CN106411764A - Dynamic bandwidth configuration adjustment method and base station equipment - Google Patents
Dynamic bandwidth configuration adjustment method and base station equipment Download PDFInfo
- Publication number
- CN106411764A CN106411764A CN201610758039.9A CN201610758039A CN106411764A CN 106411764 A CN106411764 A CN 106411764A CN 201610758039 A CN201610758039 A CN 201610758039A CN 106411764 A CN106411764 A CN 106411764A
- Authority
- CN
- China
- Prior art keywords
- band width
- bandwidth
- width configuration
- configuration scheme
- base station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/10—Flow control; Congestion control
- H04L47/24—Traffic characterised by specific attributes, e.g. priority or QoS
- H04L47/2416—Real-time traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/10—Flow control; Congestion control
- H04L47/24—Traffic characterised by specific attributes, e.g. priority or QoS
- H04L47/2425—Traffic characterised by specific attributes, e.g. priority or QoS for supporting services specification, e.g. SLA
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/70—Admission control; Resource allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W8/00—Network data management
- H04W8/02—Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks
- H04W8/04—Registration at HLR or HSS [Home Subscriber Server]
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Databases & Information Systems (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiment of the invention discloses a dynamic bandwidth configuration adjustment method and base station equipment. In the method, the base station equipment identifies a registration message reported by accessed monitoring equipment, obtains type information of the monitoring equipment from the received registration message, and adjusts a current bandwidth configuration scheme according to the obtained type information and a pre-set bandwidth adjustment strategy. By means of the technical scheme provided in the embodiment of the invention, the purpose of reasonably deploying a bandwidth configuration scheme of uplinks and downlinks according to the type of the accessed monitoring equipment under the base station equipment can be realized; the effect of adjusting the bandwidth configuration scheme in time according to different types of bandwidth resource requirement changes is realized; the problem that a fixed bandwidth configuration scheme cannot be suitable for bandwidth resource requirement changes can be avoided; and thus, network resources can be reasonably utilized maximally.
Description
Technical field
The application is related to touch control field, particularly to a kind of dynamic adjusting method of band width configuration and base station equipment.
Background technology
4G (the 4th Generation mobile communication technology, forth generation mobile communication
Technology) network formally operation get up, 4G to mobile high definition monitoring bring possibility, the video monitoring combining with 4G network
Business also widely disposes.4G is divided into two kinds of standards, LTE-FDD (Long Term Evolution-Frequency
Division Duplexing, Long Term Evolution-FDD) and TD-LTE (Time Division Long Term
Evolution, timesharing Long Term Evolution) Liang Ge camp.
The advantage of LTE (Long Term Evolution, Long Term Evolution) network is can preferably support high-speed data
With multimedia service, by using OFDM (Orthogonal Frequency Division Multiplexing, orthogonal frequency
Multiplexing), (Single-carrier Frequency-Division Multiple Access, single carrier frequency division is many for SC-FDMA
Location) and multiple key technologies such as MIMO (Multiple Input Multiple Output, multiple-input and multiple-output) can realize
Than current 2G (the 2nd Generation mobile communication technology, Generation Mobile Telecommunication System skill
Art)/3G (the 3rd Generation mobile communication technology, G mobile communication)
The faster data rate of system, provides higher cell capacity, and the time delay significantly reducing user plane and control plane.But
From unlike LTE-FDD, TD-LTE belongs to time-division system, needs more to take into account and be both time-division system during networking
TD-SCDMA network merge, not introduce interference at crossed slot, impact network quality and client perception, this introduces TD-
The time slot configuration of LTE and optimization problem.
Video monitoring service and common 4G carrying business are also not quite alike, and common 4G mainly provides net to mobile terminal
Network accesses, flow mainly following behavior master.And video monitoring service is then different, to monitoring encoding device (such as IPC (IP
Camera, web camera)) for, what it was used is all upstream bandwidth.And for decoding client, it is used
It is all downlink bandwidth.
Existing technical scheme is, no matter being IPC such front end encoding device at present, or the rear end equipment of decoding,
The all unified 4G station technology using routine at present.
Applicant finds during realizing the application, and above-mentioned existing processing scheme at least there is a problem of as follows:
Conventional 4G station technology at present, is all that substantial amounts of link channel bandwidth allocation is used to downlink traffic, and to chain
Path channels upstream bandwidth only leaves part, and this present situation does not substantially meet the practical application feature of video monitoring.
And, existing 4G base station is under TD-LTE standard, fix all the time using a kind of uplink downlink channel width
Proportioning (being all generally that downlink channel bandwidth is much larger than uplink channel bandwidth), under video monitoring scene,
Underaction.
It is currently based on the technology that bandwidth controls and dispatches, be all based in fixing link channel band width, to wherein
Miscellaneous service flow be identified classify, then carry out priority scheduling, but if practical business application traffic bandwidth surpass
Cross link channel bandwidth, dispatch anyway, all can lead to have partial service traffic loss.
Content of the invention
The embodiment of the present application provides a kind of dynamic adjusting method of band width configuration and base station equipment, to realize being set according to base station
The type of standby lower accessed monitoring device, the purpose of the band width configuration scheme of rational allocation uplink downlink, maximized conjunction
Reason utilizes Internet resources.
In order to reach above-mentioned technical purpose, this application provides a kind of dynamic adjusting method of band width configuration, methods described
Specifically include:
When base station equipment receives the message that monitoring device reports, judge whether described message is logon message;
If it is judged that being yes, described base station equipment obtains entrained monitoring device type letter in described logon message
Breath;
Described base station equipment according to described type information and default Bandwidth adjustment strategy, to current band width configuration side
Case is adjusted.
Preferably, described base station equipment is according to described type information and default Bandwidth adjustment strategy, to current band
Wide allocation plan is adjusted, and specifically includes:
When described type information is specially front end encoding device, described base station equipment increases current band width configuration scheme
In ascending resource configuration quantity, or in default band width configuration scheme set, select ascending resource allocation ratio to be higher than to work as
The band width configuration scheme of front band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration side
Case;
Or,
When described type information is specially decoding device, described base station equipment is by under in current band width configuration scheme
Row resource distribution quantity increases, or in default band width configuration scheme set, selects downlink resource allocation ratio to be higher than current
Band width configuration scheme band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration side
Case.
Preferably, described base station equipment is according to described type information and default Bandwidth adjustment strategy, to current band
After wide allocation plan is adjusted, also include:
Described base station equipment intercepts the mutual message that current registered monitoring device is reported;
Described base station equipment obtains entrained bandwidth demand type information and bandwidth demand amount letter in described mutual message
Breath;
Described base station equipment carries out cumulative record to different types of bandwidth demand amount respectively.
Preferably, after described base station equipment carries out cumulative record to different types of bandwidth demand amount respectively, also include:
Described base station equipment obtains the different types of bandwidth demand amount in the preset time range of current record;
Described base station equipment is according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment
Upstream bandwidth in current band width configuration scheme and the resource distribution quantitative proportion of downlink bandwidth, or in default band width configuration
In scheme set, the immediate bandwidth of ratio of the demand carry-over amount of selection and upstream bandwidth and the demand carry-over amount of downlink bandwidth
Allocation plan, and selected band width configuration scheme is updated to current band width configuration scheme;
Wherein, described base station equipment exceedes the bandwidth need of preset time range to the included record time in cumulative record
The amount of asking information is purged.
Preferably, after described base station equipment carries out cumulative record to different types of bandwidth demand amount respectively, also include:
Described base station equipment judges currently whether reach the bandwidth resources configuration adjustment cycle;
If reached, recorded in the described base station equipment acquisition current bandwidth resource distribution adjustment cycle is different types of
Bandwidth demand amount;
Described base station equipment is according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment
Upstream bandwidth in current band width configuration scheme and the resource distribution quantitative proportion of downlink bandwidth, or in default band width configuration
In scheme set, the immediate bandwidth of ratio of the demand carry-over amount of selection and upstream bandwidth and the demand carry-over amount of downlink bandwidth
Allocation plan, and selected band width configuration scheme is updated to current band width configuration scheme;
Described base station equipment is deleted current bandwidth resource distribution and is adjusted the different types of bandwidth demand being recorded in the cycle
Amount.
On the other hand, the embodiment of the present application additionally provides a kind of base station equipment, specifically includes:
Receiver module, for receiving the message that monitoring device is reported;
Judge module, for judging whether the message received by described receiver module is logon message;
Acquisition module, for when the judged result of described judge module is logon message, obtaining in described logon message
Entrained monitoring device type information;
Adjusting module, for the type information according to acquired in described acquisition module and default Bandwidth adjustment strategy,
Current band width configuration scheme is adjusted.
Preferably, described adjusting module, specifically for:
When described type information is specially front end encoding device, increase the ascending resource in current band width configuration scheme
Configuration quantity, or in default band width configuration scheme set, select ascending resource allocation ratio to be higher than current band width configuration
The band width configuration scheme of scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Or,
When described type information is specially decoding device, by the downlink resource configuration number in current band width configuration scheme
Amount increases, or in default band width configuration scheme set, selects downlink resource allocation ratio to be higher than current band width configuration side
The band width configuration scheme of case, and selected band width configuration scheme is updated to current band width configuration scheme.
Preferably, described base station equipment, also includes logging modle:
Described judge module, is additionally operable to judge whether the message received by described receiver module is current registered prison
The mutual message that control equipment is reported;
Described acquisition module, is additionally operable to, when the judged result of described judge module is mutual message, obtain described interaction
Entrained bandwidth demand type information in message and bandwidth demand amount information;
Described logging modle, for carrying out to different types of bandwidth demand amount respectively acquired in described acquisition module
Cumulative record.
Preferably,
Described acquisition module, is additionally operable to, when described logging modle completes current cumulative record, obtain described record mould
Different types of bandwidth demand amount in the preset time range of block current record;
Described adjusting module, be additionally operable to the demand carry-over amount of upstream bandwidth according to acquired in described acquisition module with descending
The ratio of the demand carry-over amount of bandwidth, the upstream bandwidth in the current band width configuration scheme of adjustment and the resource distribution of downlink bandwidth
Quantitative proportion, or in default band width configuration scheme set, select the demand carry-over amount with upstream bandwidth and downlink bandwidth
The ratio immediate band width configuration scheme of demand carry-over amount, and selected band width configuration scheme is updated to current bandwidth
Allocation plan;
Described logging modle, is additionally operable to the included record time in cumulative record is exceeded with the bandwidth of preset time range
Demand information is purged.
Preferably,
Described judge module, is additionally operable to judge whether current time reaches the bandwidth resources configuration adjustment cycle;
Described acquisition module, is additionally operable to, when the judged result of described judge module is to reach, obtain current bandwidth resource
The different types of bandwidth demand amount being recorded in the configuration adjustment cycle;
Described adjusting module, be additionally operable to the demand carry-over amount of upstream bandwidth according to acquired in described acquisition module with descending
The ratio of the demand carry-over amount of bandwidth, the upstream bandwidth in the current band width configuration scheme of adjustment and the resource distribution of downlink bandwidth
Quantitative proportion, or in default band width configuration scheme set, select the demand carry-over amount with upstream bandwidth and downlink bandwidth
The ratio immediate band width configuration scheme of demand carry-over amount, and selected band width configuration scheme is updated to current bandwidth
Allocation plan;
Described logging modle, is additionally operable to complete, in described adjusting module, the bandwidth that current bandwidth resources configure the adjustment cycle
After configuration adjustment, delete current bandwidth resource distribution and adjust the different types of bandwidth demand amount being recorded in the cycle.
Compared with prior art, the Advantageous Effects of the technical scheme that the embodiment of the present application is proposed include:
The embodiment of the present application discloses a kind of dynamic adjusting method of band width configuration and base station equipment, in the method, base
The logon message that station equipment is reported to the monitoring device accessing is identified, and obtains monitoring in received logon message
The type information of equipment, according to acquired type information and default Bandwidth adjustment strategy, to current band width configuration side
Case is adjusted, by applying the technical scheme that proposed of the embodiment of the present application, it is possible to achieve accessed according to base station equipment is lower
Monitoring device type, the purpose of the band width configuration scheme of rational allocation uplink downlink, reach according to different types of band
Wide resource requirement change, the effect that band width configuration scheme is adjusted in time, it is to avoid occur fixing using a kind of band width configuration
Scheme cannot adapt to the problem of bandwidth resources changes in demand, maximized reasonable utilization Internet resources.
Brief description
In order to be illustrated more clearly that the technical scheme of the application, the accompanying drawing of required use in embodiment being described below
Be briefly described it should be apparent that, drawings in the following description are only some embodiments of the present application, general for this area
For logical technical staff, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
A kind of schematic flow sheet of the dynamic adjusting method of band width configuration that Fig. 1 is proposed by the embodiment of the present application;
The schematic diagram of a kind of concrete monitoring scene that Fig. 2 is proposed by the embodiment of the present application;
The dynamic adjusting method of the band width configuration under a kind of concrete application scene that Fig. 3 is proposed by the embodiment of the present application
Schematic flow sheet;
The schematic diagram of the logon message under a kind of concrete application scene that Fig. 4 proposes for the embodiment of the present application;
The schematic diagram of the mutual message under a kind of concrete application scene that Fig. 5 proposes for the embodiment of the present application;
A kind of structural representation of base station equipment that Fig. 6 is proposed by the embodiment of the present application.
Specific embodiment
As the application background technology is stated, in existing resource allocation proposal, base station equipment can according to configuration,
Fixing within a period of time use a kind of band width configuration scheme, until the adjustment of allocation plan next time, so fixing bandwidth
Allocation plan cannot adapt to the change of bandwidth demand, and bandwidth resources can be caused cannot to meet actual demand, and bandwidth resources wave
Situation about taking.
Present inventor wishes by method provided herein, it is possible to achieve accessed according to base station equipment is lower
Monitoring device type, the purpose of the band width configuration scheme of rational allocation uplink downlink, reach according to different types of band
Wide resource requirement change, the effect that band width configuration scheme is adjusted in time, it is to avoid occur fixing using a kind of band width configuration
Scheme cannot adapt to the problem of bandwidth resources changes in demand, maximized reasonable utilization Internet resources.
As shown in figure 1, a kind of flow process of the dynamic adjusting method of the band width configuration being proposed by the embodiment of the present application is illustrated
Figure, specifically includes:
Step S101, when base station equipment receives the message that monitoring device reports, judge whether described message is registration
Message.
Specific judgment mode can determine according to characteristic in specific application scenarios for the logon message, for example:Word
Segment information feature, signature identification, proprietary ports etc., the change of concrete judgment mode can determine, so according to actual needs
Change can't affect the protection domain of the application.
If it is judged that being yes, then execution step S102;
If it is judged that being no, then proceed monitoring messages, until after receiving new message, re-executing step
S101.
Step S102, described base station equipment obtain entrained monitoring device type information in described logon message.
Specific acquisition modes can determine according to the concrete field information in message, hereinafter can be given and specifically show
Example, is not repeated.
Step S103, described base station equipment according to described type information and default Bandwidth adjustment strategy, to current
Band width configuration scheme is adjusted.
In specific application scenarios, the processing procedure of this step specifically includes following two situations:
Situation one, type information are specially front end encoding device.In this case, specific adjustment mode includes following two
Kind:
Mode one, the configuration adjustment based on existing allocation plan.
Base station equipment increases the ascending resource configuration quantity in current band width configuration scheme.
Mode two, with default allocation plan, existing allocation plan is replaced.
In default band width configuration scheme set, ascending resource allocation ratio is selected to be higher than current band width configuration scheme
Band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration scheme.
No matter using which kind of above-mentioned mode, its purpose is all to increase the ascending resource configuration number in channel resource configuration
Amount, the ascending resource meeting front end encoding device requires.
Situation two, type information are specially decoding device.In this case, similar with aforesaid situation one, specifically
Adjustment mode includes following two:
Mode one, the configuration adjustment based on existing allocation plan.
Base station equipment increases the downlink resource configuration quantity in current band width configuration scheme.
Mode two, with default allocation plan, existing allocation plan is replaced.
In default band width configuration scheme set, downlink resource allocation ratio is selected to be higher than current band width configuration scheme
Band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration scheme.
No matter using which kind of above-mentioned mode, its purpose is all to increase the downlink resource configuration number in channel resource configuration
Amount, the ascending resource meeting decoding device requires.
Need it is further noted that in actual application scenarios, except front end encoding device and decoding device, also may be used
Can there is the other kinds of equipment substantially bigger than normal to bandwidth resources (the ascending resource or downlink resource) demand of a certain type,
Equally may be referred to above-mentioned resource adjustment process, when such equipment is registered, current band width configuration scheme is entered
Row adjustment, carries out tilt adjustments to the resource requirement type of this equipment, meets the resource requirement of this equipment, significantly more efficient utilization
Current bandwidth resources.The change of such device type can't affect the protection domain of the application.
By above-mentioned processing procedure, during facility registration, the embodiment of the present application proposes corresponding band width configuration
Adjusted Option, further, with the concrete application of equipment, after registration phase, or accesses under current base station equipment
During the terminal unit of demand different resource type, band width configuration scheme equally exists adjustment demand, and the embodiment of the present application is corresponding
Propose the further Adjusted Option of band width configuration, be described as follows:
After the band width configuration adjustment process of registration phase completes, base station equipment intercepts current registered monitoring device
The mutual message being reported, obtains entrained bandwidth demand type information and bandwidth demand amount letter in corresponding mutual message
Breath, and respectively cumulative record is carried out to different types of bandwidth demand amount.
By such process, base station equipment has carried out cumulative record to the demand of bandwidth resources.And according to adjustment triggering
The difference of condition, applies the processing scheme that such cumulative record carries out band width configuration adjustment to include following two.
Adjusted Option one, to receive mutual message as trigger condition.
When base station equipment receives above-mentioned mutual message, and after completing cumulative record, base station equipment obtains current to be remembered
Different types of bandwidth demand amount in the preset time range of record.Base station equipment determines therefrom that the demand carry-over amount of upstream bandwidth
With the ratio of the demand carry-over amount of downlink bandwidth, foundation similar with the two kinds of adjustment modes going out given in step S103 before
The process that above-mentioned ratio is adjusted can also be divided into direct adjustment and scheme to replace two kinds:
Mode one, the configuration adjustment based on existing allocation plan.
, according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment is current for base station equipment
Band width configuration scheme in upstream bandwidth and downlink bandwidth resource distribution quantitative proportion.
Mode two, with default allocation plan, existing allocation plan is replaced.
In default band width configuration scheme set, base station equipment selects demand carry-over amount and descending band with upstream bandwidth
The ratio immediate band width configuration scheme of wide demand carry-over amount, and selected band width configuration scheme is updated to current
Band width configuration scheme.
No matter using which kind of above-mentioned mode, its purpose is all the up-downgoing resource distribution ratio in adjustresources configuration,
Meet current up-downgoing resource requirement ratio.
Need it is further noted that because this Adjusted Option is from the time receiving mutual message, recalling one
Cumulative record in the section time, so, the content of cumulative record is constantly updated as well as the change of time, when exceeding backtracking
Between the record of scope can be aging.Therefore, in being adjusted scheme, base station equipment also needs to included note in cumulative record
The bandwidth demand amount information that the record time exceedes preset time range is purged.
Adjusted Option two, to adjust the cycle as trigger condition.
Base station equipment carries out timing, according to regular time length separation, resource allocation proposal is carried out periodically adjust.
In this case, base station equipment only needs to the change of concern time, when being not reaching to the adjustment cycle, needs to mutual message
The demand information of middle acquisition carries out lasting cumulative record.
Specifically, base station equipment judges currently whether reach the bandwidth resources configuration adjustment cycle.
If reached, recorded in the described base station equipment acquisition current bandwidth resource distribution adjustment cycle is different types of
Bandwidth demand amount.Base station equipment determines therefrom that in this cycle, the demand carry-over amount of upstream bandwidth and the demand carry-over of downlink bandwidth
The ratio of amount.Similar with the two kinds of adjustment modes going out given in step S103 before, it is adjusted according to above-mentioned ratio
Process can also be divided into direct adjustment and scheme to replace two kinds:
Mode one, the configuration adjustment based on existing allocation plan.
Described base station equipment is according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment
Upstream bandwidth in current band width configuration scheme and the resource distribution quantitative proportion of downlink bandwidth.
Mode two, with default allocation plan, existing allocation plan is replaced.
In default band width configuration scheme set, select the accumulation of the demand carry-over amount with upstream bandwidth and downlink bandwidth
The ratio immediate band width configuration scheme of demand, and selected band width configuration scheme is updated to current band width configuration
Scheme.
No matter using which kind of above-mentioned mode, its purpose is all the up-downgoing resource distribution ratio in adjustresources configuration,
Meet current up-downgoing resource requirement ratio.
After complete the bandwidth resources configuration adjustment process that this bandwidth resources configured in the adjustment cycle by said process,
Base station equipment is deleted current bandwidth resource distribution and is adjusted the different types of bandwidth demand amount being recorded in the cycle, starts new band
Wide resource distribution adjusts the cumulative record in cycle.
It should be noted that above-mentioned Adjusted Option one can trigger adjustment process in real time, meet bandwidth resources in time
Changes in demand, and band width configuration scheme that Adjusted Option two can avoid bringing due to provisional bandwidth demand fluctuation
Frequently change, it is to avoid the frequent waste changing the system resource that resource distribution is brought.Specifically adopted which kind of above-mentioned adjustment
Scheme can be adjusted according to actual needs, and such change can't affect the protection domain of the application.
Compared with prior art, the Advantageous Effects of the technical scheme that the embodiment of the present application is proposed include:
The embodiment of the present application discloses a kind of dynamic adjusting method of band width configuration and base station equipment, in the method, base
The logon message that station equipment is reported to the monitoring device accessing is identified, and obtains monitoring in received logon message
The type information of equipment, according to acquired type information and default Bandwidth adjustment strategy, to current band width configuration side
Case is adjusted, by applying the technical scheme that proposed of the embodiment of the present application, it is possible to achieve accessed according to base station equipment is lower
Monitoring device type, the purpose of the band width configuration scheme of rational allocation uplink downlink, reach according to different types of band
Wide resource requirement change, the effect that band width configuration scheme is adjusted in time, it is to avoid occur fixing using a kind of band width configuration
Scheme cannot adapt to the problem of bandwidth resources changes in demand, maximized reasonable utilization Internet resources.
Below in conjunction with the accompanying drawing in the application, clear, complete description is carried out to the technical scheme in the application, show
So, described embodiment is a part of embodiment of the application, rather than whole embodiments.Based on the enforcement in the application
Example, the every other embodiment that those of ordinary skill in the art are obtained on the premise of not making creative work, all belong to
Scope in the application protection.
In existing technical scheme, the sub-frame configuration of one radio frames of TD-LTE system supports following 7 kinds of DL (Down
Link, downlink):UL (Up Link, up-link) proportioning mode, specific as follows:
Pattern 0:1 radio frames includes 2 descending sub frames, 6 sub-frame of uplink and 2 special subframes;
Pattern 1:1 radio frames includes 4 descending sub frames, 4 sub-frame of uplink and 2 special subframes;
Pattern 2:1 radio frames includes 6 descending sub frames, 2 sub-frame of uplink and 2 special subframes;
Pattern 3:1 radio frames includes 6 descending sub frames, 3 sub-frame of uplink and 1 special subframe;
Pattern 4:1 radio frames includes 7 descending sub frames, 2 sub-frame of uplink and 1 special subframe;
Pattern 5:1 radio frames includes 8 descending sub frames, 1 sub-frame of uplink and 1 special subframe;
Pattern 6:1 radio frames includes 3 descending sub frames, 5 sub-frame of uplink and 2 special subframes.
The operation of 0 conduct actual existing network is most commonly seen in mode for current operator.
It is currently based on the technology that bandwidth controls and dispatches, be all based in fixing link channel band width, to wherein
Miscellaneous service flow be identified classify, then carry out priority scheduling, but if practical business application traffic bandwidth surpass
Cross link channel bandwidth, dispatch anyway, all can lead to have partial service traffic loss.
The embodiment of the present application is in order to solve above-mentioned problem of the prior art it is proposed that a kind of dynamic adjustment side of bandwidth resources
Method, the message being received according to eating dishes without rice or wine by base station equipment, the type of the monitoring device connecing under judging, set further according to the type monitoring
Standby bandwidth resources demand characteristic, carrys out rational allocation uplink downlink channel width, is maximally utilized with realizing Internet resources.
As shown in Fig. 2 the schematic diagram of a kind of concrete monitoring scene being proposed by the embodiment of the present application, hang under 4G base station and regard
Frequency monitoring device, these video monitoring equipments need to be linked into prison by certain agreement (GB28181/ or ONVIF etc.) agreement
On the video management platform at control center.Mobile collection car therein carries out the acquisition of video information, and is uploaded to 4G base station, passes through
After forwarded, mobile command car is sent to by another 4G base station and carries out video tour.In such monitoring scene, move
Dynamic collecting vehicle is equivalent to front end encoding device, monitoring information acquisition is encoded and uploads, and mobile command car is equivalent to decoding and sets
Standby, after receiving the monitoring information of forwarding, browsed by decoding.
As shown in figure 3, the dynamic tune of the band width configuration under a kind of concrete application scene being proposed by the embodiment of the present application
The schematic flow sheet of adjusting method, is applied in application scenarios as shown in Figure 2.The method specifically includes:
Step S301,4G base station connects the message of equipment transmission under receiving.
Step S302,4G base station judges whether received message is logon message.
In general, in field of video monitoring, video frequency terminal apparatus, in access network, need first to video management service
Device sends logon message, and the information carrying in logon message has the relevant information of registering terminal equipment, as shown in figure 4, being this Shen
Please embodiment propose a kind of concrete application scene under logon message schematic diagram.Equipment is included but is not limited in logon message
The information such as type, device version, IP address of equipment.
In logon message example as shown in Figure 4, the Register information in message is passed through in 4G base station, confirms this message
For logon message.
Under normal conditions, the logon message that video frequency terminal apparatus send, is sent to video management service through 4G base station
Device, 4G intercepts to logon message base station.Logon message has obvious aspect ratio if any fixing destination slogan, field
Feature or other identification informations, may be used to the basis of characterization of logon message, specifically can be according to reality using which kind of mode
Needs are adjusted, and such change can't affect the protection domain of the application.
In this step, if it is confirmed that being logon message, execution step S303, if not logon message, execution step
S305.
Step S303,4G base station obtains device type information in logon message.
4G base station equipment once listen to a certain message be logon message after, may proceed to this message is carried out with the spy of next step
Survey, extract the terminal equipment type information in this logon message.
After extracting terminal equipment type, 4G base station is known that down and has connect what kind of video frequency terminal apparatus, is
Front end encoding device or rear end decoding device.Also shown in FIG. 4,4G base station can be extracted in logon message
Device:The information of Describe=HIC1621x22-C, such that it is able to judge this equipment for front end encoding device.
Step S304,4G base station adjusts band width configuration scheme according to device type information.
For convenience of explanation, with aforesaid 7 kinds of common DL in the embodiment of the present application:UL proportioning mode is as default bandwidth
Allocation plan set.
After the terminal unit recognizing access is front end encoding device, up according to the more needs of front end encoding device
The feature of resource, 4G base station can select there is the DL that higher ascending resource configures quantity:UL proportioning mode.
If current DL:UL proportioning mode is pattern 1, provides 4 sub-frame of uplink, then 4G base in 1 radio frames
Standing-meeting selects the pattern 0 with more sub-frame of uplink or pattern 6 as new band width configuration scheme, to current DL:UL proportioning
Mode is updated.
Certainly, if current DL:UL proportioning mode has been pattern 0, has been to have at most up money in 7 kinds of patterns
The DL in source:UL proportioning mode, then will keep current DL:UL proportioning mode.
Contrary, if after 4G identification of base stations is decoding device to the terminal unit accessing, more according to decoding device
Need the feature of downlink resource, 4G base station can select there is the DL that higher downlink resource configures quantity:UL proportioning mode.Equally
With current DL:As a example UL proportioning mode is pattern 1, then the adjustable strategies of this step are then to select there is more sub-frame of uplink
Pattern 2, pattern 3, pattern 4 or pattern 5 as new band width configuration scheme, to current DL:UL proportioning mode is updated
It should be noted that being to preset 7 kinds of DL in the embodiment of the present application:Illustrate, in reality as a example UL proportioning mode
In the application of border, further types of DL can be preset:UL proportioning mode, or do not preset, but directly to DL:UL proportioning side
Formula could be adjusted to update band width configuration scheme, and such change can't affect the protection domain of the application, example hereinafter
Similar, explanation is not repeated.
By above-mentioned process, during facility registration, 4G base station completes the adjustment of corresponding band width configuration scheme
Process.
It should be noted that above-mentioned adjustment process does not have wanting of certainty for the quantity of access device type under 4G base station
Ask, if not accessing any one monitoring device under 4G base station, after it accesses a front end encoding device, will necessarily
Selection increases ascending resource.And if having accessed a decoding device under 4G base station, now, then access a new front end
It is still desirable to increase ascending resource after encoding device, because how the resource before no matter configures, the new front end coding accessing
Equipment is necessarily required to more ascending resources, and increasing ascending resource configuration also just becomes certainty, simply, can increase width to resource
Degree produces impact.For example, accessed the currently employed pattern in 4G base station 1 (4 sub-frame of uplink) of a decoding device, then connect again as
It is contemplated that having accessed decoding device during one new front end encoding device, 4G base station will not significantly increase up money
Source, so, pattern 0 (6 sub-frame of uplink) will not be selected, and only can select pattern 6 (5 sub-frame of uplink).
Step S305,4G base station judges the friendship that the monitoring device whether received message is current registered is reported
Mutually message.
To after the intercepting primarily to ensureing registration process of mutual message, with the change to bandwidth demand for the equipment,
Band width configuration scheme can be adjusted.
If it is judged that being no, represent that this message is not the message that can embody bandwidth demand, in present treatment flow process
It need not be further processed, terminate present treatment flow process.
If it is judged that being yes, then execution step S306.
It should be noted that the present embodiment can embody the message class of bandwidth demand with logon message and two kinds of mutual message
Illustrate as a example type, if other messages also can embody the bandwidth demand of different terminal equipment, similarly may apply to
In the method that the present embodiment is proposed, corresponding handling process can also be increased with reference to the process of mutual message accordingly, so
Change can't affect the protection domain of the application.
Step S306,4G base station obtains entrained bandwidth demand type information and bandwidth demand amount letter in mutual message
Breath.
As shown in figure 5, the schematic diagram of the mutual message under a kind of concrete application scene proposing for the embodiment of the present application.4G
The Media Protocol of this message is passed through in base station:Next udp information is it may be determined that what the transmitting terminal of this mutual message needed
It is upstream bandwidth.In addition, the bandwidth value of this message is passed through in 4G base station:2048kb/s information is it may be determined that it is to upper
The demand of row bandwidth is 2048kbps.
Step S307,4G base station carries out cumulative record to the bandwidth requirement information in the current adjustment cycle.
4G base station combines terminal equipment type, or resource requirement type, carries out cumulative record to resources requirement.
For example, for the cumulative record scene based on terminal equipment type and resources requirement, record result can be concrete
As shown in table 1:
The resources requirement cumulative record result based on terminal equipment type for the table 1
Terminal equipment type | Required code stream bandwidth |
Decoding device | 2048kbps |
Front end encoding device | 4096kbps |
Decoding device | 1024kbps |
…… | …… |
And for the cumulative record scene based on resource requirement type and resources requirement, recording result can be specifically as table
Shown in 2:
The resources requirement cumulative record result based on resource requirement type for the table 2
Resource requirement type | Required code stream bandwidth |
Downlink bandwidth | 2048kbps |
Upstream bandwidth | 4096kbps |
Downlink bandwidth | 1024kbps |
…… | …… |
Which kind of in specific application scenarios, specifically can be selected according to actual needs using recording mode, so
Change can't affect the protection domain of the application.
Step 308,4G base station judge whether to reach the adjustment cycle.
4G base station equipment carries out timing, according to regular time length separation, resource allocation proposal is carried out periodically adjust
Whole.If reached, execution step S309;
Without reaching, return to step S308, proceed to judge.
The embodiment of the present application illustrates taking the aforesaid Adjusted Option two as trigger condition with the adjustment cycle as a example, in reality
In the application scenarios on border, equally can adopt the processing scheme to receive mutual message as trigger condition, here is no longer separately
Narration, two schemes respectively have pluses and minuses, have discussed above, can be selected according to actual needs, such change
Belong to the protection domain of the application.
Step S309,4G base station determines the ratio of different resource demand according to current cumulative record result.
According to cumulative record situation as shown in table 1 in step S307,4G base station can calculate required for decoding device
Total bandwidth (i.e. downlink bandwidth summation), and the total bandwidth (i.e. upstream bandwidth summation) needed for encoding device, thus, can
To determine the ratio of upstream bandwidth summation and downlink bandwidth summation.
Step S310,4G base station adjusts band width configuration scheme according to percent information.
Equally to preset 7 kinds of DL:Illustrate as a example the application scenarios of UL proportioning mode, if determine in step S309
Ratiometric result is 11:29, then in default 7 kinds of DL:In UL proportioning mode, a closest conduct of selection percentage result is
Whole adjustment result.
To default 7 kinds of DL:It is as follows that UL proportioning mode carries out ratio accounting result:
Pattern 0:1 radio frames includes 2 descending sub frames, 6 sub-frame of uplink and 2 special subframes, i.e. up-downgoing ratio
Example 3:1;
Pattern 1:1 radio frames includes 4 descending sub frames, 4 sub-frame of uplink and 2 special subframes, i.e. up-downgoing ratio
Example 1:1;
Pattern 2:1 radio frames includes 6 descending sub frames, 2 sub-frame of uplink and 2 special subframes, i.e. up-downgoing ratio
Example 1:3;
Pattern 3:1 radio frames includes 6 descending sub frames, 3 sub-frame of uplink and 1 special subframe, i.e. up-downgoing ratio
Example 1:2;
Pattern 4:1 radio frames includes 7 descending sub frames, 2 sub-frame of uplink and 1 special subframe, i.e. up-downgoing ratio
Example 2:7;
Pattern 5:1 radio frames includes 8 descending sub frames, 1 sub-frame of uplink and 1 special subframe, i.e. up-downgoing ratio
Example 1:8;
Pattern 6:1 radio frames includes 3 descending sub frames, 5 sub-frame of uplink and 2 special subframes, i.e. up-downgoing ratio
Example 5:3.
11 being obtained based on step S309:29 up-downgoing resource ratio example, 4G base station can select pattern 2, because
In the above results, 1:3 and 11:29 is closest.
The accumulation data being recorded in the current adjustment cycle is deleted in step S311,4G base station.
The adjustment completing to represent the current adjustment cycle of this step completes, and can start the accumulation note in new adjustment cycle
Record.
Compared with prior art, the Advantageous Effects of the technical scheme that the embodiment of the present application is proposed include:
The embodiment of the present application discloses a kind of dynamic adjusting method of band width configuration and base station equipment, in the method, base
The logon message that station equipment is reported to the monitoring device accessing is identified, and obtains monitoring in received logon message
The type information of equipment, according to acquired type information and default Bandwidth adjustment strategy, to current band width configuration side
Case is adjusted, by applying the technical scheme that proposed of the embodiment of the present application, it is possible to achieve accessed according to base station equipment is lower
Monitoring device type, the purpose of the band width configuration scheme of rational allocation uplink downlink, reach according to different types of band
Wide resource requirement change, the effect that band width configuration scheme is adjusted in time, it is to avoid occur fixing using a kind of band width configuration
Scheme cannot adapt to the problem of bandwidth resources changes in demand, maximized reasonable utilization Internet resources.
For being illustrated more clearly that the scheme that the application previous embodiment provides, based on the invention structure same with said method
Think, the embodiment of the present application also proposed a kind of base station equipment, and its structural representation is as shown in fig. 6, specifically include:
Receiver module 61, for receiving the message that monitoring device is reported;
Judge module 62, for judging whether the message received by described receiver module 61 is logon message;
Acquisition module 63, for when the judged result of described judge module 62 is logon message, obtaining described registration report
Entrained monitoring device type information in literary composition;
Adjusting module 64, for the type information according to acquired in described acquisition module 63 and default Bandwidth adjustment plan
Slightly, current band width configuration scheme is adjusted.
Preferably, described adjusting module 64, specifically for:
When described type information is specially front end encoding device, increase the ascending resource in current band width configuration scheme
Configuration quantity, or in default band width configuration scheme set, select ascending resource allocation ratio to be higher than current band width configuration
The band width configuration scheme of scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Or,
When described type information is specially decoding device, by the downlink resource configuration number in current band width configuration scheme
Amount increases, or in default band width configuration scheme set, selects downlink resource allocation ratio to be higher than current band width configuration side
The band width configuration scheme of case, and selected band width configuration scheme is updated to current band width configuration scheme.
Preferably, described base station equipment, also includes logging modle 65:
Described judge module 62, is additionally operable to judge whether the message received by described receiver module 61 is current registered
The mutual message that reported of monitoring device;
Described acquisition module 63, is additionally operable to, when the judged result of described judge module 62 is mutual message, obtain described
Entrained bandwidth demand type information in mutual message and bandwidth demand amount information;
Described logging modle 65, for acquired in described acquisition module 63 respectively to different types of bandwidth demand amount
Carry out cumulative record.
Preferably,
Described acquisition module 63, is additionally operable to, when described logging modle 65 completes current cumulative record, obtain described note
Different types of bandwidth demand amount in the preset time range of record module 65 current record;
Described adjusting module 64, be additionally operable to the demand carry-over amount of upstream bandwidth according to acquired in described acquisition module 63 with
The ratio of the demand carry-over amount of downlink bandwidth, the upstream bandwidth in the current band width configuration scheme of adjustment and the resource of downlink bandwidth
Configuration quantitative proportion, or in default band width configuration scheme set, select the demand carry-over amount with upstream bandwidth and descending band
The ratio immediate band width configuration scheme of wide demand carry-over amount, and selected band width configuration scheme is updated to current
Band width configuration scheme;
Described logging modle 65, is additionally operable to the included record time in cumulative record is exceeded with the band of preset time range
Wide demand information is purged.
Preferably,
Described judge module 62, is additionally operable to judge whether current time reaches the bandwidth resources configuration adjustment cycle;
Described acquisition module 63, is additionally operable to, when the judged result of described judge module 62 is to reach, obtain current bandwidth
Resource distribution adjusts the different types of bandwidth demand amount being recorded in the cycle;
Described adjusting module 64, be additionally operable to the demand carry-over amount of upstream bandwidth according to acquired in described acquisition module 63 with
The ratio of the demand carry-over amount of downlink bandwidth, the upstream bandwidth in the current band width configuration scheme of adjustment and the resource of downlink bandwidth
Configuration quantitative proportion, or in default band width configuration scheme set, select the demand carry-over amount with upstream bandwidth and descending band
The ratio immediate band width configuration scheme of wide demand carry-over amount, and selected band width configuration scheme is updated to current
Band width configuration scheme;
Described logging modle 65, is additionally operable to complete the current bandwidth resources configuration adjustment cycle in described adjusting module 64
After band width configuration adjustment, delete current bandwidth resource distribution and adjust the different types of bandwidth demand amount being recorded in the cycle.
Compared with prior art, the Advantageous Effects of the technical scheme that the embodiment of the present application is proposed include:
The embodiment of the present application discloses a kind of dynamic adjusting method of band width configuration and base station equipment, in the method, base
The logon message that station equipment is reported to the monitoring device accessing is identified, and obtains monitoring in received logon message
The type information of equipment, according to acquired type information and default Bandwidth adjustment strategy, to current band width configuration side
Case is adjusted, by applying the technical scheme that proposed of the embodiment of the present application, it is possible to achieve accessed according to base station equipment is lower
Monitoring device type, the purpose of the band width configuration scheme of rational allocation uplink downlink, reach according to different types of band
Wide resource requirement change, the effect that band width configuration scheme is adjusted in time, it is to avoid occur fixing using a kind of band width configuration
Scheme cannot adapt to the problem of bandwidth resources changes in demand, maximized reasonable utilization Internet resources.
Through the above description of the embodiments, those skilled in the art can be understood that the embodiment of the present invention
Can be realized by hardware it is also possible to realize by by way of software plus necessary general hardware platform.Based on such reason
Solution, the technical scheme of the embodiment of the present invention can be embodied in the form of software product, and this software product can be stored in one
In individual non-volatile memory medium (can be CD-ROM, USB flash disk, portable hard drive etc.), including some instructions with so that a meter
Calculate machine equipment (can be personal computer, server, or network equipment etc.) execution each implement scene of the embodiment of the present invention
Described method.
It will be appreciated by those skilled in the art that accompanying drawing is a schematic diagram being preferable to carry out scene, the module in accompanying drawing or
Flow process is not necessarily implemented necessary to the embodiment of the present invention.
It will be appreciated by those skilled in the art that module in device in implement scene can according to implement scene describe into
Row is distributed in the device of implement scene it is also possible to carry out one or more dresses that respective change is disposed other than this implement scene
In putting.The module of above-mentioned implement scene can merge into a module it is also possible to be further split into multiple submodule.
The embodiments of the present invention are for illustration only, do not represent the quality of implement scene.
Only the several of the embodiment of the present invention disclosed above are embodied as scene, but, the embodiment of the present invention not office
It is limited to this, the business that the changes that any person skilled in the art can think of all should fall into the embodiment of the present invention limits scope.
Claims (10)
1. a kind of dynamic adjusting method of band width configuration is it is characterised in that methods described specifically includes:
When base station equipment receives the message that monitoring device reports, judge whether described message is logon message;
If it is judged that being yes, described base station equipment obtains entrained monitoring device type information in described logon message;
Described base station equipment, according to described type information and default Bandwidth adjustment strategy, is entered to current band width configuration scheme
Row adjustment.
2. the method for claim 1 is it is characterised in that described base station equipment is according to described type information and default
Bandwidth adjustment strategy, is adjusted to current band width configuration scheme, specifically includes:
When described type information is specially front end encoding device, described base station equipment increases in current band width configuration scheme
Ascending resource configures quantity, or in default band width configuration scheme set, selects ascending resource allocation ratio to be higher than current
The band width configuration scheme of band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Or,
When described type information is specially decoding device, described base station equipment is by the descending money in current band width configuration scheme
Source configuration quantity increases, or in default band width configuration scheme set, selects downlink resource allocation ratio to be higher than current band
The band width configuration scheme of wide allocation plan, and selected band width configuration scheme is updated to current band width configuration scheme.
3. the method for claim 1 is it is characterised in that described base station equipment is according to described type information and default
Bandwidth adjustment strategy, after current band width configuration scheme is adjusted, also includes:
Described base station equipment intercepts the mutual message that current registered monitoring device is reported;
Described base station equipment obtains entrained bandwidth demand type information and bandwidth demand amount information in described mutual message;
Described base station equipment carries out cumulative record to different types of bandwidth demand amount respectively.
4. method as claimed in claim 3 is it is characterised in that described base station equipment is respectively to different types of bandwidth demand amount
After carrying out cumulative record, also include:
Described base station equipment obtains the different types of bandwidth demand amount in the preset time range of current record;
, according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment is current for described base station equipment
Band width configuration scheme in upstream bandwidth and downlink bandwidth resource distribution quantitative proportion, or in default band width configuration scheme
In set, the immediate band width configuration of ratio of the demand carry-over amount of selection and upstream bandwidth and the demand carry-over amount of downlink bandwidth
Scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Wherein, described base station equipment exceedes the bandwidth demand amount of preset time range to the included record time in cumulative record
Information is purged.
5. method as claimed in claim 3 is it is characterised in that described base station equipment is respectively to different types of bandwidth demand amount
After carrying out cumulative record, also include:
Described base station equipment judges currently whether reach the bandwidth resources configuration adjustment cycle;
If reached, described base station equipment obtains current bandwidth resource distribution and adjusts the different types of bandwidth being recorded in the cycle
Demand;
, according to the ratio of the demand carry-over amount of upstream bandwidth and the demand carry-over amount of downlink bandwidth, adjustment is current for described base station equipment
Band width configuration scheme in upstream bandwidth and downlink bandwidth resource distribution quantitative proportion, or in default band width configuration scheme
In set, the immediate band width configuration of ratio of the demand carry-over amount of selection and upstream bandwidth and the demand carry-over amount of downlink bandwidth
Scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Described base station equipment is deleted current bandwidth resource distribution and is adjusted the different types of bandwidth demand amount being recorded in the cycle.
6. a kind of base station equipment is it is characterised in that specifically include:
Receiver module, for receiving the message that monitoring device is reported;
Judge module, for judging whether the message received by described receiver module is logon message;
Acquisition module, for when the judged result of described judge module is logon message, obtaining in described logon message and being taken
The monitoring device type information of band;
Adjusting module, for the type information according to acquired in described acquisition module and default Bandwidth adjustment strategy, to working as
Front band width configuration scheme is adjusted.
7. base station equipment as claimed in claim 6 is it is characterised in that described adjusting module, specifically for:
When described type information is specially front end encoding device, increase the ascending resource configuration in current band width configuration scheme
Quantity, or in default band width configuration scheme set, select ascending resource allocation ratio to be higher than current band width configuration scheme
Band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration scheme;
Or,
When described type information is specially decoding device, the downlink resource configuration quantity in current band width configuration scheme is increased
Plus, or in default band width configuration scheme set, select downlink resource allocation ratio to be higher than current band width configuration scheme
Band width configuration scheme, and selected band width configuration scheme is updated to current band width configuration scheme.
8. base station equipment as claimed in claim 6 is it is characterised in that also include logging modle:
Described judge module, is additionally operable to judge that the monitoring whether message received by described receiver module is current registered sets
The standby mutual message being reported;
Described acquisition module, is additionally operable to, when the judged result of described judge module is mutual message, obtain described mutual message
In entrained bandwidth demand type information and bandwidth demand amount information;
Described logging modle, for accumulating to different types of bandwidth demand amount respectively acquired in described acquisition module
Record.
9. base station equipment as claimed in claim 8 it is characterised in that
Described acquisition module, is additionally operable to, when described logging modle completes current cumulative record, obtain described logging modle and work as
Different types of bandwidth demand amount in the preset time range of front record;
Described adjusting module, is additionally operable to the demand carry-over amount of upstream bandwidth and the downlink bandwidth according to acquired in described acquisition module
Demand carry-over amount ratio, adjust the resource distribution quantity of upstream bandwidth in current band width configuration scheme and downlink bandwidth
Ratio, or in default band width configuration scheme set, select the accumulation of the demand carry-over amount with upstream bandwidth and downlink bandwidth
The ratio immediate band width configuration scheme of demand, and selected band width configuration scheme is updated to current band width configuration
Scheme;
Described logging modle, is additionally operable to the included record time in cumulative record is exceeded with the bandwidth demand of preset time range
Amount information is purged.
10. base station equipment as claimed in claim 8 it is characterised in that
Described judge module, is additionally operable to judge whether current time reaches the bandwidth resources configuration adjustment cycle;
Described acquisition module, is additionally operable to, when the judged result of described judge module is to reach, obtain current bandwidth resource distribution
The different types of bandwidth demand amount being recorded in the adjustment cycle;
Described adjusting module, is additionally operable to the demand carry-over amount of upstream bandwidth and the downlink bandwidth according to acquired in described acquisition module
Demand carry-over amount ratio, adjust the resource distribution quantity of upstream bandwidth in current band width configuration scheme and downlink bandwidth
Ratio, or in default band width configuration scheme set, select the accumulation of the demand carry-over amount with upstream bandwidth and downlink bandwidth
The ratio immediate band width configuration scheme of demand, and selected band width configuration scheme is updated to current band width configuration
Scheme;
Described logging modle, is additionally operable to complete, in described adjusting module, the band width configuration that current bandwidth resources configure the adjustment cycle
After adjustment, delete current bandwidth resource distribution and adjust the different types of bandwidth demand amount being recorded in the cycle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610758039.9A CN106411764B (en) | 2016-08-29 | 2016-08-29 | Dynamic adjustment method for bandwidth configuration and base station equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610758039.9A CN106411764B (en) | 2016-08-29 | 2016-08-29 | Dynamic adjustment method for bandwidth configuration and base station equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106411764A true CN106411764A (en) | 2017-02-15 |
CN106411764B CN106411764B (en) | 2020-01-14 |
Family
ID=58003438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610758039.9A Active CN106411764B (en) | 2016-08-29 | 2016-08-29 | Dynamic adjustment method for bandwidth configuration and base station equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106411764B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020019818A1 (en) * | 2018-07-23 | 2020-01-30 | 华为技术有限公司 | Data transmission method and apparatus |
CN112868265A (en) * | 2020-11-20 | 2021-05-28 | 达闼机器人有限公司 | Network resource management method, management device, electronic device and storage medium |
CN115988451A (en) * | 2022-12-22 | 2023-04-18 | 深圳市昂星科技有限公司 | Driving data transmission method and system |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080151834A1 (en) * | 2006-12-20 | 2008-06-26 | Motorola, Inc. | Method and apparatus for maintaining traffic flow in a mesh network |
CN101212255A (en) * | 2006-12-29 | 2008-07-02 | 华为技术有限公司 | Dynamic bandwidth adjustment and fault protection method and device for optical access network |
CN101316141A (en) * | 2007-05-29 | 2008-12-03 | 华为技术有限公司 | Band width distribution method, device, communication apparatus and system |
CN101729427A (en) * | 2010-01-20 | 2010-06-09 | 杭州华三通信技术有限公司 | Multilink load sharing and routing method and router |
CN101848538A (en) * | 2009-03-26 | 2010-09-29 | 大唐移动通信设备有限公司 | Method and equipment for determining SRS transmission bandwidth |
CN101883294A (en) * | 2009-05-07 | 2010-11-10 | 华为技术有限公司 | Method and device for allocating uplink bandwidth |
CN102571583A (en) * | 2012-01-11 | 2012-07-11 | 浙江工业大学 | Quality of service (QoS) aware self-adaptive bandwidth distribution system for wireless-optical broadband access networks (WOBAN) and self-adaptive bandwidth distribution method |
CN102905374A (en) * | 2012-10-12 | 2013-01-30 | 华为技术有限公司 | Method and device for allocating resources |
CN103889007A (en) * | 2012-12-19 | 2014-06-25 | ***通信集团上海有限公司 | Bandwidth allocation method, authentication authorization billing server, AC and AP |
CN103929784A (en) * | 2013-01-10 | 2014-07-16 | ***通信集团上海有限公司 | User bandwidth control method, apparatus and system |
CN105530302A (en) * | 2015-12-15 | 2016-04-27 | 中国联合网络通信集团有限公司 | Method and system for controlling uplink bandwidth |
-
2016
- 2016-08-29 CN CN201610758039.9A patent/CN106411764B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080151834A1 (en) * | 2006-12-20 | 2008-06-26 | Motorola, Inc. | Method and apparatus for maintaining traffic flow in a mesh network |
CN101212255A (en) * | 2006-12-29 | 2008-07-02 | 华为技术有限公司 | Dynamic bandwidth adjustment and fault protection method and device for optical access network |
CN101316141A (en) * | 2007-05-29 | 2008-12-03 | 华为技术有限公司 | Band width distribution method, device, communication apparatus and system |
CN101848538A (en) * | 2009-03-26 | 2010-09-29 | 大唐移动通信设备有限公司 | Method and equipment for determining SRS transmission bandwidth |
CN101883294A (en) * | 2009-05-07 | 2010-11-10 | 华为技术有限公司 | Method and device for allocating uplink bandwidth |
CN101729427A (en) * | 2010-01-20 | 2010-06-09 | 杭州华三通信技术有限公司 | Multilink load sharing and routing method and router |
CN102571583A (en) * | 2012-01-11 | 2012-07-11 | 浙江工业大学 | Quality of service (QoS) aware self-adaptive bandwidth distribution system for wireless-optical broadband access networks (WOBAN) and self-adaptive bandwidth distribution method |
CN102905374A (en) * | 2012-10-12 | 2013-01-30 | 华为技术有限公司 | Method and device for allocating resources |
CN103889007A (en) * | 2012-12-19 | 2014-06-25 | ***通信集团上海有限公司 | Bandwidth allocation method, authentication authorization billing server, AC and AP |
CN103929784A (en) * | 2013-01-10 | 2014-07-16 | ***通信集团上海有限公司 | User bandwidth control method, apparatus and system |
CN105530302A (en) * | 2015-12-15 | 2016-04-27 | 中国联合网络通信集团有限公司 | Method and system for controlling uplink bandwidth |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020019818A1 (en) * | 2018-07-23 | 2020-01-30 | 华为技术有限公司 | Data transmission method and apparatus |
CN112868265A (en) * | 2020-11-20 | 2021-05-28 | 达闼机器人有限公司 | Network resource management method, management device, electronic device and storage medium |
CN112868265B (en) * | 2020-11-20 | 2023-08-25 | 达闼机器人股份有限公司 | Network resource management method, management device, electronic equipment and storage medium |
CN115988451A (en) * | 2022-12-22 | 2023-04-18 | 深圳市昂星科技有限公司 | Driving data transmission method and system |
CN115988451B (en) * | 2022-12-22 | 2023-08-29 | 深圳市昂星科技有限公司 | Driving data transmission method and system |
Also Published As
Publication number | Publication date |
---|---|
CN106411764B (en) | 2020-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103249007B (en) | D2D multi-casting communication in IMT-A system is set up and its wireless resource allocation methods | |
CN1135013C (en) | Flexible radio access and resource allocation in universal mobile telephone system (UMTS) | |
CN101554078B (en) | Method for supporting quality of service over a connection lifetime | |
CN101951600B (en) | Wireless communication systems | |
CN104756587A (en) | Method and apparatus for switching between multicast/broadcast and unicast service | |
CN106982435A (en) | A kind of capacity adjustment method and device of F-band mixed networking | |
CN101132545B (en) | Method and system for implementing multimedia broadcast multicast in mobile communication system | |
CN103260244A (en) | D2D uplink resource reuse mode switch method in cellular system | |
CN106411764A (en) | Dynamic bandwidth configuration adjustment method and base station equipment | |
CN106922031A (en) | Dispatching method and device in a kind of radio communication | |
WO2017148446A1 (en) | Network resource scheduling method, device and system, and network node | |
JP2010536209A (en) | Method of allocating radio resource quotas to control entities in a wireless telecommunications network | |
CN102333315A (en) | Frequency resource allocation method, device and system | |
EP1492367A4 (en) | Radio network system and radio communication control method | |
CN110198565A (en) | The distribution method and device of ascending resource in a kind of small bandwidth system | |
CN108260160A (en) | Dispatch the method and system of user | |
CN101400066A (en) | Method, relay and base station for data transmission on relay link | |
CN1604679B (en) | Method of dynamic rate splitting | |
CN107431901A (en) | Scheduling in cellular network | |
CN102202413B (en) | Method for dispatching resources by combining network coding and user pairing | |
CN107846702A (en) | Strengthen the resource allocation method of Physical Downlink Control Channel | |
CN105101042B (en) | Device-to-device communication and cell client/server adaptation scheme and user equipment | |
CN104170309B (en) | A kind of method for managing resource and device | |
CN101449528B (en) | Method and node for providing a quality of service support in multihop communication systems | |
US20240064523A1 (en) | Method of controlling a radio access point |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |