CN106437811A - Pressure-discharging type ventilation method and model of short parallel pilot tunnels of double-hole single-line tunnel - Google Patents
Pressure-discharging type ventilation method and model of short parallel pilot tunnels of double-hole single-line tunnel Download PDFInfo
- Publication number
- CN106437811A CN106437811A CN201610607202.1A CN201610607202A CN106437811A CN 106437811 A CN106437811 A CN 106437811A CN 201610607202 A CN201610607202 A CN 201610607202A CN 106437811 A CN106437811 A CN 106437811A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- hole
- way
- transverse passage
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009423 ventilation Methods 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000007599 discharging Methods 0.000 title abstract description 4
- 230000002441 reversible effect Effects 0.000 claims abstract description 61
- 230000009471 action Effects 0.000 claims description 11
- 239000013589 supplement Substances 0.000 claims description 8
- 230000008859 change Effects 0.000 claims description 5
- 230000008676 import Effects 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 238000004804 winding Methods 0.000 claims description 4
- 230000001914 calming effect Effects 0.000 claims description 3
- 230000002000 scavenging effect Effects 0.000 claims description 3
- 230000003247 decreasing effect Effects 0.000 claims description 2
- 230000005611 electricity Effects 0.000 claims 1
- 238000005265 energy consumption Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000011161 development Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 230000005662 electromechanics Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000006386 neutralization reaction Methods 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
- E21F1/003—Ventilation of traffic tunnels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
- E21F1/02—Test models
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04D—NON-POSITIVE-DISPLACEMENT PUMPS
- F04D27/00—Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ventilation (AREA)
Abstract
The invention discloses a pressure-discharging type ventilation method and model of short parallel pilot tunnels of a double-hole single-line tunnel. The method comprises the following steps that the short parallel pilot tunnels parallel to tunnel main holes are formed in the outer sides of entrances and exits of the double-hole tunnel correspondingly, the entrances of the short parallel pilot tunnels are located at the one-third positions of the entrances and the exits of the tunnel main holes, and reversible axial-flow type draught fans are arranged in the short parallel pilot tunnels; and meanwhile, reversible axial-flow type draught fans are also arranged in a transverse traffic passage and a transverse pedestrian passage between the tunnel main holes, when the precondition that the sum of required air volumes of the two tunnel main holes, the transverse traffic passage and the transverse pedestrian passage is equal to or smaller than the sum of the largest allowed ventilation quantity of the two tunnel main holes, the transverse traffic passage and the transverse pedestrian passage is guaranteed, by adjusting the ventilation quantity of the reversible axial-flow type draught fans, air flow throughout the tunnel is enabled to be stable, and air in the tunnel is discharged through air outlets of the parallel pilot tunnels at the exits of the main holes of the double-hole tunnel. Controlling of changes of air speed at the joints of the tunnel and the transverse passages is achieved, and energy consumption of the draught fans is controlled to be the minimum.
Description
Technical field
The present invention relates to tunnel ventilation technical field is and in particular to single file tunnel short parallel pilot tunnel pressure discharge type in a kind of pair of hole leads to
The method of wind and model.
Background technology
Enter into the middle and late stage in 20th century, with the continuous progress of scientific and technical theory and industrial manufacturing level, tunnel leads to
Wind technology is also developed rapidly, successively occur in that transverse ventilation, semi-transverse ventilation, jet blower longitudinal ventilation mode,
Hole is concentrated feeding formula, is concentrated many force ventilation modes such as discharge formula, vertical shaft blow and exhaust, substantially meets dilution car tail
Gas, improves the needs of sanitary standard.
With the raising of each side standard, different problems also immediately come, and the ventilation scale in tunnel gradually have impact on tunnel
Subject construction, its put into loss also increasing, arrange create Highway Tunnel Ventilation System " repair and must rise, can not afford "
Contradiction, has had become as a difficult point of highway industry, and at this stage, the ventilating engineering cost of long highway tunnel is larger, necessarily
The bottleneck of restriction vcehicular tunnel development is become on degree.Extra-long Highway Tunnel ventilation adopts vertical shaft Network Ventilation, wherein sets
Standby and civil engineering costs accounts for the large percentage of total cost, required expense often to square being directly proportional of length of tunnel, and tunnel builds up
Running cost after being open to traffic also pay wages huge, thus explore tunnel ventilation the great economic worth of energy saving optimizing problem and society meaning
Justice.On the premise of meeting Road Tunnel Safety requirement, reduce related electromechanics as far as possible and purchase and run disbursement, or strive
Find optimal equilibrium point between the two, try hard to be safety, science, green, this will be that following vcehicular tunnel construction needs for a long time
Faced by probing direction.
Make a general survey of the differentiation of various countries' highway tunnel ventilation mode, draft type experienced by transversal ventilation in last century middle and late stage
Development course to longitudinal ventilation.Using double holes one-way traffic more than modern major long tunnel, draft type frequently with full jet machine,
The longitudinal ventilation mode of the perpendicular multiple combination such as (oblique) well, axial flow blower.And, explore the wind solving tunnel and transverse passage-way junction
The control of speed change and to control the energy consumption of blower fan in minimum be also those skilled in the art's focus of interest.
Content of the invention
The defect existing for above-mentioned prior art or deficiency, it is an object of the invention to, a kind of pair of hole single file tunnel is provided
The method of the short parallel pilot tunnel pressure discharge type ventilation in road and model.
In order to realize above-mentioned task, the present invention takes following technical solution:
The method of the short parallel pilot tunnel pressure discharge type ventilation in a kind of pair of hole single file tunnel is it is characterised in that the method is in double holes tunnel
The main hole in tunnel in road respectively opens up, outside importing and exporting, the short parallel pilot tunnel that hole main with tunnel is parallel to each other, the entrance of this short parallel pilot tunnel
At three point that the main hole in tunnel is imported and exported, in short parallel pilot tunnel, it is placed with reversible axial flow blower fan;Meanwhile, in double holes tunnel
Garage's transverse passage-way between road and People's Bank of China's transverse passage-way also place reversible axial flow blower fan, are ensureing that two main tunnels, garage are horizontal logical
On the premise of required airflow sum in road and People's Bank of China's transverse passage-way is not more than its maximum allowable ventilation sum, by adjusting reversible axle
Flow type fan ventilation size and make in tunnel unstable airflow everywhere, and the parallel pilot tunnel in the exit by the main hole of double-hole tunnel
At exhaust outlet, the wind in tunnel is discharged.
According to the present invention, the airflow direction in the main hole in described tunnel is consistent with wagon flow direction, and there is Piston Action Wind, tunnel master
There is air-flow between garage's transverse passage-way in hole or People's Bank of China's transverse passage-way and parallel pilot tunnel to exchange, horizontal logical through garage's transverse passage-way or People's Bank of China
Behind road, air quantity is decreased or increased, and flow velocity accordingly reduces or increases, and now just adjusts reversible axial flow blower fan to supplement or to reduce wind
Amount makes wind speed in the main hole in tunnel be unlikely to change too big so that the air quantity in whole double-hole tunnel keeps balance.
Described Piston Action Wind is the air-flow being produced by vehicle motion in tunnel, and Piston Action Wind air force determines according to actual measurement.
Reversible axial flow blower fan in the short parallel pilot tunnel of described tunnel Zhu Dong entrance plays scavenging action, described tunnel master
The reversible axial flow blower fan in short parallel pilot tunnel at hole outlet acts the effect of calming the anger, in described garage transverse passage-way and People's Bank of China's transverse passage-way
Reversible axial flow blower fan be then the air force adjusting garage's transverse passage-way and People's Bank of China's transverse passage-way;According to ventilation in the main hole in tunnel
Concrete condition, by the size direction of each section of wind speed in the main hole in tunnel, by adjusting the press-in of reversible axial flow blower fan or discharging wind
The size of amount is changing ventilation condition in the main hole in tunnel.
Described reversible axial flow blower fan is using band winding type synchronous motor, or adopts band hydraulic servo type blade dynamic regulation
The axial fan of device.
The uninterrupted ventilation frequency of described reversible axial flow blower fan is not less than 5 times per hour;Less or special for the volume of traffic
Long tunnel, using 3~4 times per hour, increases rate of ventilation in case of fire, uses the tunnel of longitudinal ventilation, in tunnel simultaneously
Ventilation wind speed is not less than 2.5m/s, and maximum wind velocity is not higher than 15m/s.
The main hole in tunnel arranges precipitron with garage's transverse passage-way or transverse passage-way intersection of People's Bank of China.
The short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel that said method is set up, including parallel double holes tunnel
, there are garage's transverse passage-way and People's Bank of China's transverse passage-way in road it is characterised in that entering in the main hole in the tunnel of double-hole tunnel between the main hole of double-hole tunnel
The short parallel pilot tunnel that hole main with tunnel is parallel to each other respectively is opened up, the entrance of this short parallel pilot tunnel enters positioned at the main hole in tunnel outside outlet
At three point of outlet, in short parallel pilot tunnel, it is placed with reversible axial flow blower fan;Meanwhile, the garage between double-hole tunnel is horizontal
Passage and People's Bank of China's transverse passage-way also place reversible axial flow blower fan.
Compared with prior art, the method for the short parallel pilot tunnel pressure discharge type ventilation in double hole single file tunnel of the present invention and its foundation
Having the technical effect that of bringing of model:
(1) only do not assist the construction of main hole when constructing, such as construction cuts the effect such as draining;Advance geologic can be played pre- simultaneously
Report and open up main tunnel second construction surface and carry out parallel operations, the effect of accelerating construction progress, substantially increase work efficiency.
(2) in the case of there is fire or emergency episode, because the power lighting system of short parallel pilot tunnel is independent of master
The reliable fresh air that tunnel can provide again, therefore short parallel pilot tunnel can use as a bicycle road multiple line, Cheng Weiren
Member, the emergency evacuation passage of vehicle and rescue passage.Furthermore it is possible to manually or automatically control garage's transverse passage-way or People's Bank of China
The switch in transverse passage-way air port, to ensure security of the lives and property when the fugitive life of personnel or rescue.
(3) because the hole of short parallel pilot tunnel is provided with reversible axial flow blower fan, not only provide further relative savings air-blower control room
Place and ventilation installation's mounting cost, and the management of reversible axial flow blower fan and power supply also more collect neutralization conveniently, so
Just save the expense of sidewalk investment and maintenance in the future, also make the live and work of staff convenient simultaneously.
(4) tunnel planning at a specified future date and enlarging are conducive to, with the development of tunnel economic level in the neighbourhood, the volume of traffic
Increase, short parallel pilot tunnel can expand as Binary line's tunnel.
Brief description
Fig. 1 is the short parallel pilot tunnel pressure discharge type ventilation model structural representation in double hole single file tunnel of the present invention;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is enlarged drawing at B in Fig. 1.
Fig. 4 is enlarged drawing at C in Fig. 1;
Fig. 5 is enlarged drawing at D in Fig. 1;
The labelling of Fig. 1 bracket represents respectively:Ith, the main hole in the first tunnel, the main hole in the II, second tunnel, the 1, first reversible axle stream
Formula blower fan, the 2, second reversible axial flow blower fan, the 3, the 3rd reversible axial flow blower fan, the 4, the 4th reversible axial flow blower fan, the 5, the 5th
Reversible axial flow blower fan, the 6, the 6th reversible axial flow blower fan, the 7, first parallel pilot tunnel, the 8, second parallel pilot tunnel, the 9, the 3rd is parallel
Pilot tunnel, the 10, the 4th parallel pilot tunnel, 11, garage's transverse passage-way, 12, People's Bank of China's transverse passage-way;
A, the main hole in the first tunnel I and garage's transverse passage-way 11 intersection point, B, the main hole in the first tunnel I and People's Bank of China's transverse passage-way 12 intersection point,
C, the main hole in the second tunnel II and People's Bank of China's transverse passage-way 12 intersection point, D, the main hole in the second tunnel II and garage's transverse passage-way 11 intersection point;
In Fig. 2 to Fig. 5, Q01、Q02It is respectively the first tunnel main hole I, the piston air quantity in the main hole in the second tunnel II, remaining word
Female is air quantity in each passage.
Specific embodiment
Referring to Fig. 1 to Fig. 5, the method that the present embodiment provides the short parallel pilot tunnel pressure discharge type ventilation in a kind of pair of hole single file tunnel,
The method respectively opens up the short parallel pilot tunnel that hole main with tunnel is parallel to each other outside the import and export of double-hole tunnel, this short parallel pilot tunnel
Entrance be located at the main hole in tunnel import and export three point one at, be placed with reversible axial flow blower fan in short parallel pilot tunnel;Meanwhile, double
Garage's transverse passage-way between hole tunnel and People's Bank of China's transverse passage-way also place reversible axial flow blower fan, are ensureing two main tunnels, garages
On the premise of required airflow sum in transverse passage-way and People's Bank of China's transverse passage-way is not more than its maximum allowable ventilation sum, can by adjusting
Inverse axial fan ventilation size and make in tunnel unstable airflow everywhere, and by the main hole of double-hole tunnel exit parallel
At pilot tunnel exhaust outlet, the wind in tunnel is discharged.
Airflow direction in the main hole in described tunnel is consistent with wagon flow direction, and there is Piston Action Wind, and the garage in the main hole in tunnel is horizontal
There is air-flow between passage or People's Bank of China's transverse passage-way and parallel pilot tunnel to exchange, after garage's transverse passage-way or People's Bank of China's transverse passage-way, air quantity subtracts
Little or increase, flow velocity accordingly reduces or increases, and now just regulation reversible axial flow blower fan makes tunnel master to supplement or to reduce air quantity
In hole, wind speed is unlikely to change too big so that the air quantity in whole double-hole tunnel keeps balance.
Described Piston Action Wind is the air-flow being produced by vehicle motion in tunnel, and Piston Action Wind air force determines according to actual measurement.
Reversible axial flow blower fan in the short parallel pilot tunnel of described tunnel Zhu Dong entrance plays scavenging action, described tunnel master
The reversible axial flow blower fan in short parallel pilot tunnel at hole outlet acts the effect of calming the anger, in described garage transverse passage-way and People's Bank of China's transverse passage-way
Reversible axial flow blower fan be then the air force adjusting garage's transverse passage-way and People's Bank of China's transverse passage-way;According to ventilation in the main hole in tunnel
Concrete condition, by the size direction of each section of wind speed in the main hole in tunnel, by adjusting the press-in of reversible axial flow blower fan or discharging wind
The size of amount is changing ventilation condition in the main hole in tunnel.
The short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel that said method is set up, including parallel double holes tunnel
, there are garage's transverse passage-way and People's Bank of China's transverse passage-way in road between the main hole of double-hole tunnel, import and export outside in the main hole in the tunnel of double-hole tunnel each
Open up the short parallel pilot tunnel that hole main with tunnel is parallel to each other, the entrance of this short parallel pilot tunnel is located at three points that the main hole in tunnel is imported and exported
At one, in short parallel pilot tunnel, it is placed with reversible axial flow blower fan;Meanwhile, the garage's transverse passage-way between double-hole tunnel and People's Bank of China
Transverse passage-way also places reversible axial flow blower fan.
In the present embodiment, the second reversible axial flow blower fan 2 is placed in the second parallel pilot tunnel 8 exit, and the 3rd parallel pilot tunnel 9 enters
The 3rd reversible axial flow blower fan 3 is placed, the 4th reversible axial flow blower fan 4, garage are placed in the 4th parallel pilot tunnel 10 entrance at mouthful
Transverse passage-way 11 places the 5th reversible axial flow blower fan 5, and People's Bank of China's transverse passage-way 12 places the 6th reversible axial flow blower fan 6.The main hole in tunnel
Exist between transverse passage-way and parallel pilot tunnel air-flow exchange, after garage's transverse passage-way or People's Bank of China's transverse passage-way air quantity reduce (or
Increase), flow velocity accordingly reduces (or increase), and now just can supplement (or minimizing) air quantity with reversible axial flow regulation blower fan makes
In the main hole in tunnel wind speed be unlikely to change too big.
In the short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel, the air quantity in whole double-hole tunnel keeps flat
Weighing apparatus.Wherein, the first reversible axial flow blower fan 1 takes discharge away by flowing into the gas in the main hole in the first tunnel I in garage's lateral road 11, the
Two reversible axial flow blower fans 2 will supplement the gas being flowed in People's Bank of China's transverse passage-way 12 by the main hole in the first tunnel I.3rd reversible axial flow
Blower fan 3 takes the gas in the main hole II in 12 second tunnels in People's Bank of China's transverse passage-way away discharge.4th reversible axial flow blower fan 4 will supplement
Gas in garage's lateral road 11 is flowed into by the main main hole in second tunnel II.
1 to accompanying drawing 4 can be obtained by air balance principle with reference to the accompanying drawings:
For A point:qa1=qa3, qa2=Q1+Q01;
I.e. the first reversible axial flow blower fan 1 takes row away by flowing into the gas in the main hole in the first tunnel I in garage's transverse passage-way 11
Go out.
For B point:qb1=qb2, qa2=Q2+Q01;
I.e. the second reversible axial flow blower fan 2 will supplement the gas being flowed in People's Bank of China's transverse passage-way 12 by the main hole in the first tunnel I.
For C point:qc2=qb2, qc2=Q3+Q02;
I.e. the 3rd reversible axial flow blower fan 3 takes row away by flowing into the gas in the main hole in the second tunnel II in People's Bank of China's transverse passage-way 12
Go out.
For D point:qa3=qd1, qc2=Q4+Q02.
I.e. the 4th reversible axial flow blower fan 4 will supplement the gas being flowed in garage's lateral road 12 by the main hole in the second tunnel II.
There is (turnover air quantity is equal) to whole double-hole tunnel:
Q1+Q3+Q01+qb1+qd1=Q2+Q4+Q02+qa1+qc1
Wherein:Q01、Q02It is respectively the first tunnel main hole I, the piston air quantity in the main hole in the second tunnel II, remaining letter is each
Air quantity in passage.
Piston Action Wind in the short parallel pilot tunnel pressure discharge type ventilation model in above-mentioned pair of hole single file tunnel is to be moved by vehicle in tunnel
The air-flow producing, Piston Action Wind air force determines according to actual measurement.
In the present embodiment, the first to the 6th reversible axial flow blower fan (1,2,3,4,5,6) is using band winding type synchronous motor
Adjust rotating speed, or using the axial fan with hydraulic servo type blade dynamic regulation device.Fan blade peace is adjusted during work
Dress angular adjustment wind supply quantity.
The power of the first to the 6th reversible axial flow blower fan (1,2,3,4,5,6) should be according to《Highway tunnel ventilation illuminates
Design specification determines》, that is, tunnel space uninterruptedly take a breath frequency, not preferably less than per hour 5 times;For the volume of traffic is less or speciality
Tunnel, can suitably increase rate of ventilation using 3~4 times per hour, use the tunnel of longitudinal ventilation simultaneously under fire condition,
In tunnel, ventilation wind speed is not less than 2.5m/s.
First tunnel main hole I, the main hole in the second tunnel II and garage's transverse passage-way 11 or People's Bank of China's transverse passage-way 12 intersection (A, B, C,
D) place can arrange precipitron, carry out filtration, purification to the air of intersection (A, B, C, D), so can carry to a certain extent
Air quality in the main hole in high tunnel.
In view of described reversible axial flow power of fan has certain restriction, so the length in tunnel need to control in allowed band
Interior.
In the case of there is fire or emergency episode, because the power lighting system of parallel pilot tunnel is independent of tunnel master
Hole, the reliable fresh air that again can provide, therefore parallel pilot tunnel can use as a bicycle road multiple line, become personnel,
The emergency evacuation passage of vehicle and rescue passage.Furthermore it is possible to manually or automatically control garage's transverse passage-way 11, People's Bank of China horizontal logical
The air switch in road 12, to ensure security of the lives and property when the fugitive life of personnel or rescue.
Claims (10)
1. the method for the short parallel pilot tunnel pressure discharge type ventilation in a kind of pair of hole single file tunnel is it is characterised in that the method is in double-hole tunnel
Import and export outside respectively open up the short parallel pilot tunnel that hole main with tunnel is parallel to each other, the entrance of this short parallel pilot tunnel is located at tunnel master
At three point that hole is imported and exported, it is placed with reversible axial flow blower fan in short parallel pilot tunnel;Meanwhile, the garage between double-hole tunnel
Transverse passage-way and People's Bank of China's transverse passage-way also place reversible axial flow blower fan, are ensureing that two main tunnels, garage's transverse passage-way and People's Bank of China are horizontal logical
On the premise of required airflow sum in road is not more than its maximum allowable ventilation sum, by adjusting reversible axial flow blower ventilation
Amount size and make in tunnel unstable airflow everywhere, and by the main hole of double-hole tunnel exit parallel pilot tunnel exhaust outlet by tunnel
Wind in road is discharged.
2. the method for claim 1 is it is characterised in that the airflow direction in the main hole in described tunnel and wagon flow direction one
Cause, and there is Piston Action Wind, there is air-flow between garage's transverse passage-way in the main hole in tunnel or People's Bank of China's transverse passage-way and parallel pilot tunnel and exchange, warp
After crossing garage's transverse passage-way or People's Bank of China's transverse passage-way, air quantity is decreased or increased, and flow velocity accordingly reduces or increases, and now just adjusts reversible axle
Flow type fan come to supplement or reduce air quantity make wind speed in the main hole in tunnel be unlikely to change too big so that wind in whole double-hole tunnel
Amount keeps balance.
3. method as claimed in claim 2 is it is characterised in that described Piston Action Wind is the gas being produced by vehicle motion in tunnel
Stream, Piston Action Wind air force determines according to actual measurement.
4. the method for claim 1 is it is characterised in that reversible in the short parallel pilot tunnel of described tunnel Zhu Dong entrance
Axial fan plays scavenging action, and the reversible axial flow blower fan in short parallel pilot tunnel at the main hole outlet in described tunnel acts work of calming the anger
With the reversible axial flow blower fan in described garage transverse passage-way and People's Bank of China's transverse passage-way is then to adjust garage's transverse passage-way and People's Bank of China's transverse passage-way
Air force;According to the concrete condition of ventilation in the main hole in tunnel, by the size direction of each section of wind speed in the main hole in tunnel, by adjusting
The size of section reversible axial flow blower fan press-in or draft capacity is changing ventilation condition in the main hole in tunnel.
5. the method for claim 1 is it is characterised in that described reversible axial flow blower fan is using the synchronous electricity of band winding type
Machine, or using the axial fan with hydraulic servo type blade dynamic regulation device.
6. the method for claim 1 is not it is characterised in that the uninterrupted ventilation frequency of described reversible axial flow blower fan is low
In per hour 5 times;For the volume of traffic is less or super long tunnel, using 3~4 times per hour, increase ventilation time in case of fire
Number, uses the tunnel of longitudinal ventilation simultaneously, and in tunnel, ventilation wind speed is not less than 2.5m/s, and maximum wind velocity is not higher than 15m/s.
7. the method for claim 1 is it is characterised in that the main hole in described tunnel is handed over garage's transverse passage-way or People's Bank of China's transverse passage-way
Precipitron is set at remittance.
8. the short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel that one of them methods described of claim 1 to 7 is set up,
Including parallel double-hole tunnel, there are garage's transverse passage-way and People's Bank of China's transverse passage-way between the main hole of double-hole tunnel it is characterised in that in Shuan Dong
The main hole in tunnel in tunnel respectively opens up, outside importing and exporting, the short parallel pilot tunnel that hole main with tunnel is parallel to each other, this short parallel conductive 0. hole
Entrance is located at three point that the main hole in tunnel is imported and exported, is placed with reversible axial flow blower fan in short parallel pilot tunnel;Meanwhile, double
Garage's transverse passage-way between hole tunnel and People's Bank of China's transverse passage-way also place reversible axial flow blower fan.
9. as claimed in claim 8 the short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel it is characterised in that described can
Inverse axial fan adopts band winding type synchronous motor, or using the axial-flow type wind with hydraulic servo type blade dynamic regulation device
Machine.
10. the short parallel pilot tunnel pressure discharge type ventilation model in double hole single file tunnel as claimed in claim 1 is it is characterised in that institute
State the main hole in tunnel and garage's transverse passage-way or transverse passage-way intersection of People's Bank of China are provided with precipitron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610607202.1A CN106437811B (en) | 2016-07-28 | 2016-07-28 | The method and model of double short parallel pilot tunnel pressure discharge type ventilations in hole uniline tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610607202.1A CN106437811B (en) | 2016-07-28 | 2016-07-28 | The method and model of double short parallel pilot tunnel pressure discharge type ventilations in hole uniline tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106437811A true CN106437811A (en) | 2017-02-22 |
CN106437811B CN106437811B (en) | 2018-05-25 |
Family
ID=58184920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610607202.1A Expired - Fee Related CN106437811B (en) | 2016-07-28 | 2016-07-28 | The method and model of double short parallel pilot tunnel pressure discharge type ventilations in hole uniline tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437811B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107288673A (en) * | 2017-07-11 | 2017-10-24 | 广东工业大学 | A kind of vcehicular tunnel energy-saving ventilating air control method based on wind speed |
CN109209461A (en) * | 2018-10-09 | 2019-01-15 | 同济大学 | Single channel and perpendicular inclined shaft modular ventilation system in a kind of major long tunnel |
CN110573804A (en) * | 2017-02-23 | 2019-12-13 | 米内特克投资有限公司 | System and method for ventilation of a duct |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10246100A (en) * | 1997-03-04 | 1998-09-14 | Toshiba Corp | Tunnel ventilation system |
CN101368483A (en) * | 2008-10-14 | 2009-02-18 | 中铁一局集团有限公司 | Ventilation construction method for pressure regulating distribution chamber in tunnel auxiliary pilot pit |
CN102296963A (en) * | 2011-08-01 | 2011-12-28 | 湖南省交通规划勘察设计院 | Construction method for ultra-long deep-buried road tunnel |
CN102704980A (en) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | Tunnel cavity separated roadway ventilation method |
CN104314600A (en) * | 2014-09-05 | 2015-01-28 | 中铁五局(集团)有限公司 | Method for constructing and ventilating three parallel tunnels |
-
2016
- 2016-07-28 CN CN201610607202.1A patent/CN106437811B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10246100A (en) * | 1997-03-04 | 1998-09-14 | Toshiba Corp | Tunnel ventilation system |
CN101368483A (en) * | 2008-10-14 | 2009-02-18 | 中铁一局集团有限公司 | Ventilation construction method for pressure regulating distribution chamber in tunnel auxiliary pilot pit |
CN102296963A (en) * | 2011-08-01 | 2011-12-28 | 湖南省交通规划勘察设计院 | Construction method for ultra-long deep-buried road tunnel |
CN102704980A (en) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | Tunnel cavity separated roadway ventilation method |
CN104314600A (en) * | 2014-09-05 | 2015-01-28 | 中铁五局(集团)有限公司 | Method for constructing and ventilating three parallel tunnels |
Non-Patent Citations (1)
Title |
---|
刘本昌: "西藏嘎拉山隧道的设计与施工", 《公路交通科技(应用技术版)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110573804A (en) * | 2017-02-23 | 2019-12-13 | 米内特克投资有限公司 | System and method for ventilation of a duct |
CN107288673A (en) * | 2017-07-11 | 2017-10-24 | 广东工业大学 | A kind of vcehicular tunnel energy-saving ventilating air control method based on wind speed |
CN107288673B (en) * | 2017-07-11 | 2019-07-23 | 广东工业大学 | A kind of vcehicular tunnel energy-saving ventilating air control method based on wind speed |
CN109209461A (en) * | 2018-10-09 | 2019-01-15 | 同济大学 | Single channel and perpendicular inclined shaft modular ventilation system in a kind of major long tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN106437811B (en) | 2018-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102271447B (en) | Stepless dimming control method of LED illumination for expressway tunnel | |
CN109209461B (en) | Single channel and perpendicular inclined shaft modular ventilation system in a kind of major long tunnel | |
CN106437811A (en) | Pressure-discharging type ventilation method and model of short parallel pilot tunnels of double-hole single-line tunnel | |
CN202391448U (en) | Roadway type ventilating structure of no-air door of long-distance tunnel | |
CN202391447U (en) | Single-head tunneling no-air-door roadway type ventilation structure of super-long tunnel | |
CN203867603U (en) | Smoke control structure in subway station wiring region | |
CN102400701A (en) | Road tunnel intercommunication type longitudinal ventilation mode | |
CN107605526A (en) | Vcehicular tunnel is segmented emphasis smoke evacuation system and smoke exhaust method | |
CN104314600B (en) | Article three, the construction ventilation method of Parallel Tunnel | |
CN108343459B (en) | It is a kind of can ventilation inclined shaft to double track tunnel supply and exhaust | |
CN209115139U (en) | A kind of band erects the compensatory formula ventilating system of two-wire of inclined shaft | |
CN108661687A (en) | A kind of tunnel energy-saving ventilating air linkage complex control system and installation method | |
CN104389620A (en) | Double-track tunnel based on reversible complementary ventilation | |
CN205823315U (en) | The short parallel pilot tunnel pressure discharge type ventilation model in single file tunnel, double hole | |
CN204231852U (en) | The energy-conservation Cabinet of integrated radiating | |
CN107605525B (en) | Flow guiding device and flow guiding method for tunnel jet fan | |
CN104378959A (en) | Cooling energy-saving circulation system applied to outdoor cabinet and control method thereof | |
CN207485461U (en) | Vcehicular tunnel is segmented emphasis smoke evacuation system | |
CN107083984A (en) | A kind of colliery central water sump whole wind pressure ventilation system and design method | |
CN111885792B (en) | Method for optimizing lighting design speed of highway tunnel in alpine region | |
CN108716419B (en) | A kind of urban road tunnel ring road collaboration method of ventilation | |
CN104420879B (en) | A kind of tunnel forced ventilation cooling device and cool-down method | |
CN212690087U (en) | Ventilation equipment for track traffic | |
CN220813450U (en) | Bridge steel box Liang Gelong opening embedded guiding device | |
CN110454210A (en) | Subway is grown up admission section threaded list road smoke control system out |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |