CN106436735B - A kind of installation method of blower foundation ring - Google Patents

A kind of installation method of blower foundation ring Download PDF

Info

Publication number
CN106436735B
CN106436735B CN201610598477.3A CN201610598477A CN106436735B CN 106436735 B CN106436735 B CN 106436735B CN 201610598477 A CN201610598477 A CN 201610598477A CN 106436735 B CN106436735 B CN 106436735B
Authority
CN
China
Prior art keywords
foundation
foundation ring
reinforcing bar
ring
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610598477.3A
Other languages
Chinese (zh)
Other versions
CN106436735A (en
Inventor
童文军
郑九德
任永双
潘兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Construction Group Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201610598477.3A priority Critical patent/CN106436735B/en
Publication of CN106436735A publication Critical patent/CN106436735A/en
Application granted granted Critical
Publication of CN106436735B publication Critical patent/CN106436735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of installation methods of blower foundation ring, include the installation of basic embedded part, blinding layer pours, basic ring support installation, foundation ring installation, foundation forms peace, reinforcement foundation binding and base concrete pour, the design and installation of each installation steps ensure that the intensity of foundation ring and the stability of mounting structure.

Description

A kind of installation method of blower foundation ring
Technical field
The present invention relates to Construction of Wind Power field, the installation method of specifically a kind of blower foundation ring.
Background technology
It is arrived it is well known that the Chinese government makes promise in Copenhagen climate change conference in 2009 to international community The year two thousand twenty unit GDP CO2 emissions declined 40%~50% than 2005, and non-fossil energy will meet this country 15% energy demand, this is proposed the development scale of China's future wind-powered electricity generation and progress etc. unprecedented expectation, accelerates wind energy money The utilization in source with develop by as in China's considerably long one period realize the strategy of sustainable development important measure, to the year two thousand twenty China's wind-powered electricity generation installation reaches 2.3 hundred million KW;Good greatly development environment and opportunity are provided for our Wind Power Developments.
The core of wind-powered electricity generation conversion is wind turbine, and the support of wind turbine is supported using tower, and the base support of tower uses base Plinth ring is supported, and the stability of foundation ring mounting structure determines the service life of wind turbine.
Invention content
The technical problem to be solved in the present invention is to provide a kind of installation method of blower foundation ring, installation fixed structure is steady It is fixed, it ensure that the normal use and service life of wind turbine.
The technical scheme is that:
A kind of installation method of blower foundation ring, has specifically included following steps:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check true Recognize errorless after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured, The absolute altitude of three pre-embedded steel slabs in bed course is measured using automatic compensated level again, calculates the height of three pre-embedded steel slabs in bed course Difference adjusts three support adjusting rods according to the height difference of three built-in fittings, foundation ring apical side height, pacifies the support adjusting rod of each point Upper plane after dress is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind Then machine basis tower door direction connects three support adjusting rods and three foundation bolts, is directed at corresponding exact position just Position, while fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 self leveling is equipped with during installation Spirit level carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, the highest point and the lowest point The difference of level value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, passes through jack Coordinate three support adjusting rods, and readjust spirit level, detect again, measurement is so repeated with adjusting, until making The levelness of foundation ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connects Head mutually staggers, and has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, has set up steel pipe frame, for brace foundation master in work progress Beam steel, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, with the punching block slab supporting processed in advance, template after the completion of reinforcing bar Seam will paste sponge strip mortar leakage prevention, and circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, under Portion's fulcrum spacing is not more than 60cm, and top fulcrum spacing is not more than 90cm spacing;
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete has been poured using periphery before concrete placings Concrete is to the effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor During concrete, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
Reinforcing bar, electric instrument built-in pipe are checked before the foundation forms molding, ensures reinforcing bar, electric instrument built-in pipe exhaustive, position Put it is accurate, firmly install.
The sizing punching block surface smear interleaving agent, and the distortionless deformation of appearance, sticking two-faced adhesive tape band at form joint With mortar leakage prevention.
Advantages of the present invention:
The installation steps of foundation ring of the present invention include basic embedded part installation, blinding layer pours, basic ring support is installed, Foundation ring installation, foundation forms peace, reinforcement foundation binding and base concrete pour, and the design and installation of each installation steps are equal It ensure that the intensity of foundation ring and the stability of mounting structure.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment shall fall within the protection scope of the present invention.
A kind of installation method of blower foundation ring, has specifically included following steps:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check true Recognize errorless after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured, The absolute altitude of three pre-embedded steel slabs in bed course is measured using automatic compensated level again, calculates the height of three pre-embedded steel slabs in bed course Difference adjusts three support adjusting rods according to the height difference of three built-in fittings, foundation ring apical side height, pacifies the support adjusting rod of each point Upper plane after dress is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind Then machine basis tower door direction connects three support adjusting rods and three foundation bolts, is directed at corresponding exact position just Position, while fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 self leveling is equipped with during installation Spirit level carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, the highest point and the lowest point The difference of level value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, passes through jack Coordinate three support adjusting rods, and readjust spirit level, detect again, measurement is so repeated with adjusting, until making The levelness of foundation ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connects Head mutually staggers, and has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, has set up steel pipe frame, for brace foundation master in work progress Beam steel, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, punching block surface smear interleaving agent of shaping, and the distortionless deformation of appearance, Sticking two-faced adhesive tape band is with mortar leakage prevention at form joint, and reinforcing bar is after the completion with the punching block slab supporting processed in advance, form joint Sponge strip mortar leakage prevention is pasted, circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, lower part branch Point spacing is not more than 90cm spacing no more than 60cm, top fulcrum spacing;Check that reinforcing bar, electric instrument are pre-buried before foundation forms molding Pipe ensures that reinforcing bar, electric instrument built-in pipe exhaustive, position is accurate, firmly installs
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete has been poured using periphery before concrete placings Concrete is to the effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor During concrete, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of installation method of blower foundation ring, it is characterised in that:Following steps are specifically included:
(1), it is first that basic ring support embedded part and lower rebar mesh sheet is secured according to air door direction location and installation, check confirm nothing Accidentally after-pouring concrete cushion;After the completion of pouring, the center of blower foundation center line and foundation ring support element is measured, then is adopted The absolute altitude of three pre-embedded steel slabs in bed course is measured with automatic compensated level, calculates the height difference of three pre-embedded steel slabs in bed course, Three support adjusting rods are adjusted according to the height difference of three built-in fittings, foundation ring apical side height, the support adjusting rod of each point is installed Upper plane afterwards is on same absolute altitude, blower foundation tower door mark direction and in 90 ° to 135 ° angles of prevailing wind direction;
(2), foundation ring is sling into certain altitude degree with crane after, slowly rotate foundation ring, make 0 point of foundation ring label towards wind turbine base Then plinth tower door direction connects three support adjusting rods and three foundation bolts, it is in place to be directed at corresponding exact position, together When fastening support adjusting rod and foundation ring connecting screw and reach defined moment values;1 Beam Auto-Level is equipped with during installation Instrument carries out tracking observation measurement, detects the height of equally distributed 12 points of foundation ring upper flange, and the highest point and the lowest point is horizontal The difference of value is no more than 1mm, if it exceeds the angle that should be then turned by accurately calculating three support adjusting rods, is coordinated by jack Three support adjusting rods, and spirit level is readjusted, it detects again, measurement is so repeated with adjusting, until making basis The levelness of ring is controlled within the scope of defined;
(3), after bed course reaches intensity value, by drawing snap the line on bed course, mark reinforcement location line, reinforcing bar sole plate connector phase It is mutually staggered, has been bound in the upper and lower mesh sheet reinforcing bar of sole plate, set up steel pipe frame, for brace foundation girder steel in work progress Muscle, while bind basic beam steel;
(4), foundation forms using sizing punching block assembling, with the punching block slab supporting processed in advance, form joint after the completion of reinforcing bar Sponge strip mortar leakage prevention is pasted, circular arc is made hoop and reinforced using reinforcing bar or steel pipe, is vertically reinforced with steel pipe and flitch, lower part branch Point spacing is not more than 90cm spacing no more than 60cm, top fulcrum spacing;
(5), reinforcing bar be laid with and complete and after the completion of template support, casting concrete, the concrete pair that periphery is utilized before concrete placings to pour The effect solid base ring of reinforcing bar, because base thickness is larger, vibration compacting during to ensure that lower floor pours is pouring lower floor's coagulation When native, the personnel of pouring, which should enter in steel reinforcement cage, vibrates.
2. a kind of installation method of blower foundation ring according to claim 1, it is characterised in that:The foundation forms closes Reinforcing bar, electric instrument built-in pipe are checked before mould, ensures that reinforcing bar, electric instrument built-in pipe exhaustive, position is accurate, firmly installs.
3. a kind of installation method of blower foundation ring according to claim 1, it is characterised in that:The sizing punching block table Interleaving agent, and the distortionless deformation of appearance are smeared in face, and sticking two-faced adhesive tape band is with mortar leakage prevention at form joint.
CN201610598477.3A 2016-07-27 2016-07-27 A kind of installation method of blower foundation ring Active CN106436735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610598477.3A CN106436735B (en) 2016-07-27 2016-07-27 A kind of installation method of blower foundation ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610598477.3A CN106436735B (en) 2016-07-27 2016-07-27 A kind of installation method of blower foundation ring

Publications (2)

Publication Number Publication Date
CN106436735A CN106436735A (en) 2017-02-22
CN106436735B true CN106436735B (en) 2018-06-12

Family

ID=58184419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610598477.3A Active CN106436735B (en) 2016-07-27 2016-07-27 A kind of installation method of blower foundation ring

Country Status (1)

Country Link
CN (1) CN106436735B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703068A (en) * 2017-03-01 2017-05-24 北京建筑大学 Concrete tower cylinder and foundation connecting mode

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747746A (en) * 2012-07-25 2012-10-24 中国二十二冶集团有限公司 Device and method for mounting and leveling foundation ring of fan
CN103243746A (en) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 Wind generator foundation ring precision calibrating system and construction method thereof
CN103967048A (en) * 2014-05-21 2014-08-06 中冶天工集团有限公司 Wind turbine foundation ring leveling method
CN103967041A (en) * 2014-05-21 2014-08-06 中冶天工集团有限公司 Wind turbine foundation ring construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8443557B2 (en) * 2011-09-16 2013-05-21 General Electric Company Tower base section of a wind turbine, a wind turbine and a system for mounting a tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747746A (en) * 2012-07-25 2012-10-24 中国二十二冶集团有限公司 Device and method for mounting and leveling foundation ring of fan
CN103243746A (en) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 Wind generator foundation ring precision calibrating system and construction method thereof
CN103967048A (en) * 2014-05-21 2014-08-06 中冶天工集团有限公司 Wind turbine foundation ring leveling method
CN103967041A (en) * 2014-05-21 2014-08-06 中冶天工集团有限公司 Wind turbine foundation ring construction method

Also Published As

Publication number Publication date
CN106436735A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN203320700U (en) Steel structure column foot connecting structure
CN201649633U (en) Steel formwork for forming building stair treads
CN105220808B (en) Large-span prestressed arch bar in-situ precast construction method of installation
CN105908902B (en) Precast Pier Columns steel reinforcement cage locating rack and pier stud steel reinforcement cage construction method
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN102433841A (en) Method for installing abnormal-shape curve steel box girder
CN102864928B (en) Construction method for spiral stairs with large-spspace
CN207063515U (en) A kind of scalable aluminium frame template
CN110374321A (en) A kind of assembled waffle beam superstructure gang form and construction method
CN102900098B (en) Basis built-in fitting leveling construction technology
CN106193589A (en) Concrete superelevation heavy type beam and superimposed sheet combinative structure method for supporting
CN103255866B (en) Roof circular arc-shaped dome structure and manufacturing method
CN106436735B (en) A kind of installation method of blower foundation ring
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN114717954A (en) Ultrahigh concrete tower column construction method based on three-dimensional space coordinate positioning
CN215210582U (en) Large-span steel-concrete composite beam falling device
CN113756561A (en) Novel cantilever scaffold building method for high-assembly-rate building
CN205839568U (en) A kind of cast-in-situ box girder model sheetinstallat structure
CN110409800B (en) High-precision formwork construction method for cast-in-situ bare concrete wind tunnel
CN217810530U (en) Oblique steel column base positioner
CN103174165A (en) Full diameter embedded bolt positioning method
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN206646817U (en) The form bracing system of the cast-in-place decorative panel of staged Arc Stand
CN205955197U (en) A fixing device that be used for prefabricated non - design of bench, can all rotary die boards

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province

Patentee after: China Energy Construction Group Co.,Ltd.

Address before: No. 218, Xiangzhang Avenue, high tech Zone, Hefei City, Anhui Province, 230088

Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd.

CP03 Change of name, title or address