CN106436590B - A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge - Google Patents

A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge Download PDF

Info

Publication number
CN106436590B
CN106436590B CN201610967110.4A CN201610967110A CN106436590B CN 106436590 B CN106436590 B CN 106436590B CN 201610967110 A CN201610967110 A CN 201610967110A CN 106436590 B CN106436590 B CN 106436590B
Authority
CN
China
Prior art keywords
bridge
ring orientation
orientation prestress
horizontal correction
reaction frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610967110.4A
Other languages
Chinese (zh)
Other versions
CN106436590A (en
Inventor
张志红
窦勇芝
韦福堂
孙长军
李建立
罗迪
梁冰
欧志莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU OVM ENGINEERING Co Ltd
Original Assignee
LIUZHOU OVM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU OVM ENGINEERING Co Ltd filed Critical LIUZHOU OVM ENGINEERING Co Ltd
Priority to CN201610967110.4A priority Critical patent/CN106436590B/en
Publication of CN106436590A publication Critical patent/CN106436590A/en
Application granted granted Critical
Publication of CN106436590B publication Critical patent/CN106436590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of ring orientation prestress for the horizontal correction of bridge to anchor counter-force deviation correcting device, belong to the horizontal deviation rectification technical field of construction of bridge, specifically include cross reaction frame, horizontal correction jack, leveling bridle iron, steering bridle iron, ring orientation prestress steel wire bundle, stretch-draw jack, stretching end anchorage and fixing end anchorage, cross reaction frame is anchored at pier stud side by prestressing tendon, withstand the top of cross reaction frame in horizontal correction jack one end, other end jacking and pushing bridge girder, realizes deviation rectification.Present invention construction small portable, operating expenses economy, install convenient, easy to standardized construction, short time limit is smaller on structure stress influence, high with bridge pier column design feature conjugation, is influenced from pier stud top installation space.

Description

A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge
Technical field
It is specifically a kind of to be used for what bridge level was rectified a deviation the present invention relates to the horizontal deviation rectification technical field of construction of bridge Ring orientation prestress anchors counter-force deviation correcting device.
Background technology
At present, bridge deviation rectification sets counter-force deviation correcting device using two ways mostly, and first way is in pier stud Surrounding sets the basic and large-scale correction counter-force supporting rack of counter-force, such as Chinese patent CN104947606A, discloses bridge top knot The method for correcting error of structure, sets steel thick pillar beam on bridge pier, and steel thick pillar beam is fixed by bolt and bridge pier, with branch between steel thick pillar beam Support is connected as a single entity, and solves bridge pier and limitation of the bridge space deficiency to lifting operation, when reducing bridge superstructure correction by The resistance arrived, but there are the shortcomings that counter-force supporting rack system is complicated, and long construction period, operating expenses is high, and construction speed is slow at the same time.
The second way is to utilize setting counter-force deviation correcting device between pier stud head space, public such as Chinese patent CN103821091B The replacing and rectificating method after a kind of beam bridge beam body longitudinal direction off normal is opened, reaction frame includes horizontal part, and horizontal part is placed longitudinally On the corresponding pier coping portion bent cap of the off normal beam body, one end lower part of horizontal part is equipped with downward bracket, downward bracket inner side Equipped with backing plate, backing plate is attached to face where the corresponding pier cap beam correction direction of the off normal beam body in correction, in horizontal part Other end top is equipped with upward bracket, and correction jack is located between upward bracket and the off normal beam body diaphragm plate.Solve huge The power transmission problem of big correction strength, while thrust reduction of rectifying a deviation, but exist at the same time when smaller between pier stud head space, it can not meet to pacify The shortcomings that anti-loaded power deviation correcting device space requirement.
The content of the invention
The object of the present invention is to provide a kind of ring orientation prestress for the horizontal correction of bridge to anchor counter-force deviation correcting device, tool Have a construction small portable, operating expenses economy, install convenient, easy to standardized construction, short time limit, structure stress is influenced compared with It is small, it is high with bridge pier column design feature conjugation, influence advantage from pier stud top installation space.
The purpose of the present invention is be achieved through the following technical solutions:
A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge, including:Cross reaction frame (1), horizontal correction jack(2), leveling bridle iron(3), turn to bridle iron(4), ring orientation prestress steel wire bundle(5), tensioning Jack(6), stretching end anchorage(7)With fixing end anchorage(8), the horizontal correction jack(2)Withstand the bridge in one end Girder(9), the other end withstands the cross reaction frame(1)Top, the leveling bridle iron(3)Towards bridge pier(10)Side For arcwall face, opposite side is fixed on the reaction frame(1)Longeron on, the fixing end anchorage(8)It is fixed on the cross Reaction frame(1)Crossbeam one end, the ring orientation prestress steel wire bundle(5)One end is connected to the fixing end anchorage(8)On, The steering bridle iron(4)Towards bridge pier(10)Side is arcwall face, and opposite side is arc-shaped limit groove(401), it is arranged on and ten Font reaction frame(1)Opposite bridge pier(10)Opposite side, the ring orientation prestress steel wire bundle(4)Pass through the arc-shaped limit Groove(401)It is wrapped in the steering bridle iron(4)On, the other end passes through the stretching end anchorage(7)It is connected to the tensioning thousand Jin top(6)On, the stretching end anchorage(7)Withstand the stretch-draw jack in one end(6), it is anti-that the other end is fixed on the cross Power frame(1)Crossbeam the other end.The structure has construction small portable, operating expenses economy, install convenient, easy to standardize Construction, short time limit is smaller on structure stress influence, high with bridge pier column design feature conjugation, from pier stud top installation space Influence advantage.
Preferably, the cross reaction frame(1)Including reaction supporting beam A(101), reaction supporting beam B(102)And anchor Gu girder steel(103), reaction supporting beam A(101)It is welded on anchoring girder steel(103)Top, reaction supporting beam B(102)It is symmetrically welded In anchoring girder steel(103)Lower part, the cross reaction frame(1)It is simple in structure, occupy little space, processing cost is low.
Preferably, the arc-shaped limit groove(401)To be at least one, the ring orientation prestress steel wire bundle(5)Number Amount and arc-shaped limit groove(401)Quantity is identical, using at least one set of ring orientation prestress steel wire bundle(5)Anchored, increased Add anchor force, improve firmly installing property and reliability.
Preferably, the leveling bridle iron(3)To be at least one, the cross reaction frame is fixed on(1)Longeron On, using multiple spot fixed form, increase device and bridge pier(10)Bonded area, strengthen the stability of anchoring.
Preferably, the cross reaction frame(1)Crossbeam both ends be both provided with perpendicular to cross reaction frame(1)Ten The horizontal through hole of font plane, ring orientation prestress steel wire bundle(4)Through the through hole, the stretch-draw jack is connected(6), institute State stretching end anchorage(7)With the fixing end anchorage(8).
Preferably, girder steel is anchored(103)It is provided at both ends with stiffener(104), the reaction supporting beam A(101)With it is described Reaction supporting beam B(102)Upper and lower part is provided with stiffener(104), increase reaction frame structural strength.
Preferably, the anchoring girder steel(103), the reaction supporting beam A(101)With the reaction supporting beam B(104), It is made of shaped steel, processing is simple, and production cost is low.
Preferably, the leveling bridle iron(3)With the steering bridle iron(4), it is made of steel plate, processing is simple, production Cost is low.
Beneficial effects of the present invention:
