CN106498814B - A kind of construction equipment and method of city track traffic U type beam solid concrete roabed - Google Patents

A kind of construction equipment and method of city track traffic U type beam solid concrete roabed Download PDF

Info

Publication number
CN106498814B
CN106498814B CN201611176643.7A CN201611176643A CN106498814B CN 106498814 B CN106498814 B CN 106498814B CN 201611176643 A CN201611176643 A CN 201611176643A CN 106498814 B CN106498814 B CN 106498814B
Authority
CN
China
Prior art keywords
track
section
rail
construction equipment
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611176643.7A
Other languages
Chinese (zh)
Other versions
CN106498814A (en
Inventor
王浩
耿冬梅
姚坤锋
刘伟
张传程
周衍领
纪博林
章远方
万鹏
王德乾
李刚
赵博
贺春龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Railway No5 Institute Engineering Machinery Co Ltd, China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical Beijing Railway No5 Institute Engineering Machinery Co Ltd
Priority to CN201611176643.7A priority Critical patent/CN106498814B/en
Publication of CN106498814A publication Critical patent/CN106498814A/en
Application granted granted Critical
Publication of CN106498814B publication Critical patent/CN106498814B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses a kind of construction equipment and method of city track traffic U type beam solid concrete roabed, construction equipment includes rail row supporting system, template system, the section of track are mated formation straddle truck, rail row transport car, section of track assembly platform and suspender.Construction method mainly includes scope of operation cleaning → surveying setting-out → reinforcing bar colligation → section of track erection → template erection → track accurate adjustment locking → concreting → railway roadbed maintenance → support frame and form removable, Monolithic Track Bed Construction is carried out by above-mentioned steps circulation, it is easy with equipment operation, efficiency of construction is high, the features such as mechanization degree is high, and labor strength is low.

Description

A kind of construction equipment and method of city track traffic U type beam solid concrete roabed
Technical field
The present invention relates to a kind of urban track traffic trackways engineering construction technology, more particularly to a kind of city track traffic U The construction equipment and construction method of type beam (trough girder) solid concrete roabed.
Background technology
Domestic city orbit traffic overhead line more and more uses U-shaped girder construction, and U-shaped beam Monolithic Track Bed Construction is due to knot Structure limitation is most of at present to carry out Monolithic Track Bed Construction, support frame knot using plain type rail brace frame using manually scattered laying method Structure is simple, and rigidity is poor, and supporting leg is arranged in railway roadbed, influences railway roadbed quality and subsequent construction.It is artificial to dissipate paving construction technology efficiency It is low, labor strength is big, mechanization degree is not high.
The content of the invention
It is an object of the invention to provide a kind of city track traffic U easy to operate, mechanization degree is high, speed of application is fast The construction equipment and method of type beam solid concrete roabed.
The purpose of the present invention is achieved through the following technical solutions:
The construction equipment of the city track traffic U type beam solid concrete roabed of the present invention, including rail row supporting system, template body System, the section of track are mated formation straddle truck, rail row transport car, section of track assembly platform and suspender;
Described rail row supporting system includes rail to regulation strut, elevation screw rod, screw bolt seat, angle adjustment bolt, rail Adjusting bolt, middle bracket, rail pallet, rail cant locking bolt, lateral bracket;
The elevation screw support is on the outside of railway roadbed;
The rail is supported on to regulation strut to be fixed on the channel-section steel on U-shaped web, and the channel-section steel is consolidated by T-bolt Fixed, the T-bolt head is stuck in the pre-buried channel flow on U-shaped web, and the T-bolt end of thread passes through nut and clamp The channel-section steel is compressed, the 2 row channel-section steels are fixed on inside U-shaped beam on two coxostermums respectively.
The construction method of the construction equipment of the above-mentioned city track traffic U type beam solid concrete roabed of the present invention, including step:
The scope of operation is cleared up;
Surveying setting-out;
Reinforcing bar colligation;
The section of track is set up, and the described section of track, is completed in tracklaying base, is transported by rail row transport car to job site, By the section of track mat formation straddle truck be hoisted to laying place set up;
Template erection;
Track accurate adjustment locks;
Concreting, described concrete, complete to prepare in concrete mixing plant, transported by concrete mixer to construction Scene, concreting is carried out using hopper or pump truck;
Railway roadbed conserves;
Support frame and form removable.
As seen from the above technical solution provided by the invention, city track traffic U type provided in an embodiment of the present invention The construction equipment and method of beam solid concrete roabed, it is easy to operate, mechanization degree is high, speed of application is fast.
Brief description of the drawings
Fig. 1 is rail row supporting system composition schematic diagram in the embodiment of the present invention;
Fig. 1 a are that U-shaped web fixes channel-section steel schematic diagram in the embodiment of the present invention;
Fig. 2 is template system composition schematic diagram in the embodiment of the present invention;
Fig. 3 is the middle berth base of the rail of the embodiment of the present invention ground upper bridge schematic diagram of section of track lifting;
Fig. 4 is that the section of track is mated formation gantry crane lifting section of track schematic diagram in the embodiment of the present invention;
Fig. 5 is that section of track assembly platform collapses, divides pillow view in the embodiment of the present invention.
In figure:
1 rail bracket, 7 into regulation strut, 2 elevation screw rods, 3 screw bolt seats, 4 angle adjustment bolts, 5 rail adjusting bolts, 6 Rail pallet, 8 rail cant locking bolts, 9 lateral brackets, 10T types bolt, 11 clamps, 12 channel-section steels, 13 outer side braces, 14 longitudinal mode plates, 15 cross templates, 16 middle struts, 17 rail row transport cars, 18 sections of track, 19 sections of track lifting straddle truck, 20 sections of track are mated formation straddle truck, 21 Walking rails.
Embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Based on this The embodiment of invention, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to protection scope of the present invention.
The construction equipment of the city track traffic U type beam solid concrete roabed of the present invention, its preferable embodiment are:
Mat formation including rail row supporting system, template system, the section of track and straddle truck, rail row transport car, section of track assembly platform and hang Tool;
Described rail row supporting system includes rail to regulation strut, elevation screw rod, screw bolt seat, angle adjustment bolt, rail Adjusting bolt, middle bracket, rail pallet, rail cant locking bolt, lateral bracket;
The elevation screw support is on the outside of railway roadbed;
The rail is supported on to regulation strut to be fixed on the channel-section steel on U-shaped web, and the channel-section steel is consolidated by T-bolt Fixed, the T-bolt head is stuck in the pre-buried channel flow on U-shaped web, and the T-bolt end of thread passes through nut and clamp The channel-section steel is compressed, the 2 row channel-section steels are fixed on inside U-shaped beam on two coxostermums respectively.
Described template system is that steel form splicing forms, and the steel form between railway roadbed is connected by middle strut, outside railway roadbed The steel form of side is supported on described be fixed on the channel-section steel on U-shaped web by outer side brace.
Described rail row transport car is the loading 25m sections of track or the railroad track flatcar of single 25m rail and sleeper assembly.
Described single 25m rail includes 2 sets of single 25m rail and sleeper assembly with sleeper assembly, transports to applying The standard section of track is formed behind work scene.
Described section of track straddle truck of mating formation is suspended on U-shaped beam wing plate top surface by travelling wheel, and 2 are used cooperatively.
Described section of track straddle truck of mating formation includes mating formation across single line and straddle truck and mated formation straddle truck across two-wire.
Described section of track assembly platform is provided with sleeper positioner, automatic point of pillow device and adjusts pillow away from device.
Described suspender includes sleeper suspender, steel rail lifting appliance and section of track suspender.
The construction method of the construction equipment of the above-mentioned city track traffic U type beam solid concrete roabed of the present invention, its is preferable Embodiment is:
Including step:
The scope of operation is cleared up;
Surveying setting-out;
Reinforcing bar colligation;
The section of track is set up, and the described section of track, is completed in tracklaying base, is transported by rail row transport car to job site, By the section of track mat formation straddle truck be hoisted to laying place set up;
Template erection;
Track accurate adjustment locks;
Concreting, described concrete, complete to prepare in concrete mixing plant, transported by concrete mixer to construction Scene, concreting is carried out using hopper or pump truck;
Railway roadbed conserves;
Support frame and form removable.
The construction equipment and method of the city track traffic U type beam solid concrete roabed of the present invention, easy to operate, mechanization degree Height, speed of application are fast.
Compared with prior art, U-shaped beam (trough girder) Monolithic Track Bed Construction equipment employs rail row supporting system, template body System, add the section of track and mat formation straddle truck, rail row transport car, section of track assembly platform and suspender etc., section of track assembling use tracklaying base Standardized work, section of track assembling quality are high.Rail row transport realizes mechanization transportation using rail row transport car, is mated formation dragon using the section of track Gantry crane mechanization handling is laid, and Monolithic Track Bed Construction mechanization degree is high, and efficiency of construction is fast;U-shaped beam (trough girder) solid concrete roabed Construction method flow is simple, process interference is small, operation procedure streamlined, mechanization, standardization, can ensure urban track traffic U-shaped beam (trough girder) Monolithic Track Bed Construction high standard, high accuracy, high efficiency are completed.
It is of the invention compared with existing manually scattered laid process:
First, the elevation screw rod of rail row supporting system is arranged on the outside of railway roadbed, is avoided and is internally formed cavity in railway roadbed, enters The secondary benefit concrete construction of row, ensure that the globality of railway roadbed, while reduce because elevation screw rod is arranged on required plastics in railway roadbed The input of the construction auxiliary material such as sleeve pipe;Secondly, the section of track is assembled in tracklaying base completion, avoids all track construction material transportation edges Line transports, and reduces builder's road expropriation of land, and all track construction material collective conveyances to tracklaying base are assembled into the section of track, and the section of track passes through Section of track lifting straddle truck is carried to U-shaped beam viaduct, is transported by rail row transport car to job site.Avoid has in U-shaped beam Limit and material is stacked in space, Assembling, laying, the multiple operation interference construction for adjusting the section of track.Construction method energy of the present invention It is enough to realize circulation parallel construction, there is the advantages of construction interference is small, and mechanization degree is high, and speed of application is fast.
Specific embodiment:
As shown in Figures 1 to 5, including rail row supporting system, template system, the section of track are mated formation straddle truck, rail row transport car, rail Arrange assembly platform and suspender;
Described rail row supporting system is rail brace frame, including rail is to regulation strut 1, elevation screw rod 2, screw bolt seat 3, angle Spend adjustment bolt 4, rail adjusting bolt 5, middle bracket 6, rail pallet 7, rail cant locking bolt 8, lateral bracket 9 etc..
Described rail row supporting system elevation screw rod 2 is supported on the outside of railway roadbed, and described rail row supporting system is supported on solid Due on the channel-section steel 12 on U-shaped web.
The described channel-section steel 12 being fixed on U-shaped web, is fixed, T-bolt head is stuck in U-shaped by T-bolt 10 In pre-buried channel flow on web, the end of thread compresses channel-section steel 12 by nut and clamp 11, and 2 row channel-section steels 12 are fixed on into U respectively Inside type beam on two coxostermums, support stress point is provided for rail brace frame.
Described template system is spliced using steel form, and 2 row railway roadbed templates 14 use integral reinforcing mode, are used between railway roadbed Strut 16 couples, and the outer side brace 13 of railway roadbed is supported on the channel-section steel 12 being fixed on U-shaped web.
Described rail row transport car 17 can use the railway rail car and flatcar of self-control or selection standard, act as 25m The section of track 18 or single 25m rail are transported to the section of track with sleeper assembly from tracklaying base lays scene.
Described single 25m rail and sleeper assembly, the sleeper group of railway roadbed design drawing and respective numbers is pressed for 25m rail Integrally, transport to job site, using the rail brace frame of respective numbers by 2 sets of single 25m rail and sleeper assembly group Laid into the standard section of track.
The described section of track is mated formation straddle truck 20, and traveling is used cooperatively in U-shaped beam wing plate top surface, 2, common lifting, transport, The 25m sections of track 18 are laid, or individually lift by crane other construction materials.
Described section of track straddle truck 20 of mating formation includes mating formation straddle truck across single line and across two-wire.
Described section of track assembly platform is that equipment is selected in section of track assembling in tracklaying base, can use man-made assembly, section of track group Assembling platform has sleeper positioning, automatic point of pillow, and adjustable pillow is away from function.
Described suspender is that section of track assembling selects equipment, including sleeper suspender, steel rail lifting appliance and the section of track to hang in tracklaying base Tool.
The above-mentioned U-shaped beam Monolithic Track Bed Construction equipment of the present invention realizes U-shaped beam Monolithic Track Bed Construction method, including step:
The scope of operation is cleared up;
Surveying setting-out;
Reinforcing bar colligation;
The section of track is set up, and the described section of track, is completed in tracklaying base, is transported by rail row transport car to job site, By the section of track mat formation straddle truck be hoisted to laying place set up;
Template erection;
Track accurate adjustment locks;
Concreting, described concrete, complete to prepare in concrete mixing plant, transported by concrete mixer to construction Scene, concreting is carried out using hopper or pump truck;
Railway roadbed conserves;
Support frame and form removable.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art is in the technical scope of present disclosure, the change or replacement that can readily occur in, It should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims Enclose and be defined.

Claims (9)

1. a kind of construction equipment of city track traffic U type beam solid concrete roabed, it is characterised in that including rail row supporting system, mould Plate body system, the section of track mat formation straddle truck, rail row transport car, section of track assembly platform and suspender;
Described rail row supporting system includes rail and adjusted to regulation strut, elevation screw rod, screw bolt seat, angle adjustment bolt, rail Screw rod, middle bracket, rail pallet, rail cant locking bolt, lateral bracket;
The elevation screw support is on the outside of railway roadbed;
The rail is supported on to regulation strut to be fixed on the channel-section steel on U-shaped web, and the channel-section steel is fixed by T-bolt, The T-bolt head is stuck in the pre-buried channel flow on U-shaped web, and the T-bolt end of thread passes through nut and clamp pressure The tight channel-section steel, the 2 row channel-section steels are fixed on inside U-shaped beam on two coxostermums respectively.
2. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 1, it is characterised in that described Template system for steel form splicing composition, the steel form between railway roadbed is connected by middle strut, and the steel form on the outside of railway roadbed leads to Cross outer side brace and be supported on described be fixed on the channel-section steel on U-shaped web.
3. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 2, it is characterised in that described Rail row transport car to load the railroad track flatcar of the 25m sections of track or single 25m rail and sleeper assembly.
4. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 3, it is characterised in that described Single 25m rail and sleeper assembly include 2 sets of single 25m rail and sleeper assembly, formed after transporting to job site The standard section of track.
5. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 4, it is characterised in that described Section of track straddle truck of mating formation U-shaped beam wing plate top surface is suspended on by travelling wheel, 2 are used cooperatively.
6. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 5, it is characterised in that described Section of track straddle truck of mating formation include mating formation across single line and straddle truck and mat formation straddle truck across two-wire.
7. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 6, it is characterised in that described Section of track assembly platform be provided with sleeper positioner, automatic point of pillow device and adjust pillow away from device.
8. the construction equipment of city track traffic U type beam solid concrete roabed according to claim 7, it is characterised in that described Suspender include sleeper suspender, steel rail lifting appliance and section of track suspender.
A kind of 9. construction party of the construction equipment of the city track traffic U type beam solid concrete roabed described in any one of claim 1 to 8 Method, it is characterised in that including step:
The scope of operation is cleared up;
Surveying setting-out;
Reinforcing bar colligation;
The section of track is set up, and the described section of track, is completed, is transported by rail row transport car to job site, by rail in tracklaying base Row mat formation straddle truck be hoisted to laying place set up;
Template erection;
Track accurate adjustment locks;
Concreting, described concrete, complete to prepare in concrete mixing plant, transported by concrete mixer existing to construction , concreting is carried out using hopper or pump truck;
Railway roadbed conserves;
Support frame and form removable.
CN201611176643.7A 2016-12-19 2016-12-19 A kind of construction equipment and method of city track traffic U type beam solid concrete roabed Active CN106498814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611176643.7A CN106498814B (en) 2016-12-19 2016-12-19 A kind of construction equipment and method of city track traffic U type beam solid concrete roabed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611176643.7A CN106498814B (en) 2016-12-19 2016-12-19 A kind of construction equipment and method of city track traffic U type beam solid concrete roabed

Publications (2)

Publication Number Publication Date
CN106498814A CN106498814A (en) 2017-03-15
CN106498814B true CN106498814B (en) 2018-03-06

Family

ID=58333803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611176643.7A Active CN106498814B (en) 2016-12-19 2016-12-19 A kind of construction equipment and method of city track traffic U type beam solid concrete roabed

Country Status (1)

Country Link
CN (1) CN106498814B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939954B (en) * 2017-03-20 2019-01-15 中国航空规划设计研究总院有限公司 A kind of large size load ground rail system and its building method
CN107313313B (en) * 2017-05-25 2019-04-30 中国铁道科学研究院铁道建筑研究所 The framed bent construction method of prefabricated urethane cures railway roadbed
CN109778662B (en) * 2019-03-14 2024-04-02 中铁第四勘察设计院集团有限公司 Rigid frame groove type beam bridge crossing shallow-buried tunnel
CN110565458B (en) * 2019-09-29 2024-03-29 中铁一局集团有限公司 Laying trolley and method for laying U-shaped beam track
CN111910478A (en) * 2020-08-24 2020-11-10 耿超玮 Steel rail support frame for urban rail transit integral ballast bed construction and construction method
CN112301891A (en) * 2020-09-24 2021-02-02 青岛一建集团有限公司 Detachable construction platform system of subway U type groove
CN112391881A (en) * 2020-09-30 2021-02-23 贵州诸葛云网络科技有限公司 Construction equipment for U-shaped beam integral ballast bed of rail transit
CN112376429B (en) * 2020-10-21 2022-09-13 中铁二十局集团有限公司 Construction method and device for ballastless track of continuous beam-arch combined bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5619928A (en) * 1994-05-10 1997-04-15 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for transporting an assembled track section
EP1386816B1 (en) * 2002-08-01 2007-04-25 Leopold Härtensteiner Wagon moveable on rails for loading and unloading of railway rails
EP2155967A1 (en) * 2007-05-10 2010-02-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Crane vehicle
CN103321111A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Tramcar track continuous-laying construction method
CN103835195A (en) * 2014-02-26 2014-06-04 中铁上海工程局有限公司 Rail layer low-position jacking and rapid transversely-moving span changing device and method
CN104179090A (en) * 2014-08-11 2014-12-03 天津市明信焊接工程有限公司 Subway rail laying system
CN206308564U (en) * 2016-12-19 2017-07-07 中铁第五勘察设计院集团有限公司 A kind of construction equipment of city track traffic U type beam solid concrete roabed

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5619928A (en) * 1994-05-10 1997-04-15 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for transporting an assembled track section
EP1386816B1 (en) * 2002-08-01 2007-04-25 Leopold Härtensteiner Wagon moveable on rails for loading and unloading of railway rails
EP2155967A1 (en) * 2007-05-10 2010-02-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Crane vehicle
CN103321111A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Tramcar track continuous-laying construction method
CN103835195A (en) * 2014-02-26 2014-06-04 中铁上海工程局有限公司 Rail layer low-position jacking and rapid transversely-moving span changing device and method
CN104179090A (en) * 2014-08-11 2014-12-03 天津市明信焊接工程有限公司 Subway rail laying system
CN206308564U (en) * 2016-12-19 2017-07-07 中铁第五勘察设计院集团有限公司 A kind of construction equipment of city track traffic U type beam solid concrete roabed

Also Published As

Publication number Publication date
CN106498814A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN106498814B (en) A kind of construction equipment and method of city track traffic U type beam solid concrete roabed
CN206308564U (en) A kind of construction equipment of city track traffic U type beam solid concrete roabed
CN104895584B (en) A kind of modularization steel form carrier and construction technology thereof
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN100482891C (en) Method for building railway bridge and simple support T beam bridge
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
CN105755915A (en) Construction method for CRTS III plate type ballastless track bed plate
CN107217551A (en) A kind of assembly concrete-filled steel tube double-block type sleeper
CN103321111A (en) Tramcar track continuous-laying construction method
CN101372231B (en) Technique for drawing, transporting and lifting ground rail type cable railway equipment
CN101691726A (en) Construction technology of double-block type ballastless track
CN111455852A (en) Assembling method of movable formwork for bridge construction
CN112227416A (en) Construction method of assembled steel pipe support and distribution beam combined support
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN202730654U (en) Sliding-groove-type transverse moving device for assisting with large-size box girder hoisting
CN101768906B (en) Double-line construction method for double-block ballastless track bed board of railway passenger special line
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN102518010A (en) Combined device for laying and grouting ballastless track board
CN104233909A (en) Heavy haul railway elastic supporting block type ballastless track construction device and construction method
CN110374018A (en) A kind of combined steel cross bearer sets up multispan just beam track strengthening method
CN106320181A (en) Construction method for installing precast beam slabs by adopting bridge girder erection machine
CN109235265A (en) System for track girder of constructing
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN107288039A (en) Railway Through Steel concrete combination bridge floor steel truss girder construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant