21 in work progress performance state computing module 2, the deformation of maximum stratified deformation, maximum vertical, maximum top layer acceleration under load action such as in structure construction procedure etc., can carry out early warning more than performance indications;
According to the result that monitoring scheme and numerical simulation are calculated, the laying and measurement of vertical displacement measuring point are carried out;, in structure global displacement or Core Walls Structure and the larger region of outside framework relative deformation theoretical value, semi-girder truss, the huge post in corner, Core Walls Structure and truss junction can be used as vertical displacement monitoring points for vertical displacement layout of the monitoring points.It is evenly arranged according to symmetry principle during above-mentioned each layout of the monitoring points.The ess-strain layout of the monitoring points complicated position of stress peak point and stress in the structure, especially pays close attention to the big position of conversion layer, enhancement layer, tall and big formwork, gradient or rod member;
Carry out the scene laying of data collecting system;Position first according to structural symmetry, vertical structure variation characteristic and selection data acquisition plane distribution website; further according to point layout floor determining data acquisition floor website; then key position floor is selected as data-collecting sub-station; data-collecting sub-station is selected apart from the nearer position in tower crane position; and strengthen the damp-proof and fireproof protection to website; avoid work progress material transport from damaging website, should make to indicate in site location;The point position of arrangement and website are simulated in BIM;
Various kinds of sensors signal uniform modulation is digital signal by data-collecting sub-station, and terminal data acquisition server will be sent in data set by controller and wireless router, the transmitting information communications tower being then then forwarded on tower crane;Signal is wirelessly transmitted to transmitting information communications tower the signal receiver of command centre of project management department, and Jing optical cable transmissions are to computer, and the data analysiss of construction monitoring, process, evaluation, early warning work are carried out in registry entry management system in computer;And effective pictorial information and text message are sent to the technical staff and management personnel of project management department by gsm module, to realize the process control of the performance to site operation process.
Project management department's central control module of the present invention, work progress performance state computing module, data acquisition module, communication module, monitoring information sharing module constitute new monitoring system, correspond to construction monitoring process control, monitoring calculation analysis and Performance Evaluation, data acquisition, information transmission and information sharing function respectively.The early warning value for wherein adopting the purpose of work progress performance state computing module to be easy for overall performance index setting area monitoring's index.Structure general image is shown using BIM and numerical value simulation calculation and local performance state carries out Construction Course Analysis, and picture/text message module is set carries out the process of effective information, and the cellphone subscriber of project management department personnel is sent in order to information sharing and early warning by GSM.According to plane domain, symmetry, floor, tower crane position etc. using data acquisition plane distribution website, data acquisition floor website, data-collecting sub-station three-level monitoring point arrangement, the level of monitoring arrangement is realized, construction monitoring website is eliminated and is laid blindness.Transmitting communication tower is set on tower crane and coordinates terminal to realize the transmission of signal, terminal has information transfer and emission function, can be used for overcoming signal shielding.
There is between monitoring site of the present invention systematicness, contribute to guide field construction monitoring and layout;Wired and wireless monitor complementation approach is realized, reduces impact of the complex characteristics of site operation environment to signal shielding, reduce the cost of monitoring personnel scene regulation and control.Numerical simulation, field measurement, management decision-making, information sharing and Construction control effectively can be carried out system combination by the present invention, make using network intelligence technological means collection, analysis, process, issue and the working actively for warning of data be converted into the achievement of visual pattern, realize the purpose of information sharing and information management;Install and operate simple and feasible, good stability, low cost, efficiency high, be particularly well-suited to the not enough high-rise building engineering of coastal wind field bad environments, monitored by personnel's condition.
Description of the drawings
Below, with reference to accompanying drawing, the present invention is further illustrated:
Fig. 1 is the schematic diagram of the high-building construction monitoring system of one embodiment of the invention;
Structural representations of the Fig. 2 for the work progress performance state computing module in high-building construction monitoring system shown in Fig. 1;
Fig. 3 is the data acquisition module schematic diagram in high-building construction monitoring system shown in Fig. 1;
Fig. 4 is the communication module schematic diagram in high-building construction monitoring system shown in Fig. 1;
Fig. 5 is the monitoring information sharing module schematic diagram in high-building construction monitoring system shown in Fig. 1.
Specific embodiment
As depicted in figs. 1 and 2, a kind of high-building construction monitoring system of the invention, including project management department's central control module 1, work progress performance state computing module 2, data acquisition module 3, communication module 4, monitoring information sharing module 5.Command console of the project management department's central control module 1 for whole monitoring system, it is made up of signal receiver 11 and project management system 12, is connected with work progress performance state computing module 2, data acquisition module 3, communication module 4, monitoring information sharing module 5 in the form of network connection.Project management department's central control module 1 is mainly used in project management department management personnel and technical staff and the performance state of work progress is monitored, analyzes, evaluates and is controlled;Mainly it is made up of signal receiver and project management system, construction monitoring as the important component part of information management, is effectively run by project management system for guiding construction process engineering.The work progress performance state computing module 2 calculates 22, BIM 23, simulation and measured data comparison information 24, " focus " processing information 25, image display 26 by configuration state performance instruction input 21, numerical simulation;Work progress performance state computing module 2 is adjusted to the method and flow process of Construction simulation for desired Properties Control index for project management department supervisory engineering staff, then according to calculated performance indications such as ess-strain, displacement etc. makees complementary guidance to construction monitoring scheme, and Synchronization Analysis field measurement data, the Construction Simulation process of model is adjusted according to measured data, in addition combine BIM to be synchronously simulated the difficult point and key point of work progress, and " focus " region larger to ess-strain is highlighted, and resulting effective information is transferred to each member of project under construction enforcement, the information of engineering is shared, early warning is carried out especially for the dangerous factors of instability are likely to occur, to point out participant to provide control measure, to eliminate security risk.The data acquisition module 3 is made up of monitoring site 34, data acquisition plane distribution website 33, data acquisition floor website 32, data-collecting sub-station 31, wherein monitoring site 34 is mainly the laying of the monitoring site of concrete component level, including the test of stress strain gauge, wind speed/Pressure testing sensor, floor perpendicularity, vertical displacement measurement and horizontal displacement measurement;The data acquisition plane distribution website 33 refers to that the laying of the planar point position on a certain floor divides collection point position according to plane domain;Data acquisition floor website 32 refers to the laying website of concrete floor;Data-collecting sub-station 31 refers to the collection website divided by floor section.The monitoring site 34 is connected with data acquisition plane distribution website 33 by wired, the data acquisition plane distribution website 33 is adopted with data acquisition floor website 32 and is wirelessly connected, with data-collecting sub-station 31 using being wirelessly connected, wherein data acquisition plane distribution website 33 also can divide website according to Core Walls Structure and framework to the data acquisition floor website 32.The communication module 4 is made up of data-collecting sub-station 31, terminal 42 and transmitting information communications tower 43;The data-collecting sub-station 31 includes that acquisition module 311, controller 312 and wireless router 313 are constituted;The terminal 42 has information transfer and emission function, for overcoming signal shielding;The transmitting communication tower 43 is installed on tower crane with terminal 42 and passes to project management department's central control module 1 with transmission signal.Simple, intuitive, internal memory little effective information is sent to the management personnel relevant with project construction monitoring and technical staff by gsm module 54 in the form of note and wechat by the image display 51 and warning module 52 in project management system 12 by picture/text message 53 by the monitoring information sharing module 5, realizes the purpose of safe early warning and information sharing.
The construction monitoring method that Frame-Shear wall is applied to using the present invention is described below:
Numerical simulation first in using work progress performance state computing module 2 calculates 22 and carries out construction simulation analysis, and the calculating key takeaway of the step includes:Key member such as frame column, semi-girder truss, diagonal brace, waist truss ess-strain peak point;Core Walls Structure body of wall, the vertical displacement peak value of frame column and correlation displacement peak point.Core Walls Structure answers selective analysiss sedimentation compression difference between the two with outside framework as the material for using is different.Due to the relation of semi-girder truss installa-tion sequential, need concern that sequential and the relation between structural behaviour state, additional stress three are installed.Integrally-built main performance index can be input in configuration state performance instruction input 21 in work progress performance state computing module 2, the deformation of maximum stratified deformation, maximum vertical, maximum top layer acceleration under load action such as in structure construction procedure etc., can carry out early warning more than performance indications.
22 result is calculated according to monitoring scheme and numerical simulation, the laying and measurement of vertical displacement measuring point is carried out., in structure global displacement or Core Walls Structure and the larger region of outside framework relative deformation theoretical value, semi-girder truss, the huge post in corner, Core Walls Structure and truss junction can be used as vertical displacement monitoring points for vertical displacement layout of the monitoring points.It is evenly arranged according to symmetry principle during above-mentioned each layout of the monitoring points.The ess-strain layout of the monitoring points complicated position of stress peak point and stress in the structure, especially pays close attention to the big position of conversion layer, enhancement layer, tall and big formwork, gradient or rod member.
Carry out the scene laying of data collecting system.Position first according to structural symmetry, vertical structure variation characteristic and selection data acquisition plane distribution website 33; further according to point layout floor determining data acquisition floor website 32; then key position floor is selected as data-collecting sub-station 31; data-collecting sub-station is selected apart from the nearer position in tower crane position; and strengthen the damp-proof and fireproof protection to website; avoid work progress material transport from damaging website, should make to indicate in site location.The point position of arrangement and website can be simulated in BIM.
Various kinds of sensors signal uniform modulation is digital signal by data-collecting sub-station 31, and 42 data acquisition server of terminal will be sent in data set by controller 312 and wireless router 313, the transmitting information communications tower 43 being then then forwarded on tower crane.Signal is wirelessly transmitted to transmitting information communications tower 43 signal receiver 11 of command centre of project management department, and Jing optical cable transmissions are to computer, the data analysiss of construction monitoring, process, evaluation, early warning work are carried out in registry entry management system 12 in computer;And effective pictorial information and text message are sent to the technical staff and management personnel of project management department by gsm module 54, to realize the process control of the performance to site operation process.

Claims (2)

1. a kind of high-building construction monitoring system, it is characterised in that including project management department's central control module, work progress performance state computing module, data acquisition module, communication module and monitoring information sharing module;
Project management department's central control module is the command console of whole monitoring system, it is made up of signal receiver and project management system, is connected with work progress performance state computing module, data acquisition module, communication module, monitoring information sharing module in the form of network connection;
The work progress performance state computing module includes configuration state performance instruction input, numerical simulation calculating, BIM, simulation and measured data comparison information, " focus " processing information, image display;
The data acquisition module is made up of monitoring site, data acquisition plane distribution website, data acquisition floor website, data-collecting sub-station,
Wherein monitoring site is mainly the laying of the monitoring site of concrete component level, including the test of stress strain gauge, wind speed/Pressure testing sensor, floor perpendicularity, vertical displacement measurement and horizontal displacement measurement;The data acquisition plane distribution website refers to that the laying of the planar point position on a certain floor divides collection point position according to plane domain;
Data acquisition floor website refers to the laying website of concrete floor;Data-collecting sub-station refers to the collection website divided by floor section;The monitoring site is connected with data acquisition plane distribution website by wired, and the data acquisition plane distribution website is adopted with data acquisition floor website and is wirelessly connected;
With data-collecting sub-station using being wirelessly connected, wherein data acquisition plane distribution website also can divide website according to Core Walls Structure and framework to the data acquisition floor website;
The communication module is made up of data-collecting sub-station, terminal and transmitting information communications tower;The data-collecting sub-station includes acquisition module, controller and wireless router composition;The terminal has information transfer and emission function, for overcoming signal shielding;The transmitting communication tower is installed on tower crane with terminal and passes to project management department's central control module with transmission signal;
Simple, intuitive, internal memory little effective information is sent to the management personnel relevant with project construction monitoring and technical staff by gsm module in the form of note and wechat by the image display and warning module in project management system by picture/text message by the monitoring information sharing module, realizes the purpose of safe early warning and information sharing.
2. a kind of monitoring method of high-building construction monitoring system according to claim 1, it is characterised in that it includes:
Numerical simulation first in using work progress performance state computing module is calculated and carries out construction simulation analysis, and the calculating key takeaway of the step includes:Key member such as frame column, semi-girder truss, diagonal brace, waist truss ess-strain peak point;Core Walls Structure body of wall, the vertical displacement peak value of frame column and correlation displacement peak point;
Core Walls Structure answers selective analysiss sedimentation compression difference between the two with outside framework as the material for using is different;
Due to the relation of semi-girder truss installa-tion sequential, need concern that sequential and the relation between structural behaviour state, additional stress three are installed;
Integrally-built main performance index can be input in configuration state performance instruction input 21 in work progress performance state computing module 2, the deformation of maximum stratified deformation, maximum vertical, maximum top layer acceleration under load action such as in structure construction procedure etc., can carry out early warning more than performance indications;
According to the result that monitoring scheme and numerical simulation are calculated, the laying and measurement of vertical displacement measuring point are carried out;, in structure global displacement or Core Walls Structure and the larger region of outside framework relative deformation theoretical value, semi-girder truss, the huge post in corner, Core Walls Structure and truss junction can be used as vertical displacement monitoring points for vertical displacement layout of the monitoring points;
It is evenly arranged according to symmetry principle during above-mentioned each layout of the monitoring points;
The ess-strain layout of the monitoring points complicated position of stress peak point and stress in the structure, especially pays close attention to the big position of conversion layer, enhancement layer, tall and big formwork, gradient or rod member;
Carry out the scene laying of data collecting system;Position first according to structural symmetry, vertical structure variation characteristic and selection data acquisition plane distribution website; further according to point layout floor determining data acquisition floor website; then key position floor is selected as data-collecting sub-station; data-collecting sub-station is selected apart from the nearer position in tower crane position; and strengthen the damp-proof and fireproof protection to website; avoid work progress material transport from damaging website, should make to indicate in site location;The point position of arrangement and website are simulated in BIM;
Various kinds of sensors signal uniform modulation is digital signal by data-collecting sub-station, and terminal data acquisition server will be sent in data set by controller and wireless router, the transmitting information communications tower being then then forwarded on tower crane;Signal is wirelessly transmitted to transmitting information communications tower the signal receiver of command centre of project management department, and Jing optical cable transmissions are to computer, and the data analysiss of construction monitoring, process, evaluation, early warning work are carried out in registry entry management system in computer;And effective pictorial information and text message are sent to the technical staff and management personnel of project management department by gsm module, to realize the process control of the performance to site operation process.
CN201510631021.8A 2015-09-29 2015-09-29 A kind of high-building construction monitoring system and monitoring method Active CN106557040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510631021.8A CN106557040B (en) 2015-09-29 2015-09-29 A kind of high-building construction monitoring system and monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510631021.8A CN106557040B (en) 2015-09-29 2015-09-29 A kind of high-building construction monitoring system and monitoring method

Publications (2)

Publication Number Publication Date
CN106557040A true CN106557040A (en) 2017-04-05
CN106557040B CN106557040B (en) 2019-04-26

Family

ID=58416824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510631021.8A Active CN106557040B (en) 2015-09-29 2015-09-29 A kind of high-building construction monitoring system and monitoring method

Country Status (1)

Country Link
CN (1) CN106557040B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107843230A (en) * 2017-10-31 2018-03-27 成都市第四建筑工程公司 High and big die plate fastener type support frame deformation monitoring method and system based on BIM
CN108821117A (en) * 2018-08-09 2018-11-16 中铁大桥科学研究院有限公司 A kind of intelligent erection crane
CN109099962A (en) * 2018-06-29 2018-12-28 宝葫历史建筑科技(上海)有限公司 A kind of real-time monitoring system of historical building
CN109682417A (en) * 2018-12-26 2019-04-26 中国铁路广州局集团有限公司 High-speed rail station Long-Span Steel Space Structures health monitoring sensor-based system
CN110083116A (en) * 2019-05-13 2019-08-02 上海荷福人工智能科技(集团)有限公司 High-supported formwork monitoring method based on artificial intelligence
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform
CN113034004A (en) * 2021-03-26 2021-06-25 福建汇川物联网技术科技股份有限公司 Construction safety inspection method and device
CN113723772A (en) * 2021-08-14 2021-11-30 浙江宏瑞达工程管理有限公司 Construction project supervision and acceptance method, system, storage medium and intelligent terminal
CN114199182A (en) * 2021-10-08 2022-03-18 马福明 Hydraulic structure vertical deformation monitoring device and method
CN114234901A (en) * 2021-11-30 2022-03-25 中建四局第一建设有限公司 Information monitoring method and system for dismantling and modifying super high-rise building
CN116256016A (en) * 2022-11-30 2023-06-13 广东省建筑设计研究院有限公司 Whole process health monitoring system of building structure system
CN116257986A (en) * 2023-01-03 2023-06-13 中铁十九局集团有限公司 Super high-rise building core section of thick bamboo level structure construction early warning system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607644A (en) * 2012-02-23 2012-07-25 中建钢构有限公司 Building construction monitoring system and monitoring method thereof
CN202486562U (en) * 2012-03-23 2012-10-10 长安大学 Wireless data acquisition device used in bridge construction monitoring
CN202810183U (en) * 2012-08-03 2013-03-20 重庆大学 Automatic monitoring system for high and large formwork support system construction
CN103016063A (en) * 2012-12-13 2013-04-03 长安大学 Monitoring system for construction safety
CN103031862A (en) * 2013-01-12 2013-04-10 中铁二十一局集团有限公司 Three-dimensional digital prewarning method and facility for remote intelligent monitoring of deep foundation pit deformation stability
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607644A (en) * 2012-02-23 2012-07-25 中建钢构有限公司 Building construction monitoring system and monitoring method thereof
CN202486562U (en) * 2012-03-23 2012-10-10 长安大学 Wireless data acquisition device used in bridge construction monitoring
CN202810183U (en) * 2012-08-03 2013-03-20 重庆大学 Automatic monitoring system for high and large formwork support system construction
CN103016063A (en) * 2012-12-13 2013-04-03 长安大学 Monitoring system for construction safety
CN103031862A (en) * 2013-01-12 2013-04-10 中铁二十一局集团有限公司 Three-dimensional digital prewarning method and facility for remote intelligent monitoring of deep foundation pit deformation stability
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107843230A (en) * 2017-10-31 2018-03-27 成都市第四建筑工程公司 High and big die plate fastener type support frame deformation monitoring method and system based on BIM
CN109099962A (en) * 2018-06-29 2018-12-28 宝葫历史建筑科技(上海)有限公司 A kind of real-time monitoring system of historical building
CN108821117B (en) * 2018-08-09 2020-01-14 中铁大桥科学研究院有限公司 Intelligent bridge deck crane
CN108821117A (en) * 2018-08-09 2018-11-16 中铁大桥科学研究院有限公司 A kind of intelligent erection crane
CN109682417A (en) * 2018-12-26 2019-04-26 中国铁路广州局集团有限公司 High-speed rail station Long-Span Steel Space Structures health monitoring sensor-based system
CN110083116A (en) * 2019-05-13 2019-08-02 上海荷福人工智能科技(集团)有限公司 High-supported formwork monitoring method based on artificial intelligence
CN110241739A (en) * 2019-06-28 2019-09-17 中铁七局集团有限公司 Hydraulic climbing formwork digital intelligent control platform
CN113034004A (en) * 2021-03-26 2021-06-25 福建汇川物联网技术科技股份有限公司 Construction safety inspection method and device
CN113723772A (en) * 2021-08-14 2021-11-30 浙江宏瑞达工程管理有限公司 Construction project supervision and acceptance method, system, storage medium and intelligent terminal
CN113723772B (en) * 2021-08-14 2024-03-05 浙江宏瑞达工程管理有限公司 Method and system for supervising and accepting constructional engineering, storage medium and intelligent terminal
CN114199182A (en) * 2021-10-08 2022-03-18 马福明 Hydraulic structure vertical deformation monitoring device and method
CN114234901A (en) * 2021-11-30 2022-03-25 中建四局第一建设有限公司 Information monitoring method and system for dismantling and modifying super high-rise building
CN116256016A (en) * 2022-11-30 2023-06-13 广东省建筑设计研究院有限公司 Whole process health monitoring system of building structure system
CN116257986A (en) * 2023-01-03 2023-06-13 中铁十九局集团有限公司 Super high-rise building core section of thick bamboo level structure construction early warning system
CN116257986B (en) * 2023-01-03 2023-08-25 中铁十九局集团有限公司 Super high-rise building core section of thick bamboo level structure construction early warning system

Also Published As

Publication number Publication date
CN106557040B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN106557040A (en) A kind of high-building construction monitoring system and monitoring method
CN106593534B (en) A kind of intelligent tunnel construction safety monitoring system
CN104879169B (en) Underground engineering and the unattended real time monitoring early warning system of deep basal pit and its working method
KR101696629B1 (en) System and method for warning collapse using monitoring of structure deformation
CN108050952B (en) Method for monitoring tunnel section deformation by using tunnel section deformation monitoring system
CN107121954A (en) Civil engineering Excavation Monitoring system and monitoring method
CN105819339A (en) Virtual command module for large lifting operations and working method of virtual command module
CN107894254A (en) Linear control intelligent management system and method for continuous beam construction
CN204758021U (en) Safe wireless Intelligence monitor of building formwork system construction and system thereof
CN113340344B (en) Hydraulic climbing mould intelligent monitoring control early warning system based on digital twin technology
Kan et al. A cyber–physical system (CPS) for planning and monitoring mobile cranes on construction sites
CN107806906A (en) A kind of monitoring system and method for high and big die plate support system
KR101353387B1 (en) Communication tower-structure status monitoring system using displacement sensor
CN110307036B (en) Variable cross-section tunnel structure full-life monitoring and early warning method
CN205634668U (en) Virtual command system of large -scale hoist and mount operation
CN104264589B (en) A kind of Hanging Basket status real time monitor method
CN108821117A (en) A kind of intelligent erection crane
CN208903300U (en) A kind of construction risk automatic monitoring system based on BIM technology
CN203024763U (en) Construction beam posture monitoring system
CN202495176U (en) Examination site evaluation system
CN108762171B (en) Template support system safety monitoring system and monitoring method
CN117236892A (en) Digital twin-based bridge steel web water transportation hoisting system and control method
CN205957954U (en) Hang basket monitoring devices for pre -compaction
CN102621965A (en) Clustered bridge safety real-time monitoring system based on Wi-Fi network technique
CN104729869A (en) Bridge structure monitoring system based on WSNs and multi-main-body cooperation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant