CN106545015A - 岩溶裂隙区域砼灌注桩浇筑防漏方法 - Google Patents

岩溶裂隙区域砼灌注桩浇筑防漏方法 Download PDF

Info

Publication number
CN106545015A
CN106545015A CN201510592243.3A CN201510592243A CN106545015A CN 106545015 A CN106545015 A CN 106545015A CN 201510592243 A CN201510592243 A CN 201510592243A CN 106545015 A CN106545015 A CN 106545015A
Authority
CN
China
Prior art keywords
concrete
pile
geotextiles
righting
positioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510592243.3A
Other languages
English (en)
Inventor
杨前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201510592243.3A priority Critical patent/CN106545015A/zh
Publication of CN106545015A publication Critical patent/CN106545015A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及砼灌注桩,尤其涉及砼灌注桩浇筑方法。一种岩溶裂隙区域砼灌注桩浇筑防漏方法,它包括:步骤一,岩层区域施工灌注桩部位定位钻孔、清孔;步骤二,制作灌注桩钢筋笼、焊接扶正定位装置;扶正定位装置是搭接在相邻两段钢筋笼之间的半圆环件;步骤三,焊接灌注桩封底堵头钢板;步骤四,外包弹性土工布,位于扶正定位装置处可开口,使弹性土工布位于定位扶正装置内;步骤五,土工布与封底堵头紧固连接;步骤六,钢筋笼放好后安装导管浇筑混凝土。本发明防止岩溶裂隙区域钻孔灌注桩混凝土流失。

Description

岩溶裂隙区域砼灌注桩浇筑防漏方法
技术领域
本发明涉及砼灌注桩,尤其涉及砼灌注桩浇筑方法。
背景技术
钻孔灌注桩位于岩层区域施工时,因多处岩层区域存在岩层裂隙发育及岩溶孔洞等。灌注桩成孔放入钢筋笼后,因岩溶孔洞及裂隙的存在会使灌入的混凝土大量流失,造成极大的浪费与质量隐患。
发明内容
本发明旨在解决现有技术的上述缺陷,提供一种岩溶裂隙区域砼灌注桩浇筑防漏方法。本发明防止岩溶裂隙区域钻孔灌注桩混凝土流失。
本发明是这样实现的:一种岩溶裂隙区域砼灌注桩浇筑防漏方法,它包括:
步骤一,岩层区域施工灌注桩部位定位钻孔、清孔;
步骤二,制作灌注桩钢筋笼、焊接扶正定位装置;扶正定位装置是搭接在相邻两段钢筋笼之间的半圆环件;
步骤三,焊接灌注桩封底堵头钢板;
步骤四,外包弹性土工布,位于扶正定位装置处可开口,使弹性土工布位于定位扶正装置内;
步骤五,土工布与封底堵头紧固连接;
步骤六,钢筋笼放好后安装导管浇筑混凝土。
本发明浇筑后的混凝土压力作用会使弹性土工布向外扩张,夹在岩层与灌注桩混凝土之间,与之紧密贴合,封闭岩溶孔洞及裂隙,防止灌入的混凝土大量流失;即起到隔离岩溶孔洞与裂隙的作用,又能保证砼灌注桩的完整性及施工质量。
具体实施方式
在成孔后制作钢筋笼时,在钢筋笼底部设置小于灌注桩成孔孔径的封底堵头,在钢筋笼外侧主筋上对称焊接定位扶正装置,然后外包弹性土工布,土工布底部与封底堵头紧固连接,然后将钢筋笼放入灌注桩孔内,浇筑混凝土,浇筑后的混凝土压力作用会使弹性土工布向外扩张,夹在岩层与灌注桩混凝土之间,与之紧密贴合,即起到隔离岩溶孔洞与裂隙的作用,又能保证砼灌注桩的完整性及施工质量。

Claims (1)

1.一种岩溶裂隙区域砼灌注桩浇筑防漏方法,其特征在于,它包括:
步骤一,岩层区域施工灌注桩部位定位钻孔、清孔;
步骤二,制作灌注桩钢筋笼、焊接扶正定位装置;扶正定位装置是搭接在相邻两段钢筋笼之间的半圆环件;
步骤三,焊接灌注桩封底堵头钢板;
步骤四,外包弹性土工布,位于扶正定位装置处可开口,使弹性土工布位于定位扶正装置内;
步骤五,土工布与封底堵头紧固连接;
步骤六,钢筋笼放好后安装导管浇筑混凝土。
CN201510592243.3A 2015-09-17 2015-09-17 岩溶裂隙区域砼灌注桩浇筑防漏方法 Pending CN106545015A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510592243.3A CN106545015A (zh) 2015-09-17 2015-09-17 岩溶裂隙区域砼灌注桩浇筑防漏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510592243.3A CN106545015A (zh) 2015-09-17 2015-09-17 岩溶裂隙区域砼灌注桩浇筑防漏方法

Publications (1)

Publication Number Publication Date
CN106545015A true CN106545015A (zh) 2017-03-29

Family

ID=58362779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510592243.3A Pending CN106545015A (zh) 2015-09-17 2015-09-17 岩溶裂隙区域砼灌注桩浇筑防漏方法

Country Status (1)

Country Link
CN (1) CN106545015A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984151A (zh) * 2019-11-20 2020-04-10 中冶天工集团有限公司 一种新型灌注桩砼浇筑导管的紧固装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1507518A (en) * 1975-10-10 1978-04-19 Higgs & Hill Ltd Pile construction
JP2004360240A (ja) * 2003-06-03 2004-12-24 Kubota Corp 杭頭部とフーチングとの結合方法及びその結合部の構造
CN202265821U (zh) * 2011-08-26 2012-06-06 中天建设集团有限公司 一种钻孔灌注桩保护层定位结构
CN203200747U (zh) * 2013-04-17 2013-09-18 广州华磊建筑基础工程有限公司 一种适用于溶洞地质的灌注桩
CN104612143A (zh) * 2014-12-31 2015-05-13 云南建工基础工程有限责任公司 一种溶洞/土洞地质条件下的钻孔复合桩结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1507518A (en) * 1975-10-10 1978-04-19 Higgs & Hill Ltd Pile construction
JP2004360240A (ja) * 2003-06-03 2004-12-24 Kubota Corp 杭頭部とフーチングとの結合方法及びその結合部の構造
CN202265821U (zh) * 2011-08-26 2012-06-06 中天建设集团有限公司 一种钻孔灌注桩保护层定位结构
CN203200747U (zh) * 2013-04-17 2013-09-18 广州华磊建筑基础工程有限公司 一种适用于溶洞地质的灌注桩
CN104612143A (zh) * 2014-12-31 2015-05-13 云南建工基础工程有限责任公司 一种溶洞/土洞地质条件下的钻孔复合桩结构

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984151A (zh) * 2019-11-20 2020-04-10 中冶天工集团有限公司 一种新型灌注桩砼浇筑导管的紧固装置

Similar Documents

Publication Publication Date Title
US11028574B2 (en) Steel-plate-encased precast concrete column foot joint and construction method therefor
CN104404983B (zh) 一种用于顶管施工的骑马井装置及其施工方法
CN103205964B (zh) 使用钢管柱接桩的灌注桩施工方法
CN205530247U (zh) 一种预钻孔囊袋注浆锚杆结构
CN103132537A (zh) 钢格构柱回字型混凝土承台组合式塔吊基础结构及施工方法
CN103122632A (zh) 一种在流塑地层和溶洞地层的钻孔灌注桩施工方法
CN106759881B (zh) 预制柱连接节点灌浆封堵结构及方法
JP2016089404A (ja) 場所打ちコンクリート杭におけるグラウト工法
CN103556623B (zh) 横跨深埋大型市政管线的连续墙施工方法
KR101644498B1 (ko) 마이크로파일 보강구조체와 이를 이용한 기초콘크리트 보강공법
CN105464105B (zh) 一种无摩擦桩成桩方法
CN106545015A (zh) 岩溶裂隙区域砼灌注桩浇筑防漏方法
KR20150025409A (ko) 소구경강관을 이용한 터널구조 및 이의 시공방법
CN203654272U (zh) 隔离桩侧摩阻力钻孔灌注桩
CN102220764A (zh) 深基坑支护体系及其施工方法
CN108999227B (zh) 一种建筑物基础的加固结构及其施工方法
CN104060622A (zh) 一种坑中坑钢桶降排水方法
CN103924599A (zh) 一种基坑内支撑钢立柱施工不到位的处理方法
CN204252168U (zh) 圆形检查井保护装置
JP2005264446A (ja) 場所打ち杭と鋼管柱との接合方法
CN205999885U (zh) 一种空心桩
CN104234039B (zh) 一种钻孔灌注桩空孔部分填充物的置换装置及方法
CN103790162B (zh) 同步式钢板桩桩孔填充装置
JP5126001B2 (ja) 地盤の補強方法、補強地盤
CN109826251B (zh) 防止声测管堵管的基桩检测施工结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170329