The horizontal reacting force deviation correcting device has construction small portable, and operating expenses economy, install convenient, is applied easy to standardize Work, short time limit is smaller on structure stress influence, high with bridge pier column design feature conjugation, from pier stud top installation space shadow Ring advantage.
Brief description of the drawings
Fig. 1 is the installment state schematic diagram of the present invention.
Fig. 2 is the line A-A sectional view of Fig. 1.
Fig. 3 is the structure diagram of the present invention.
Fig. 4 is the structure diagram of the leveling bridle iron of the present invention.
Fig. 5 is the structure diagram of the anchoring girder steel of the present invention.
Fig. 6 is the structure diagram of the reaction supporting beam A of the present invention.
Fig. 7 is the structure diagram of the reaction supporting beam B of the present invention.
Fig. 8 is the structure diagram of the steering bridle iron of the present invention.
In figure:
1 reaction frame, 101 reaction supporting beam A, 102 reaction supporting beam B, 103 anchor girder steels,
104 stiffeners, 2 horizontal correction jacks, 3 leveling bridle irons, 4 turn to bridle iron,
401 arc-shaped limit grooves, 5 ring orientation prestress steel wire bundles, 6 stretch-draw jacks,
7 stretching end anchorages, 8 fixing end anchorages, 9 bridge main beams, 10 bridge pier columns.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.
:A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge, Including:Cross reaction frame(1), horizontal correction jack(2), leveling bridle iron(3), turn to bridle iron(4), ring orientation prestress Steel wire bundle(5), stretch-draw jack(6), stretching end anchorage(7)With fixing end anchorage(8), horizontal correction jack(2)One end Withstand bridge main beam(9), the other end withstands cross reaction frame(1)Top, reaction frame is as horizontal correction jack(2)'s Fulcrum, horizontal correction jack(2)Jacking and pushing bridge girder(9), design position is made up to, realizes deviation rectification, leveling steel branch Seat (3) is towards bridge pier(10)Side is arcwall face, and the arcwall face is consistent with abutment surface shape, is bonded with abutment surface, leveling steel branch Seat (3) opposite side is fixed on reaction frame(1)Longeron on, fixing end anchorage(8)It is fixed on cross reaction frame(1)Crossbeam One end, ring orientation prestress steel wire bundle(6)One end is connected to fixing end anchorage(8)On, turn to bridle iron(4)It is arranged on cross Reaction frame(1)Opposite bridge pier(10)Opposite side, towards bridge pier(10)Side is arcwall face, the arcwall face and abutment surface shape one Cause, be bonded with abutment surface, opposite side is arc-shaped limit groove(401), ring orientation prestress steel wire bundle(4)Pass through arc-shaped limit groove (401)It is wrapped in steering bridle iron(4)On, the other end passes through stretching end anchorage(7)It is connected to stretch-draw jack(6)On, tensioning Hold anchorage(7)Withstand stretch-draw jack in one end(6), the other end is fixed on cross reaction frame(1)Crossbeam the other end, tensioning Jack(6)With stretching end anchorage(7)For fulcrum, tensioning ring orientation prestress steel wire bundle(5), make cross reaction frame(1)Anchor Gu in pier stud side, counter-force application point is provided for level correction.The structure has construction small portable, operating expenses economy, peace It is convenient to fill, and easy to standardized construction, short time limit is smaller on structure stress influence, high with bridge pier column design feature conjugation, no Advantage is influenced by pier stud top installation space.
As shown in Figure 3:Cross reaction frame(1)Including reaction supporting beam A(101), reaction supporting beam B(102)And anchoring Girder steel(103), reaction supporting beam A(101)It is welded on anchoring girder steel(103)Top, reaction supporting beam B(102)It is symmetrically welded at Anchor girder steel(103)Lower part, cross reaction frame(1)It is simple in structure, occupy little space, processing cost is low.
Arc-shaped limit groove(401)To be at least one, ring orientation prestress steel wire bundle(5)Quantity and limiting slot number phase Together, using at least one set of ring orientation prestress steel wire bundle(5)Anchored, increase anchor force, improve firmly installing property.
Leveling bridle iron(3)To be at least one, cross reaction frame is fixed on(1)Longeron on, using multiple spot fixation side Formula, increases device and bridge pier(10)Bonded area, strengthen the stability of anchoring.
Cross reaction frame(1)Crossbeam both ends be both provided with perpendicular to cross reaction frame(1)Cross plane Horizontal through hole, ring orientation prestress steel wire bundle(4)Through through hole, stretch-draw jack is connected(6), stretching end anchorage(7)And fixation Hold anchorage(8).
As shown in Fig. 5, Fig. 6 and Fig. 7:Anchor girder steel(103)It is provided at both ends with stiffener(104), reaction supporting beam A (101)With reaction supporting beam B(102)Upper and lower part is provided with stiffener(104), increase reaction frame structural strength.
Anchor girder steel(103), reaction supporting beam A(101)With reaction supporting beam B(102), it is made of shaped steel, leveling steel branch Seat(3)With steering bridle iron(4), it is made of steel plate, processing is simple, and production cost is low.
The operation principle of the device is:
Under use state, 10 both sides of bridge pier column are respectively placed with the device more than a set of or a set of, by ring orientation prestress steel Strand bundle(5)One end is fixed on cross reaction frame(1)The fixing end anchorage of crossbeam one end(8)On, then by ring orientation prestress Steel wire bundle(5)The other end is successively around unilateral bridge pier column(10), turn to bridle iron(4)Arc-shaped limit groove(401), even Connect cross reaction frame(1)The stretch-draw jack of the crossbeam other end(6), turn to bridle iron(4)It is fixed on and cross reaction frame (1)On, with respect to bridge pier(10)Side and bridge pier(10)Fitting, leveling bridle iron(3)Side and cross reaction frame(1)Gu It is fixed, opposite side and bridge pier(10)Fitting, stretch-draw jack(6)With with stretching end anchorage(7)For fulcrum tensioning pretension steel strand wires, make The horizontal reacting force deviation correcting device is anchored at pier stud(10)Side, counter-force application point, horizontal correction jack are provided for level correction (2)Withstand cross reaction frame in one end(1)Counter-force fulcrum of the top as correction, the other end withstands bridge main beam(9), pass through Bridge pier(10)Horizontal correction jack on this device of both ends(2)Jacking and pushing bridge girder repeatedly(9), design position is made up to, Realize that bridge resets.

Claims (8)

  1. A kind of 1. ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge, it is characterised in that including:Cross Reaction frame (1), horizontal correction jack (2), leveling bridle iron (3), steering bridle iron (4), ring orientation prestress steel wire bundle (5), stretch-draw jack (6), stretching end anchorage (7) and fixing end anchorage (8), described horizontal correction jack (2) one end are withstood Bridge main beam (9), the other end withstand the top of the cross reaction frame (1), and the leveling bridle iron (3) is towards bridge pier (10) Side is arcwall face, and opposite side is fixed on the longeron of cross reaction frame (1), and the fixing end anchorage (8) is fixed on described One end of cross reaction frame (1) crossbeam, described ring orientation prestress steel wire bundle (5) one end are connected to the fixing end anchorage (8) on, the steering bridle iron (4) is arcwall face towards bridge pier (10) side, and opposite side is arc-shaped limit groove (401), described Ring orientation prestress steel wire bundle (4) is wrapped on the steering bridle iron (4) by the arc-shaped limit groove (401), the other end It is connected to through the stretching end anchorage (7) on the stretch-draw jack (6), described stretching end anchorage (7) one end is withstood described Stretch-draw jack (6), the other end are fixed on the other end of the crossbeam of the cross reaction frame (1).
  2. 2. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 1 for the horizontal correction of bridge, its feature It is:The cross reaction frame (1) includes reaction supporting beam A (101), reaction supporting beam B (102) and anchoring girder steel (103), the reaction supporting beam A (101) is welded on anchoring girder steel (103) top, and the reaction supporting beam B (102) is welded on Anchor girder steel (103) lower part.
  3. 3. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 1 for the horizontal correction of bridge, its feature It is:The arc-shaped limit groove (401) is at least one, quantity and the arc of the ring orientation prestress steel wire bundle (5) Limiting slot (401) quantity is identical.
  4. 4. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 1 for the horizontal correction of bridge, its feature It is:The leveling bridle iron (3) is at least one, is fixed on the longeron of the cross reaction frame (1).
  5. 5. it is used for the ring orientation prestress anchoring counter-force correction dress of the horizontal correction of bridge according to 1 or 2 any one of them of claim Put, it is characterised in that:The crossbeam both ends of the cross reaction frame (1) are both provided with horizontal through hole, the ring orientation prestress steel Strand bundle (4) passes through the through hole, connects the stretch-draw jack (6), the stretching end anchorage (7) and the fixing end anchorage (8)。
  6. 6. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 2 for the horizontal correction of bridge, its feature It is:Anchoring girder steel (103), the reaction supporting beam A (101) and the reaction supporting beam B (102) are both provided with and put more energy into Plate (104).
  7. 7. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 2 for the horizontal correction of bridge, its feature It is:Anchoring girder steel (103), the reaction supporting beam A (101) and the reaction supporting beam B (104), are made of shaped steel.
  8. 8. the ring orientation prestress anchoring counter-force deviation correcting device according to claim 2 for the horizontal correction of bridge, its feature It is:The leveling bridle iron (3) and the steering bridle iron (4), are made of steel plate.
CN201610967110.4A 2016-10-28 2016-10-28 A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge Active CN106436590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610967110.4A CN106436590B (en) 2016-10-28 2016-10-28 A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610967110.4A CN106436590B (en) 2016-10-28 2016-10-28 A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge

Publications (2)

Publication Number Publication Date
CN106436590A CN106436590A (en) 2017-02-22
CN106436590B true CN106436590B (en) 2018-04-24

Family

ID=58180690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610967110.4A Active CN106436590B (en) 2016-10-28 2016-10-28 A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge

Country Status (1)

Country Link
CN (1) CN106436590B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190656B (en) * 2017-07-21 2023-10-20 贝正河北工程技术有限公司 Transverse automatic deviation correcting device for bent bridge body and installation method thereof
CN109056558B (en) * 2018-08-20 2021-01-15 中铁大桥(南京)桥隧诊治有限公司 Circumferential reinforcing structure for preventing pier top from splitting and laying method thereof
CN113356096B (en) * 2021-07-19 2022-10-14 周占国 Bridge active deviation correcting device adjacent to foundation pit and implementation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080017240A (en) * 2006-08-21 2008-02-26 주식회사 신화 엠앤씨 J.k bracket method
JP2009167734A (en) * 2008-01-18 2009-07-30 Ohmoto Gumi Co Ltd Method and device for intruding reinforcement steel plate into ground in seismic strengthening construction
CN102733320A (en) * 2012-06-21 2012-10-17 河海大学 Pier annular bracket type column embracing beam for jacking bridge
CN206204806U (en) * 2016-10-28 2017-05-31 柳州欧维姆工程有限公司 A kind of ring orientation prestress for the correction of bridge level anchors counter-force deviation correcting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821090B (en) * 2014-02-27 2015-12-30 武汉中交试验检测加固工程有限责任公司 Replacing and rectificating method after pier slope

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080017240A (en) * 2006-08-21 2008-02-26 주식회사 신화 엠앤씨 J.k bracket method
JP2009167734A (en) * 2008-01-18 2009-07-30 Ohmoto Gumi Co Ltd Method and device for intruding reinforcement steel plate into ground in seismic strengthening construction
CN102733320A (en) * 2012-06-21 2012-10-17 河海大学 Pier annular bracket type column embracing beam for jacking bridge
CN206204806U (en) * 2016-10-28 2017-05-31 柳州欧维姆工程有限公司 A kind of ring orientation prestress for the correction of bridge level anchors counter-force deviation correcting device

Also Published As

Publication number Publication date
CN106436590A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106436590B (en) A kind of ring orientation prestress anchoring counter-force deviation correcting device for the horizontal correction of bridge
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN103669224A (en) Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
CN204983171U (en) Prefabricated post connecting device
CN109235639A (en) Prestressing without bondn assembling type node and construction method with energy-consuming device
CN206204806U (en) A kind of ring orientation prestress for the correction of bridge level anchors counter-force deviation correcting device
CN107338864A (en) Prefabricated reinforced concrete frame structure node
CN203613467U (en) Steel pipe bracket for construction of arch tower in oblique arch tower double-cable plane pre-stressed concrete cable-stayed bridge
CN208899348U (en) A kind of rack platform using cushion cap bearing diagonal
CN210658887U (en) Novel prestressed arch corrugated steel roof system for enhancing bearing capacity through inhaul cables and rigid supporting rods
KR20030029077A (en) The arch bridge with leaned support
CN109056559B (en) Bridge body lifting method based on bent cap
CN208777758U (en) A kind of steel roof truss lower boom reinforcing device
CN202466839U (en) Reinforced concrete frame beam cable rib configuring structure
CN215758476U (en) Structure for enhancing wind resistance stability of cable-way bridge in mountainous area canyon turbulent wind field
CN212533734U (en) Cable buckle integrated tower
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN212404849U (en) Temporary buttress anchoring system of continuous beam bridge
CN107034788B (en) A kind of suspender tension device and its construction method
CN108374323B (en) Cable tower bundling anchoring structure for arch-supporting cable-stayed bridge
CN208151868U (en) A kind of counter-force base device for drawing jack placement for steel truss girder
CN208267095U (en) A kind of drum steel structure column
CN207934292U (en) One kind is baroclined bar truss beam string composite structure
CN202194073U (en) Large-volume long-cantilever capping beam construction device
CN110805261A (en) Steel platform steel beam structure based on prestress reinforcement and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant