CN106552445A - A kind of rectangle Zhou Jinzhou goes out second pond and its using method - Google Patents
A kind of rectangle Zhou Jinzhou goes out second pond and its using method Download PDFInfo
- Publication number
- CN106552445A CN106552445A CN201611050761.3A CN201611050761A CN106552445A CN 106552445 A CN106552445 A CN 106552445A CN 201611050761 A CN201611050761 A CN 201611050761A CN 106552445 A CN106552445 A CN 106552445A
- Authority
- CN
- China
- Prior art keywords
- water
- cell body
- pond
- outlet
- mud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/02—Settling tanks with single outlets for the separated liquid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/24—Feed or discharge mechanisms for settling tanks
- B01D21/2405—Feed mechanisms for settling tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/24—Feed or discharge mechanisms for settling tanks
- B01D21/2444—Discharge mechanisms for the classified liquid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/24—Feed or discharge mechanisms for settling tanks
- B01D21/245—Discharge mechanisms for the sediments
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/30—Control equipment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D21/00—Separation of suspended solid particles from liquids by sedimentation
- B01D21/30—Control equipment
- B01D21/34—Controlling the feed distribution; Controlling the liquid level ; Control of process parameters
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Sewage (AREA)
- Treatment Of Sludge (AREA)
Abstract
A kind of rectangle Zhou Jinzhou of present invention design goes out second pond and its using method, it is provided with cell body, water inlet system, outlet system and mud extraction system, cell body is rectangle, water inlet system is the inlet channel that the side in cell body is arranged, the bottom of inlet channel is provided with evenly distributed water distributing pore, and outlet system is the outlet canal being arranged side by side in the inboard of inlet channel;Sludge drainage system is the discharge pipeline that the several ditch flute profiles storage buckets that arrange on cell body bottom surface and tube wall have hole, and the upper end outlet of the discharge pipeline is provided with the telescoping valve of opening and closing sleeve in the upper port of discharge pipeline in the spoil disposal canal for arranging;Cell body bottom is provided with cleaning shoe, and the position of the water-retention water surface is provided with the scum board for striking off water surface scum silica frost in the cell body, and is provided with and drives the slagging-off of scum board and cleaning shoe to scrape mud motor.Inlet and outlet water is quick, water distribution is uniform, sludge settling is fast, and mud extraction is slagged tap easily effect, and energy-conserving and environment-protective are a kind of new second ponds of ideal sewage disposal.
Description
Technical field
The invention belongs to a kind of wastewater processing technology, a kind of new technique with regard to sedimentation tank, specifically a kind of rectangle is from week
Side intakes and the second pond from peripheral effluent.The new second pond structure is novel, and operational effect is good, efficiency high.
Background technology
Sedimentation tank is widely used in sewage treatment process, it using the sludge or various float in mixing liquid from
Heavy sensation of the body amount, is precipitated under gravity, is then concentrated the sludge and various float removed in water, is reached solid-liquid separation dirty
The purpose of Water warfare.The effect of second pond mainly carries out the precipitation of sludge, and its precipitation is non-in sewage treatment process
It is often important.Traditional second pond, side water inlet, side water outlet.The shortcoming of this structure is:Wastewater influent is disturbed to the water body in pond
It is dynamic larger, it is unfavorable for the rapid precipitation of sludge;Wastewater influent concentrates side, it is impossible to is uniformly distributed in pond as early as possible, makes full use of
The volume of cell body, accelerates sludge settling;Spoil disposal row froth structure is also not efficient enough, thus operational effect and efficiency are not ideal enough.
Hence it is highly desirable to propose that a kind of structure is more reasonable, rapid water distribution of intaking is uniform, and sludge settling is fast, and spoil disposal deslagging is quick, fortune
Row effect and the more preferable second pond of efficiency, to obtain more preferable productivity effect.
The content of the invention
The invention aims to solve above-mentioned technical problem, propose that a kind of rectangle Zhou Jinzhou goes out second pond.This two sink
Pond, using the structure of circumferential water feed peripheral effluent, in making pond, sewage is quickly and evenly distributed, and forms the water beneficial to rapid precipitation
Stream flow direction;The collection discharge structure of more rational sludge scum silica frost and sludge is set, reached that Inlet and outlet water is quick, water distribution is uniform,
Sludge settling is fast, and mud extraction is slagged tap easily effect, is a kind of new second pond of ideal sewage disposal.
The present invention adopts following technical scheme:
A kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and mud extraction system, it is characterized in that:
The cell body is rectangle, is that single cell body or multiple cell body are arranged side by side together;The water inlet system is the side in cell body
The inlet channel that side is arranged, the inlet channel connect water inlet pipe;Be provided with evenly distributed water distributing pore in the bottom of the inlet channel, it is described go out
Water system is the outlet canal being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out weir board, and the outlet canal is connected
Outlet pipe;The sludge drainage system is the several ditch flute profile storage buckets arranged on cell body bottom surface, and in storage bucket being provided with tube wall has
The discharge pipeline in hole, one end of the discharge pipeline are connected in the vertically disposed siphoning type sludge discharging sleeve of pool side, are brought out on the discharge pipeline
Mouth is provided with the telescoping valve of opening and closing sleeve in the upper port of discharge pipeline in the spoil disposal canal for arranging;Cell body bottom is provided with cleaning shoe,
The position of the water-retention water surface is provided with the scum board for striking off water surface scum silica frost in the cell body, and is provided with the slagging-off for driving scum board and cleaning shoe
Scrape mud motor.
The present invention is further improved and the additional project of enforcement is:
Horizontally disposed reflecting curtain is provided with below the inlet channel water distributing pore, in the reflecting curtain by pond
Inboard, is provided with upper and lower vertically disposed dash skirtboard.Water distributing pore and reflecting curtain, dash skirtboard are to slow down the impact into water
Power, with energy dissipating, the effect of deceleration, water distribution are uniform, and flow velocity is reduced, and form backflow, activated sludge can be promoted to flocculate in area, plus
The precipitation of fast sludge.
The scum board for stopping that scum silica frost enters outlet canal is provided with the inside of the outlet canal, is provided with cell body bottom and is scraped mud
Plate track, is provided with scum board track in pool inner water face position;The cleaning shoe and scum board are same part, scrape mud electricity slag is scraped
Under machine drives, in bottom of pond and the circular flow of pool inner water face, the sludge removal of bottom of pond can be scraped in bottom of pond operation when going journey described
In storage bucket, the scum silica frost of water surface is blown off in backhaul, scum silica frost is concentrated before the scum silica frost pipe for arranging;The scum silica frost pipe whole body is provided with
Slag inlet, is installed on front side of the water outlet weir plate in sedimentation tank downstream, is across whole pond width, for excluding the scum silica frost in sewage.
Water-level gauge is provided with cell body, in inlet channel, in outlet canal, in the storage bucket and in spoil disposal canal, mud position is provided with
Meter, scrapes and switch electromagnetic valve is provided with the switch of mud motor with slagging-off on the water inlet pipe, outlet pipe in cell body, and be provided with PLC controls
Device carries out water level with above-mentioned water-level gauge, mud level meter, the information of mud position acquisition of information is connected, and is opened with the switch electromagnetic valve
Close control connection;The PLC is provided with water level, the monitoring of mud position and water inlet, water outlet, spoil disposal operation control module, realizes automatic
Control operation.
The PLC is additionally provided with alarm signal and module occurs, and is provided with remote wireless signals transport module, with setting
Center monitor carry out signal transmission connection, in good time will the running state information of second pond and operation it is abnormal when, i.e., each water
Position, mud position deficiency are sent to center monitor beyond the alarm signal occurred when setting normal value, realize remote monitoring.
The operation method of above-mentioned second pond, is characterized in that having steps of:
1) opening PLC, the normal operating value and alarming value of each water level of setting, the highest of mud position and minimum permission,
Water level value, the startup of spoil disposal process and the mud place value for stopping that water inlet, drainage procedure start and stop, setting are scraped slag and scrape mud motor fortune
Row and interval time;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC is opened certainly
Control operation degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, find water level, abnormal mud position or water inlet, draining, include slag, include mud and
Spoil disposal operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out when PLC sends alarm signal
Artificial treatment.
The rectangle Zhou Jinzhou of the present invention goes out the advantage of second pond:
1st, intake fast, precipitation is fast, draining is fast, spoil disposal investigation is fast, and operational effect is good, efficiency high, the waterpower of sewage disposal is born
Lotus is averagely higher by 1 times than plain edition second pond hydraulic load.
2nd, floor space and cell body area are saved, reduces equipment investment, construction cost is low.
3rd, operational management is easy, can particularly realize automatically controlling, and operating cost is substantially reduced.
4th, energy-saving and environmental protection effect is good;
5th, remote monitoring can be realized, realizes the running automatic monitoring management of Chang Neihuoduo factories.It is the one kind being worthy of popularization
Novel secondary sedimentation tank.
Description of the drawings
Fig. 1 is this with new vertical section structure schematic diagram;
Fig. 2 is the top plan view structural representation of the present invention;
Fig. 3 is A-A cross section structure schematic diagrams of Fig. 2;
Fig. 4 is the section B-B structural representation blueprint of Fig. 2.
Specific embodiment
The present invention will be described with reference to the accompanying drawings and examples:
Embodiment:Referring to accompanying drawing, a kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and goes out
Mud system, is characterized in that:The cell body 1 is rectangle, is that single cell body or multiple cell body are arranged side by side together;It is described enter water system
System is the inlet channel 5 that the side in cell body is arranged, inlet channel connection water inlet pipe;Uniform row is provided with the bottom of the inlet channel
The water distributing pore 12 of row, the outlet system are the outlet canal 4 being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out
Weir board, the outlet canal connect outlet pipe;The sludge drainage system is the several ditch flute profile storage buckets 9 arranged on cell body bottom surface,
One end that tube wall is provided with storage bucket the discharge pipeline 8 in hole, the discharge pipeline is connected in the vertically disposed static pressure type spoil disposal of pool side
Sleeve 10, the upper end outlet of the spoil disposal sleeve are provided with opening and closing set in the upper port of spoil disposal sleeve in the spoil disposal canal 13 for arranging
The telescoping valve 2 of cylinder;Cell body bottom is provided with cleaning shoe 15, in the cell body position of the water-retention water surface be provided with strike off water surface scum silica frost scrape slag
Plate 3, and be provided with drive scum board and cleaning shoe slagging-off scrape mud motor 14.
Horizontally disposed reflecting curtain 6 is provided with below the inlet channel water distributing pore, in the reflecting curtain by pond
Inboard, be provided with upper and lower vertically disposed dash skirtboard 7.Water distributing pore and reflecting curtain, dash skirtboard are to slow down rushing into water
Power is hit, with energy dissipating, the effect of deceleration, water distribution are uniform, and flow velocity is reduced, and form backflow, activated sludge can be promoted to flocculate in area,
Accelerate the precipitation of sludge.
The scum board 16 for stopping that scum silica frost enters outlet canal is provided with the inside of the outlet canal, is provided with cell body bottom and is scraped
Mud plate track, is provided with scum board track in pool inner water face position, described to scrape slag track with scum board with one lifting of pool inner water face;
The cleaning shoe and scum board are same part, scrape under mud Motor drive slag is scraped, in bottom of pond and pool inner water face circulating, go journey
When bottom of pond operation the sludge removal of bottom of pond can be scraped it is described storage bucket in, the scum silica frost of water surface is blown off in backhaul,
Scum silica frost is concentrated before the scum silica frost pipe 11 of setting;The scum silica frost pipe whole body is provided with slag inlet, before being installed on the water outlet weir plate in sedimentation tank downstream
Side, is across whole pond width, for excluding the scum silica frost in sewage.
Water-level gauge is provided with cell body, in inlet channel, in outlet canal, in the storage bucket and in spoil disposal canal, mud position is provided with
Meter, scrapes and switch electromagnetic valve is provided with the switch of mud motor with slagging-off on the water inlet pipe, outlet pipe in cell body, and be provided with PLC controls
Device carries out water level with above-mentioned water-level gauge, mud level meter, the information of mud position acquisition of information is connected, and is opened with the switch electromagnetic valve
Close control connection;The PLC is provided with water level, the monitoring of mud position and water inlet, water outlet, spoil disposal operation control module, realizes automatic
Control operation.
The PLC is additionally provided with alarm signal and module occurs, and is provided with remote wireless signals transport module, with setting
Center monitor carry out signal transmission connection, in good time will the running state information of second pond and operation it is abnormal when, i.e., each water
Position, mud position deficiency are sent to center monitor beyond the alarm signal occurred when setting normal value, realize remote monitoring.
The operation method of above-mentioned second pond, is characterized in that having steps of:
1) opening PLC, the normal operating value and alarming value of each water level of setting, the highest of mud position and minimum permission,
Water level value, the startup of spoil disposal process and the mud place value for stopping that water inlet, drainage procedure start and stop, setting are scraped slag and scrape mud motor fortune
Row and interval time;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC is opened certainly
Control operation degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, find water level, abnormal mud position or water inlet, draining, include slag, include mud and
Spoil disposal operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out when PLC sends alarm signal
Artificial treatment.
The present embodiment does not occur once artificial dry in certain large-scale wastewater treatment plant trial operation 3 months, basic normal operation
Give, operational efficiency improves 40%, save operator 3/5ths, the labor intensity of operator is reduced significantly, and go out
Water quality is significantly improved.
It should be understood that:On the premise of the basic structure of this patent is not changed, the technical scheme of similar change also should
Belong to the protection domain of this patent, its product should also belong to infringing products.
Claims (6)
1. a kind of rectangle Zhou Jinzhou goes out second pond, is provided with cell body, water inlet system, outlet system and mud extraction system, it is characterized in that:Institute
It is rectangle to state cell body (1), is that single cell body or multiple cell body are arranged side by side together;The water inlet system is the side in cell body
The inlet channel (5) that side is arranged, the inlet channel connect water inlet pipe;Evenly distributed water distributing pore is provided with the bottom of the inlet channel
(12), the outlet system is the outlet canal (4) being arranged side by side in the inboard of inlet channel, and the inboard of the outlet canal sets out mill weir
Plate, the outlet canal connect outlet pipe;The sludge drainage system is several ditch flute profiles storage bucket (9) arranged on cell body bottom surface,
One end that tube wall is provided with storage bucket the discharge pipeline (8) in hole, the discharge pipeline is connected in the vertically disposed static pressure type spoil disposal of pool side
Sleeve (10), the upper end outlet of the spoil disposal sleeve are provided with out in the spoil disposal canal (13) for arranging in the upper port of spoil disposal sleeve
Close the telescoping valve (2) of sleeve;Cell body bottom is provided with cleaning shoe (15), and the position of the water-retention water surface is provided with and strikes off water surface floating in the cell body
The scum board (3) of slag, and be provided with drive scum board and cleaning shoe slagging-off scrape mud motor (14).
2. second pond according to claim 1, is characterized in that:It is provided with horizontally disposed below the inlet channel water distributing pore
Reflecting curtain (6), in the reflecting curtain by the inboard in pond, be provided with upper and lower vertically disposed dash skirtboard (7).
3. second pond according to claim 1, is characterized in that:Stop scum silica frost is provided with the inside of the outlet canal to enter
The scum board (16) of water channel, is provided with cleaning shoe track in cell body bottom, is provided with scum board track in pool inner water face position;It is described
Cleaning shoe and scum board are same part, scrape under mud Motor drive slag is scraped, in bottom of pond and pool inner water face circulating, remove Cheng Shi
Bottom of pond operation can scrape the sludge removal of bottom of pond in the storage bucket, blow the scum silica frost of water surface off in backhaul, arranging
Scum silica frost pipe (11) before scum silica frost is concentrated;The scum silica frost pipe whole body is provided with slag inlet, is installed on front side of the water outlet weir plate in sedimentation tank downstream,
Whole pond width is across, for excluding the scum silica frost in sewage.
4. second pond according to claim 1, is characterized in that:Water level is provided with cell body, in inlet channel, in outlet canal
Meter, it is described storage bucket in and spoil disposal canal in be provided with mud level meter, on the water inlet pipe, outlet pipe in cell body and slagging-off scrape mud motor
Switch is provided with switch electromagnetic valve, and is provided with PLC and carries out water level, mud position acquisition of information with above-mentioned water-level gauge, mud level meter
Information connection, and carry out on-off control with the switch electromagnetic valve and be connected;The PLC be provided with water level, mud position monitoring and
Water inlet, water outlet, spoil disposal operation control module, realize auto-controll operation.
5. second pond according to claim 1, is characterized in that:The PLC is additionally provided with alarm signal and module occurs,
And remote wireless signals transport module is provided with, signal transmission is carried out with the center monitor for arranging and be connected, in good time by second pond
When running state information and abnormal operation, i.e., each water level, mud position is not enough or beyond setting normal value when the alarm signal that occurs
Send to center monitor, realize remote monitoring.
6. the operation method of second pond according to claim 5, is characterized in that having steps of:
1) open PLC, arrange the normal operating value and alarming value of each water level, the highest of mud position and minimum permission, water inlet,
Drainage procedure start and stop water level value, spoil disposal process start and stop mud place value, setting scrape slag scrape mud motor operation and
Interval time, and open the network link with center monitor;
2) the hand switch valve of water inlet pipe and outlet pipe is opened, after pool inner water position reaches normal water level, PLC automatic controls fortune is opened
Stroke degree, second pond enter normal operation;
3) operator on duty that patrols periodically is patrolled, and is found water level, abnormal mud position or water inlet, draining, is scraped slag, scrapes mud and spoil disposal
Operation is abnormal, PLC operation is abnormal carries out manually dry giving;Or occur to carry out manually when PLC sends alarm signal
Process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611050761.3A CN106552445B (en) | 2016-11-24 | 2016-11-24 | A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611050761.3A CN106552445B (en) | 2016-11-24 | 2016-11-24 | A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106552445A true CN106552445A (en) | 2017-04-05 |
CN106552445B CN106552445B (en) | 2018-09-11 |
Family
ID=58443514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611050761.3A Active CN106552445B (en) | 2016-11-24 | 2016-11-24 | A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106552445B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108553946A (en) * | 2018-04-18 | 2018-09-21 | 中国天辰工程有限公司 | A kind of novel setting pot |
CN110526403A (en) * | 2019-10-14 | 2019-12-03 | 鹏鹞环保股份有限公司 | A kind of method and its system of bio-denitrifying sewage dephosphorization system processing sewage |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101879382A (en) * | 2009-05-06 | 2010-11-10 | 得利满水处理***(北京)有限公司 | Sewage second-level settling pond |
CN201889102U (en) * | 2010-11-18 | 2011-07-06 | 北京城市排水集团有限责任公司 | Apron plate of secondary sedimentation tank |
JP2013188721A (en) * | 2012-03-15 | 2013-09-26 | Toshiba Corp | Sludge thickener tank, sludge treatment system, and sludge treatment method |
CN105233535A (en) * | 2015-11-03 | 2016-01-13 | 上海市城市建设设计研究总院 | Horizontal sedimentation tank with sludge pump house |
CN105344134A (en) * | 2015-12-09 | 2016-02-24 | 浦华环保股份有限公司 | Circumferentially-feeding and circumferentially-discharging flow assisting type sedimentation basin |
CN205151868U (en) * | 2015-10-30 | 2016-04-13 | 浦华环保股份有限公司 | Activated sludge gravity is from flowing back sewage treatment integrated device |
-
2016
- 2016-11-24 CN CN201611050761.3A patent/CN106552445B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101879382A (en) * | 2009-05-06 | 2010-11-10 | 得利满水处理***(北京)有限公司 | Sewage second-level settling pond |
CN201889102U (en) * | 2010-11-18 | 2011-07-06 | 北京城市排水集团有限责任公司 | Apron plate of secondary sedimentation tank |
JP2013188721A (en) * | 2012-03-15 | 2013-09-26 | Toshiba Corp | Sludge thickener tank, sludge treatment system, and sludge treatment method |
CN205151868U (en) * | 2015-10-30 | 2016-04-13 | 浦华环保股份有限公司 | Activated sludge gravity is from flowing back sewage treatment integrated device |
CN105233535A (en) * | 2015-11-03 | 2016-01-13 | 上海市城市建设设计研究总院 | Horizontal sedimentation tank with sludge pump house |
CN105344134A (en) * | 2015-12-09 | 2016-02-24 | 浦华环保股份有限公司 | Circumferentially-feeding and circumferentially-discharging flow assisting type sedimentation basin |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108553946A (en) * | 2018-04-18 | 2018-09-21 | 中国天辰工程有限公司 | A kind of novel setting pot |
CN108553946B (en) * | 2018-04-18 | 2021-07-30 | 中国天辰工程有限公司 | Novel grit chamber |
CN110526403A (en) * | 2019-10-14 | 2019-12-03 | 鹏鹞环保股份有限公司 | A kind of method and its system of bio-denitrifying sewage dephosphorization system processing sewage |
Also Published As
Publication number | Publication date |
---|---|
CN106552445B (en) | 2018-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104817209A (en) | Buried efficient treater of initial rainwater | |
CN104829007A (en) | Dissolved air flotation sewage processing device with self-cleaning function | |
CN204607764U (en) | Buried efficient early-stage rainwater treatment unit | |
CN106552445B (en) | A kind of rectangle Zhou Jinzhou goes out secondary settling tank and its application method | |
CN209098440U (en) | A kind of small-sized integrated countryside sewage treatment equipment of double iris types | |
CN104671321A (en) | Efficient dissolved air flotation machine | |
CN209853876U (en) | Integrated grease separation water purifier | |
CN201882993U (en) | Oily sewage settling treatment device | |
CN216998048U (en) | Oil-water separation lifting device | |
CN207031014U (en) | A kind of new batch-type air-dissolving air-float equipment for separating liquid from solid | |
CN204644011U (en) | A kind of air-dissolving air-float waste disposal plant possessing self-cleaning function | |
CN108751611A (en) | Efficient printing and dyeing wastewater treatment system and its processing method | |
CN204645241U (en) | A kind of manhole sediment by aeration device | |
CN204097283U (en) | Air supporting integrated device for biochemical treatment | |
CN209053196U (en) | Bridge floor initial rainwater collection processing system implementing | |
CN203346120U (en) | Built-in type full-automatic oil separating and lifting integrated equipment | |
CN106237670A (en) | A kind of efficiently up-flow anisotropic flow inclined-plate clarifying basin | |
CN203269621U (en) | Integrated full-automatic deoiling and lifting all-in-one equipment | |
CN112194281A (en) | Accident pool combination system and method for tunnel construction wastewater treatment | |
CN104775507A (en) | Aeration sand setting device of inspection well | |
CN206858319U (en) | A kind of oil field liquid waste processing coagulation air-float device | |
CN205187913U (en) | Water treatment equipment | |
CN201470196U (en) | Purifier for sewage, waste water and reclaimed water | |
CN219815376U (en) | Inclined plate sand setting device for overflow sewage pretreatment | |
CN219399074U (en) | Advection sedimentation tank with mud discharging device function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |