CN106522212A - Externally suspended formwork, assisting device and construction method for oblique pile construction - Google Patents

Externally suspended formwork, assisting device and construction method for oblique pile construction Download PDF

Info

Publication number
CN106522212A
CN106522212A CN201611149670.5A CN201611149670A CN106522212A CN 106522212 A CN106522212 A CN 106522212A CN 201611149670 A CN201611149670 A CN 201611149670A CN 106522212 A CN106522212 A CN 106522212A
Authority
CN
China
Prior art keywords
template
guiding gutter
taper pile
concrete
side perforation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611149670.5A
Other languages
Chinese (zh)
Other versions
CN106522212B (en
Inventor
金玲玲
宋文利
谢兰敏
宋克备
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201611149670.5A priority Critical patent/CN106522212B/en
Publication of CN106522212A publication Critical patent/CN106522212A/en
Application granted granted Critical
Publication of CN106522212B publication Critical patent/CN106522212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an externally suspended formwork and an assisting device for oblique pile construction. The externally suspended formwork comprises a bottom formwork body, a middle formwork body and a top formwork body, wherein the bottom formwork body, the middle formwork body and the top formwork body are matched with one another. The bottom formwork body is rectangular. The upper portion of the middle formwork body is of a sunken structure. The lower portion of the top formwork body is of a protruding fan-shaped structure. The assisting device comprises a flow guiding chute, a fixed support, an arch-shaped hook frame and an opposite-pull threaded rod. The invention further discloses a construction method for oblique pile construction. The construction method comprises the steps that the flow guiding chute is installed on a fixed formwork; the bottom formwork body is erected; the middle formwork body is erected; the top formwork body is erected; the arch-shaped hoop frame and the opposite-pull threaded rod are installed; the opposite-pull threaded rod and the arch-shaped hoop frame are removed; and the flow guiding chute is removed, and the top formwork body, the middle formwork body and the bottom formwork body are removed in sequence. The problems that the concrete pouring process of a pile opening of an oblique pile is difficult, the pouring effect is poor, the fastening effect between the externally suspended formworks as well as between the externally suspended formwork and the pile opening is not ideal, according to a traditional construction method, the overall effect is poor, the quality is hard to guarantee, and the consistency of the oblique piles is poor are creatively solved.

Description

A kind of plug-in template, auxiliary device and construction method constructed for taper pile
Technical field
The invention belongs to taper pile construction field in architectural engineering, more particularly to a kind of plug-in template for taper pile construction, Auxiliary device and construction method.
Background technology
At present, developing rapidly with domestic and abroad bridge technology, multiarch bridge, Deck Arch Bridges, steel arch bridge etc. possess and have The bridge structure that landscape effect is good, meet landform requires is arisen at the historic moment, and not only embodies the unique design level of designer, while And the Engineering Projects for being related to taper pile in Arch Bridge Construction is more, under water taper pile is verified to a kind of of different types of rridges construction method Relatively universal, the mostly taper pile of major diameter is designed as full face inclined steel-pipe pile, using tunneling boring impact holing, impact holing more Equipment is also more ripe at home and abroad.
But design for the taper pile of minor radius, both at home and abroad without ripe construction technology and equipment, more using manually digging hole Construction method, guarantees quality and the safety constructed, but the disadvantage of many quality controls is yet suffered from work progress, because tiltedly The special construction principle of stake, in concreting process, because of gravity, concrete is ready that generation is caved in, and because the section of taper pile There is certain oblique angle in direction.Therefore after taper pile pore-forming, during casting concrete, the shape of template of stake mouth and the sequencing of installation, Construction method etc. all constrains the pouring quality of aperture concrete.
Because taper pile is during casting concrete, start casting concrete from side, concrete is poured on the upside of side event stake mouth Build quality to ensure, concrete at taper pile stake mouth top closure is normally due to cannot vibrate, side casting concrete cannot be protected The degree of compaction of card concrete above, concrete are more open, can only solve casting concrete above using rear compensating method mostly Problem, but after the effect poured it is generally bad, after concrete formation form removal, step is more apparent, apparent mass extreme difference, another intensity There is open defect, directly affect the total quality of taper pile;Scene adopts how spliced bamboo slab rubber, using repeatedly splicing, Can just complete to pour, while bamboo slab rubber is difficult to fix on light-gauge taper pile, it is many using being manually fixed at present, pouring Hand fit, method is needed relatively to fall behind while concrete, man efficiency is low, after the completion of pouring, layer holds again above taper pile Be also easy to produce concrete to come off and cavitation, and main cause to be the incorrect and Formwork Installation Method that template is adopted unreasonable make Into.
As shown in figure 1, before taper pile pore-forming after-pouring concrete, the concrete knot that taper pile includes that inwall has sprayed and solidifies Structure, includes steel arch-shelf 4 inside the xoncrete structure, include equally distributed reinforced mesh reinforcing bar 7, institute on the outside of the steel arch-shelf 4 State reinforced mesh reinforcing bar 7 and leave extension elongation;It is equally distributed steel reinforcement cage vertical reinforcement 8 on the inside of the steel arch-shelf 4, this is vertical Reinforcing bar 8 leaves extension elongation, and the position and distribution density of all reinforced mesh reinforcing bars 7 and vertical reinforcement 8 are all counted before construction Calculate, reinforced mesh reinforcing bar 7 is relatively thin, vertical reinforcement 8 is relatively thick, therefore 7 position of reinforced mesh reinforcing bar is unstable, vertical reinforcement 8 Put more stable, and because fixation of the steel reinforcement cage also including equally distributed transverse steel so that the position of vertical reinforcement 8 is more steady It is fixed.
As the template for designing is assembled by polylith, it is fixed up where there are many deficiencies, coordinates between template Also displacement is susceptible to, is easily occurred swollen film after pouring and is run film phenomenon, have a strong impact on the quality of taper pile.
The content of the invention
The technical problem to be solved is:Taper pile stake mouth concreting process is difficult, it is poor to pour effect, plug-in Between template and plug-in template is undesirable with the fastening effect of stake mouth, conventional construction method whole structure is poor, difficult quality is protected Barrier, taper pile concordance are poor.
In order to solve above-mentioned technical problem, the invention discloses it is a kind of for taper pile construction plug-in template, auxiliary device, The plug-in template includes end template, middle template and the top template for cooperating, and the end template is rectangle, on the end template Side perforation in the first outer side perforation and first is evenly distributed with, the first outer side perforation is cruciform shape, in described first Side perforation is square, and the first drop handle is provided with the middle part of the end template, and the end template top is additionally provided with the first connecting pole; The middle template top is sunk structure, and side perforation in the second outer side perforation and second, institute are evenly distributed with the middle template It is cruciform shape to state the second outer side perforation, and in described second, side perforation is square, is provided with second in the middle part of the middle template Drop handle, the middle template bottom are provided with the second connecting pole;It is raised sector structure that the top template is bottom, the top template On be evenly distributed with side perforation in the 3rd outer side perforation and the 3rd, the 3rd outer side perforation is cruciform shape, the described 3rd Interior side perforation is square, and the top template bottom is provided with the 3rd drop handle, and in the middle part of the top template, both sides are provided with the 3rd company Post is connect, elliptical openings and screwed hole, the screw thread hole position in the 3rd connecting pole and the 3rd, between side perforation, is additionally provided with In opening surrounding;The auxiliary device includes guiding gutter, fixed support, arch spider and Screw arbor with nut at both-ends, the water conservancy diversion trench bottom Top template upper surface is connected to removably, the water conservancy diversion trench bottom is adapted to the opening;The fixed support is matched with One connecting pole, the second connecting pole and the 3rd connecting pole;The arch spider end is provided with the screw hole being adapted to Screw arbor with nut at both-ends.Enter One step, the fixed support includes the first connecting plate, the second connecting plate and the 3rd connecting plate, and first connecting plate is " X " Shape, the first connecting plate bottom two ends are provided with the first connecting hole, and at the top of first connecting plate, two ends are provided with the second company Connect hole;Second connecting plate and the 3rd connecting plate are all provided with for the two ends of strip, second connecting plate and the 3rd connecting plate The one end for being equipped with connecting hole, second connecting plate and the 3rd connecting plate is hinged with the second connecting hole respectively, and the other end is the 3rd Connecting hole, first connecting hole and the first connecting pole coordinate, and second connecting hole and the second connecting pole coordinate, and the described 3rd Connecting hole and the 3rd connecting pole clearance fit.
Further, the guiding gutter is that male and female coordinates the structure being bent upwards, including male end and female end, the male end bottom Portion is provided with male end base, and the male end base is provided with male end screwed hole;The female end bottom is provided with female end base, the female end Base is provided with female end screwed hole;The male end screwed hole and female end screwed hole after male end and female end cooperation with the screwed hole Adaptation.
Further, locking clip is also combined with the guiding gutter.
Further, first drop handle has two groups.
Further, the end template, middle template and top template are the steel plates that thickness is 5mm~10mm.
The invention also discloses a kind of construction method for taper pile construction, including perforate, laying bar-mat reinforcement, erection steel arch The preamble work of frame, gunite concrete and decentralization steel reinforcement cage, it is further comprising the steps of:
Step one:Guiding gutter is installed on into solid plate
Step 2:Set up end template
A1, the vertical reinforcement that end template is reserved through the steel reinforcement cage of taper pile stake mouth bottom in taper pile stake mouth position and reinforcing bar The reserved reinforced mesh reinforcing bar of net;
A2, end template colligation is fixed on taper pile stake mouth bottom;
A3, casting concrete are extremely less than the peak of end template, while being carried out to the concrete for having poured with electromagnetic shaker Vibrations degassing processing;
Step 3:Set up middle template
B1, middle template bottom is alignd with the top of end template, also cross reserved perpendicular of the cage of taper pile stake mouth middle part To the reserved reinforced mesh reinforcing bar of reinforcing bar and bar-mat reinforcement;
B2, taper pile stake mouth is fixed on in middle template colligation;
B3, middle die head and both sides are beaten, and fixed support is placed between end template and middle template, described first connects Connect hole to coordinate with the first connecting pole, second connecting hole and the second connecting pole coordinate;
B4, continue casting concrete to the peak less than middle template, while with electromagnetic shaker to the concrete that poured Carry out vibrations degassing processing;
Step 4:Set up top template
C1, top template bottom is alignd with middle die head, through the reserved vertical reinforcement of the cage at the top of taper pile stake mouth The reinforced mesh reinforcing bar reserved with bar-mat reinforcement, while the 3rd connecting hole and the 3rd connecting pole are coordinated;
C2, by guiding gutter continue casting concrete fill guiding gutter to concrete, while by guiding gutter electromagnetic shaker Concrete to having poured carries out vibrations degassing processing;
Step 5:Arch spider and Screw arbor with nut at both-ends are installed, arch spider are entangled into reinforced mesh reinforcing bar periphery, is used in bottom Screw arbor with nut at both-ends is locked.
Step 6:8 hours~12 hours after concrete initial set, Screw arbor with nut at both-ends and arch spider are removed;
Remove guiding gutter and remove top template, middle template and end template successively.
Further, steel wire lashing or adjacent or end template both sides by other reinforcement weldings is used in step 2 A Vertical reinforcement, limits the position of end template.
Further, guiding gutter inner concrete is promoted to carry out auxiliary casting concrete with push rod in step 4 C.
Further, the position for mutually fitting between the top template, middle template and end template is provided with nested with one another matching somebody with somebody The structure of conjunction, the structure of the nested arrangements is the raised structure of side depression opposite side.
Compared with prior art, the present invention can obtain following technique effect:
1) plug-in template of the invention includes end template, middle template and the top template for cooperating, can according to construct into Degree is installed and casting concrete successively from bottom to top, and casting process is more reasonable, the first outer side perforation, on the outside of second Perforation and the 3rd outer side perforation adapt to reinforced mesh reinforcing bar, side perforation in described first, in second in side perforation and the 3rd Side perforation adapts to vertical reinforcement, so as to play a part of to limit lateral displacement;End template is only needed after being installed in place will be adjacent Vertical reinforcement pass through steel wire lashing or welding can limit vertical displacement, middle template and top template vertical displacement limiting mode phase Together;The clamp device of the present invention can be anchored on the outside of reinforced mesh reinforcing bar after the completion of model sheetinstallat, fixed by split bolt Connection, removes after concrete setting, and program fastening effect is substantially, easy for installation.
2) heretofore described fixed support includes the first connecting plate, the second connecting plate and the 3rd connecting plate, and the locking is tied Structure is conducive to locking between template, prevents from being subjected to displacement between template, improves the fastening effect between plug-in template, solve Easily go out again swollen film after pouring and run the problem of film phenomenon.
3) in plug-in template of the invention in template top be sunk structure, the structure is conducive to concreting convenient.
4) in plug-in template of the invention, the first outer side perforation, the second outer side perforation and the 3rd outer side perforation are cross friendship Fork-shaped, the program overcome the unstable defect of reinforced mesh reinforcement location so that the suitability of perforation is higher, and fixed effect is more It is good.
5) plug-in template of the invention also includes guiding gutter, and the water conservancy diversion trench bottom is removably connected to top template upper table Face, the water conservancy diversion trench bottom be adapted tos with the opening, after concreting is completed and is solidified because of guiding gutter detachably, operation Personnel can pull down guiding gutter and overall plug-in template, and the program has ensured that the concreting of top template position is complete, concrete into After type form removal, no step, preferably, another intensity is obviously improved apparent mass, and the total quality of taper pile is protected.
6) guiding gutter of the present invention is the structure being bent upwards;Locking clip is combined with guiding gutter also.The program is conducive to Casting concrete is convenient, is more beneficial for realizing the dismounting of guiding gutter and installation.
7) the first drop handle is provided with the middle part of end template of the present invention, in the middle part of the middle template, is provided with the second drop handle, institute State top template bottom and be provided with the 3rd drop handle, the program is conducive to template dismounting, installs, carries and convenient storage.
8) end template of the invention, middle template and top template are the steel plates that thickness is 5mm~10mm, and the program causes outer Hang template to reuse, save resource, and improve taper pile stake mouth concordance.
9) construction method advantages of simple of the invention, construction procedure are all linked with one another, improve work progress concordance, overcome Conventional construction method whole structure is poor, difficult quality guarantee and taper pile concordance are poor problem.
10) position mutually fitted between top template, middle template and end template in the present invention is provided with cooperation nested with one another Structure, the program can prevent concrete mud from overflowing from the gap between top template, middle template and end template, ensure Concrete pouring quality.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, for those of ordinary skill in the art come Say, on the premise of not paying creative work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the taper pile stake mouth schematic cross-section before taper pile pore-forming after-pouring concrete.
Fig. 2 is plug-in template schematic cross-section.
Fig. 3 is guiding gutter top view.
Fig. 4 is guiding gutter side view.
Fig. 5 is guiding gutter schematic perspective view.
Fig. 6 is support bracket fastened schematic cross-section.
Fig. 7 is arch spider and Screw arbor with nut at both-ends cooperation schematic diagram.
Fig. 8 is plug-in template and auxiliary device cooperation schematic diagram.
Wherein:1. end template, 11. first outer side perforations, side perforation in 12. first, 13. first drop handles, 14. first connections Post, 2. in template, 21. second outer side perforations, side perforation in 22. second, 23. second drop handles, 24. second connecting poles, 3. backform Plate, 31. the 3rd outer side perforations, side perforation in 32. the 3rd, 33. the 3rd drop handles, 34. the 3rd connecting poles, 35. openings, 36. screw threads Hole, 4. steel arch-shelf, 5. guiding gutter, 51. male ends, 52. female ends, 53. male end screwed holes, 54. female end screwed holes, 55. male end bases, 56. female end bases, 6. locking clip, 7. reinforced mesh reinforcing bar, 8. vertical reinforcement, 9. fixed support, 91. first connecting plates, 92. second Connecting plate, 93. the 3rd connecting plates, 94. first connecting holes, 95. second connecting holes, 96. the 3rd connecting holes, 101. arch spiders, 102. Screw arbor with nut at both-ends.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that specific embodiment described herein is not used to only to explain the present invention Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment to the present invention application principle be further described.
Embodiment one
As shown in Figures 1 to 8, a kind of plug-in template for taper pile construction, auxiliary device, the plug-in template includes phase End template 1, middle template 2 and the top template 3 for mutually coordinating, the end template 1 is rectangle, and the is evenly distributed with the end template 1 Side perforation 12 in one outer side perforation 11, first, the first outer side perforation 11 be cruciform shape, side perforation 12 in described first For square, the first drop handle 13 in the middle part of the end template 1, is provided with, 1 top of the end template is additionally provided with the first connecting pole 14; 2 top of middle template is sunk structure, and side perforation in the second outer side perforation 21 and second is evenly distributed with the middle template 2 22, the second outer side perforation 21 is cruciform shape, and in described second, side perforation 22 is square, in the middle part of the middle template 2 The second drop handle 23 is provided with, 2 bottom of middle template is provided with the second connecting pole 24;It is raised fan that the top template 3 is bottom Shape structure, is evenly distributed with side perforation 32 in the 3rd outer side perforation 31 and the 3rd, the 3rd outer side perforation on the top template 3 31 is cruciform shape, and in the described 3rd, side perforation 32 is square, and 3 bottom of the top template is provided with the 3rd drop handle 33, institute State 3 middle part both sides of top template and be provided with the 3rd connecting pole 34, also set between side perforation 32 in the 3rd connecting pole 34 and the 3rd Elliptical openings 35 and screwed hole 36 are equipped with, the screwed hole 36 is located at 35 surrounding of opening;The auxiliary device includes guiding gutter 5th, fixed support 9, arch spider 101 and Screw arbor with nut at both-ends 102,5 bottom of the guiding gutter is removably connected to 3 upper table of top template Face, 5 bottom of the guiding gutter are adapted to the opening 35;The fixed support 9 is matched with the first connecting pole 14, the second connecting pole 24 and the 3rd connecting pole 34;101 end of arch spider is provided with the screw hole being adapted to Screw arbor with nut at both-ends 102.
Wherein:The fixed support 9 includes the first connecting plate 91, the second connecting plate 92 and the 3rd connecting plate 93, described One connecting plate 91 is X-shaped, and first connecting plate, 91 bottom two ends are provided with the first connecting hole 94, first connecting plate 91 Top two ends are provided with the second connecting hole 95;Second connecting plate 92 and the 3rd connecting plate 93 are strip, and described second connects The two ends of fishplate bar 92 and the 3rd connecting plate 93 are provided with one end of connecting hole, second connecting plate 92 and the 3rd connecting plate 93 It is hinged with the second connecting hole 95 respectively, the other end is the 3rd connecting hole 96, and first connecting hole 94 matched somebody with somebody with the first connecting pole 14 Close, second connecting hole 95 coordinated with the second connecting pole 24, the 3rd connecting hole 96 and 34 clearance fit of the 3rd connecting pole; The guiding gutter 5 is that male and female coordinates the structure being bent upwards, including male end 51 and female end 52, and 51 bottom of the male end is provided with male end Base 55, the male end base 55 are provided with male end screwed hole 53;52 bottom of the female end is provided with female end base 56, the female end Base 56 is provided with female end screwed hole 54;The male end screwed hole 53 and female end screwed hole 54 are after male end 51 and female end 52 coordinate It is adapted to the screwed hole 36;Locking clip 6 is combined with the guiding gutter 5 also;First drop handle 13 has two groups;The bottom Template 1, middle template 2 and top template 3 are the steel plates that thickness is 5mm.
Embodiment two
As shown in Figures 1 to 8, a kind of plug-in template for taper pile construction, auxiliary device, the plug-in template includes phase End template 1, middle template 2 and the top template 3 for mutually coordinating, the end template 1 is rectangle, and the is evenly distributed with the end template 1 Side perforation 12 in one outer side perforation 11, first, the first outer side perforation 11 be cruciform shape, side perforation 12 in described first For square, the first drop handle 13 in the middle part of the end template 1, is provided with, 1 top of the end template is additionally provided with the first connecting pole 14; 2 top of middle template is sunk structure, and side perforation in the second outer side perforation 21 and second is evenly distributed with the middle template 2 22, the second outer side perforation 21 is cruciform shape, and in described second, side perforation 22 is square, in the middle part of the middle template 2 The second drop handle 23 is provided with, 2 bottom of middle template is provided with the second connecting pole 24;It is raised fan that the top template 3 is bottom Shape structure, is evenly distributed with side perforation 32 in the 3rd outer side perforation 31 and the 3rd, the 3rd outer side perforation on the top template 3 31 is cruciform shape, and in the described 3rd, side perforation 32 is square, and 3 bottom of the top template is provided with the 3rd drop handle 33, institute State 3 middle part both sides of top template and be provided with the 3rd connecting pole 34, also set between side perforation 32 in the 3rd connecting pole 34 and the 3rd Elliptical openings 35 and screwed hole 36 are equipped with, the screwed hole 36 is located at 35 surrounding of opening;The auxiliary device includes guiding gutter 5th, fixed support 9, arch spider 101 and Screw arbor with nut at both-ends 102,5 bottom of the guiding gutter is removably connected to 3 upper table of top template Face, 5 bottom of the guiding gutter are adapted to the opening 35;The fixed support 9 is matched with the first connecting pole 14, the second connecting pole 24 and the 3rd connecting pole 34;101 end of arch spider is provided with the screw hole being adapted to Screw arbor with nut at both-ends 102.
Wherein:The fixed support 9 includes the first connecting plate 91, the second connecting plate 92 and the 3rd connecting plate 93, described One connecting plate 91 is X-shaped, and first connecting plate, 91 bottom two ends are provided with the first connecting hole 94, first connecting plate 91 Top two ends are provided with the second connecting hole 95;Second connecting plate 92 and the 3rd connecting plate 93 are strip, and described second connects The two ends of fishplate bar 92 and the 3rd connecting plate 93 are provided with one end of connecting hole, second connecting plate 92 and the 3rd connecting plate 93 It is hinged with the second connecting hole 95 respectively, the other end is the 3rd connecting hole 96, and first connecting hole 94 matched somebody with somebody with the first connecting pole 14 Close, second connecting hole 95 coordinated with the second connecting pole 24, the 3rd connecting hole 96 and 34 clearance fit of the 3rd connecting pole; The guiding gutter 5 is that male and female coordinates the structure being bent upwards, including male end 51 and female end 52, and 51 bottom of the male end is provided with male end Base 55, the male end base 55 are provided with male end screwed hole 53;52 bottom of the female end is provided with female end base 56, the female end Base 56 is provided with female end screwed hole 54;The male end screwed hole 53 and female end screwed hole 54 are after male end 51 and female end 52 coordinate It is adapted to the screwed hole 36;Locking clip 6 is combined with the guiding gutter 5 also;First drop handle 13 has two groups;The bottom Template 1, middle template 2 and top template 3 are the steel plates that thickness is 10mm.
Embodiment three
As shown in Figures 1 to 8:A kind of plug-in template for taper pile construction, the construction method of auxiliary device, including opening Hole, laying bar-mat reinforcement, the preamble work for setting up steel arch-shelf, gunite concrete and decentralization steel reinforcement cage, it is further comprising the steps of:
Step one:Guiding gutter 5 is installed on into solid plate 3
Step 2:Set up end template 1
A1, the vertical reinforcement 8 that end template 1 is reserved through the steel reinforcement cage of taper pile stake mouth bottom in taper pile stake mouth position and steel The reserved reinforced mesh reinforcing bar 7 of muscle net;
A2,1 colligation of end template is fixed on taper pile stake mouth bottom;
A3, casting concrete are extremely less than the peak of end template 1, while being carried out to the concrete for having poured with electromagnetic shaker Vibrations degassing processing;
Step 3:Set up middle template 2
B1,2 bottom of middle template is alignd with the top of end template 1, reserved also cross the cage of taper pile stake mouth middle part The reserved reinforced mesh reinforcing bar 7 of vertical reinforcement 8 and bar-mat reinforcement;
B2, taper pile stake mouth is fixed on in 2 colligation of middle template;
B3, beat at the top of middle template 2 and both sides, and fixed support 9 is placed between end template 1 and middle template 2, described One connecting hole 94 is coordinated with the first connecting pole 14, and second connecting hole 95 is coordinated with the second connecting pole 24;
B4, continue cast concrete to the peak less than middle template 2, while with electromagnetic shaker to the concrete that poured Carry out vibrations degassing processing;
Step 4:Set up top template 3
C1,3 bottom of top template is alignd with the top of middle template 2, through the reserved vertical steel of the cage at the top of taper pile stake mouth The reserved reinforced mesh reinforcing bar 7 of muscle 8 and bar-mat reinforcement, while the 3rd connecting hole 96 and the 3rd connecting pole 34 are coordinated;
C2, by guiding gutter 5 continue cast concrete to concrete fill guiding gutter 5, while by guiding gutter 5 with vibrations Device carries out vibrations degassing processing to the concrete for having poured;
Step 5:Arch spider 101 and Screw arbor with nut at both-ends 102 are installed, arch spider 101 is entangled outside reinforced mesh reinforcing bar 7 Enclose, in bottom, Screw arbor with nut at both-ends 102 is locked.
Step 6:8 hours~12 hours after concrete initial set, Screw arbor with nut at both-ends 102 and arch spider 101 are removed;
Remove guiding gutter 5 and remove top template 3, middle template 2 and end template 1 successively.
Wherein:Use in the step 2 A2 steel wire lashing or by other reinforcement weldings are adjacent or end template both sides it is vertical Reinforcing bar 8, limits the position of end template 1;In step 4 C2 with push rod promote 5 inner concrete of guiding gutter carry out auxiliary pour it is mixed Solidifying soil.
Example IV
As shown in Figures 1 to 8:A kind of plug-in template for taper pile construction, the construction method of auxiliary device, including opening Hole, laying bar-mat reinforcement, the preamble work for setting up steel arch-shelf, gunite concrete and decentralization steel reinforcement cage, it is further comprising the steps of:
Step one:Guiding gutter 5 is installed on into solid plate 3
Step 2:Set up end template 1
A1, the vertical reinforcement 8 that end template 1 is reserved through the steel reinforcement cage of taper pile stake mouth bottom in taper pile stake mouth position and steel The reserved reinforced mesh reinforcing bar 7 of muscle net;
A2,1 colligation of end template is fixed on taper pile stake mouth bottom;
A3, casting concrete are extremely less than the peak of end template 1, while being carried out to the concrete for having poured with electromagnetic shaker Vibrations degassing processing;
Step 3:Set up middle template 2
B1,2 bottom of middle template is alignd with the top of end template 1, reserved also cross the cage of taper pile stake mouth middle part The reserved reinforced mesh reinforcing bar 7 of vertical reinforcement 8 and bar-mat reinforcement;
B2, taper pile stake mouth is fixed on in 2 colligation of middle template;
B3, beat at the top of middle template 2 and both sides, and fixed support 9 is placed between end template 1 and middle template 2, described One connecting hole 94 is coordinated with the first connecting pole 14, and second connecting hole 95 is coordinated with the second connecting pole 24;
B4, continue cast concrete to the peak less than middle template 2, while with electromagnetic shaker to the concrete that poured Carry out vibrations degassing processing;
Step 4:Set up top template 3
C1,3 bottom of top template is alignd with the top of middle template 2, through the reserved vertical steel of the cage at the top of taper pile stake mouth The reserved reinforced mesh reinforcing bar 7 of muscle 8 and bar-mat reinforcement, while the 3rd connecting hole 96 and the 3rd connecting pole 34 are coordinated;
C2, by guiding gutter 5 continue cast concrete to concrete fill guiding gutter 5, while by guiding gutter 5 with vibrations Device carries out vibrations degassing processing to the concrete for having poured;
Step 5:Arch spider 101 and Screw arbor with nut at both-ends 102 are installed, arch spider 101 is entangled outside reinforced mesh reinforcing bar 7 Enclose, in bottom, Screw arbor with nut at both-ends 102 is locked.
Step 6:8 hours~12 hours after concrete initial set, Screw arbor with nut at both-ends 102 and arch spider 101 are removed;
Remove guiding gutter 5 and remove top template 3, middle template 2 and end template 1 successively.
Wherein:Use in the step 2 A2 steel wire lashing or by other reinforcement weldings are adjacent or end template both sides it is vertical Reinforcing bar 8, limits the position of end template 1;In step 4 C2 with push rod promote 5 inner concrete of guiding gutter carry out auxiliary pour it is mixed Solidifying soil;The position mutually fitted between the top template 3, middle template 2 and end template 1 is provided with the structure of cooperation nested with one another, The structure of the nested arrangements is the raised structure of side depression opposite side.
In the present invention, the technique effect of above scheme is realized in:
In the present invention, the plug-in template of the present invention includes end template, middle template and the top template for cooperating, can basis Construction speed is installed and casting concrete successively from bottom to top, and casting process is more reasonable, the first outer side perforation, the Two outer side perforations and the 3rd outer side perforation adapt to reinforced mesh reinforcing bar, side perforation in described first, in second side perforation and In 3rd, side perforation adapts to vertical reinforcement, so as to play a part of to limit lateral displacement;End template is only needed after being installed in place Adjacent vertical reinforcement is passed through into steel wire lashing or welding can limit vertical displacement, middle template and top template vertical displacement are limited Mode is identical;The clamp device of the present invention can be anchored on after the completion of model sheetinstallat on the outside of reinforced mesh reinforcing bar, by drawing spiral shell Bolt is fixedly connected, and removes after concrete setting, and program fastening effect is substantially, easy for installation.Heretofore described fixation Frame includes the first connecting plate, the second connecting plate and the 3rd connecting plate, and the locking mechanism is conducive to locking between template, prevents template Between be subjected to displacement, improve the fastening effect between plug-in template, solve easily go out again after pouring swollen film and run film phenomenon Problem.In in the plug-in template of the present invention, template top is sunk structure, and the structure is conducive to concreting convenient.This In bright plug-in template, the first outer side perforation, the second outer side perforation and the 3rd outer side perforation are cruciform shape, the program gram The unstable defect of reinforced mesh reinforcement location is taken so that the suitability of perforation is higher, and fixed effect is more preferable.The present invention's is outer Hanging template also includes guiding gutter, and the water conservancy diversion trench bottom is removably connected to top template upper surface, the water conservancy diversion trench bottom with The opening adaptation, because guiding gutter is detachable, after concreting is completed and solidified, operating personnel can pull down guiding gutter and whole External to hang template, the program has ensured that the concreting of top template position is complete, after concrete formation form removal, no step, and table Preferably, another intensity is obviously improved appearance quality, and the total quality of taper pile is protected.Guiding gutter of the present invention is to be bent upwards Structure;Locking clip is combined with guiding gutter also.The program is conducive to casting concrete convenient, is more beneficial for realizing tearing open for guiding gutter Unload and install.The first drop handle is provided with the middle part of end template of the present invention, the second drop handle in the middle part of the middle template, is provided with, it is described Top template bottom is provided with the 3rd drop handle, and the program is conducive to template dismounting, installs, carries and convenient storage.The bottom of the present invention Template, middle template and top template are the steel plates that thickness is 5mm~10mm, and the program allows plug-in template to reuse, Resource is saved, and improves taper pile stake mouth concordance.The construction method advantages of simple of the present invention, construction procedure are all linked with one another, Work progress concordance is improve, poor conventional construction method whole structure, difficult quality guarantee and taper pile concordance is overcome Poor problem.The position mutually fitted between top template, middle template and end template in the present invention is provided with cooperation nested with one another Structure, the program can prevent concrete mud from overflowing from the gap between top template, middle template and end template, ensure Concrete pouring quality.

Claims (10)

1. it is a kind of for taper pile construction plug-in template, auxiliary device, it is characterised in that:The plug-in template includes cooperating End template (1), middle template (2) and top template (3), the end template (1) is rectangle, is uniformly distributed on the end template (1) There is side perforation (12) in the first outer side perforation (11) and first, the first outer side perforation (11) is cruciform shape, described In one, side perforation (12) is square, and the first drop handle (13), end template (1) top are provided with the middle part of the end template (1) It is additionally provided with the first connecting pole (14);Middle template (2) top is sunk structure, is evenly distributed with the middle template (2) Side perforation (22) in second outer side perforation (21) and second, the second outer side perforation (21) is cruciform shape, described second Interior side perforation (22) is square, and the second drop handle (23) is provided with the middle part of the middle template (2), and middle template (2) bottom sets There is the second connecting pole (24);It is raised sector structure that the top template (3) is bottom, is uniformly distributed on the top template (3) There is side perforation (32) in the 3rd outer side perforation (31) and the 3rd, the 3rd outer side perforation (31) is cruciform shape, described In three, side perforation (32) is square, and top template (3) bottom is provided with the 3rd drop handle (33), in the middle part of the top template (3) Both sides are provided with the 3rd connecting pole (34), are additionally provided with ellipse in the 3rd connecting pole (34) and the 3rd between side perforation (32) Shape opening (35) and screwed hole (36), the screwed hole (36) is positioned at opening (35) surrounding;The auxiliary device includes guiding gutter (5), fixed support (9), arch spider (101) and Screw arbor with nut at both-ends (102), guiding gutter (5) bottom are removably connected to Top template (3) upper surface, guiding gutter (5) bottom are adapted to the opening (35);The fixed support (9) is matched with first Connecting pole (14), the second connecting pole (24) and the 3rd connecting pole (34);Arch spider (101) end is provided with and Screw arbor with nut at both-ends (102) screw hole being adapted to.
2. it is according to claim 1 it is a kind of for taper pile construction plug-in template, auxiliary device, it is characterised in that:It is described Fixed support (9) includes the first connecting plate (91), the second connecting plate (92) and the 3rd connecting plate (93), first connecting plate (91) it is X-shaped, the first connecting plate (91) bottom two ends are provided with the first connecting hole (94), first connecting plate (91) Top two ends are provided with the second connecting hole (95);Second connecting plate (92) and the 3rd connecting plate (93) are strip, described The two ends of the second connecting plate (92) and the 3rd connecting plate (93) are provided with connecting hole, and second connecting plate (92) and the 3rd connects One end of fishplate bar (93) is hinged with the second connecting hole (95) respectively, the other end be the 3rd connecting hole (96), first connecting hole (94) coordinate with the first connecting pole (14), second connecting hole (95) is coordinated with the second connecting pole (24), the 3rd connection Hole (96) and the 3rd connecting pole (34) clearance fit.
3. it is according to claim 1 and 2 it is a kind of for taper pile construction plug-in template, auxiliary device, it is characterised in that:Institute State guiding gutter (5) and coordinate the structure being bent upwards, including male end (51) and female end (52) for male and female, male end (51) bottom sets There is male end base (55), the male end base (55) is provided with male end screwed hole (53);Female end (52) bottom is provided with female end Base (56), the female end base (56) are provided with female end screwed hole (54);The male end screwed hole (53) and female end screwed hole (54) it is adapted to the screwed hole (36) after male end (51) and female end (52) coordinate.
4. it is according to claim 3 it is a kind of for taper pile construction plug-in template, auxiliary device, it is characterised in that:It is described Locking clip (6) is combined with guiding gutter (5) also.
5. it is according to claim 3 it is a kind of for taper pile construction plug-in template, auxiliary device, it is characterised in that:It is described First drop handle (13) has two groups.
6. according to any one of claim 1 to 5 it is a kind of for taper pile construction plug-in template, auxiliary device, its feature It is:The end template (1), middle template (2) and top template (3) are the steel plates that thickness is 5mm~10mm.
7. as described in claim 1 or 6 it is a kind of for taper pile construction plug-in template, auxiliary device construction method, including Perforate, laying bar-mat reinforcement, set up steel arch-shelf, gunite concrete and decentralization steel reinforcement cage preamble work, it is characterised in that include with Lower step:
Step one:Guiding gutter (5) is installed on into solid plate (3)
Step 2:Set up end template (1)
A1, the vertical reinforcement (8) that end template (1) is reserved through the steel reinforcement cage of taper pile stake mouth bottom in taper pile stake mouth position and steel The reserved reinforced mesh reinforcing bar (7) of muscle net;
A2, end template (1) colligation is fixed on taper pile stake mouth bottom;
A3, casting concrete are extremely less than the peak of end template (1), while being shaken to the concrete for having poured with electromagnetic shaker Dynamic degassing processing;
Step 3:Set up middle template (2)
B1, middle template (2) bottom is alignd with the top of end template (1), reserved also cross the cage of taper pile stake mouth middle part The reserved reinforced mesh reinforcing bar (7) of vertical reinforcement (8) and bar-mat reinforcement;
B2, taper pile stake mouth is fixed on in middle template (2) colligation;
B3, beat at the top of middle template (2) and both sides, and fixed support (9) is placed between end template (1) and middle template (2), institute State the first connecting hole (94) to coordinate with the first connecting pole (14), second connecting hole (95) is coordinated with the second connecting pole (24);
B4, continuation casting concrete are extremely less than the peak of middle template (2), while being entered to the concrete for having poured with electromagnetic shaker Row vibrations degassing processing;
Step 4:Set up top template (3)
C1, top template (3) bottom is alignd with the top of middle template (2), through the reserved vertical steel of the cage at the top of taper pile stake mouth The reserved reinforced mesh reinforcing bar (7) of muscle (8) and bar-mat reinforcement, while the 3rd connecting hole (96) is coordinated with the 3rd connecting pole (34);
C2, by guiding gutter (5) continue casting concrete to concrete fill guiding gutter (5), while by guiding gutter (5) with shake Dynamic device carries out vibrations degassing processing to the concrete for having poured;
Step 5:Arch spider (101) and Screw arbor with nut at both-ends (102) are installed, arch spider (101) is entangled into reinforced mesh reinforcing bar (7) periphery, is locked with Screw arbor with nut at both-ends (102) in bottom.
Step 6:8 hours~12 hours after concrete initial set, Screw arbor with nut at both-ends (102) and arch spider (101) are removed;Remove Guiding gutter (5) simultaneously removes top template (3), middle template (2) and end template (1) successively.
8. construction method according to claim 7, it is characterised in that:Steel wire lashing is used in step 2 A2 or passes through which The vertical reinforcement (8) of his reinforcement welding adjacent or end template both sides, limits the position of end template (1).
9. construction method according to claim 7, it is characterised in that:Guiding gutter is promoted with push rod in step 4 C2 (5) inner concrete carries out auxiliary casting concrete.
10. construction method according to claim 7, it is characterised in that:The top template (3), middle template (2) and end template (1) position mutually fitted between is provided with the structure of cooperation nested with one another, and the structure of the nested arrangements is that side depression is another The raised structure in side.
CN201611149670.5A 2016-12-14 2016-12-14 A kind of plug-in template, auxiliary device and construction method for taper pile construction Active CN106522212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611149670.5A CN106522212B (en) 2016-12-14 2016-12-14 A kind of plug-in template, auxiliary device and construction method for taper pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611149670.5A CN106522212B (en) 2016-12-14 2016-12-14 A kind of plug-in template, auxiliary device and construction method for taper pile construction

Publications (2)

Publication Number Publication Date
CN106522212A true CN106522212A (en) 2017-03-22
CN106522212B CN106522212B (en) 2018-06-26

Family

ID=58343237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611149670.5A Active CN106522212B (en) 2016-12-14 2016-12-14 A kind of plug-in template, auxiliary device and construction method for taper pile construction

Country Status (1)

Country Link
CN (1) CN106522212B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4030864A (en) * 1975-06-24 1977-06-21 Ingenior F. Selmer A/S Apparatus for making inclined hollow concrete columns using sliding formwork
JP2000017643A (en) * 1998-06-30 2000-01-18 Takenaka Komuten Co Ltd Working method for pile head portion of diagonally assembled pile body
CN205088678U (en) * 2015-11-01 2016-03-16 南京景淮润土木工程有限公司 A mould that is used for pile bolck concrete secondary to pour
CN205444197U (en) * 2016-03-24 2016-08-10 山东科技大学 Batter pile test model concrete placement stand pipe inclines
CN106120806A (en) * 2016-06-30 2016-11-16 张继红 A kind of composite steel tube taper pile construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4030864A (en) * 1975-06-24 1977-06-21 Ingenior F. Selmer A/S Apparatus for making inclined hollow concrete columns using sliding formwork
JP2000017643A (en) * 1998-06-30 2000-01-18 Takenaka Komuten Co Ltd Working method for pile head portion of diagonally assembled pile body
CN205088678U (en) * 2015-11-01 2016-03-16 南京景淮润土木工程有限公司 A mould that is used for pile bolck concrete secondary to pour
CN205444197U (en) * 2016-03-24 2016-08-10 山东科技大学 Batter pile test model concrete placement stand pipe inclines
CN106120806A (en) * 2016-06-30 2016-11-16 张继红 A kind of composite steel tube taper pile construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘献伟等: "人工挖孔斜桩施工技术", 《施工技术》 *

Also Published As

Publication number Publication date
CN106522212B (en) 2018-06-26

Similar Documents

Publication Publication Date Title
CN207177303U (en) Rail type vibrating rod
CN105239725A (en) Construction method and construction template for ultrahigh oblique concrete column
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN109707040A (en) A kind of assembly concrete frame beam column connecting structure of the steel pipe with U-shaped steel corbel
CN206971732U (en) A kind of doubly-linked beam forms pouring structure
CN107675809A (en) Intelligent passive type building module
CN106906841B (en) One kind being used for lateral wall form bracing system construction
CN110409713A (en) A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure
CN208039821U (en) Floor post-cast strip template support reinforcing system
CN211369536U (en) Cast-in-place box girder template system
CN217420496U (en) Device for intercepting high-strength concrete in beam
CN108842796A (en) The installation method of catch pit anti-floating monoblock type template system and the template system
CN114922360A (en) Device for combining prefabrication and cast-in-place of roof cornice structure and construction method thereof
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN106522212A (en) Externally suspended formwork, assisting device and construction method for oblique pile construction
CN209293197U (en) Wall and floor connection structure and assembled arthitecutral structure system
CN208363609U (en) A kind of constructional column assembly type can have enough to meet the need aluminum alloy pattern plate
CN105178593B (en) Fill the mold method and structure of wall construction post
CN208918266U (en) One kind exempting from support formula steel plate post-cast strip template structure system
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN216042592U (en) Exterior wall template structure without fertilizer groove
CN206173971U (en) Can have enough to meet need unilateral form tie system of use
CN206655224U (en) A kind of plug-in template poured for taper pile stake mouth
CN213174787U (en) High-low span column concrete pouring template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant