CN106441669A CN201610788723.1A CN201610788723A CN106441669A CN 106441669 A CN106441669 A CN 106441669A CN 201610788723 A CN201610788723 A CN 201610788723A CN 106441669 A CN106441669 A CN 106441669A
Authority
CN
China
Prior art keywords
hydraulic support
setting
resistance
pressure value
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610788723.1A
Other languages
Chinese (zh)
Inventor
徐军见
刘亚辉
林引
郭江涛
孙中光
张加易
张金豪
刘慧杰
赵光绪
胡亮
邵严
贺奎
崔少鹏
胡宇
周代勇
胡英杰
何青松
徐闯
郭炜
田炎鑫
沈莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Research Institute Co Ltd filed Critical CCTEG Chongqing Research Institute Co Ltd
Priority to CN201610788723.1A priority Critical patent/CN106441669A/en
Publication of CN106441669A publication Critical patent/CN106441669A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/0028Force sensors associated with force applying means
    • G01L5/0038Force sensors associated with force applying means applying a pushing force

Landscapes

  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Presses (AREA)

Abstract

The invention provides a coal mine working face roof weighting judgment method comprising the following steps that the working parameters of hydraulic supports are acquired, wherein the working parameters include the pressure values of the hydraulic supports and the duration of pressure, and the setting load and the end resistance of the hydraulic supports are determined according to the pressure values; the average working resistance of the hydraulic supports is calculated according to the working parameters of the hydraulic support; whether the roof corresponding to the current hydraulic support has the possibility of weighting is judged according to the average working resistance and the end resistance of the hydraulic supports; and if the roof corresponding to more than preset number of the hydraulic supports of all the hydraulic supports in a defined working face area has the possibility of weighting within the preset time period, weighting of the working face roof of the current area is judged. Weighting of the roof in the coal mine can be accurately judged so that the safety risk in working of the coal mine can be eliminated.

Description

Coal mine work area roof weighting decision method
Technical field
The present invention relates to mine field, more particularly, to a kind of coal mine work area roof weighting decision method.
Background technology
In the mines such as colliery, after work surface pushes to adopt, country rock original structure receives destruction, and roof strata can occur week The fracture of phase property, across falling, i.e. periodic weighting, generally require support and top board be supported, typically adopt hydraulic support, and making During industry, hydraulic support is carried out according to the circular order that fall frame moves frame liter valency.In prior art, for face roof Whether to press and to rely primarily on professional's experience and judged, to have that poor in timeliness, accuracy rate be low, weak the asking of actual directive significance , there is security risk in topic.
It is, therefore, desirable to provide a kind of new roof weighting decision method, can in mine top board whether can occur to come Pressure is accurately judged and relatively low to professional's dependency, eliminates security risk present in mine operation, is coal mine fully-mechanized mining Work surface engineering quality control provides scientific basis.
Content of the invention
In view of this, it is an object of the invention to provide a kind of coal mine work area roof weighting decision method, can be to mine Whether accurately being judged and relatively low to professional's dependency to press of middle top board, eliminates present in mine operation Security risk, provides scientific basis for coal mine fully-mechanized mining working engineering quality control.
A kind of coal mine work area roof weighting decision method that the present invention provides, comprises the steps:
Comprise the steps:
S1. gather the running parameter of hydraulic support, when running parameter includes the pressure value of hydraulic support and pressure continues Between, and the setting load of hydraulic support and last resistance are determined according to pressure value;
S2. the running parameter according to hydraulic support calculates the average operation resistance of hydraulic support;
S3. whether the average operation resistance according to hydraulic support and last resistance judge the corresponding top board of current hydraulic support Exist and to press probability;
S4. judge in all hydraulic support in work surface defined area, exceed the hydraulic support setting quantity when setting Between corresponding top board in section exist to press probability, then judge work at present face roof weighting.
Further, in step S1, setting load is determined according to following method:
S11., after the time t1 that interval sets in the last resistance of last circulation, examination in the time t2 setting currently follows Pressure detected by ring;
S12., in setting time t2, if having multiple pressure value exceeding specified setting load, first is exceeded volume The design of pressure determining setting load is the setting load of previous cycle;
In setting time t2, if all pressure value detecting are respectively less than specified setting load, continue to setting time Examination in pressure value after t2, choosing first pressure value being more than specified setting load is specified setting load;
In setting time t2, it is in 10Mpa to yield load if there are pressure value, then select 10Mpa to volume Determine maximum pressure value between working resistance as setting load.
Further, in step S1, last Resistance Value is determined according to following method:
After the setting load value determining previous cycle, if occurring first being gradually increased and then wink in certain time side pressure force value Between drop under setup pressure value, then judge the maximum pressure value of current slot as last Resistance Value.
Further, in step S2, average operation resistance is determined according to equation below:
P=(P1T1+P1T1+…+PNTN)/(T1+T2+…+TN)
Wherein:P is average operation resistance, PNFor n-th pressure value in previous cycle;TNFor each pressure of N in previous cycle The persistent period of value.
Further, in step S3, judge the corresponding top board of hydraulic support whether pressing according to following method:
S31. roof weighting criterion P is calculated according to equation belowt′:
Wherein:
σPFor the mean square deviation of the last resistance of circulation, n is period, PtiThe last resistance of each circulation,Average for last resistance Value;
As last resistance P>Pt', then judge that the corresponding top board of this hydraulic support meets to press criterion.
S32. according to the corresponding top board of hydraulic support in following rule judgment region whether pressing:
If the last resistance of single support exceedes roof weighting criterion, it is judged as this data fit single-side stand cycle Pressure criterion, and calculate the standoff criterion of institute in one's respective area successively, integrate in one's respective area and meet single support periodic weighting criterion Data, meets to press criterion in setting time T if there are the hydraulic support setting more than quantity simultaneously, is judged as that this region is come Pressure.
Beneficial effects of the present invention:The coal mine work area roof weighting decision method of the present invention, can be to top board in mine Whether accurately can be judged to press, relatively low to professional's dependency, improve judged result accuracy, Er Qieneng Enough it is beneficial to make accurate task instruction measure according to judged result, thus eliminating security risk present in mine operation.
Brief description
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the flow chart of the present invention.
Fig. 2 is the setting load of the present invention, the characteristic curve diagram of last resistance.
Specific embodiment
Fig. 1 is the flow chart of the present invention, as illustrated, a kind of coal mine work area roof weighting judgement side that the present invention provides Method, comprises the steps:
Comprise the steps:
S1. gather the running parameter of hydraulic support, when running parameter includes the pressure value of hydraulic support and pressure continues Between, and the setting load of hydraulic support and last resistance are determined according to pressure value;
S2. the running parameter according to hydraulic support calculates the average operation resistance of hydraulic support;
S3. whether the average operation resistance according to hydraulic support and last resistance judge the corresponding top board of current hydraulic support Exist and to press probability;
S4. judge in all hydraulic support in work surface defined area, exceed the hydraulic support setting quantity when setting Between corresponding top board in section exist to press probability, then judge work at present face roof weighting;Set quantity and be generally support The 1/2 of sum;Such as in work surface overlay area, if there are 10 hydraulic supports, wherein, 5 hydraulic supports are all determined Corresponding top board there is a possibility that to press, then show that whole working region can be pressing;Judge by above-mentioned Method, can be improved the accuracy of judged result, Er Qieneng to whether accurately the judging to press of top board in mine Enough it is beneficial to make accurate task instruction measure according to judged result, thus eliminating security risk present in mine operation.
In the present embodiment, in step S1, setting load is determined according to following method:
S11., after the time t1 that interval sets in the last resistance of last circulation, examination in the time t2 setting currently follows Pressure detected by ring;
S12., in setting time t2, if having multiple pressure value exceeding specified setting load, first is exceeded volume The design of pressure determining setting load is the setting load of previous cycle;
In setting time t2, if all pressure value detecting are respectively less than specified setting load, continue to setting time Examination in pressure value after t2, choosing first pressure value being more than specified setting load is specified setting load;
In setting time t2, it is in 10Mpa to yield load if there are pressure value, then select 10Mpa to volume Determine maximum pressure value between working resistance as setting load
Wherein, setting time t1 generally 1 minute, setting time t2 generally 3 minutes, setting time t1 and setting time T2 can be set according to actual condition;
In step S1, last Resistance Value is determined according to following method:
After the setting load value determining previous cycle, if occurring first being gradually increased and then wink in certain time side pressure force value Between drop under setup pressure value, then judge the maximum pressure value of current slot as last Resistance Value, as shown in Fig. 2 passing through Said method, can accurately determine the setting load of a circulation and last resistance, thus beneficial to the judgement finally to press.
In the present embodiment, in step S2, average operation resistance is determined according to equation below:
P=(P1T1+P1T1+…+PNTN)/(T1+T2+…+TN)
Wherein:P is average operation resistance, PNFor n-th pressure value in previous cycle;TNFor each pressure of N in previous cycle The persistent period of value.
In the present embodiment, in step S3, judge the corresponding top board of hydraulic support whether pressing according to following method:
S31. roof weighting criterion P is calculated according to equation belowt′:
Wherein:
σPFor the mean square deviation of the last resistance of circulation, n is period, PtiThe last resistance of each circulation,Average for last resistance Value;
As last resistance P>Pt', then judge that the corresponding top board of this hydraulic support meets to press criterion.
S32. according to the corresponding top board of hydraulic support in following rule judgment region whether pressing:
If the last resistance of single support exceedes roof weighting criterion, it is judged as this data fit single-side stand cycle Pressure criterion, and calculate the standoff criterion of institute in one's respective area successively, integrate in one's respective area and meet single support periodic weighting criterion Data, meets to press criterion in setting time T if there are the hydraulic support setting more than quantity simultaneously, is judged as that this region is come Pressure, wherein, sets the 1/2 of quantity generally region class total hydraulic support number, setting time T is set according to actual condition, Such as 2 hours or 4 hours etc.;
In the above-mentioned methods, the support situation of hydraulic support can be analyzed by average operation resistance, and sentence to press According to jointly coming work surface overlay area be whether there is to press probability to be analyzed, improve precision of analysis, thus It is beneficial to eliminate safe hidden trouble.
Finally illustrate, above example only in order to technical scheme to be described and unrestricted, although with reference to relatively Good embodiment has been described in detail to the present invention, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, the objective without deviating from technical solution of the present invention and scope, and it all should be covered at this In the middle of the right of invention.

Claims (5)

1. a kind of coal mine work area roof weighting decision method it is characterised in that:Comprise the steps:
S1. gather the running parameter of hydraulic support, running parameter includes pressure value and the pressure duration of hydraulic support, and The setting load of hydraulic support and last resistance are determined according to pressure value;
S2. the running parameter according to hydraulic support calculates the average operation resistance of hydraulic support;
S3. the average operation resistance according to hydraulic support and last resistance judge that the corresponding top board of current hydraulic support whether there is To press probability;
S4. judge in all hydraulic support in work surface defined area, exceed the hydraulic support setting quantity in setting time section Interior corresponding top board exists to press probability, then judge work at present face roof weighting.
2. according to claim 1 coal mine work area roof weighting decision method it is characterised in that:In step S1, according to such as Lower method determines setting load:
S11. after the time t1 that interval sets in the last resistance of last circulation, examination previous cycle institute in the time t2 setting The pressure detecting;
S12. in setting time t2, if having multiple pressure value exceeding specified setting load, first is exceeded specified first The design of pressure of support force is the setting load of previous cycle;
In setting time t2, if all pressure value detecting are respectively less than specified setting load, continue to after setting time t2 Pressure value in examination, choose first be more than specified setting load pressure value be specified setting load;
In setting time t2, it is in 10Mpa to yield load if there are pressure value, then select 10Mpa to specified work Make maximum pressure value between resistance as setting load.
3. according to claim 2 coal mine work area roof weighting decision method it is characterised in that:In step S1, according to such as Lower method determines last Resistance Value:
After the setting load value determining previous cycle, if occurring first being gradually increased and then under moment in certain time side pressure force value Drop under setup pressure value, then judge the maximum pressure value of current slot as last Resistance Value.
4. according to claim 1 coal mine work area roof weighting decision method it is characterised in that:In step S2, according to such as Lower formula determines average operation resistance:
P=(P1T1+P1T1+…+PNTN)/(T1+T2+…+TN)
Wherein:P is average operation resistance, PNFor n-th pressure value in previous cycle;TNFor each pressure value of N in previous cycle Persistent period.
5. according to claim 1 coal mine work area roof weighting decision method it is characterised in that:In step S3, according to such as Lower method judges whether the corresponding top board of single hydraulic support meets to press criterion:
S31. roof weighting criterion P is calculated according to equation belowt′:
P t ′ = P t ‾ + σ P ;
Wherein:
σ p = 1 n Σ i = 1 n ( P t i - P t ‾ ) 2 , P t ‾ = 1 n Σ i = 1 n P t i ;
σPFor the mean square deviation of the last resistance of circulation, n is period, PtiThe last resistance of each circulation,Meansigma methodss for last resistance;
As last resistance P>Pt', then judge that the corresponding top board of this hydraulic support meets to press criterion.
S32. according to the corresponding top board of hydraulic support in following rule judgment region whether pressing:
If the last resistance of single support exceedes roof weighting criterion, it is judged as that this data fit single-side stand periodic weighting is sentenced According to, and calculate the standoff criterion of institute in one's respective area successively, integrate in one's respective area and meet single support periodic weighting criteria data, Meet to press criterion if there are the hydraulic support setting more than quantity in setting time T simultaneously, be judged as this region to press.
CN201610788723.1A 2016-08-31 2016-08-31 Coal mine working face roof weighting judgment method Pending CN106441669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610788723.1A CN106441669A (en) 2016-08-31 2016-08-31 Coal mine working face roof weighting judgment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610788723.1A CN106441669A (en) 2016-08-31 2016-08-31 Coal mine working face roof weighting judgment method

Publications (1)

Publication Number Publication Date
CN106441669A true CN106441669A (en) 2017-02-22

Family

ID=58165325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610788723.1A Pending CN106441669A (en) 2016-08-31 2016-08-31 Coal mine working face roof weighting judgment method

Country Status (1)

Country Link
CN (1) CN106441669A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272007A (en) * 2018-07-07 2019-01-25 河南理工大学 Setting load, last resistance recognition methods, storage medium based on deep neural network
CN109522612A (en) * 2018-10-26 2019-03-26 山东科技大学 A method of based on comprehensive mining hydraulic bracket stress inverting immediate roof thickness
CN109798138A (en) * 2019-01-09 2019-05-24 天地科技股份有限公司 A kind of circulation end drag prediction method of the hydraulic support suitable for fully-mechanized mining working
CN110847968A (en) * 2019-10-29 2020-02-28 青岛本末岩控技术有限公司 Periodic pressure-bearing dividing method based on maximum working resistance curve of support cycle
CN111681125A (en) * 2020-07-08 2020-09-18 神华神东煤炭集团有限责任公司 Top plate pressure calculation method, storage medium, and electronic apparatus
CN111734492A (en) * 2020-07-02 2020-10-02 中国矿业大学 Intelligent working surface roof fall early warning method based on U-shaped area characteristic parameter extraction
CN111879538A (en) * 2020-07-09 2020-11-03 郑州普泽能源科技有限公司 Top plate incoming pressure accurate monitoring method
CN112302720A (en) * 2020-09-30 2021-02-02 中煤科工开采研究院有限公司 Method and system for judging initial supporting force and cycle end resistance of working surface hydraulic support
CN112798042A (en) * 2020-12-30 2021-05-14 中国矿业大学 Intelligent diagnosis method for working state and supporting quality of hydraulic support

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590846A (en) * 2013-10-28 2014-02-19 山东科技大学 Method of verifying reasonable working resistance of working face hydraulic support
CN103790628A (en) * 2013-05-30 2014-05-14 天地科技股份有限公司 Warning evaluation method for fully mechanized mining face roof disasters

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790628A (en) * 2013-05-30 2014-05-14 天地科技股份有限公司 Warning evaluation method for fully mechanized mining face roof disasters
CN103590846A (en) * 2013-10-28 2014-02-19 山东科技大学 Method of verifying reasonable working resistance of working face hydraulic support

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
徐亚雄等: "《2010全国煤矿机械与救援装备高层轮坛既新产品技术交流会论文集》", 31 October 2010 *
徐军见: "工作面顶板灾害预测预紧技术", 《煤矿安全》 *
王家臣: "《厚煤层开采理论与技术》", 30 September 2009 *
肖远见等: "液压支架初撑力的确定", 《矿业安全与环保》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272007B (en) * 2018-07-07 2021-07-02 河南理工大学 Initial supporting force and terminal resistance identification method based on deep neural network and storage medium
CN109272007A (en) * 2018-07-07 2019-01-25 河南理工大学 Setting load, last resistance recognition methods, storage medium based on deep neural network
CN109522612A (en) * 2018-10-26 2019-03-26 山东科技大学 A method of based on comprehensive mining hydraulic bracket stress inverting immediate roof thickness
CN109798138A (en) * 2019-01-09 2019-05-24 天地科技股份有限公司 A kind of circulation end drag prediction method of the hydraulic support suitable for fully-mechanized mining working
CN110847968A (en) * 2019-10-29 2020-02-28 青岛本末岩控技术有限公司 Periodic pressure-bearing dividing method based on maximum working resistance curve of support cycle
CN111734492A (en) * 2020-07-02 2020-10-02 中国矿业大学 Intelligent working surface roof fall early warning method based on U-shaped area characteristic parameter extraction
CN111734492B (en) * 2020-07-02 2021-08-24 中国矿业大学 Intelligent working surface roof fall early warning method based on U-shaped area characteristic parameter extraction
CN111681125A (en) * 2020-07-08 2020-09-18 神华神东煤炭集团有限责任公司 Top plate pressure calculation method, storage medium, and electronic apparatus
CN111879538A (en) * 2020-07-09 2020-11-03 郑州普泽能源科技有限公司 Top plate incoming pressure accurate monitoring method
CN111879538B (en) * 2020-07-09 2022-09-20 郑州普泽能源科技有限公司 Top plate incoming pressure accurate monitoring method
CN112302720A (en) * 2020-09-30 2021-02-02 中煤科工开采研究院有限公司 Method and system for judging initial supporting force and cycle end resistance of working surface hydraulic support
CN112302720B (en) * 2020-09-30 2023-02-28 中煤科工开采研究院有限公司 Method and system for judging initial supporting force and cycle end resistance of working surface hydraulic support
CN112798042A (en) * 2020-12-30 2021-05-14 中国矿业大学 Intelligent diagnosis method for working state and supporting quality of hydraulic support

Similar Documents

Publication Publication Date Title
CN106441669A (en) Coal mine working face roof weighting judgment method
CN103590846B (en) The ratification method of the reasonable working resistance of a kind of working surface hydraulic support
CN102337922B (en) Method for inspecting burst-preventing effect of areas
CN112199836B (en) Working face periodic pressure-entering early warning method, device and equipment based on deep learning
JP2020500299A5 (en)
CN103790628B (en) A kind of roof of coal face disaster alarm evaluation methodology
CN107559045A (en) Underground coal mine Face Pressure Early-Warning System and method
CN111681125B (en) Top plate pressure calculation method, storage medium, and electronic apparatus
CN112302720B (en) Method and system for judging initial supporting force and cycle end resistance of working surface hydraulic support
CN106997334A (en) One kind is based on time-weighted mine pressure data handling system and method
CN110748365B (en) Method and system for automatically identifying coal mining cycle number based on support load change
CN112528229B (en) Working face hydraulic support supporting quality evaluation method based on control chart analysis
CN115481530A (en) Coal mine working face pressure prediction system and method based on region division
CN106401556A (en) Cloud platform and method for drilling supervision
CN110630328A (en) Method and system for measuring protective range of mining protective layer
CN110766293A (en) Overlying strata fracture zone influence factor weight analysis method based on grey system theory
CN106014365A (en) Method for predicting water-flooding development oil field output decline rate
CN117605539A (en) Intelligent early warning system and method for monitoring coal mine water damage
Vallejos et al. Omori’s law applied to mining-induced seismicity and re-entry protocol development
CN112989984B (en) Coal-rock interface identification method
CN111273352A (en) Intelligent detection method and device for geological structure and electronic equipment
CN106651615A (en) Oil well measure-based well selection method and apparatus
CN110043317A (en) Knowledge method for early warning is sentenced in a kind of mine disaster many reference amounts local danger area
CN109272007A (en) Setting load, last resistance recognition methods, storage medium based on deep neural network
CN103971020B (en) Method for the detection of pneumatic control valve viscous

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222