CN106522419A - Column-supported-by-beam transfer beam with steel plate reinforced concrete shear walls arranged in adjacent spans - Google Patents

Column-supported-by-beam transfer beam with steel plate reinforced concrete shear walls arranged in adjacent spans Download PDF

Info

Publication number
CN106522419A
CN106522419A CN201611261890.7A CN201611261890A CN106522419A CN 106522419 A CN106522419 A CN 106522419A CN 201611261890 A CN201611261890 A CN 201611261890A CN 106522419 A CN106522419 A CN 106522419A
Authority
CN
China
Prior art keywords
steel
concrete
steel plate
reinforced concrete
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611261890.7A
Other languages
Chinese (zh)
Other versions
CN106522419B (en
Inventor
张伟
周晓光
严力军
陈龙
夏熙尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hong Kong Huayi Design Consultants Shenzhen Ltd
Original Assignee
Hong Kong Huayi Design Consultants Shenzhen Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hong Kong Huayi Design Consultants Shenzhen Ltd filed Critical Hong Kong Huayi Design Consultants Shenzhen Ltd
Priority to CN201611261890.7A priority Critical patent/CN106522419B/en
Publication of CN106522419A publication Critical patent/CN106522419A/en
Application granted granted Critical
Publication of CN106522419B publication Critical patent/CN106522419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a column-supported-by-beam transfer beam with steel plate reinforced concrete shear walls arranged in adjacent spans. The column-supported-by-beam transfer beam comprises a profile steel reinforced concrete transfer beam body, profile steel reinforced concrete columns, the steel plate reinforced concrete shear walls, concrete-filled square steel tubular columns and profile steel reinforced concrete beams. The concrete-filled square steel tubular columns are arranged on the profile steel reinforced concrete transfer beam body. The steel plate reinforced concrete shear walls are located on the two sides of the profile steel reinforced concrete transfer beam body and symmetrically arranged at the whole layer height in the adjacent spans. The two sides of each profile steel reinforced concrete column are connected with the corresponding steel plate reinforced concrete shear wall and the profile steel reinforced concrete transfer beam body separately. The profile steel reinforced concrete columns and the steel plate reinforced concrete shear walls bear vertical loads and horizontal loads transferred by the profile steel reinforced concrete transfer beam body correspondingly. The steel plate reinforced concrete shear walls are arranged at the whole layer height in the adjacent spans to bear shear force, so that the problem that when the profile steel reinforced concrete transfer beam body is relatively high, the shear resistance of the profile steel reinforced concrete columns for supporting the profile steel reinforced concrete transfer beam body from the two sides may be insufficient is solved.

Description

It is a kind of adjacent across the beam support conversion beam for arranging steel plate concrete shear wall
Technical field
The present invention relates to a kind of conversion beam in structural engineering field, more particularly to a kind of adjacent across setting steel plate coagulation The beam support conversion beam of native shear wall.
Background technology
At present, there are needs special at some due to the needs of upper and lower floor difference building function in high-rise, high-rise building Determine storey setting conversion beam, to realize that upper floor frame segment trestle needs to cancel below certain layer, realize bottom floor post across Size is more than portion's floor upstairs.It is general in floor total height and in the case of needing number of floor levels to be converted less, using normal The frame framework of rule " beam support " form is capable of achieving above-mentioned building function and requires, properly settles problems.
To high-rise, high-rise building, bottom floor is large space, and post net needs large-size, and in, the more floor in top Building function changes, and colum network size diminishes, it is necessary in some storey setting conversion beams, give reality with " beam support " form Existing above-mentioned requirements.To meet the demand of bearing capacity and stiffness, general conversion beam deck-molding is higher, mutually should be used as supporting the frame of conversion beam Pillar is in the less situation of conversion layer clear height.As the internal force undertaken by conversion beam, frame-supporting column is huge, may there is support and turn Change the floor frame-supporting column shearing resistance of beam place to be difficult to meet the problem of design requirement, if simple using increase column cross-section size or in conversion Although the adjacent measure for setting up shear wall across logical height of layer can solve the problem in technological layer, due to the shear wall set up and The frame-supporting column of increasing section size can be affected greatly to building function, not with operability so that process problems It is difficult to find a kind of simple effective, method of economical rationality.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of adjacent across the beam support turn for arranging steel plate concrete shear wall Change beam technology so as to which energy effectively solving when higher using steel reinforced concrete conversion beam deck-molding can have supported on both sides shaped steel and mix The not enough problem of the profile steel concrete column shearing resistance of soil conversion beam is coagulated, is arranged by designing a kind of construction of simple effective, economical rationality Apply, bearing capacity mutation can be solved so as to possess enough shear resistances, can at utmost reduce again and work(is built to each floor The impact of energy.
The technical scheme is that:The present invention is adjacent across the beam support conversion beam for arranging steel plate concrete shear wall, bag Include steel reinforced concrete conversion beam, profile steel concrete column, steel plate concrete shear wall, concrete-filled steel square tubular column and steel reinforced concrete Beam, wherein concrete-filled steel square tubular column are placed on steel reinforced concrete conversion beam, and steel plate concrete shear wall turns positioned at steel reinforced concrete Beam both sides are changed, and it is adjacent across along flood high setting, it is arranged symmetrically;The profile steel concrete column left and right sides respectively with steel plate concrete Shear wall is connected with steel reinforced concrete conversion beam.
The steel reinforced concrete conversion beam, girder with rolled steel section en cased in concrete are constituted by beams of concrete, steel I-beam, steel I-beam position Inside beams of concrete.
The steel I-beam is made up of I-steel top flange, I-steel web, I-steel lower flange, I-steel top flange and I-steel lower flange is respectively welded at the two ends of I-steel web, constitutes steel I-beam.
The profile steel concrete column is made up of concrete column, cross reinforcing bar, steel diaphragm, and cross reinforcing bar is located at concrete Inside post, steel diaphragm is welded in cross reinforcing bar floor relevant position.
The steel plate concrete shear wall is by concrete shear force wall, embedded steel plate shear force wall, shaped steel sleeper, vertically put more energy into Rib, level are constituted to ribbed stiffener;Embedded steel plate shear force wall, shaped steel sleeper, vertical ribbed stiffener, level are located at concrete to ribbed stiffener Inside shear wall, shaped steel sleeper is arranged on the end of embedded steel plate shear force wall, and the two is welded as a whole;Vertical ribbed stiffener, level Vertically it is set in qually spaced in the horizontal direction and respectively on embedded steel plate shear force wall, and be symmetrically welded at embedded steel to ribbed stiffener The both sides of plate shear wall.
The embedded steel plate shear force wall respectively vertically, horizontal direction in both sides symmetric position, vertical ribbed stiffener and water are set Flat ribbed stiffener, and the embedded symmetrical spaced set peg in steel plate shear force wall both sides.The quantity of vertical ribbed stiffener and sash rib Depending on can be according to actual loading demand.
The cross steel in the side and profile steel concrete column of steel plate shear force wall is embedded in the steel plate concrete shear wall Bone photo connects, and the upper and lower end of steel plate concrete shear wall is connected with the steel I-beam in girder with rolled steel section en cased in concrete so that steel plate concrete Three sides of shear wall formation are fixed, the free force modes in one side.
The concrete-filled steel square tubular column is made up of square steel tube, built-in concrete, lateral shrouding, end shrouding;Built-in coagulation Soil is poured inside square steel tube, and lateral shrouding, end shrouding are located at immediately below square steel tube, and are welded on and are vertically gone up with square steel tube On steel I-beam inside the steel reinforced concrete conversion beam of lower aligned position.
The concrete-filled steel square tubular column bottom welding in steel reinforced concrete conversion beam steel I-beam top flange top surface, with square steel The steel I-beam web both sides symmetric position of pipe concrete column correspondence position welds lateral shrouding and end shrouding along short transverse; Wherein, end shrouding does not lead to high setting along steel I-beam web height direction on the premise of force request is met, must be close Certain altitude space is reserved at I-steel lower flange;Meanwhile, concrete-filled steel square tubular column is in the range of steel I-beam top flange is enclosed Concreting hole is symmetrical arranged, to facilitate regional casting and compacting of concrete in steel reinforced concrete conversion beam closely knit.
Steel I-beam top flange, steel I-beam web, steel I-beam lower flange, end in the steel reinforced concrete conversion beam Portion's shrouding, lateral shrouding must arrange peg.Particular number and spacing are determined by detailing requiments and calculating are comprehensive.
It is a kind of adjacent across the beam support conversion beam for arranging steel plate concrete shear wall that the present invention is provided, with following excellent Point:
1)The present invention propose when the deck-molding using steel reinforced concrete conversion beam is higher, by it is adjacent across arrange steel plate concrete Shear wall is to undertake shearing, not enough to solve the problems, such as profile steel concrete column shearing resistance.The method takes into full account structure feature, And consider from building function, only supporting conversion beam both sides adjacent across respectively arranging one steel plate concrete shear wall along flood is high, The impact to building function is at utmost reduced, accomplishes the coordinating and unifying of building function and structural system.
2)Space to built-in steel beam columns such as profile steel concrete column, steel reinforced concrete conversion beam, steel plate concrete shear walls Relation provides design and supporting construction measure in detail, meanwhile, the feasibility and convenience of construction are taken into full account, maximum possible is true Protect the realizability of construction quality.
The present invention is applied to the design of high-rise, high-rise building longspan structure, guaranteeing fabric architecture reasonable stress, On the premise of meeting every bearing capacity and detailing requiments, the diversity of building function and the exploitativeness of construction are taken into full account, is fitted For the situation of frame framework, and conversion beam, transition mast are respectively adopted the feelings of steel reinforced concrete conversion beam, profile steel concrete column Condition.
Description of the drawings
Fig. 1 is the adjacent across the beam support conversion beam structural representation for arranging steel plate concrete shear wall of the present invention;
Fig. 2 is light plate concrete shear force wall detail drawing of the present invention;
Fig. 3 is the B-B sections in the present invention in Fig. 2, i.e. steel plate concrete shear wall sectional detail drawing;
Fig. 4 is that the A-A sections of Fig. 1 in the present invention, i.e. concrete-filled steel square tubular column change beam connecting node detail drawing with steel reinforced concrete;
Fig. 5 supports Behavior of Concrete-filled Square Steel Tubular Column Connections detail drawing for the medium-sized steel concrete conversion beam of invention;
Fig. 6 is the C-C sections of Fig. 5 in the present invention, i.e. concrete-filled steel square tubular column bottom is connected detail drawing with steel I-beam top flange.
Specific embodiment
The specific embodiment of the present invention is described in further detail below in conjunction with accompanying drawing.
It is of the present invention for high-rise, high-rise building longspan structure in it is a kind of adjacent across setting steel plate concrete The beam support conversion beam of shear wall is as shown in figure 1, include steel reinforced concrete conversion beam 1, profile steel concrete column 2, steel plate coagulation Native shear wall 3, concrete-filled steel square tubular column 4 and girder with rolled steel section en cased in concrete 5;The steel reinforced concrete conversion beam 1, girder with rolled steel section en cased in concrete 5 Constituted by beams of concrete 11, steel I-beam 12 in form, but the spatial relationship of its concrete sectional dimension and adjacent members is not It is identical to the greatest extent;The profile steel concrete column 2 is made up of concrete column 21, cross reinforcing bar 22, steel diaphragm 23;The square steel tube coagulation Earth pillar 4 is made up of square steel tube 41, built-in concrete 41, lateral shrouding 43, end shrouding 44;Wherein, steel I-beam 12 is by I-shaped Steel top flange 121, I-steel web 122, I-steel lower flange 123 constitute.Wherein, concrete-filled steel square tubular column 4 is held on shaped steel On concrete conversion beam 1, its quantity, horizontal layout are determined according to Practical Project situation;Steel plate concrete shear wall 3 is located at type 1 both sides of steel concrete conversion beam are adjacent across along flood high setting, are arranged symmetrically;2 left and right sides of profile steel concrete column respectively with Steel plate concrete shear wall 3 is connected with steel reinforced concrete conversion beam 1.
Fig. 2 is light plate concrete shear force wall detail drawing of the present invention, wherein, the steel plate concrete shear wall 3 is by concrete Shear wall 31, embedded steel plate shear force wall 32, shaped steel sleeper 33, vertical ribbed stiffener 34, level are constituted to ribbed stiffener 35.Embedded steel plate 32 side of shear wall is connected with the cross reinforcing bar 22 in profile steel concrete column 2, the work in upper and lower end and girder with rolled steel section en cased in concrete 5 Word girder steel 12 is connected, and three sides of the formation of steel plate concrete shear wall 3 are fixed, free force modes.Steel plate concrete is sheared , only in 1 place floor of steel reinforced concrete conversion beam along flood high setting, length and thickness are by detailing requiments and to calculate stress comprehensive for wall 3 Close and determine.Embedded steel plate shear force wall 32 can according to actual loading demand, respectively vertically, level it is a number of vertical to arranging Ribbed stiffener 34 and level are to ribbed stiffener 35, but at least should ensure that one level to ribbed stiffener 35 and adjacent steel reinforced concrete The alignment of steel I-beam lower flange 123 or so in conversion beam 1 is arranged.
Fig. 3 is the B-B sections in the present invention in Fig. 2, as steel plate concrete shear wall top view sectional detail drawing, wherein, Vertical ribbed stiffener 34 and level are arranged symmetrically in embedded 32 both sides of steel plate shear force wall to ribbed stiffener 35, and are sheared in embedded steel plate The symmetrical spaced set peg in 32 both sides of wall 7.Embedded steel plate shear force wall 32, cross reinforcing bar 22, steel I-beam web 122 are same Alignment on one axis is arranged, by being weldingly connected between three.
Fig. 4 is the A-A sections of Fig. 1 in the present invention, and as square combined steel and concrete column 4 is connected with steel reinforced concrete conversion beam 1 Node sectional detail drawing, wherein, 4 bottom welding of steel core concrete column is in the built-in steel I-beam upper limb of steel reinforced concrete conversion beam 1 121 top surface of edge, and in the 122 both sides symmetric position of steel I-beam web with 4 correspondence position of concrete-filled steel square tubular column along height side To lateral shrouding 43 and end shrouding 44 is welded, thickness of slab is same with concrete-filled steel square tubular column 4 thick, wherein, end shrouding 44 is meeting Arrange along 122 short transverse part of steel I-beam web on the premise of force request, must be at steel I-beam lower flange 123 Reserved certain altitude space.
Fig. 5 supports Behavior of Concrete-filled Square Steel Tubular Column Connections facade detail drawing for the medium-sized steel concrete conversion beam of invention, wherein, it is welded in Steel I-beam top flange 121, steel I-beam web 122, the lateral shrouding 43 of steel I-beam lower flange 123 and end shrouding 44 with 4 consistency from top to bottom of concrete-filled steel square tubular column is arranged.Steel I-beam top flange 121, I-steel in the steel reinforced concrete conversion beam 1 Lower flange of girder edge 123, both sides is close in the range of 122 one fixed width of steel I-beam web of profile steel concrete column 2, end shrouding 44, Peg 7 must be set in 122 certain limit of lateral shrouding 43 and position steel I-beam web, and particular number and spacing are by constructing Read group total is wanted comprehensively to determine.
Fig. 6 is the C-C sections of Fig. 5 in the present invention, i.e. 4 bottom of concrete-filled steel square tubular column and steel I-beam top flange (121) Connection detail drawing, wherein, the symmetrically reserved concreting in the range of steel I-beam top flange 121 is enclosed of concrete-filled steel square tubular column 4 Hole 8, to facilitate regional casting and compacting of concrete in steel reinforced concrete conversion beam 1 closely knit.
Fig. 1 is the adjacent beam support conversion beam detail of construction across setting steel plate concrete shear wall in concrete engineering example, The present invention is applied in certain engineering project, 7 degree of seismic fortification intensity, first group of classification of design earthquake, II class of site category.This 2 layers of engineering underground, 31 layers on the ground of high building, index bed floor height 4.2m, main structure body total height 148.8m is high-rise building, knot Structure system is the band frame shear wall structure that repeatedly two-way beam support is changed.High building horizontal layout is rectangle, based on special building The needs of Facade form and each layer building function, high building part turn in 10,18,22,26 layers of setting unit respectively along short transverse Beam is changed, there are 2 ~ 4 road conversion beams respectively, on beam, support 1 ~ 3 frame column, form local frame framework, conversion beam maximum span 24m.Neighbouring conversion beam is respectively horizontally and vertical to being alternately arranged every several floors in horizontal layout.That is structure Not only there are many secondary beam lift post conversions in system.Positioned at high building corner shear wall and framework and Zhongting position armored concrete cylinder Arrange along the upper and lower insertion of short transverse, other regional frame trestles are by carriage trestle on conversion beam more than 10 layers Mode realize.In the project, respectively in 10,18,22,26 layers of end bay position conversion beam using proposed by the invention adjacent Across the technical scheme of the beam support conversion beam for arranging steel plate concrete shear wall.
The present invention to have taken into full account and supported on both sides steel reinforced concrete turn occur due to adopting the conversion beam of higher deck-molding to cause The not enough problem of 2 shearing resistance of profile steel concrete column of beam 1 is changed, by the adjacent steel plate coagulation across along flood high setting certain length Native shear wall 3 undertakes shearing, not only simply and effectively solves the problem, and can at utmost reduce structural elements to building work( Can impact, the structural system simple structure, power transmission clearly, be easy to construction.
Present example enumerates above-mentioned embodiment, but due to the diversity of cross-section of frame column form, it is corresponding it is adjacent across Arrange Difference in detail is deposited in structural form, unless the change of the interdependent node for causing is beyond the scope of this invention, otherwise all Should be included within protection scope of the present invention.

Claims (10)

1. a kind of adjacent across the beam support conversion beam for arranging steel plate concrete shear wall, it is characterised in that:Including steel reinforced concrete Conversion beam, profile steel concrete column, steel plate concrete shear wall, concrete-filled steel square tubular column and girder with rolled steel section en cased in concrete, wherein square steel tube Concrete column is placed on steel reinforced concrete conversion beam, and steel plate concrete shear wall is located at steel reinforced concrete conversion beam both sides, and phase Neighbour is arranged symmetrically across along flood high setting;The profile steel concrete column left and right sides respectively with steel plate concrete shear wall and shaped steel Concrete conversion beam is connected.
2. according to claim 1 adjacent across the beam support conversion beam for arranging steel plate shear force wall, it is characterised in that:The type Steel concrete conversion beam, girder with rolled steel section en cased in concrete are constituted by beams of concrete, steel I-beam, and steel I-beam is located in beams of concrete Portion.
3. according to claim 2 adjacent across the beam support conversion beam for arranging steel plate shear force wall, it is characterised in that:The work Word girder steel is made up of I-steel top flange, I-steel web, I-steel lower flange, I-steel top flange and I-steel bottom wing fate The two ends of I-steel web are not welded on, steel I-beam is constituted.
4. according to claim 3 adjacent across the beam support conversion beam for arranging steel plate shear force wall, it is characterised in that:The type Steel concrete column is made up of concrete column, cross reinforcing bar, steel diaphragm, and cross reinforcing bar is located inside concrete column, steel diaphragm It is welded in cross reinforcing bar floor relevant position.
5. according to claim 3 adjacent across the beam support conversion beam for arranging steel plate shear force wall, it is characterised in that:The steel Board concrete shear wall is from concrete shear force wall, embedded steel plate shear force wall, shaped steel sleeper, vertical ribbed stiffener, level to ribbed stiffener Composition;Embedded steel plate shear force wall, shaped steel sleeper, vertical ribbed stiffener, level are located inside concrete shear force wall to ribbed stiffener, shaped steel Sleeper is arranged on the end of embedded steel plate shear force wall, and the two is welded as a whole;Vertical ribbed stiffener, level are to ribbed stiffener along level side To and be vertically set in qually spaced on embedded steel plate shear force wall respectively, and be symmetrically welded at the both sides of embedded steel plate shear force wall.
6. according to claim 5 adjacent across the beam support conversion beam for arranging steel plate concrete shear wall, it is characterised in that: The embedded steel plate shear force wall respectively vertically, horizontal direction in both sides symmetric position, vertical ribbed stiffener and sash are set Rib, and the embedded symmetrical spaced set peg in steel plate shear force wall both sides.
7. adjacent across the beam support conversion beam for arranging steel plate shear force wall according to any one of claim 3 to 6, its feature exists In:The cross reinforcing bar phase in side and the profile steel concrete column of steel plate shear force wall is embedded in the steel plate concrete shear wall Even, the upper and lower end of steel plate concrete shear wall is connected with the steel I-beam in girder with rolled steel section en cased in concrete so that steel plate concrete is sheared Three sides of wall formation are fixed, the free force modes in one side.
8. according to claim 7 adjacent across the beam support conversion beam for arranging steel plate shear force wall, it is characterised in that:The side Steel core concrete column is made up of square steel tube, built-in concrete, lateral shrouding, end shrouding;Built-in concreting is in square steel tube Inside, lateral shrouding, end shrouding are located at immediately below square steel tube, and are welded on the type with square steel tube vertically consistency from top to bottom position On steel I-beam inside steel concrete conversion beam.
9. according to claim 8 adjacent across the beam support conversion beam for arranging steel plate concrete shear wall, it is characterised in that: The concrete-filled steel square tubular column bottom welding in steel reinforced concrete conversion beam steel I-beam top flange top surface, with Concrete-Filled Square Steel Tube The steel I-beam web both sides symmetric position of post correspondence position welds lateral shrouding and end shrouding along short transverse;Wherein, hold Portion's shrouding does not lead to high setting along steel I-beam web height direction on the premise of force request is met, must be under I-steel Certain altitude space is reserved at the edge of a wing;Meanwhile, concrete-filled steel square tubular column is symmetrical arranged in the range of steel I-beam top flange is enclosed Concreting hole, to facilitate regional casting and compacting of concrete in steel reinforced concrete conversion beam closely knit.
10. according to claim 9 adjacent across the beam support conversion beam for arranging steel plate concrete shear wall, its feature exists In:Steel I-beam top flange, steel I-beam web, steel I-beam lower flange, end envelope in the steel reinforced concrete conversion beam Plate, lateral shrouding must arrange peg.
CN201611261890.7A 2016-12-30 2016-12-30 Adjacent beam-supporting column conversion beam that strides and set up steel sheet concrete shear force wall Active CN106522419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611261890.7A CN106522419B (en) 2016-12-30 2016-12-30 Adjacent beam-supporting column conversion beam that strides and set up steel sheet concrete shear force wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611261890.7A CN106522419B (en) 2016-12-30 2016-12-30 Adjacent beam-supporting column conversion beam that strides and set up steel sheet concrete shear force wall

Publications (2)

Publication Number Publication Date
CN106522419A true CN106522419A (en) 2017-03-22
CN106522419B CN106522419B (en) 2022-12-09

Family

ID=58336338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611261890.7A Active CN106522419B (en) 2016-12-30 2016-12-30 Adjacent beam-supporting column conversion beam that strides and set up steel sheet concrete shear force wall

Country Status (1)

Country Link
CN (1) CN106522419B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152105A (en) * 2017-05-04 2017-09-12 浙江绿筑集成科技有限公司 H profile steel combined concrete shear wall with T-shaped stiffener and preparation method thereof
CN108331172A (en) * 2018-04-20 2018-07-27 香港华艺设计顾问(深圳)有限公司 A kind of conversion beam of the unidirectional diagonal brace of setting
CN109057149A (en) * 2018-09-18 2018-12-21 中国铁路设计集团有限公司 A kind of steel reinforced concrete conversion beam and its inverted order construction method
CN113833120A (en) * 2021-08-30 2021-12-24 三东筑工(德州)有限公司 Connection structure of assembled precast concrete shear wall and girder steel
CN114033070A (en) * 2021-12-17 2022-02-11 中国建筑第八工程局有限公司 Anti-seismic combined shear wall structure
IT202100024860A1 (en) 2021-09-29 2023-03-29 Info Mtr Srl HOLLOW COLUMN FOR MIXED STEEL-CONCRETE STRUCTURES WITH STRESS TRANSFER SYSTEM BETWEEN STEEL AND CONCRETE

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046109A (en) * 2006-03-31 2007-10-03 同济大学 New type of frame supported shear wall structure and its making process
CN201704800U (en) * 2010-06-13 2011-01-12 单云霞 Beam support used for steel structure
CN102704596A (en) * 2012-05-25 2012-10-03 北京工业大学 Combined shear wall with concrete wrapped steel plate dense beam embedded between profile steel overlapped columns and externally wrapping concrete and manufacturing method
CN103397695A (en) * 2013-08-01 2013-11-20 香港华艺设计顾问(深圳)有限公司 Concrete filled steel tube combination column high position connected structure provided with bidirectional steel trusses
CN203924115U (en) * 2014-06-25 2014-11-05 中铁第一勘察设计院集团有限公司 A kind of subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar
CN104314199A (en) * 2014-11-19 2015-01-28 东南大学 Novel truss-holed steel plate shear wall structural system
CN204781316U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Diaphragm welding structure in steel column of flat box cross -section
CN105178440A (en) * 2015-08-08 2015-12-23 广州市设计院 Internal steel plate-concrete composite shear wall with end part externally-wrapping structures, and cross beam structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046109A (en) * 2006-03-31 2007-10-03 同济大学 New type of frame supported shear wall structure and its making process
CN201704800U (en) * 2010-06-13 2011-01-12 单云霞 Beam support used for steel structure
CN102704596A (en) * 2012-05-25 2012-10-03 北京工业大学 Combined shear wall with concrete wrapped steel plate dense beam embedded between profile steel overlapped columns and externally wrapping concrete and manufacturing method
CN103397695A (en) * 2013-08-01 2013-11-20 香港华艺设计顾问(深圳)有限公司 Concrete filled steel tube combination column high position connected structure provided with bidirectional steel trusses
CN203924115U (en) * 2014-06-25 2014-11-05 中铁第一勘察设计院集团有限公司 A kind of subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar
CN104314199A (en) * 2014-11-19 2015-01-28 东南大学 Novel truss-holed steel plate shear wall structural system
CN204781316U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Diaphragm welding structure in steel column of flat box cross -section
CN105178440A (en) * 2015-08-08 2015-12-23 广州市设计院 Internal steel plate-concrete composite shear wall with end part externally-wrapping structures, and cross beam structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁立等: "某超高层型钢转换梁设计", 《四川建筑科学研究》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152105A (en) * 2017-05-04 2017-09-12 浙江绿筑集成科技有限公司 H profile steel combined concrete shear wall with T-shaped stiffener and preparation method thereof
CN108331172A (en) * 2018-04-20 2018-07-27 香港华艺设计顾问(深圳)有限公司 A kind of conversion beam of the unidirectional diagonal brace of setting
CN109057149A (en) * 2018-09-18 2018-12-21 中国铁路设计集团有限公司 A kind of steel reinforced concrete conversion beam and its inverted order construction method
CN113833120A (en) * 2021-08-30 2021-12-24 三东筑工(德州)有限公司 Connection structure of assembled precast concrete shear wall and girder steel
CN113833120B (en) * 2021-08-30 2022-05-03 三东筑工(德州)有限公司 Connection structure of assembled precast concrete shear wall and girder steel
IT202100024860A1 (en) 2021-09-29 2023-03-29 Info Mtr Srl HOLLOW COLUMN FOR MIXED STEEL-CONCRETE STRUCTURES WITH STRESS TRANSFER SYSTEM BETWEEN STEEL AND CONCRETE
CN114033070A (en) * 2021-12-17 2022-02-11 中国建筑第八工程局有限公司 Anti-seismic combined shear wall structure

Also Published As

Publication number Publication date
CN106522419B (en) 2022-12-09

Similar Documents

Publication Publication Date Title
CN106522419A (en) Column-supported-by-beam transfer beam with steel plate reinforced concrete shear walls arranged in adjacent spans
CN106703197B (en) A kind of large span multilayer anti-seismic frame structure system and its construction method
CN107761950B (en) Assembled reinforced concrete angle support frame and construction method thereof
CN203174767U (en) Steel reinforced concrete frame four-corner barrel bi-directional large-span steel truss mixed structure
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN207700371U (en) A kind of assembled steel reinforced concrete angle brace frame
CN107246016A (en) A kind of suspension type inner support system and foundation ditch construction method suitable for base pit engineering
CN210049103U (en) High-grade high-speed highway bracket spanned by large-span cast-in-place box girder
CN109424072A (en) The connecting node and construction method of spacer bar concrete column on a kind of girder steel
CN206428854U (en) It is a kind of adjacent across the beam support conversion beam for setting steel plate concrete shear wall
KR100876679B1 (en) Bridge soundproof structure and method of executing the same
CN107460948A (en) The double-deck RC plate-type transfer floors and construction method of superstructure are poured after a kind of
CN107268422A (en) Across the self-anchored type suspension cable arched girder co-operative system bridge such as one kind
CN207092108U (en) A kind of suspension type inner support system suitable for base pit engineering
CN106088328A (en) A kind of group frame
CN104100000A (en) Steel reinforced concrete frame four-corner barrel bi-directional large-span steel truss mixed structure
CN111058535A (en) Super large span eccentric support grid structure coal shed
CN110424246A (en) A kind of Long span bowstring arch bridge access bridge jack-up system and jack-up construction method
CN102392417A (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN214833739U (en) Novel assembled shear force wall
CN206034271U (en) Novel shelter bridge concrete foundation structure
CN104831928A (en) Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform
CN205776898U (en) Overall assembled reinforced concrete shear wall structure system
CN211873331U (en) Super large span eccentric support grid structure coal shed
CN113882508A (en) Large-scale suspension type steel structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant