CN106529990A - Deviation electric quantity settlement method - Google Patents

Deviation electric quantity settlement method Download PDF

Info

Publication number
CN106529990A
CN106529990A CN201610895685.XA CN201610895685A CN106529990A CN 106529990 A CN106529990 A CN 106529990A CN 201610895685 A CN201610895685 A CN 201610895685A CN 106529990 A CN106529990 A CN 106529990A
Authority
CN
China
Prior art keywords
electricity
sale
purchase
deviation
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610895685.XA
Other languages
Chinese (zh)
Inventor
龙苏岩
程海花
薛必克
郑亚先
杨争林
耿建
邵平
徐骏
郭艳敏
史新红
陈爱林
黄春波
吕建虎
叶飞
米富丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610895685.XA priority Critical patent/CN106529990A/en
Publication of CN106529990A publication Critical patent/CN106529990A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Finance (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a deviation electric quantity settlement method, which comprises steps of performing a peak, flat and valley time division on an electricity purchasing and selling area according to a load level in the electricity purchasing and selling area; respectively determining deviation electric quantity reference electricity prices of the peak, flat, valley periods in the electricity purchasing and selling area; using the relation between an electricity purchasing/selling contract electricity price and the deviation electric quantity reference electricity price to determine a settlement electricity price of the deviation electric quantity of an electricity purchasing/selling contract; and determining settlement electricity charge of the electricity purchasing/selling contract according to the settlement electricity price of the deviation electric quantity of the electricity purchasing/selling contract. The method provided by the invention gives the real-time price attribute of the deviation electric quantity. Under the framework of the trans-regional and trans-provincial power transaction which has not established the real-time market temporarily, the specific real-time pricing method is used for preventing transaction participants from using the deviation electric quantity arbitrage to disorder the market, enhances the binding of the transaction contract, plays the role of optimal scheduling, and does not exorbitantly increase the complexity of the pricing and settlement work system, and has a strong practical value.

Description

A kind of deviation electricity settlement method
Technical field
The present invention relates to the technical field of electricity transaction clearing, and in particular to a kind of deviation electricity settlement method.
Background technology
According to national energy development plan, energy development center of gravity accelerates dispersion, the big rule of electric power with power load center The trans-regional conveying of mould and the demand dissolved are more urgent.Meanwhile, with the iterative method of electric system reform, China's electric power Industrial market trend increasingly strengthens.Transregional electricity transaction transprovincially is the breach of market-oriented reform, in propulsion large scale electric network On the basis of interconnection, market mechanism is introduced, make full use of the difference of different regions time dimension and Spatial Dimension, realize a point season Section, channelling surplus goods to needly areas at times, interregional, supply and demand are complementary, distributing rationally and extensive conventional power source to China's electric power resource Or the conveying and dissolving of regenerative resource has great importance.
In the transregional clearing work of electricity transaction transprovincially, grid company, tissue purchase sale of electricity both sides sign electricity transaction contract, And charge calculation is completed with purchase sale of electricity both sides respectively, while collecting transmission charges.During electricity, charge calculation are electricity transaction work Mission critical, be to sign sale of electricity contract, formulate generation schedule and perform after the work such as generation schedule, by electricity transaction participant Production and operation active transition be the significant process for managing result, the execution for transregional electricity transaction transprovincially provides economic guarantee.
The process of deviation electricity is the key issue in China's current power settlement of transactions work.Deviation electricity can typically be determined Justice is interconnection critical point actual metered electricity and the difference for planning electricity.According to the electricity transaction settlement data of Guo Wang companies, I In a few days deviation electricity can reach more than the 4% of plan electricity to state extra-high voltage direct-current interconnection, and alternating current interconnection is due to conveying Power directly cannot be controlled, and the ratio of deviation electricity may be higher.Deviation electricity is due to the existing power market transaction frame of China There is no the situation of Real-time markets under frame and produce, as the transaction of the current transregional most short-term of transprovincially concluding the business of China only has a few days ago Conclude the business, therefore the actual metered in a few days producing cannot be processed with market instruments with the difference of plan electricity.The process of deviation electricity is lost When the economic interests of electricity transaction both sides will be directly affected not only, even result in send out a transmission of electricity plan, the market is in a chaotic state so that danger Evil system safe and stable operation.
A kind of deviation electricity of Chinese invention patent (application number 201410653199.8) individually weights the electricity of area transprovincially of price Can transaction settlement method, calculate the plan electricity of each power transmission side and each power purchase side respectively, online appraised and decided according to each transaction Electricity price and landing electricity price and plan electricity volume and landing electricity Settlement Plan electricity charge calculating deviation electricity and electricity price, each transaction master The deviation electricity of body is equal to the deviation of actual online (landing) electricity and plan electricity, electricity price root of the deviation electricity price by each transaction Obtain according to plan electricity weighted average.The composition of the processing method Main Basiss deviation electricity of the deviation electricity is fixed a price, but Do not recognize real time price attribute that deviation electricity has and deviation electricity share after actual ownership, to strengthening the pact of contract Beam force, Maintenance Market order do not have effect.
The content of the invention
The present invention provides a kind of deviation electricity settlement method, its objective is to solve in the transregional key issue of electricity transaction transprovincially The Real-Time Pricing of deviation electricity and the problem of clearing.
The purpose of the present invention is realized using following technical proposals:
A kind of deviation electricity settlement method, which thes improvement is that, including:
According to the load level in purchase sale of electricity region, peak, flat, paddy Time segments division is carried out to purchasing sale of electricity region;
Determine that the peak in purchase sale of electricity region, flat, the deviation electricity of paddy period refer to electricity price respectively;
The relation of electricity price is referred to using purchase/sale of electricity contract electricity price and the deviation electricity, it is determined that the deviation of purchase/sale of electricity contract The Settlement price of electricity;
The clearing electricity charge of purchase/sale of electricity contract are determined according to the Settlement price of the deviation electricity of the purchase/sale of electricity contract.
Preferably, the load level according in purchase sale of electricity region, carries out peak, flat, paddy period stroke to purchasing sale of electricity region Point, including:
It is determined that partitioning standards variable R (t) in purchase sale of electricity region;
Peak, flat, paddy Time segments division are carried out to purchasing sale of electricity region according to partitioning standards variable R (t).
Further, as the following formula (1) determines partitioning standards variable R (t) in purchase sale of electricity region:
In formula (1), L (t) is the Real-time Load for purchasing power system in sale of electricity region, LminFor purchasing power train in sale of electricity region The day minimum load of system, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
Further, if partitioning standards variable R (t) in the purchase sale of electricity region meet:0≤R (t) < 1/3, the then purchase Load level in sale of electricity region is the valley period, if partitioning standards variable R (t) in the purchase sale of electricity region meet:1/3≤R T ()≤2/3, then the load level in the purchase sale of electricity region is the level values period, if the partitioning standards in the purchase sale of electricity region become Amount R (t) meets:2/3 < R (t)≤1, then the load level in the purchase sale of electricity region is peak period.
Preferably, the peak for determining purchase sale of electricity region respectively, flat, the deviation electricity of paddy period refer to electricity price, including:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of peak periodp, formula is:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of level values perioda, formula is:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of valley periodv, formula is:
In above-mentioned formula (2)-(4), CiThe cost of electricity-generating of i-th service capacity unit, it is L that n is loadmaxFortune in time domain The unit quantity exerted oneself of row, p for load isThe unit quantity of service capacity in time domain, q for load isThe unit quantity of service capacity, L in time domainminFor purchasing the day minimal negative of power system in sale of electricity region Lotus, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
Preferably, the relation for referring to electricity price using purchase/sale of electricity contract electricity price and the deviation electricity, it is determined that purchasing/selling The Settlement price of the deviation electricity of electric contract includes:
The sale of electricity contract electricity price is made to bePurchase risk electricity price isThe Settlement price of the deviation electricity of sale of electricity contract isThe Settlement price of the deviation electricity of purchase risk isIf the purchase sale of electricity region internal loading level of present period is peak value, Then the deviation electricity of present period is F with reference to electricity pricex=FpIf the purchase sale of electricity region internal loading level of present period is peak value, The deviation electricity of present period is F with reference to electricity pricex=FaIf the purchase sale of electricity region internal loading level of present period is valley, when The deviation electricity of front period is F with reference to electricity pricex=Fv
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity be it is negative, then
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity are just, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
Further, the purchase/sale of electricity contract electricity price meets:
In formula (5), FtransFor the transmission charges checked and approved, FlossConvert into money for line loss;
Wherein, line loss is converted into money FlossFormula be:
In formula (6), alossFor the line loss per unit of circuit.
Preferably, the Settlement price of the deviation electricity according to the purchase/sale of electricity contract determines the knot of purchase/sale of electricity contract The electricity charge are calculated, including:
The clearing electricity charge S of sale of electricity contract is determined as the following formulas
In formula (7),For sale of electricity contract electricity price,For the Settlement price of the deviation electricity of sale of electricity contract,Close for sale of electricity Simultaneous interpretation trnamission capacity,For the deviation electricity of sale of electricity contract transmission of electricity composition seller;
The clearing electricity charge S of purchase risk is determined as the following formulab
In formula (8), MtFor the transmission electricity of interconnection end measurement, MsFor the transmission electricity of interconnection top measurement.
Beneficial effects of the present invention:
(1) technical scheme that the present invention is provided, according to the real time price of real-time load curve stock dividends electricity, it is fixed to carry out Valency contributes to the restraining force of enhancing contract, safeguards the market order of transregional electricity transaction transprovincially, directly avoids inclined by adjustment The arbitrage behavior of difference electricity;
(2) technical scheme that the present invention is provided, cannot temporarily set up electricity transaction Real-time markets or equilibrium market in China In the case of, it is proposed that easily operated, the relatively simple deviation electricity processing method of workload, can be used as power market reform The solution of middle transition;
(3) technical scheme that the present invention is provided, operation is simple, and step is clear, and calculation scale is little, it is adaptable to Line, off-line analysis, quickly and easily can be completed to analyze, be settled accounts work using clearing software;
(4) technical scheme that the present invention is provided, clearing department can obtain higher transmission service pricing, with this expense with one Certainty ratio compensation provides the transaction participant of balanced service, solves the problems, such as that balancing participant in the past bears a loss.
Description of the drawings
Fig. 1 is a kind of flow chart of deviation electricity settlement method of the invention.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is elaborated.
For making purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, those of ordinary skill in the art The all other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
A kind of deviation electricity settlement method that the present invention is provided, the regional generation limit checked and approved according to peak, flat, paddy period into This reference electricity price as deviation electricity, and the price of deviation electricity is completed through a series of step, and then complete electricity charge knot Calculate work.The method is equivalent to the real time price for imparting deviation electricity, existing in the China for being temporarily not set up Real-time markets Under the transregional framework of electricity transaction transprovincially, transaction participant is avoided with clear and definite real time pricing method and is endangered using the arbitrage of deviation electricity The behavior of evil market order, enhances the restraining force of trade contract, has played the effect of Optimized Operation, and has not had not too much Increase price, the complexity of clearing work system, have stronger actual application value, as shown in figure 1, including:
101., according to the load level in purchase sale of electricity region, carry out peak, flat, paddy Time segments division to purchasing sale of electricity region;
102. determine that the peak in purchase sale of electricity region, flat, the deviation electricity of paddy period refer to electricity price respectively;
103. relations for referring to electricity price using purchase/sale of electricity contract electricity price and the deviation electricity, it is determined that purchase/sale of electricity contract The Settlement price of deviation electricity;
The 104. clearing electricity charge for determining purchase/sale of electricity contract according to the Settlement price of the deviation electricity of the purchase/sale of electricity contract.
When being generally in low load levels in region, system internal loading is undertaken by base lotus unit, and cost of electricity-generating is relatively low, and works as In high load capacity level when, system internal loading is undertaken by peak load unit or regulating units, then cost of electricity-generating is higher.It is believed that system Generating or the load level of purchases strategies and system there is certain functional relation, current power system does not still possess prison in real time The ability of marginal generation cost in a region is surveyed, therefore system under different load levels need to be checked and approved before transaction occurs and generated electricity Marginal cost.Assume that marginal generation cost with load level relationship expression isWherein, F represents generating Marginal cost, L represent load level, and wherein, in region, marginal generation cost and load level relation are by region interior power structure Determine, its relation need by power monitoring department in advance region is generated electricity in the system under different load level condition limit into The power purchase marginal cost of sheet or grid company is calculated, specifically, the step 101, including:
It is determined that partitioning standards variable R (t) in purchase sale of electricity region;
Peak, flat, paddy Time segments division are carried out to purchasing sale of electricity region according to partitioning standards variable R (t).
Further, as the following formula (1) determines partitioning standards variable R (t) in purchase sale of electricity region:
In formula (1), L (t) is the Real-time Load for purchasing power system in sale of electricity region, LminFor purchasing power train in sale of electricity region The day minimum load of system, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
Wherein, if partitioning standards variable R (t) in the purchase sale of electricity region meet:0≤R (t) < 1/3, then the purchase sale of electricity Load level in region is the valley period, if partitioning standards variable R (t) in the purchase sale of electricity region meet:1/3≤R(t)≤ 2/3, then the load level in the purchase sale of electricity region is the level values period, if partitioning standards variable R (t) in the purchase sale of electricity region Meet:2/3 < R (t)≤1, then the load level in the purchase sale of electricity region is peak period.
The step 102, including:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of peak periodp, formula is:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of level values perioda, formula is:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of valley periodv, formula is:
In above-mentioned formula (2)-(4), CiThe cost of electricity-generating of i-th service capacity unit, it is L that n is loadmaxFortune in time domain The unit quantity exerted oneself of row, p for load isThe unit quantity of service capacity in time domain, q for load isThe unit quantity of service capacity, L in time domainminFor purchasing the day minimal negative of power system in sale of electricity region Lotus, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
The step 103 includes:
The sale of electricity contract electricity price is made to bePurchase risk electricity price isThe Settlement price of the deviation electricity of sale of electricity contract isThe Settlement price of the deviation electricity of purchase risk isIf the purchase sale of electricity region internal loading level of present period is peak value, Then the deviation electricity of present period is F with reference to electricity pricex=FpIf the purchase sale of electricity region internal loading level of present period is peak value, The deviation electricity of present period is F with reference to electricity pricex=FaIf the purchase sale of electricity region internal loading level of present period is valley, when The deviation electricity of front period is F with reference to electricity pricex=Fv
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity be it is negative, then
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity are just, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
Wherein, the purchase/sale of electricity contract electricity price meets:
In formula (5), FtransFor the transmission charges checked and approved, FlossConvert into money for line loss;
Wherein, line loss is converted into money FlossFormula be:
In formula (6), alossFor the line loss per unit of circuit.
The step 104, including:
The clearing electricity charge S of sale of electricity contract is determined as the following formulas
In formula (7),For sale of electricity contract electricity price,For the Settlement price of the deviation electricity of sale of electricity contract,Close for sale of electricity Simultaneous interpretation trnamission capacity,For the deviation electricity of sale of electricity contract transmission of electricity composition seller;
The clearing electricity charge S of purchase risk is determined as the following formulab
In formula (8), MtFor the transmission electricity of interconnection end measurement, MsFor the transmission electricity of interconnection top measurement.
Finally it should be noted that:Above example is only to illustrate technical scheme rather than a limitation, most Pipe has been described in detail to the present invention with reference to above-described embodiment, and those of ordinary skill in the art should be understood:Still The specific embodiment of the present invention can be modified or equivalent, and without departing from any of spirit and scope of the invention Modification or equivalent, which all should be covered within the claims of the present invention.

Claims (8)

1. a kind of deviation electricity settlement method, it is characterised in that methods described includes:
According to the load level in purchase sale of electricity region, peak, flat, paddy Time segments division is carried out to purchasing sale of electricity region;
Determine that the peak in purchase sale of electricity region, flat, the deviation electricity of paddy period refer to electricity price respectively;
The relation of electricity price is referred to using purchase/sale of electricity contract electricity price and the deviation electricity, it is determined that the deviation electricity of purchase/sale of electricity contract Settlement price;
The clearing electricity charge of purchase/sale of electricity contract are determined according to the Settlement price of the deviation electricity of the purchase/sale of electricity contract.
2. the method for claim 1, it is characterised in that the load level according in purchase sale of electricity region, sells to purchase Electric region carries out peak, flat, paddy Time segments division, including:
It is determined that partitioning standards variable R (t) in purchase sale of electricity region;
Peak, flat, paddy Time segments division are carried out to purchasing sale of electricity region according to partitioning standards variable R (t).
3. method as claimed in claim 2, it is characterised in that (1) determines the partitioning standards variable R in purchase sale of electricity region as the following formula (t):
R ( t ) = L ( t ) - L m i n L max - L min - - - ( 1 )
In formula (1), L (t) is the Real-time Load for purchasing power system in sale of electricity region, LminFor purchasing power system in sale of electricity region Day minimum load, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
4. method as claimed in claim 2, it is characterised in that if partitioning standards variable R (t) in the purchase sale of electricity region are full Foot:0≤R (t) < 1/3, then the load level in the purchase sale of electricity region is the valley period, if the division in the purchase sale of electricity region Meet according to variable R (t):1/3≤R (t)≤2/3, then the load level in the purchase sale of electricity region is the level values period, if described Partitioning standards variable R (t) in purchase sale of electricity region meet:2/3 < R (t)≤1, then the load level in the purchase sale of electricity region be Peak period.
5. the method for claim 1, it is characterised in that the peak for determining purchase sale of electricity region respectively, flat, paddy period Deviation electricity refers to electricity price, including:
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of peak periodp, formula is:
F p = Σ i = 1 n C i L m a x - - - ( 2 )
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of level values perioda, formula is:
F a = Σ i = 1 p C i 1 3 ( L m a x - L min ) + L m i n - - - ( 3 )
It is determined that purchase sale of electricity region internal loading level refers to electricity price F for the deviation electricity of valley periodv, formula is:
F v = Σ i = 1 q C i 2 3 ( L m a x - L m i n ) + L m i n - - - ( 4 )
In above-mentioned formula (2)-(4), CiThe cost of electricity-generating of i-th service capacity unit, it is L that n is loadmaxService capacity in time domain Unit quantity, p for load isThe unit quantity of service capacity in time domain, q for load isThe unit quantity of service capacity, L in time domainminFor purchasing the day minimal negative of power system in sale of electricity region Lotus, LmaxFor purchasing the Daily treatment cost of power system in sale of electricity region.
6. the method for claim 1, it is characterised in that described using purchase/sale of electricity contract electricity price and the deviation electricity With reference to the relation of electricity price, it is determined that the Settlement price of the deviation electricity of purchase/sale of electricity contract includes:
The sale of electricity contract electricity price is made to bePurchase risk electricity price isThe Settlement price of the deviation electricity of sale of electricity contract isPurchase The Settlement price of the deviation electricity of electric contract isIf the purchase sale of electricity region internal loading level of present period is peak value, currently The deviation electricity of period is F with reference to electricity pricex=FpIf the purchase sale of electricity region internal loading level of present period is peak value, when current The deviation electricity of section is F with reference to electricity pricex=FaIf the purchase sale of electricity region internal loading level of present period is valley, present period Deviation electricity with reference to electricity price be Fx=Fv
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity be it is negative, then
For sale of electricity side, ifAnd many power transmission amounts in sale of electricity side, i.e. deviation electricity are just, then
For sale of electricity side, ifAnd the few power transmission amount in sale of electricity side, i.e. deviation electricity are just, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
For power purchase side, ifAnd the multiplex electricity in power purchase side, i.e. deviation electricity are just, then
For power purchase side, ifAnd power purchase side few power consumption, i.e. deviation electricity be it is negative, then
7. method as claimed in claim 6, it is characterised in that the purchase/sale of electricity contract electricity price meets:
F c b = F c s + F t r a n s + F l o s s - - - ( 5 )
In formula (5), FtransFor the transmission charges checked and approved, FlossConvert into money for line loss;
Wherein, line loss is converted into money FlossFormula be:
F l o s s = F c s ( 1 - a l o s s ) - F c s - - - ( 6 )
In formula (6), alossFor the line loss per unit of circuit.
8. the method for claim 1, it is characterised in that the knot of the deviation electricity according to the purchase/sale of electricity contract The clearing electricity charge that electricity price determines purchase/sale of electricity contract are calculated, including:
The clearing electricity charge S of sale of electricity contract is determined as the following formulas
S s = F c s Q c s + F d s Q d s - - - ( 7 )
In formula (7),For sale of electricity contract electricity price,For the Settlement price of the deviation electricity of sale of electricity contract,Pass for sale of electricity contract Trnamission capacity,For the deviation electricity of sale of electricity contract transmission of electricity composition seller;
The clearing electricity charge S of purchase risk is determined as the following formulab
S b = F c b Q c s M t M s + F d b Q d s M t M s - - - ( 8 )
In formula (8), MtFor the transmission electricity of interconnection end measurement, MsFor the transmission electricity of interconnection top measurement.
CN201610895685.XA 2016-10-13 2016-10-13 Deviation electric quantity settlement method Pending CN106529990A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610895685.XA CN106529990A (en) 2016-10-13 2016-10-13 Deviation electric quantity settlement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610895685.XA CN106529990A (en) 2016-10-13 2016-10-13 Deviation electric quantity settlement method

Publications (1)

Publication Number Publication Date
CN106529990A true CN106529990A (en) 2017-03-22

Family

ID=58331714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610895685.XA Pending CN106529990A (en) 2016-10-13 2016-10-13 Deviation electric quantity settlement method

Country Status (1)

Country Link
CN (1) CN106529990A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107301537A (en) * 2017-06-16 2017-10-27 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN107507066A (en) * 2017-08-29 2017-12-22 昆明电力交易中心有限责任公司 A kind of monthly generating assignment of contract transaction system and method for commerce
CN108985826A (en) * 2018-07-03 2018-12-11 国网陕西省电力公司电力科学研究院 It is a kind of to consider that electricity market entirety electricity deviation and power consumer enter the market the deviation electricity settlement method and system of time
CN110472826A (en) * 2019-07-09 2019-11-19 大连理工大学 A kind of step power station load variations real-time adaptive method considering daily electricity deviation
CN110940948A (en) * 2019-11-22 2020-03-31 广东电力交易中心有限责任公司 Method, device and equipment for calculating settlement deviation generated by ammeter clock drift
CN112258281A (en) * 2020-10-22 2021-01-22 国网四川省电力公司成都供电公司 MATLAB-based electric power marketization transaction electric power fee refunding method and system
CN112669079A (en) * 2020-12-31 2021-04-16 新奥数能科技有限公司 Stock deviation income monitoring method and device for electricity selling company under double-track system and terminal
CN113421128A (en) * 2021-07-13 2021-09-21 国网安徽省电力有限公司经济技术研究院 Unbalance analysis method in electric power spot market environment based on electric power big data analysis technology

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107301537A (en) * 2017-06-16 2017-10-27 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN107301537B (en) * 2017-06-16 2018-03-02 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN107507066A (en) * 2017-08-29 2017-12-22 昆明电力交易中心有限责任公司 A kind of monthly generating assignment of contract transaction system and method for commerce
CN107507066B (en) * 2017-08-29 2018-08-28 昆明电力交易中心有限责任公司 The monthly power generation assignment of contract transaction system of one kind and method of commerce
CN108985826A (en) * 2018-07-03 2018-12-11 国网陕西省电力公司电力科学研究院 It is a kind of to consider that electricity market entirety electricity deviation and power consumer enter the market the deviation electricity settlement method and system of time
CN110472826A (en) * 2019-07-09 2019-11-19 大连理工大学 A kind of step power station load variations real-time adaptive method considering daily electricity deviation
CN110472826B (en) * 2019-07-09 2022-11-18 大连理工大学 Gradient hydropower station load change real-time self-adaption method considering daily electric quantity deviation
CN110940948A (en) * 2019-11-22 2020-03-31 广东电力交易中心有限责任公司 Method, device and equipment for calculating settlement deviation generated by ammeter clock drift
CN112258281A (en) * 2020-10-22 2021-01-22 国网四川省电力公司成都供电公司 MATLAB-based electric power marketization transaction electric power fee refunding method and system
CN112669079A (en) * 2020-12-31 2021-04-16 新奥数能科技有限公司 Stock deviation income monitoring method and device for electricity selling company under double-track system and terminal
CN113421128A (en) * 2021-07-13 2021-09-21 国网安徽省电力有限公司经济技术研究院 Unbalance analysis method in electric power spot market environment based on electric power big data analysis technology

Similar Documents

Publication Publication Date Title
CN106529990A (en) Deviation electric quantity settlement method
Spodniak et al. The impact of wind power and electricity demand on the relevance of different short-term electricity markets: The Nordic case
Wu et al. Demand response exchange in the stochastic day-ahead scheduling with variable renewable generation
CN107240002A (en) A kind of electricity transaction method, device and micro-grid system
CN109377411A (en) Block chain-based centralized matching transaction method and device for power market
Wiser et al. Renewable energy policy and electricity restructuring: a California case study
CN110119963A (en) A kind of micro-capacitance sensor power trade method based on principal and subordinate's intelligence contract
CN107153986A (en) A kind of Generation Rights Trade method for promoting new energy to dissolve
CN103455941A (en) Intra-provincial power generation right transfer transaction method adopting two pricing mechanisms
Anaya et al. The role of distribution network operators in promoting cost-effective distributed generation: Lessons from the United States of America for Europe
CN107220868A (en) The computational methods that a kind of electricity that draws water concentrates trade at competitive price to go out clear electricity price
CN113205423A (en) Energy trading system based on block chain and trading method thereof
CN112132309A (en) Electricity purchasing and selling optimization method and system for electricity selling company under renewable energy power generation quota system
Hochberg et al. The Brazilian electricity market architecture: An analysis of instruments and misalignments
CN107886347A (en) One kind plan and market merger, decoupling method
Newbery Strengths and weaknesses of the British market model
CN107103501A (en) Electricity settlement method under pre- listed moon balance deviation mechanism
CN110929978A (en) Electric power market risk assessment method and system
CN108376296A (en) A kind of power trade optimization clearing method and system for supporting two-way composite price quotation
Kayo Power sector reforms in Zimbabwe: will reforms increase electrification and strengthen local participation?
Bernard et al. Alternative auction institutions for purchasing electric power: An experimental examination
Wang et al. Research on US green certificate trading mechanism experience and domestic implementation prospects
Duan et al. Power flow based monetary flow method for electricity transmission and wheeling pricing
CN112215612B (en) Photovoltaic absorption optimization method and system based on block chain
Cham The Philippine power sector: issues and solutions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322