CN106550476A - A kind of resource regulating method and base station and terminal - Google Patents

A kind of resource regulating method and base station and terminal Download PDF

Info

Publication number
CN106550476A
CN106550476A CN201710036279.2A CN201710036279A CN106550476A CN 106550476 A CN106550476 A CN 106550476A CN 201710036279 A CN201710036279 A CN 201710036279A CN 106550476 A CN106550476 A CN 106550476A
Authority
CN
China
Prior art keywords
physical resource
terminal
resource block
time
application
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710036279.2A
Other languages
Chinese (zh)
Inventor
孙立新
丁颖哲
周明宇
刘桂栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baicells Technologies Co Ltd
Original Assignee
Baicells Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baicells Technologies Co Ltd filed Critical Baicells Technologies Co Ltd
Priority to CN201710036279.2A priority Critical patent/CN106550476A/en
Publication of CN106550476A publication Critical patent/CN106550476A/en
Priority to PCT/CN2018/073085 priority patent/WO2018133802A1/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/543Allocation or scheduling criteria for wireless resources based on quality criteria based on requested quality, e.g. QoS

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of resource regulating method and base station and terminal.Wherein, the method includes:The scheduling of resource application of receiving terminal, the transport block size of the expectation application and the Physical Resource Block of expectation application;Time interval between current time and last time resource allocation time is in predetermined period, or, from current time to the variations of terminal last time resource allocation time in preset range when, according to the coding and modulation system situation, the transport block size of expectation application and the Physical Resource Block for expecting to apply and currently valid Physical Resource Block of upper sub-distribution, it is the terminal distribution Physical Resource Block;When time interval between current time and last time resource allocation time exceedes predetermined period, and variations more than preset range, performing link circuit self-adapting algorithm carries out resource allocation for the terminal.When variations are in preset range, the schedule information for being multiplexed last time link circuit self-adapting is terminal distribution resource to the present invention, reduces the time for terminal distribution resource.

Description

A kind of resource regulating method and base station and terminal
Technical field
The present invention relates to communication technology, more particularly to a kind of resource regulating method and base station and terminal.
Background technology
Mobile operator uses small station, such as evolved base station (Evolved Node B, abbreviation eNB) to spread over Scope and lifting network capacity.In disposing indoors, the application scenarios in current small station are roughly divided into three classes:It is family, enterprise, public Region.When disposing small station within the family, typically it is not concerned with user and accesses quantity, is also not concerned with covering requirement.Enterprise or public area Domain, for example, school, government, enterprise's office building, coffee shop, market, library, hotel, these local crowds concentrate, access amount Greatly, and coverage is typically required at 10 meters in 100 meters.
Inventor has found that at least there are the following problems for prior art during the present invention is realized:
Small station is limited due to congenital hardware, and the number of users that each small station can service is fewer, and a large number of users asks clothes simultaneously Time delay during business is long.In order to solve such problem, network capacity is lifted often by website quantity is increased.So And, increasing site deployment can cause presence of intercell interference big again, but also increase cost of installation and maintenance.Therefore, in prior art The service quality in small station is poor, it is impossible to meet user's request.
The content of the invention
It is an object of the present invention to be directed to the poor problem of prior art middle and small stations service quality, propose that a kind of resource is adjusted Degree method and base station and terminal, effectively increase the number of users of small station scheduling, and having reached reduces the mesh of the scheduled time delay of user 's.
For achieving the above object, the one side embodiment of the present invention provides a kind of resource regulating method, including:
The scheduling of resource application of receiving terminal, the scheduling of resource application include transport block size and the expectation for expecting application The Physical Resource Block of application;
Time interval between current time and last time resource allocation time in predetermined period, or, from it is current when Between to terminal between last time resource allocation time variations in preset range when, according to the coding of upper sub-distribution with Modulation system, the transport block size for expecting application and the Physical Resource Block for expecting to apply and currently valid Physical Resource Block, For the terminal distribution Physical Resource Block.
Alternatively, coding and modulation system situation, the transport block size of expectation application and the expectation Shen according to upper sub-distribution Physical Resource Block please and currently valid Physical Resource Block, are the terminal distribution Physical Resource Block, including:
If currently valid Physical Resource Block meets the Physical Resource Block for expecting application, it is determined that for terminal distribution Physical Resource Block is the Physical Resource Block for expecting application, and determines that currently used modulation was terminal point with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively,
If currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, according to the tune of upper sub-distribution System and coded system, the transport block size of expectation application and currently valid Physical Resource Block, are defined as the physics of terminal distribution Resource Block and transport block size, and determine that currently used modulation is used when being terminal distribution resource with last time with coded system Modulation it is identical with coded system.
Alternatively, after the scheduling of resource application of receive user, also include:
If difference of the terminal between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time More than the first preset value, or, less than the second preset value, determine terminal from current time to last time resource allocation time Variations exceed preset range.
Alternatively, according to noise and the adjustment of interference, power headroom reporting and outer shroud, determine the terminal in current time Signal to Interference plus Noise Ratio.
For achieving the above object, on the other hand, the embodiment of the present invention provides a kind of base station, including:
Transport module, for the scheduling of resource application of receiving terminal, the transport block size of the expectation application and expectation Shen Physical Resource Block please;
Processing module, for the time interval between current time and last time resource allocation time in predetermined period, Or, from current time to the variations of terminal last time resource allocation time in preset range when, according to upper The coding of sub-distribution and modulation system, the transport block size for expecting application and expect the Physical Resource Block of application and the currently active Physical Resource Block, be the terminal distribution Physical Resource Block.
Alternatively, the processing module, is additionally operable to
If currently valid Physical Resource Block meets the Physical Resource Block for expecting application, it is determined that for terminal distribution Physical Resource Block be the Physical Resource Block for expecting application, and determine that currently used modulation was terminal with coded system and last time The modulation used during Resources allocation is identical with coded system;
If the discontented whole Physical Resource Block for expecting application of currently valid Physical Resource Block, according to upper sub-distribution Modulation and coded system, expect the transport block size and currently valid Physical Resource Block of application, be defined as terminal distribution Physical Resource Block and transport block size, and when to determine currently used modulation and coded system be terminal distribution resource with last time The modulation for using is identical with coded system.
Alternatively, the processing module, if being additionally operable to the terminal from current time to the letter of last time resource allocation time Road mass change is in preset range;The terminal dry with the letter of last time resource allocation time is made an uproar in the Signal to Interference plus Noise Ratio of current time Difference than between is more than the first preset value, or, less than the second preset value, determine that terminal is divided from current time to last time resource Exceed preset range with the variations between the time.
Alternatively, the processing module, is additionally operable to according to noise and the adjustment of interference, power headroom reporting and outer shroud, it is determined that Signal to Interference plus Noise Ratio of the terminal in current time.
For achieving the above object, the another aspect embodiment of the present invention also provides a kind of base station, including:Transmitter, receiver, Memorizer and the processor being connected with transmitter, receiver and memorizer respectively;Wherein, one group of journey is stored in the memorizer Sequence code, and the program code stored during the processor is used to call the memorizer,
The receiver, for obtaining the scheduling of resource application of terminal, the scheduling of resource includes the transmission for expecting application Block size and the Physical Resource Block of expectation application;
The processor, is additionally operable to perform following operation:Time between current time and last time resource allocation time It is spaced in predetermined period, or, from current time to the variations of terminal last time resource allocation time pre- If when in scope, the physics of coding and modulation system, the transport block size for expecting application and expectation application according to upper sub-distribution Resource Block and currently valid Physical Resource Block, are the terminal distribution Physical Resource Block.
Alternatively, the processor is additionally operable to perform following operation:If currently valid Physical Resource Block meets the phase Hope the Physical Resource Block of application, it is determined that the Physical Resource Block for terminal distribution is to expect the Physical Resource Block applied, and is determined The modulation that currently used modulation is used when being terminal distribution resource with last time with coded system is identical with coded system.
Alternatively, the processor is additionally operable to perform following operation:If currently valid Physical Resource Block is unsatisfactory for described Expect the Physical Resource Block applied, according to the modulation of upper sub-distribution with coded system, expect the transport block size of application and current Effectively Physical Resource Block, is defined as the Physical Resource Block and transport block size of terminal distribution, and determines currently used tune The modulation that system is used when being terminal distribution resource with last time with coded system is identical with coded system.
Alternatively, the processor is additionally operable to perform following operation:If the terminal current time Signal to Interference plus Noise Ratio with Difference between the Signal to Interference plus Noise Ratio of last time resource allocation time is more than the first preset value, or, less than the second preset value, determine institute State terminal and exceed preset range from current time to the variations last time resource allocation time.
Alternatively, the processor is additionally operable to perform following operation:According to noise and interference, power headroom reporting and outer shroud Adjustment, determines Signal to Interference plus Noise Ratio of the terminal in current time.
For achieving the above object, the another further aspect embodiment of the present invention also provides another resource regulating method, including:
Scheduling of resource application is sent to base station, the scheduling of resource application includes transport block size and the expectation for expecting application The Physical Resource Block of application;
The resource allocation message that the base station sends is received, resource allocation message includes providing for the physics of the terminal distribution Source block, wherein, the time interval between current time and last time resource allocation time in predetermined period, or, from current When between time to last time resource allocation time, the variations of terminal are in preset range, the base station was according to last time point The coding matched somebody with somebody and modulation system, the transport block size of expectation application and the Physical Resource Block for expecting to apply and currently valid thing Reason Resource Block, is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, it is terminal point The Physical Resource Block matched somebody with somebody and transport block size, modulation and the coded system, the transport block size of expectation application according to upper sub-distribution Determine with currently valid Physical Resource Block, and currently used modulation and coded system are when being terminal distribution resource with last time The modulation for using is identical with coded system.
Alternatively, if the terminal is between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time Difference be more than the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation Variations between time exceed preset range.
For achieving the above object, another aspect, the embodiment of the present invention also provide a kind of terminal, including:Transmitter, reception Machine, memorizer and the processor being connected with transmitter, receiver and memorizer respectively;Wherein, one is stored in the memorizer Group program code, and the program code stored during the processor is used to call the memorizer;
The transmitter, for sending scheduling of resource application to base station, the scheduling of resource application includes expecting application Transport block size and the Physical Resource Block of expectation application;
The receiver, for receiving the resource allocation message that the base station sends, resource allocation message is included for described The Physical Resource Block of terminal distribution, wherein, the time interval between current time and last time resource allocation time is in default week In phase, or, from current time to the variations of terminal last time resource allocation time in preset range when, institute State coding and modulation system, the Physical Resource Block expecting the transport block size applied and expect application of the base station according to upper sub-distribution And currently valid Physical Resource Block, it is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point If the currently valid Physical Resource Block of the thing matched somebody with somebody is unsatisfactory for the Physical Resource Block for expecting application, it is the physics money of terminal distribution Source block and transport block size, modulation and coded system according to upper sub-distribution, expect the transport block size of application and the currently active Physical Resource Block determine, and the modulation that currently used modulation and coded system are used when being terminal distribution resource with last time It is identical with coded system.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point If difference of the thing the matched somebody with somebody terminal between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time is big In the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation time Variations exceed preset range.
For achieving the above object, the another aspect embodiment of the present invention also provides another kind of resource scheduling device, including:
Application module, for sending scheduling of resource application to base station, the scheduling of resource application includes the biography for expecting application Defeated block size and the Physical Resource Block of expectation application;
Receiver module, for receiving the resource allocation message that the base station sends, resource allocation message was included for the end The Physical Resource Block of end distribution, wherein, the time interval between current time and last time resource allocation time is in predetermined period It is interior, or, from current time to the variations of terminal last time resource allocation time in preset range when, it is described Base station according to the coding of upper sub-distribution with modulation system, expect application transport block size and expect the Physical Resource Block of application with And currently valid Physical Resource Block, it is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, it is terminal point The Physical Resource Block matched somebody with somebody and transport block size, modulation and the coded system, the transport block size of expectation application according to upper sub-distribution Determine with currently valid Physical Resource Block, and currently used modulation and coded system are when being terminal distribution resource with last time The modulation for using is identical with coded system.
Alternatively, if the terminal is between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time Difference be more than the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation Variations between time exceed preset range.
In the technical scheme that the present invention is provided, scheduling time inter is in predetermined period and variations are in default model When enclosing interior, the schedule information for being multiplexed last time link circuit self-adapting is terminal distribution resource, it is not necessary to re-execute link circuit self-adapting calculation Method, improves the number of users of each Transmission Time Interval TTI scheduling, improves the number of users of each station services, reduces user Etc. time delay to be scheduled, the quality for End-user services is improve, and then reduces site deployment number to reduce maintenance cost; Requirement of the system to hardware resources such as CPU is reduced, so as to reduce the cost of whole website.
Description of the drawings
A kind of resource regulating method schematic flow sheet that Fig. 1 is provided for the present invention;
Another kind of resource regulating method schematic flow sheet that Fig. 2 is provided for the present invention;
A kind of architecture of base station schematic diagram that Fig. 3 present invention is provided;
Another kind of architecture of base station schematic diagram that Fig. 4 is provided for the present invention;
Another resource regulating method schematic flow sheet that Fig. 5 is provided for the present invention;
A kind of terminal structure schematic diagram that Fig. 6 is provided for the present invention;
Another kind of terminal structure schematic diagram that Fig. 7 is provided for the present invention.
Specific embodiment
, during the present invention is realized, by analyzing application scenarios, small station coverage is little for inventor, its service The features such as user has poor mobility, in small station, user channel quality is almost unchanged or changes slower.In subscriber channel When mass change is in preset range, the schedule information of last time link circuit self-adapting can be multiplexed, be provided with reducing each terminal distribution The time in source, so as to increase the number of users per individual sub- hardwood scheduling.Increase per the number of users of individual sub- hardwood scheduling, user can be reduced again Etc. the number of users that time delay to be scheduled and increase can be serviced, therefore poor user experience can be solved the problems, such as, portion can be avoided again Affix one's name to too many small station and increase cost of installation and maintenance.
A kind of resource regulating method schematic flow sheet that Fig. 1 is provided for the present invention.The executive agent of the present embodiment can be All kinds of base stations such as small station, micro-base station, macro base station.As shown in figure 1, the method that the present embodiment is provided includes:
Step 101:The scheduling of resource application of receiving terminal, the application include Physical Resource Block and the expectation for expecting application The transport block size of application;
Step 102:When time interval between current time and last time resource allocation time is in predetermined period, or Person, from current time to the variations of terminal last time resource allocation time in preset range when, according to upper The coding of sub-distribution and modulation system, the transport block size for expecting application and expect the Physical Resource Block of application and the currently active Physical Resource Block, be the terminal distribution Physical Resource Block.
Time when last time resource allocation time refers to that last time is terminal distribution resource.
Time interval between current time and last time resource allocation time showed apart from last time as eventually in predetermined period The time of end Resources allocation is shorter, in order to avoid frequently calculating, can be multiplexed the schedule information of last time link circuit self-adapting, without Re-execute link circuit self-adapting algorithm.Current time to last time resource allocation time terminal variations in default model In enclosing, show from current time to last time resource allocation time, the channel of terminal is almost unchanged or change is relatively slower, to subtract It is the time of terminal distribution resource less, the schedule information of last time link circuit self-adapting can be multiplexed, specifically, if PRB resources are filled Foot, is multiplexed PRB and MCS, if PRB inadequate resources, is only multiplexed MCS, without re-executing link circuit self-adapting algorithm.
According to the coding and modulation system situation, the physics expected the transport block size applied and expect application of upper sub-distribution Resource Block and currently valid Physical Resource Block, are the terminal distribution Physical Resource Block.Can be specifically:
Judge whether currently valid Physical Resource Block meets the Physical Resource Block for expecting application;If it is satisfied, being The enough Physical Resource Block of the terminal distribution (Physical Resource Block, abbreviation PRB), that is, divide for terminal Physical Resource Block with its expectation application.Modulation and coded system situation, expectation application if be unsatisfactory for, according to upper sub-distribution Transport block size (Transmission Block Size, abbreviation TBS) and currently valid Physical Resource Block, be the end End distribution Physical Resource Block.
Time interval between current time and last time resource allocation time exceedes predetermined period, and variations During more than preset range, performing link circuit self-adapting algorithm carries out resource allocation for the terminal.
Link circuit self-adapting algorithm is prior art, and it determines the capacity of present channel according to channel situation, and then changes biography The character rate of defeated information, transmission rate and modulation and coded system (Modulation and Coding Scheme, referred to as The parameter such as MCS).The transformat of MCS includes the parameters such as transmission data code rate and modulation system.Perform link circuit self-adapting to calculate Method, obtains transmission resource block, transport block size and MCS, is the terminal distribution resource.
In the method that the present embodiment is provided, when variations are in preset range, last time link circuit self-adapting is multiplexed Schedule information is terminal distribution resource, it is not necessary to re-executes link circuit self-adapting algorithm, reduces to central processing unit resource Consume, reduce the time for terminal distribution resource, so as to increased the number of users per individual sub- hardwood scheduling, improve and using for terminal The quality of family service.Increase per the number of users of individual sub- hardwood scheduling, the time delay to be scheduled such as user can be reduced again and increased taking The number of users of business, can avoid disposing too many small station again.
Another kind of resource regulating method schematic flow sheet that Fig. 2 is provided for the present invention.As shown in Fig. 2 the present embodiment is provided Method include:
Step 200:The all terminals that can be scheduled are circulated one by one, until all terminals were all scheduled.
Step 201:For the terminal that can be currently scheduled, judge between current time and last time resource allocation time when Between interval of delta t ime whether in predetermined period.If in predetermined period, execution step 202, otherwise execution step 206.
Last time resource allocation time LastTime refers to the last time for terminal distribution resource.Judge current time Whether the time interval Δ time between CurrentTime and the last time for terminal distribution resource is in predetermined period. If in predetermined period, determining whether the variations of the terminal whether in preset range.If not default In cycle, link circuit self-adapting algorithm is re-executed for the terminal distribution resource.
Step 202:Time interval between current time and last time resource allocation time in predetermined period, according to described Signal to Interference plus Noise Ratio of the terminal in the Signal to Interference plus Noise Ratio and last time resource allocation time of current time, judge the terminal from current time to Whether the variations of last time resource allocation time are in preset range.If in preset range, execution step 203, Otherwise execution step 206.
According to noise and the adjustment of interference, power headroom reporting (Power Headroom Report, abbreviation PHR) and outer shroud, Determine Signal to Interference plus Noise Ratio (Signal to Interference and Noise ratio, abbreviation of the terminal in current time SINR)。
The Signal to Interference plus Noise Ratio of Signal to Interference plus Noise Ratio CurrentSinr of the terminal in current time and last time resource allocation time Difference DELTA sinr between LastSinr is more than the first preset difference value Δ 1, or, less than the second preset difference value Δ 2, it is determined that letter Road mass change exceedes preset range.The terminal dry with the letter of last time resource allocation time is made an uproar in the Signal to Interference plus Noise Ratio of current time Difference than between is between the first preset difference value Δ 1 and the second preset difference value Δ 2, it is determined that variations are not above Preset range, that is, be not changed in or change slow.Signal to Interference plus Noise Ratio and last time resource allocation time of the terminal in current time Signal to Interference plus Noise Ratio between difference be more than the first preset difference value Δ 1, show that channel quality improves;Less than the second preset difference value Δ 2, Show that channel quality is deteriorated.Being introduced for of first preset difference value Δ 1 and the second preset difference value Δ 2 avoids the table tennis field of SINR Scape.
Step 203:Judge whether currently valid Physical Resource Block Aprb meets the Physical Resource Block for expecting application (Eprb);If it is satisfied, execution step 204, otherwise execution step 205.
Step 204:If it is satisfied, then determining that the final Physical Resource Block for terminal distribution is the physical resource for expecting application Block, and determine that the modulation that current MCS is used when being terminal distribution resource with last time is identical with coded system MCS.
If currently valid Physical Resource Block Aprb meets the Physical Resource Block Eprb for expecting application, it is finally terminal The Physical Resource Block Cprb of distribution is the Physical Resource Block Eprb for expecting application, and current MCS multiplexing last time is terminal distribution The modulation used during resource and coded system MCS.Afterwards, return to step 200, the terminal that the circulation next one can be scheduled, until It is recycled to all terminals being scheduled.
Step 205:Modulation and coded system MCS situation, the transmission of expectation application if be unsatisfactory for, according to upper sub-distribution Block size Etbs and currently valid Physical Resource Block Aprb, it is determined that the Physical Resource Block and transmission block finally for terminal distribution is big It is little, and determine that the modulation that current MCS is used when being terminal distribution resource with last time is identical with coded system MCS.Afterwards, return Step 200, the terminal that the circulation next one can be scheduled, until being recycled to all terminals being scheduled.
When currently valid Physical Resource Block Aprb meets the Physical Resource Block Eprb for expecting to apply, then it is terminal distribution Physical Resource Block is the Physical Resource Block for expecting application, and is multiplexed MCS of the last resource allocation time for terminal distribution;Currently When effectively Physical Resource Block Aprb is unsatisfactory for expecting the Physical Resource Block Eprb of application, last resource allocation time is only multiplexed For the MCS of terminal distribution, the Physical Resource Block and transport block size of terminal distribution are recalculated as.
Step 206:Time interval between current time and last time resource allocation time exceedes predetermined period, and channel When mass change exceedes preset range, performing link circuit self-adapting algorithm, to obtain Physical Resource Block for terminal distribution, transmission block big Little and MCS.Afterwards, return to step 200, the terminal that the circulation next one can be scheduled, until being recycled to all ends being scheduled End.
In the method that the present embodiment is provided, scheduling time inter is in predetermined period and variations are in preset range When interior, the schedule information for being multiplexed last time link circuit self-adapting is terminal distribution resource, it is not necessary to re-execute link circuit self-adapting algorithm, The number of users of each Transmission Time Interval TTI scheduling is improve, the number of users of each station services is improve, user is reduced and is waited The time delay of scheduling, improves the quality for End-user services, and then reduces site deployment number to reduce maintenance cost;Reduce Requirement of the system to hardware resources such as CPU, so as to reducing the cost of whole website.
A kind of architecture of base station schematic diagram that Fig. 3 present invention is provided.As shown in figure 3, the base station that the present embodiment is provided includes:Pass Defeated module 31 and processing module 32.
Transport module 31, for the scheduling of resource application of receiving terminal, the transport block size of the expectation application and expectation The Physical Resource Block of application;
Processing module 32, for the time interval between current time and last time resource allocation time in predetermined period It is interior, or, when the variations of current time to last time resource allocation time are in preset range, according to upper sub-distribution Coding and modulation system, the Physical Resource Block and currently valid physics money expected the transport block size applied and expect application Source block, is the terminal distribution Physical Resource Block.
Alternatively, the processing module, the time interval being additionally operable between current time and last time resource allocation time More than predetermined period, and variations exceed preset range when, perform link circuit self-adapting algorithm provided for the terminal Source is distributed.
Alternatively, the processing module 32, if being additionally operable to currently valid Physical Resource Block meets the expectation application Physical Resource Block, it is determined that the Physical Resource Block for terminal distribution is to expect the Physical Resource Block applied, and is determined currently used The modulation that uses when being terminal distribution resource with last time of modulation and coded system it is identical with coded system;
Alternatively, the processing module 32, if being additionally operable to currently valid Physical Resource Block is unsatisfactory for the expectation application Physical Resource Block, according to the modulation of upper sub-distribution with coded system, expect the transport block size and currently valid thing of application Reason Resource Block, is defined as the Physical Resource Block and transport block size of terminal distribution, and determines currently used modulation with coding The modulation that mode is used when being terminal distribution resource with last time is identical with coded system.
Alternatively, the processing module 32, if being additionally operable to the terminal from current time to last time resource allocation time Variations are in preset range;The terminal is done with the letter of last time resource allocation time in the Signal to Interference plus Noise Ratio of current time The difference made an uproar than between is more than the first preset value, or, less than the second preset value, determine terminal current time to last time resource point Variations with the time exceed preset range.Specifically, the processing module 32, is additionally operable to the resource in receive user After scheduling application, according to the terminal in the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time, sentence Whether the terminal of breaking is from current time to the variations of last time resource allocation time in preset range;The terminal Difference between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time is more than the first preset value, or Person, less than the second preset value, determines that variations exceed preset range.
Alternatively, the processing module 32, is additionally operable to be adjusted according to noise and interference, power headroom reporting and outer shroud, really Signal to Interference plus Noise Ratio of the fixed terminal in current time.Specifically, the processing module 32, is additionally operable to worked as according to the terminal The Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of front time, judges the terminal from current time to last time resource The variations of distribution time whether in the preset range before, according to noise and interference, power headroom reporting and outer shroud Adjustment, determines Signal to Interference plus Noise Ratio of the terminal in current time.
The base station that the present invention is provided, scheduling time inter is in predetermined period and variations are in preset range When, the schedule information for being multiplexed last time link circuit self-adapting is terminal distribution resource, it is not necessary to re-executes link circuit self-adapting algorithm, carries The high number of users of each Transmission Time Interval TTI scheduling, improves the number of users of each station services, reduces user and wait adjusting The time delay of degree, improves the quality for End-user services, and then reduces site deployment number to reduce maintenance cost;Reduce Requirement of the system to hardware resources such as CPU, so as to reduce the cost of whole website.
As shown in figure 4, the embodiment of the present invention also provides a kind of base station, including:Transmitter 422, receiver 421, memorizer 423 and the processor 424 that is connected with transmitter, receiver and memorizer respectively;Wherein, one group of journey is stored in the memorizer Sequence code, and the program code stored during the processor is used to call the memorizer,
The receiver, for obtaining the scheduling of resource application of terminal, the scheduling of resource includes the transmission for expecting application Block size and the Physical Resource Block of expectation application;
The processor, is additionally operable to perform following operation:Time between current time and last time resource allocation time It is spaced in predetermined period, or, from current time to the variations of terminal last time resource allocation time pre- If when in scope, the physics of coding and modulation system, the transport block size for expecting application and expectation application according to upper sub-distribution Resource Block and currently valid Physical Resource Block, are the terminal distribution Physical Resource Block.
Alternatively, the processor is additionally operable to perform following operation:
If currently valid Physical Resource Block meets the Physical Resource Block for expecting application, it is determined that for terminal distribution Physical Resource Block is the Physical Resource Block for expecting application, and determines that currently used modulation was terminal point with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, the processor is additionally operable to perform following operation:If currently valid Physical Resource Block is unsatisfactory for described Expect the Physical Resource Block applied, according to the modulation of upper sub-distribution with coded system, expect the transport block size of application and current Effectively Physical Resource Block, is defined as the Physical Resource Block and transport block size of terminal distribution, and determines currently used tune The modulation that system is used when being terminal distribution resource with last time with coded system is identical with coded system.
Alternatively, the processor is additionally operable to perform following operation:If the terminal current time Signal to Interference plus Noise Ratio with Difference between the Signal to Interference plus Noise Ratio of last time resource allocation time is more than the first preset value, or, less than the second preset value, determine institute State terminal and exceed preset range from current time to the variations last time resource allocation time.
Alternatively, the processor is additionally operable to perform following operation:According to noise and interference, power headroom reporting and outer shroud Adjustment, determines Signal to Interference plus Noise Ratio of the terminal in current time.
As shown in figure 5, the embodiment of the present invention also provides another resource regulating method, including:
Step 501:Scheduling of resource application is sent to base station, the scheduling of resource application includes expecting that the transmission block of application is big Physical Resource Block that is little and expecting application;
Step 502:The resource allocation message that the base station sends is received, resource allocation message is included for the terminal distribution Physical Resource Block, wherein, the time interval between current time and last time resource allocation time in predetermined period, or Person, from current time to the variations of terminal last time resource allocation time in preset range when, the base station Physical Resource Block and work as that the transport block size and expectation applied with modulation system, expectation according to the coding of upper sub-distribution is applied Front effective Physical Resource Block, is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, it is terminal point The Physical Resource Block matched somebody with somebody and transport block size, modulation and the coded system, the transport block size of expectation application according to upper sub-distribution Determine with currently valid Physical Resource Block, and currently used modulation and coded system are when being terminal distribution resource with last time The modulation for using is identical with coded system.
Alternatively, if the terminal is between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time Difference be more than the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation Variations between time exceed preset range.
As shown in fig. 6, the embodiment of the present invention also provides a kind of terminal, including:Transmitter 621, receiver 622, memorizer 623 and the processor 624 that is connected with transmitter, receiver and memorizer respectively;Wherein, one group of journey is stored in the memorizer Sequence code, and the program code stored during the processor is used to call the memorizer;
The transmitter, for sending scheduling of resource application to base station, the scheduling of resource application includes expecting application Transport block size and the Physical Resource Block of expectation application;
The receiver, for receiving the resource allocation message that the base station sends, resource allocation message is included for described The Physical Resource Block of terminal distribution, wherein, the time interval between current time and last time resource allocation time is in default week In phase, or, from current time to the variations of terminal last time resource allocation time in preset range when, institute State coding and modulation system, the Physical Resource Block expecting the transport block size applied and expect application of the base station according to upper sub-distribution And currently valid Physical Resource Block, it is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point If the currently valid Physical Resource Block of the thing matched somebody with somebody is unsatisfactory for the Physical Resource Block for expecting application, it is the physics money of terminal distribution Source block and transport block size, modulation and coded system according to upper sub-distribution, expect the transport block size of application and the currently active Physical Resource Block determine, and the modulation that currently used modulation and coded system are used when being terminal distribution resource with last time It is identical with coded system.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point If difference of the thing the matched somebody with somebody terminal between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time is big In the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation time Variations exceed preset range.
As shown in fig. 7, the embodiment of the present invention also provides another kind of resource scheduling device, including:
Application module 701, for sending scheduling of resource application to base station, the scheduling of resource application includes expecting application Transport block size and the Physical Resource Block of expectation application;
Receiver module 702, for receiving the resource allocation message that the base station sends, resource allocation message is included for described The Physical Resource Block of terminal distribution, wherein, the time interval between current time and last time resource allocation time is in default week In phase, or, from current time to the variations of terminal last time resource allocation time in preset range when, institute State coding and modulation system, the Physical Resource Block expecting the transport block size applied and expect application of the base station according to upper sub-distribution And currently valid Physical Resource Block, it is defined as the terminal distribution Physical Resource Block.
Alternatively, if currently valid Physical Resource Block meets the Physical Resource Block for expecting application, for terminal point The Physical Resource Block matched somebody with somebody is the Physical Resource Block for expecting application, and currently used modulation was that terminal is divided with coded system and last time The modulation used during with resource is identical with coded system.
Alternatively, if currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, it is terminal point The Physical Resource Block matched somebody with somebody and transport block size, modulation and the coded system, the transport block size of expectation application according to upper sub-distribution Determine with currently valid Physical Resource Block, and currently used modulation and coded system are when being terminal distribution resource with last time The modulation for using is identical with coded system.
Alternatively, if the terminal is between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time Difference be more than the first preset value, or, less than the second preset value, determine the terminal from current time to last time resource allocation Variations between time exceed preset range.
Finally it should be noted that:Various embodiments above only to illustrate technical scheme, rather than a limitation;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that:Its according to So the technical scheme described in foregoing embodiments can be modified, or which part or all technical characteristic are entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of resource regulating method, it is characterised in that include:
The scheduling of resource application of terminal is obtained, the scheduling of resource includes the transport block size for expecting application and the thing for expecting application Reason Resource Block;
Time interval between current time and last time resource allocation time in predetermined period, or, from current time to When between last time resource allocation time, the variations of terminal are in preset range, according to coding and the modulation of upper sub-distribution Mode, the transport block size for expecting application and the Physical Resource Block for expecting to apply and currently valid Physical Resource Block, are institute State terminal distribution Physical Resource Block.
2. method according to claim 1, it is characterised in that coding and modulation system according to upper sub-distribution, expect Shen Transport block size please and the Physical Resource Block for expecting to apply and currently valid Physical Resource Block, are the terminal distribution thing Reason Resource Block, including:
If currently valid Physical Resource Block meets the Physical Resource Block for expecting application,
The Physical Resource Block for being defined as terminal distribution is the Physical Resource Block for expecting application, and determines currently used modulation and compile The modulation that code mode is used when being terminal distribution resource with last time is identical with coded system.
3. method according to claim 1 and 2, it is characterised in that coding and modulation system situation according to upper sub-distribution, Expect the transport block size applied and the Physical Resource Block and currently valid Physical Resource Block of expecting application, be the terminal Distribution Physical Resource Block, including:
If currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, according to the modulation of upper sub-distribution with Coded system, the transport block size and currently valid Physical Resource Block of expecting application, are defined as the physical resource of terminal distribution Block and transport block size, and determine the tune that currently used modulation is used when being terminal distribution resource with last time with coded system System is identical with coded system.
4. method according to claim 1 and 2, it is characterised in that after the scheduling of resource application for obtaining user, also wrap Include:
If difference of the terminal between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time is more than First preset value, or, less than the second preset value, determine terminal from current time to the channel last time resource allocation time Mass change exceedes preset range.
5. method according to claim 4, it is characterised in that also include:According to noise and interference, power headroom reporting and Outer shroud is adjusted, and determines Signal to Interference plus Noise Ratio of the terminal in current time.
6. a kind of resource scheduling device, it is characterised in that include:
Transport module, for the scheduling of resource application of receiving terminal, the scheduling of resource includes the transport block size for expecting application With the Physical Resource Block for expecting application;
Processing module, for the time interval between current time and last time resource allocation time in predetermined period, or, From current time to the variations of terminal last time resource allocation time in preset range when, according to upper sub-distribution Coding and modulation system, expect the transport block size of application and expect the Physical Resource Block and currently valid physics of application Resource Block, is the terminal distribution Physical Resource Block.
7. device according to claim 6, it is characterised in that the processing module, is additionally operable to
If currently valid Physical Resource Block meets the Physical Resource Block for expecting application, if it is satisfied, then being defined as terminal The Physical Resource Block of distribution is the Physical Resource Block of expectation application, and determines currently used modulation with coded system and last time For terminal distribution resource when the modulation that uses it is identical with coded system.
8. the device according to claim 6 or 7, it is characterised in that the processing module, is additionally operable to
If currently valid Physical Resource Block is unsatisfactory for the Physical Resource Block for expecting application, according to the modulation of upper sub-distribution with Coded system, the transport block size and currently valid Physical Resource Block of expecting application, are defined as the physical resource of terminal distribution Block and transport block size, and determine what currently used modulation was used when being terminal distribution resource with the last time with coded system Modulation is identical with coded system.
9. the device according to claim 6 or 7, it is characterised in that the processing module, is additionally operable to the money in receive user If the terminal is between the Signal to Interference plus Noise Ratio of the Signal to Interference plus Noise Ratio and last time resource allocation time of current time after the scheduling application of source Difference be more than the first preset value, or, less than the second preset value, determine terminal from current time to last time resource allocation time Between variations exceed preset range.
10. device according to claim 9, it is characterised in that the processing module, be additionally operable to according to noise and interference, Power headroom reporting and outer shroud adjustment, determine Signal to Interference plus Noise Ratio of the terminal in current time.
CN201710036279.2A 2017-01-17 2017-01-17 A kind of resource regulating method and base station and terminal Pending CN106550476A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710036279.2A CN106550476A (en) 2017-01-17 2017-01-17 A kind of resource regulating method and base station and terminal
PCT/CN2018/073085 WO2018133802A1 (en) 2017-01-17 2018-01-17 Resource scheduling method, and base station and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710036279.2A CN106550476A (en) 2017-01-17 2017-01-17 A kind of resource regulating method and base station and terminal

Publications (1)

Publication Number Publication Date
CN106550476A true CN106550476A (en) 2017-03-29

Family

ID=58398800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710036279.2A Pending CN106550476A (en) 2017-01-17 2017-01-17 A kind of resource regulating method and base station and terminal

Country Status (2)

Country Link
CN (1) CN106550476A (en)
WO (1) WO2018133802A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108134660A (en) * 2017-12-19 2018-06-08 新疆石油管理局数据公司 A kind of well data processing method and period setting method and equipment
WO2018133802A1 (en) * 2017-01-17 2018-07-26 北京佰才邦技术有限公司 Resource scheduling method, and base station and terminal
CN113891359A (en) * 2021-10-11 2022-01-04 中国联合网络通信集团有限公司 Data processing method, device and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103916913A (en) * 2014-04-02 2014-07-09 电信科学技术研究院 Resource scheduling method and device
CN104581970A (en) * 2014-12-05 2015-04-29 大唐移动通信设备有限公司 Adaptive-scheduling method and equipment
CN104796238A (en) * 2015-04-28 2015-07-22 电子科技大学 Retransmission resource allocation method based on adaptive HARQ (hybrid automatic repeat request)
CN105430755A (en) * 2015-10-27 2016-03-23 魅族科技(中国)有限公司 Data transmission method and data transmission apparatus used for ultra-dense network

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102802213B (en) * 2011-05-26 2014-12-24 鼎桥通信技术有限公司 Method for improving scheduling efficiency
CN103582148A (en) * 2012-08-10 2014-02-12 中兴通讯股份有限公司 Method and device for adjusting scheduling strategy and base station
US9974097B2 (en) * 2012-12-03 2018-05-15 Lg Electronics Inc. Method and apparatus for determining transport block size in wireless communication system
CN104507170B (en) * 2014-11-21 2018-10-30 上海华为技术有限公司 A kind of resource regulating method and device
CN106550476A (en) * 2017-01-17 2017-03-29 北京佰才邦技术有限公司 A kind of resource regulating method and base station and terminal

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103916913A (en) * 2014-04-02 2014-07-09 电信科学技术研究院 Resource scheduling method and device
CN104581970A (en) * 2014-12-05 2015-04-29 大唐移动通信设备有限公司 Adaptive-scheduling method and equipment
CN104796238A (en) * 2015-04-28 2015-07-22 电子科技大学 Retransmission resource allocation method based on adaptive HARQ (hybrid automatic repeat request)
CN105430755A (en) * 2015-10-27 2016-03-23 魅族科技(中国)有限公司 Data transmission method and data transmission apparatus used for ultra-dense network

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018133802A1 (en) * 2017-01-17 2018-07-26 北京佰才邦技术有限公司 Resource scheduling method, and base station and terminal
CN108134660A (en) * 2017-12-19 2018-06-08 新疆石油管理局数据公司 A kind of well data processing method and period setting method and equipment
CN113891359A (en) * 2021-10-11 2022-01-04 中国联合网络通信集团有限公司 Data processing method, device and storage medium
CN113891359B (en) * 2021-10-11 2023-06-20 中国联合网络通信集团有限公司 Data processing method, device and storage medium

Also Published As

Publication number Publication date
WO2018133802A1 (en) 2018-07-26

Similar Documents

Publication Publication Date Title
US11575462B2 (en) Method and apparatus for determining transport block size
KR101386052B1 (en) Method for wireless resource scheduling, access network and terminal thereof
US8046020B2 (en) Control method and device of uplink access transmission power in radio communications system
US20130114494A1 (en) Method and apparatus for transmitting uplink data burst in wireless connection system
US10237868B2 (en) Signal sending method, receiving method and device
WO2021163601A1 (en) Apparatus and methods for user device buffer management in wireless networks
US20160105894A1 (en) eMBMS Management Method, Multimedia Broadcast Multicast Service Coordination Entity, and Base Station
CN106550476A (en) A kind of resource regulating method and base station and terminal
US10075255B2 (en) Physical downlink control channel (PDCCH) inter-cell-interference coordination
US10588131B2 (en) Method and network node for dynamic resource allocation for control channels
CN107534984B (en) Configuration method and equipment of component carrier group
Ali et al. Energy efficient uplink MAC protocol for M2M devices
CN103636158A (en) Extending the control channel region of a communications system in backwards compatible manner
CN113518428A (en) Resource determination method and equipment
CN104919875A (en) Base station device, communi cation method, and terminal device
CN107820216B (en) Scheduling method and device based on SC-MTCH
CN104704896B (en) Frequency resource allocation method and radio base station for semi-persistent scheduling
JP2013223181A (en) Radio communication base station, radio communication system and control method for the same radio communication base station
CN111526583B (en) Resource allocation method, resource acquisition method, network device and terminal
Hwang et al. Achieving multi-user diversity gain using user-identity feedback
CN105119693A (en) Method and device for setting MCS in unlicensed spectrum
CN101500316B (en) Method and apparatus for implementing HSDPA scheduling
CN110213832B (en) Scheduling base station and system combining PUCCH period
EP1774727B1 (en) Method and apparatus for resource allocation
KR101859619B1 (en) Method for multicasting using relay station in mobile network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329

RJ01 Rejection of invention patent application after publication