CN106552445A CN201611050761.3A CN201611050761A CN106552445A CN 106552445 A CN106552445 A CN 106552445A CN 201611050761 A CN201611050761 A CN 201611050761A CN 106552445 A CN106552445 A CN 106552445A
Authority
CN
China
Prior art keywords
water
cell body
pond
outlet
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611050761.3A
Other languages
Chinese (zh)
Other versions
CN106552445B (en
Inventor
李艳
白宇
高琼
秦春禹
李烨
贺建国
毕永伟
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Drainage Group Co Ltd
Original Assignee
Beijing Drainage Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Drainage Group Co Ltd filed Critical Beijing Drainage Group Co Ltd
Priority to CN201611050761.3A priority Critical patent/CN106552445B/en
Publication of CN106552445A publication Critical patent/CN106552445A/en
Application granted granted Critical
Publication of CN106552445B publication Critical patent/CN106552445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2405Feed mechanisms for settling tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2444Discharge mechanisms for the classified liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/245Discharge mechanisms for the sediments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/30Control equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/30Control equipment
    • B01D21/34Controlling the feed distribution; Controlling the liquid level ; Control of process parameters

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Sewage (AREA)
  • Treatment Of Sludge (AREA)

Abstract

A kind of rectangle Zhou Jinzhou of present invention design goes out second pond and its using method, it is provided with cell body, water inlet system, outlet system and mud extraction system, cell body is rectangle, water inlet system is the inlet channel that the side in cell body is arranged, the bottom of inlet channel is provided with evenly distributed water distributing pore, and outlet system is the outlet canal being arranged side by side in the inboard of inlet channel;Sludge drainage system is the discharge pipeline that the several ditch flute profiles storage buckets that arrange on cell body bottom surface and tube wall have hole, and the upper end outlet of the discharge pipeline is provided with the telescoping valve of opening and closing sleeve in the upper port of discharge pipeline in the spoil disposal canal for arranging;Cell body bottom is provided with cleaning shoe, and the position of the water-retention water surface is provided with the scum board for striking off water surface scum silica frost in the cell body, and is provided with and drives the slagging-off of scum board and cleaning shoe to scrape mud motor.Inlet and outlet water is quick, water distribution is uniform, sludge settling is fast, and mud extraction is slagged tap easily effect, and energy-conserving and environment-protective are a kind of new second ponds of ideal sewage disposal.

Description

A kind of rectangle Zhou Jinzhou goes out second pond and its using method
Technical field
The invention belongs to a kind of wastewater processing technology, a kind of new technique with regard to sedimentation tank, specifically a kind of rectangle is from week Side intakes and the second pond from peripheral effluent.The new second pond structure is novel, and operational effect is good, efficiency high.
Background technology
Sedimentation tank is widely used in sewage treatment process, it using the sludge or various float in mixing liquid from Heavy sensation of the body amount, is precipitated under gravity, is then concentrated the sludge and various float removed in water, is reached solid-liquid separation dirty The purpose of Water warfare.The effect of second pond mainly carries out the precipitation of sludge, and its precipitation is non-in sewage treatment process It is often important.Traditional second pond, side water inlet, side water outlet.The shortcoming of this structure is:Wastewater influent is disturbed to the water body in pond It is dynamic larger, it is unfavorable for the rapid precipitation of sludge;Wastewater influent concentrates side, it is impossible to is uniformly distributed in pond as early as possible, makes full use of The volume of cell body, accelerates sludge settling;Spoil disposal row froth structure is also not efficient enough, thus operational effect and efficiency are not ideal enough. Hence it is highly desirable to propose that a kind of structure is more reasonable, rapid water distribution of intaking is uniform, and sludge settling is fast, and spoil disposal deslagging is quick, fortune Row effect and the more preferable second pond of efficiency, to obtain more preferable productivity effect.
The content of the invention
The invention aims to solve above-mentioned technical problem, propose that a kind of rectangle Zhou Jinzhou goes out second pond.This two sink Pond, using the structure of circumferential water feed peripheral effluent, in making pond, sewage is quickly and evenly distributed, and forms the water beneficial to rapid precipitation Stream flow direction;The collection discharge structure of more rational sludge scum silica frost and sludge is set, reached that Inlet and outlet water is quick, water distribution is uniform, Sludge settling is fast, and mud extraction is slagged tap easily effect, is a kind of new second pond of ideal sewage disposal.
The present invention adopts following technical scheme:
A kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and mud extraction system, it is characterized in that: The cell body is rectangle, is that single cell body or multiple cell body are arranged side by side together;The water inlet system is the side in cell body The inlet channel that side is arranged, the inlet channel connect water inlet pipe;Be provided with evenly distributed water distributing pore in the bottom of the inlet channel, it is described go out Water system is the outlet canal being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out weir board, and the outlet canal is connected Outlet pipe;The sludge drainage system is the several ditch flute profile storage buckets arranged on cell body bottom surface, and in storage bucket being provided with tube wall has The discharge pipeline in hole, one end of the discharge pipeline are connected in the vertically disposed siphoning type sludge discharging sleeve of pool side, are brought out on the discharge pipeline Mouth is provided with the telescoping valve of opening and closing sleeve in the upper port of discharge pipeline in the spoil disposal canal for arranging;Cell body bottom is provided with cleaning shoe, The position of the water-retention water surface is provided with the scum board for striking off water surface scum silica frost in the cell body, and is provided with the slagging-off for driving scum board and cleaning shoe Scrape mud motor.
The present invention is further improved and the additional project of enforcement is:
Horizontally disposed reflecting curtain is provided with below the inlet channel water distributing pore, in the reflecting curtain by pond Inboard, is provided with upper and lower vertically disposed dash skirtboard.Water distributing pore and reflecting curtain, dash skirtboard are to slow down the impact into water Power, with energy dissipating, the effect of deceleration, water distribution are uniform, and flow velocity is reduced, and form backflow, activated sludge can be promoted to flocculate in area, plus The precipitation of fast sludge.
The scum board for stopping that scum silica frost enters outlet canal is provided with the inside of the outlet canal, is provided with cell body bottom and is scraped mud Plate track, is provided with scum board track in pool inner water face position;The cleaning shoe and scum board are same part, scrape mud electricity slag is scraped Under machine drives, in bottom of pond and the circular flow of pool inner water face, the sludge removal of bottom of pond can be scraped in bottom of pond operation when going journey described In storage bucket, the scum silica frost of water surface is blown off in backhaul, scum silica frost is concentrated before the scum silica frost pipe for arranging;The scum silica frost pipe whole body is provided with Slag inlet, is installed on front side of the water outlet weir plate in sedimentation tank downstream, is across whole pond width, for excluding the scum silica frost in sewage.
Water-level gauge is provided with cell body, in inlet channel, in outlet canal, in the storage bucket and in spoil disposal canal, mud position is provided with Meter, scrapes and switch electromagnetic valve is provided with the switch of mud motor with slagging-off on the water inlet pipe, outlet pipe in cell body, and be provided with PLC controls Device carries out water level with above-mentioned water-level gauge, mud level meter, the information of mud position acquisition of information is connected, and is opened with the switch electromagnetic valve Close control connection;The PLC is provided with water level, the monitoring of mud position and water inlet, water outlet, spoil disposal operation control module, realizes automatic Control operation.
The PLC is additionally provided with alarm signal and module occurs, and is provided with remote wireless signals transport module, with setting Center monitor carry out signal transmission connection, in good time will the running state information of second pond and operation it is abnormal when, i.e., each water Position, mud position deficiency are sent to center monitor beyond the alarm signal occurred when setting normal value, realize remote monitoring.
The operation method of above-mentioned second pond, is characterized in that having steps of:
1) opening PLC, the normal operating value and alarming value of each water level of setting, the highest of mud position and minimum permission, Water level value, the startup of spoil disposal process and the mud place value for stopping that water inlet, drainage procedure start and stop, setting are scraped slag and scrape mud motor fortune Row and interval time;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC is opened certainly Control operation degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, find water level, abnormal mud position or water inlet, draining, include slag, include mud and Spoil disposal operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out when PLC sends alarm signal Artificial treatment.
The rectangle Zhou Jinzhou of the present invention goes out the advantage of second pond:
1st, intake fast, precipitation is fast, draining is fast, spoil disposal investigation is fast, and operational effect is good, efficiency high, the waterpower of sewage disposal is born Lotus is averagely higher by 1 times than plain edition second pond hydraulic load.
2nd, floor space and cell body area are saved, reduces equipment investment, construction cost is low.
3rd, operational management is easy, can particularly realize automatically controlling, and operating cost is substantially reduced.
4th, energy-saving and environmental protection effect is good;
5th, remote monitoring can be realized, realizes the running automatic monitoring management of Chang Neihuoduo factories.It is the one kind being worthy of popularization
Novel secondary sedimentation tank.
Description of the drawings
Fig. 1 is this with new vertical section structure schematic diagram;
Fig. 2 is the top plan view structural representation of the present invention;
Fig. 3 is A-A cross section structure schematic diagrams of Fig. 2;
Fig. 4 is the section B-B structural representation blueprint of Fig. 2.
Specific embodiment
The present invention will be described with reference to the accompanying drawings and examples:
Embodiment:Referring to accompanying drawing, a kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and goes out Mud system, is characterized in that:The cell body 1 is rectangle, is that single cell body or multiple cell body are arranged side by side together;It is described enter water system System is the inlet channel 5 that the side in cell body is arranged, inlet channel connection water inlet pipe;Uniform row is provided with the bottom of the inlet channel The water distributing pore 12 of row, the outlet system are the outlet canal 4 being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out Weir board, the outlet canal connect outlet pipe;The sludge drainage system is the several ditch flute profile storage buckets 9 arranged on cell body bottom surface, One end that tube wall is provided with storage bucket the discharge pipeline 8 in hole, the discharge pipeline is connected in the vertically disposed static pressure type spoil disposal of pool side Sleeve 10, the upper end outlet of the spoil disposal sleeve are provided with opening and closing set in the upper port of spoil disposal sleeve in the spoil disposal canal 13 for arranging The telescoping valve 2 of cylinder;Cell body bottom is provided with cleaning shoe 15, in the cell body position of the water-retention water surface be provided with strike off water surface scum silica frost scrape slag Plate 3, and be provided with drive scum board and cleaning shoe slagging-off scrape mud motor 14.
Horizontally disposed reflecting curtain 6 is provided with below the inlet channel water distributing pore, in the reflecting curtain by pond Inboard, be provided with upper and lower vertically disposed dash skirtboard 7.Water distributing pore and reflecting curtain, dash skirtboard are to slow down rushing into water Power is hit, with energy dissipating, the effect of deceleration, water distribution are uniform, and flow velocity is reduced, and form backflow, activated sludge can be promoted to flocculate in area, Accelerate the precipitation of sludge.
The scum board 16 for stopping that scum silica frost enters outlet canal is provided with the inside of the outlet canal, is provided with cell body bottom and is scraped Mud plate track, is provided with scum board track in pool inner water face position, described to scrape slag track with scum board with one lifting of pool inner water face; The cleaning shoe and scum board are same part, scrape under mud Motor drive slag is scraped, in bottom of pond and pool inner water face circulating, go journey When bottom of pond operation the sludge removal of bottom of pond can be scraped it is described storage bucket in, the scum silica frost of water surface is blown off in backhaul, Scum silica frost is concentrated before the scum silica frost pipe 11 of setting;The scum silica frost pipe whole body is provided with slag inlet, before being installed on the water outlet weir plate in sedimentation tank downstream Side, is across whole pond width, for excluding the scum silica frost in sewage.
Water-level gauge is provided with cell body, in inlet channel, in outlet canal, in the storage bucket and in spoil disposal canal, mud position is provided with Meter, scrapes and switch electromagnetic valve is provided with the switch of mud motor with slagging-off on the water inlet pipe, outlet pipe in cell body, and be provided with PLC controls Device carries out water level with above-mentioned water-level gauge, mud level meter, the information of mud position acquisition of information is connected, and is opened with the switch electromagnetic valve Close control connection;The PLC is provided with water level, the monitoring of mud position and water inlet, water outlet, spoil disposal operation control module, realizes automatic Control operation.
The PLC is additionally provided with alarm signal and module occurs, and is provided with remote wireless signals transport module, with setting Center monitor carry out signal transmission connection, in good time will the running state information of second pond and operation it is abnormal when, i.e., each water Position, mud position deficiency are sent to center monitor beyond the alarm signal occurred when setting normal value, realize remote monitoring.
The operation method of above-mentioned second pond, is characterized in that having steps of:
1) opening PLC, the normal operating value and alarming value of each water level of setting, the highest of mud position and minimum permission, Water level value, the startup of spoil disposal process and the mud place value for stopping that water inlet, drainage procedure start and stop, setting are scraped slag and scrape mud motor fortune Row and interval time;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC is opened certainly Control operation degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, find water level, abnormal mud position or water inlet, draining, include slag, include mud and Spoil disposal operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out when PLC sends alarm signal Artificial treatment.
The present embodiment does not occur once artificial dry in certain large-scale wastewater treatment plant trial operation 3 months, basic normal operation Give, operational efficiency improves 40%, save operator 3/5ths, the labor intensity of operator is reduced significantly, and go out Water quality is significantly improved.
It should be understood that:On the premise of the basic structure of this patent is not changed, the technical scheme of similar change also should Belong to the protection domain of this patent, its product should also belong to infringing products.

Claims (6)

1. a kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and mud extraction system, it is characterized in that:Institute It is rectangle to state cell body (1), is that single cell body or multiple cell body are arranged side by side together;The water inlet system is the side in cell body The inlet channel (5) that side is arranged, the inlet channel connect water inlet pipe;Evenly distributed water distributing pore is provided with the bottom of the inlet channel (12), the outlet system is the outlet canal (4) being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out mill weir Plate, the outlet canal connect outlet pipe;The sludge drainage system is several ditch flute profiles storage bucket (9) arranged on cell body bottom surface, One end that tube wall is provided with storage bucket the discharge pipeline (8) in hole, the discharge pipeline is connected in the vertically disposed static pressure type spoil disposal of pool side Sleeve (10), the upper end outlet of the spoil disposal sleeve are provided with out in the spoil disposal canal (13) for arranging in the upper port of spoil disposal sleeve Close the telescoping valve (2) of sleeve;Cell body bottom is provided with cleaning shoe (15), and the position of the water-retention water surface is provided with and strikes off water surface floating in the cell body The scum board (3) of slag, and be provided with drive scum board and cleaning shoe slagging-off scrape mud motor (14).
2. second pond according to claim 1, is characterized in that:It is provided with horizontally disposed below the inlet channel water distributing pore Reflecting curtain (6), in the reflecting curtain by the inboard in pond, be provided with upper and lower vertically disposed dash skirtboard (7).
3. second pond according to claim 1, is characterized in that:Stop scum silica frost is provided with the inside of the outlet canal to enter The scum board (16) of water channel, is provided with cleaning shoe track in cell body bottom, is provided with scum board track in pool inner water face position;It is described Cleaning shoe and scum board are same part, scrape under mud Motor drive slag is scraped, in bottom of pond and pool inner water face circulating, remove Cheng Shi Bottom of pond operation can scrape the sludge removal of bottom of pond in the storage bucket, blow the scum silica frost of water surface off in backhaul, arranging Scum silica frost pipe (11) before scum silica frost is concentrated;The scum silica frost pipe whole body is provided with slag inlet, is installed on front side of the water outlet weir plate in sedimentation tank downstream, Whole pond width is across, for excluding the scum silica frost in sewage.
4. second pond according to claim 1, is characterized in that:Water level is provided with cell body, in inlet channel, in outlet canal Meter, it is described storage bucket in and spoil disposal canal in be provided with mud level meter, on the water inlet pipe, outlet pipe in cell body and slagging-off scrape mud motor Switch is provided with switch electromagnetic valve, and is provided with PLC and carries out water level, mud position acquisition of information with above-mentioned water-level gauge, mud level meter Information connection, and carry out on-off control with the switch electromagnetic valve and be connected;The PLC be provided with water level, mud position monitoring and Water inlet, water outlet, spoil disposal operation control module, realize auto-controll operation.
5. second pond according to claim 1, is characterized in that:The PLC is additionally provided with alarm signal and module occurs, And remote wireless signals transport module is provided with, signal transmission is carried out with the center monitor for arranging and be connected, in good time by second pond When running state information and abnormal operation, i.e., each water level, mud position is not enough or beyond setting normal value when the alarm signal that occurs Send to center monitor, realize remote monitoring.
6. the operation method of second pond according to claim 5, is characterized in that having steps of:
1) open PLC, arrange the normal operating value and alarming value of each water level, the highest of mud position and minimum permission, water inlet, Drainage procedure start and stop water level value, spoil disposal process start and stop mud place value, setting scrape slag scrape mud motor operation and Interval time, and open the network link with center monitor;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC automatic controls fortune is opened Stroke degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, and is found water level, abnormal mud position or water inlet, draining, is scraped slag, scrapes mud and spoil disposal Operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out manually when PLC sends alarm signal Process.
CN201611050761.3A 2016-11-24 2016-11-24 A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method Active CN106552445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611050761.3A CN106552445B (en) 2016-11-24 2016-11-24 A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611050761.3A CN106552445B (en) 2016-11-24 2016-11-24 A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method

Publications (2)

Publication Number Publication Date
CN106552445A true CN106552445A (en) 2017-04-05
CN106552445B CN106552445B (en) 2018-09-11

Family

ID=58443514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611050761.3A Active CN106552445B (en) 2016-11-24 2016-11-24 A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method

Country Status (1)

Country Link
CN (1) CN106552445B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108553946A (en) * 2018-04-18 2018-09-21 中国天辰工程有限公司 A kind of novel setting pot
CN110526403A (en) * 2019-10-14 2019-12-03 鹏鹞环保股份有限公司 A kind of method and its system of bio-denitrifying sewage dephosphorization system processing sewage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101879382A (en) * 2009-05-06 2010-11-10 得利满水处理***(北京)有限公司 Sewage second-level settling pond
CN201889102U (en) * 2010-11-18 2011-07-06 北京城市排水集团有限责任公司 Apron plate of secondary sedimentation tank
JP2013188721A (en) * 2012-03-15 2013-09-26 Toshiba Corp Sludge thickener tank, sludge treatment system, and sludge treatment method
CN105233535A (en) * 2015-11-03 2016-01-13 上海市城市建设设计研究总院 Horizontal sedimentation tank with sludge pump house
CN105344134A (en) * 2015-12-09 2016-02-24 浦华环保股份有限公司 Circumferentially-feeding and circumferentially-discharging flow assisting type sedimentation basin
CN205151868U (en) * 2015-10-30 2016-04-13 浦华环保股份有限公司 Activated sludge gravity is from flowing back sewage treatment integrated device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101879382A (en) * 2009-05-06 2010-11-10 得利满水处理***(北京)有限公司 Sewage second-level settling pond
CN201889102U (en) * 2010-11-18 2011-07-06 北京城市排水集团有限责任公司 Apron plate of secondary sedimentation tank
JP2013188721A (en) * 2012-03-15 2013-09-26 Toshiba Corp Sludge thickener tank, sludge treatment system, and sludge treatment method
CN205151868U (en) * 2015-10-30 2016-04-13 浦华环保股份有限公司 Activated sludge gravity is from flowing back sewage treatment integrated device
CN105233535A (en) * 2015-11-03 2016-01-13 上海市城市建设设计研究总院 Horizontal sedimentation tank with sludge pump house
CN105344134A (en) * 2015-12-09 2016-02-24 浦华环保股份有限公司 Circumferentially-feeding and circumferentially-discharging flow assisting type sedimentation basin

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108553946A (en) * 2018-04-18 2018-09-21 中国天辰工程有限公司 A kind of novel setting pot
CN108553946B (en) * 2018-04-18 2021-07-30 中国天辰工程有限公司 Novel grit chamber
CN110526403A (en) * 2019-10-14 2019-12-03 鹏鹞环保股份有限公司 A kind of method and its system of bio-denitrifying sewage dephosphorization system processing sewage

Also Published As

Publication number Publication date
CN106552445B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN104817209A (en) Buried efficient treater of initial rainwater
CN104829007A (en) Dissolved air flotation sewage processing device with self-cleaning function
CN204607764U (en) Buried efficient early-stage rainwater treatment unit
CN106552445B (en) A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method
CN209098440U (en) A kind of small-sized integrated countryside sewage treatment equipment of double iris types
CN104671321A (en) Efficient dissolved air flotation machine
CN209853876U (en) Integrated grease separation water purifier
CN201882993U (en) Oily sewage settling treatment device
CN216998048U (en) Oil-water separation lifting device
CN207031014U (en) A kind of new batch-type air-dissolving air-float equipment for separating liquid from solid
CN204644011U (en) A kind of air-dissolving air-float waste disposal plant possessing self-cleaning function
CN108751611A (en) Efficient printing and dyeing wastewater treatment system and its processing method
CN204645241U (en) A kind of manhole sediment by aeration device
CN204097283U (en) Air supporting integrated device for biochemical treatment
CN209053196U (en) Bridge floor initial rainwater collection processing system implementing
CN203346120U (en) Built-in type full-automatic oil separating and lifting integrated equipment
CN106237670A (en) A kind of efficiently up-flow anisotropic flow inclined-plate clarifying basin
CN203269621U (en) Integrated full-automatic deoiling and lifting all-in-one equipment
CN112194281A (en) Accident pool combination system and method for tunnel construction wastewater treatment
CN104775507A (en) Aeration sand setting device of inspection well
CN206858319U (en) A kind of oil field liquid waste processing coagulation air-float device
CN205187913U (en) Water treatment equipment
CN201470196U (en) Purifier for sewage, waste water and reclaimed water
CN219815376U (en) Inclined plate sand setting device for overflow sewage pretreatment
CN219399074U (en) Advection sedimentation tank with mud discharging device function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant