CN106402492A - Method and device for pipeline laying - Google Patents

Method and device for pipeline laying Download PDF

Info

Publication number
CN106402492A
CN106402492A CN201610942109.6A CN201610942109A CN106402492A CN 106402492 A CN106402492 A CN 106402492A CN 201610942109 A CN201610942109 A CN 201610942109A CN 106402492 A CN106402492 A CN 106402492A
Authority
CN
China
Prior art keywords
pipeline
pipe
rubber ring
module
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610942109.6A
Other languages
Chinese (zh)
Inventor
朱育盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610942109.6A priority Critical patent/CN106402492A/en
Publication of CN106402492A publication Critical patent/CN106402492A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a method and a device for pipeline laying. T he method comprises the following steps that firstly surveying, setting out and foundation pit excavating are conducted; flat flip midcourt line is sought on the basis of a pipeline, the quality of the pipeline is examined, and pipeline feeding operation is conducted; a steel truss crane is assembled, chain blocks are installed on the two sides of pipes, and an operation of lifting the pipeline to be installed is finished; bell and spigots of the pipes are cleaned and a rubber ring is installed; the bell and spigots of the pipes are aligned and the installed device is exited from the steel truss crane after being examined; and pipe-stabilized operation is conducted and backfill operation is conducted after two relative experiments are conducted. The method is suitable for the laying of large-scale metal and nonmetal pipeline projects, particularly suitable for the project of big pipe diameter, deep excavation, big forced landing, complicated terrain and multi-pipe simultaneous construction, machines and tools used are simple and low in investment and cost, construction procedure is easy to master, the operation is simple and the laying efficiency is good.

Description

Pipe laying method and device
Technical field
The present invention relates to technical field of building construction, particularly to a kind of pipe laying method and device.
Background technology
In conventional art, in the construction of pipe laying frame, the heavy complexity of equipment that used, put into many, high cost, apply Engineering sequence is complicated, complex operation, and effect is low, and laying effect is not highly desirable.
Content of the invention
In consideration of it, being necessary for above-mentioned the problems of the prior art it is proposed that a kind of pipe laying method and device.
For reaching goal of the invention, provide a kind of pipe laying method, methods described includes:Surveying setting-out, and execute excavation Foundation ditch;Based on pipeline foundation levelling bullet center line, check pipeline quality, execution down tube operation;Spelling steel truss crane, and it is installed Pipe both sides jack, completes to lift by crane pipe operations to be installed;Clean pipe bell and spigot, and rubber ring is installed;Execution boil on the nape opposite the mouth draws in Operation, and steel truss crane described in quality examination backed off after random is carried out to the equipment after installing;Underwater pipeline stabilizing operates, and executes two correlations Carry out backfill operation after test.
Wherein in an embodiment, described installation rubber ring is O-shaped rubber ring.
Wherein in an embodiment, include after the step of described installation rubber ring:To the described rubber ring table installed Face is lubricated the spraying operation of agent.
Wherein in an embodiment, described two related experiment include:Pipeline infiltration test and the water pressure test.
Also provide a kind of pipe laying unit based on same design, described device includes:Measurement and excavation module, for surveying Amount unwrapping wire, and execute excavation pit;Check and performing module, for based on pipeline foundation levelling bullet center line, checking pipeline quality, Execution down tube operation;First installation module, for spelling steel truss crane, and installs its pipe both sides jack, completes lifting and treat Pipe laying operates;Second installation module, for cleaning pipe bell and spigot, and installs rubber ring;Check and exit module, be used for Execution boil on the nape opposite the mouth draws in operation, and carries out steel truss crane described in quality examination backed off after random to the equipment after installing;Underwater pipeline stabilizing and backfill Module, for underwater pipeline stabilizing operation, and carries out backfill operation after executing two correlation tests.
Wherein in an embodiment, described installation rubber ring is O-shaped rubber ring.
Wherein in an embodiment, also include:Spray performing module, for carrying out to the described rubber ring surface installed The spraying operation of lubricant.
Wherein in an embodiment, described two related experiment include:Pipeline infiltration test and the water pressure test.
Beneficial effects of the present invention include:Above-mentioned pipe laying method and device, first surveying setting-out, and execute excavation base Hole;Based on pipeline foundation levelling bullet center line, check pipeline quality, execution down tube operation;Spelling steel truss crane, and its pipe is installed Sub- both sides jack, completes to lift by crane pipe operations to be installed;Clean pipe bell and spigot, and rubber ring is installed;Execution boil on the nape opposite the mouth draws in behaviour Make, and steel truss crane described in quality examination backed off after random is carried out to the equipment after installing;Underwater pipeline stabilizing operates, and it is real to execute two correlations Carry out backfill operation after testing.Said method is applied to band large-scale metal and the laying of nonmetal pipeline engineering, is particularly well-suited to big Caliber, excavate the engineering that deep, forced landing is big, with a varied topography, multitube is constructed simultaneously, and the equipment being utilized is simple, less investment, cost Low, operational procedure easily grasps, simple to operate, and laying effect is good.
Brief description
Fig. 1 is the schematic flow sheet of pipe laying method in an embodiment;And
Fig. 2 is the structural representation of pipe laying unit in an embodiment.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention become more apparent, below in conjunction with drawings and Examples pair Inventive pipeline laying method and device are further elaborated.It should be understood that specific embodiment described herein is only In order to explain the present invention, it is not intended to limit the present invention.
In one embodiment, as shown in Figure 1, there is provided a kind of pipe laying method, specific the method includes following Step:
Step 100, surveying setting-out, and execute excavation pit.
In the present embodiment, carry out job site surveying setting-out according to being pre-designed drawing.Specifically, put according to measurement center line Go out excavating sideline, with excavator stage excavation to designed elevation, every layer height is less than 50cm.On-site concrete pipeline is carried out Quality examination, that is, have or not dew stone, dew muscle, arrisdefect, play drum, crackle etc..Socket work surface tolerance+2mm, bellmouth work surface is straight Footpath tolerance -1mm-+2mm.Rubber seal must not have pore, crack peeling and seam, shore hardness 45-55 degree, breaks Intensity 16MPa, percentage elongation 500%.
Further, execution excavation pit specifically includes:Foundation trench excavates and will ensure the every side of pipe socket external wall construction width 70-80cm, bottom of trench is pressed design requirement and is tamped, and dry density 1.65g/cm3 paves 3:7 dirt, every layer of paving thickness 20-25cm, Rammed using ramming machine and press 3-5 time, compacting factor>0.95, dirt layer surface flatness allowable error ± 50mm.
Step 200, based on pipeline foundation levelling bullet center line, checks pipeline quality, execution down tube operation.Wherein, down tube and Comb, lays steel truss mounted track, spelling steel truss, 15-20cm more than clear span every side than pipe socket outer wall in steel truss, and pipeline The levelling bullet center line in basis, and dig out working pit by duct length, then with truck crane, the pipeline being transported to limes marginis is put in ditch Cao, Arrange, by pipe centerline symmetrical laying pipeline.
Step 300, spelling steel truss crane, and its pipe both sides jack is installed, complete to lift by crane pipe operations to be installed.Its In, steel truss Hoisting tackle is mainly made up of steel truss crane and slideway two large divisions.Steel truss crane is by light rail, I-shaped Steel, angle steel, steel pipe are processed into rod member spelling and form, and use steel plate bolt connection between rod member.Track adopts light rail, uses between rail Steel plate connects, and rail foot welds a duck's foot plate every 0.5m.
In the present embodiment, spelling steel truss crane on track, fix each node bolt, two is solid on sliding way simultaneously Fixed 2 30KN lift by crane jack.Then with 2 30KN in upper beam two lifting jack, pipeline to be installed is sling, adjustment pipeline so as to Centrage deviates pipe centerline and is not more than 50mm, installs both sides boil on the nape opposite the mouth simultaneously and draws in each one with 50KN jack.
Step 400, cleans pipe bell and spigot, and installs rubber ring.
In the present embodiment, after the jack installation of both sides, propulsion port overhead crane is so as to close install the bell of pipe During 30cm, clean bell and spigot, " o " type rubber ring is installed, by stable for rubber ring in socket side 2cm right position, rubber ring must not Distortion, with aerosol apparatus on pipe bell and spigot and rubber ring spraying lubricant.Adjustment both sides jack so as to symmetrical stress, when drawing When proceeding to bellmouth outer guiding slope, suspend, adjustment rubber ring, pipe level and gap up and down, after alignment clearance is uniform, pulling Both sides jack, slowly draws in, and so that " O " type rubber ring is uniformly rolled to socket joint chewing gum platform position.
Step 500, executes boil on the nape opposite the mouth and draws in operation, and carry out quality examination backed off after random steel truss to the equipment after installing and hang Car.
In the present embodiment, pipe installation quality checks, should first check for O-shaped rubber ring position, reexamines pipe joint and indulges To gap, radial clearance, Pipeline elevation, pipe centerline, specification and design requirement should be met, if problematic, will connect Mouth pulls open constructs again by operation.The firm truss of qualified backed off after random carries out next procedure construction.
Step 600, underwater pipeline stabilizing operates, and carries out backfill operation after executing two correlation tests.
In the present embodiment, pipeline backfills, and reserves each 50cm in two bell and spigot position and enter to two from centre outside pipeline The stepped rammer of row plain fill is filled out, and makes pipe stable.After Pipe installing is to test length, every 800-1000m, does once infiltration examination Test, pipeline two is blocked, is 72h and tests and carry out respective record.After the completion of infiltration test, with electronic force (forcing) pump to pipeline plus Pressure, (pressure requires to meet the requirement of GBJ242-82), voltage stabilizing 10min after reaching pressure requirement, gauge pressure drop-out value is less than 0.05MPa, is qualified, otherwise ascertains the reason, again pour water after repairing, do the water pressure test, until qualified.Hydraulic test of pipeline is complete Bi Hou, to carrying out the stepped backfill of rammed earth at bell and spigot.
Above-mentioned pipe laying method, first surveying setting-out, and execute excavation pit;Based on pipeline foundation levelling bullet center line, Check pipeline quality, execution down tube operation;Spelling steel truss crane, and install its pipe both sides jack, completes to lift by crane to be installed Pipe operations;Clean pipe bell and spigot, and rubber ring is installed;Execution boil on the nape opposite the mouth draws in operation, and carries out matter to the equipment after installing Amount checks steel truss crane described in backed off after random;Underwater pipeline stabilizing operates, and carries out backfill operation after executing two correlation tests.Above-mentioned side Method is applied to band large-scale metal and the laying of nonmetal pipeline engineering, is particularly well-suited to Large Diameter Pipeline, excavation is deep, forced landing is big, landform is multiple The engineering that miscellaneous, multitube is constructed simultaneously, and the equipment being utilized is simple, less investment, low cost, operational procedure is easily grasped, is operated letter Single, laying effect is good.
Based on same inventive concept, also provide a kind of pipe laying unit, due to this device solve problem principle with front State a kind of pipe laying method similar, therefore, the enforcement of this device can be realized according to the concrete steps of preceding method, repeats it Place repeats no more.
As shown in Fig. 2 the structural representation for one of embodiment pipe laying unit.This pipe laying unit 10 include measurement and excavate module 100, check that installing module 300, second with performing module 200, first installs module 400, inspection Look into and exit module 500 and underwater pipeline stabilizing and backfill module 600.
Wherein, measurement is used for surveying setting-out with excavating module 100, and executes excavation pit;Check and use with performing module 200 In based on pipeline foundation levelling bullet center line, checking pipeline quality, execution down tube operates;First installs module 300 is used for spelling steel Overhead crane, and its pipe both sides jack is installed, complete to lift by crane pipe operations to be installed;Second installation module 400 is used for cleaning Pipe bell and spigot, and rubber ring is installed;Check and draw in operation with exiting module 500 and being used for executing boil on the nape opposite the mouth, and to setting after installing Standby carry out steel truss crane described in quality examination backed off after random;Underwater pipeline stabilizing is used for underwater pipeline stabilizing with backfill module 600 and operates, and executes two phases Carry out backfill operation after closing test.
In the present embodiment, installation rubber ring is O-shaped rubber ring, and two related experiment include:Pipeline infiltration test and water Pressure test.
In one embodiment, this pipe laying unit 10 also includes:Spray performing module 700 (not shown) to be used for The rubber ring surface installed is lubricated with the spraying operation of agent.
Above-mentioned pipe laying unit, first measurement and excavation module 100 surveying setting-out, and execute excavation pit;Check with Performing module 200 is based on pipeline foundation levelling bullet center line, checks pipeline quality, execution down tube operation;First 300 groups of module of installation Spell steel truss crane, and its pipe both sides jack is installed, complete to lift by crane pipe operations to be installed;Second installation module 400 cleans Pipe bell and spigot, and rubber ring is installed;Check and exit module 500 execution boil on the nape opposite the mouth and draw in operation, and the equipment after installing is entered Steel truss crane described in row quality examination backed off after random;Underwater pipeline stabilizing and backfill module 600 execution underwater pipeline stabilizing operation, and execute two related examinations Carry out backfill operation after testing.Said apparatus are applied to band large-scale metal and the laying of nonmetal pipeline engineering, are particularly well-suited to big Caliber, excavate the engineering that deep, forced landing is big, with a varied topography, multitube is constructed simultaneously, and the equipment being utilized is simple, less investment, cost Low, operational procedure easily grasps, simple to operate, and laying effect is good.
One of ordinary skill in the art will appreciate that realizing all or part of flow process in above-described embodiment method, it is permissible Instruct related hardware to complete by computer program, described program can be stored in a computer read/write memory medium In, this program is upon execution, it may include as the flow process of the embodiment of above-mentioned each method.Wherein, described storage medium can be magnetic Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access Memory, RAM) etc..
Each technical characteristic of embodiment described above can arbitrarily be combined, for making description succinct, not to above-mentioned reality The all possible combination of each technical characteristic applied in example is all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all it is considered to be the scope of this specification record.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (8)

1. a kind of pipe laying method is it is characterised in that methods described includes:
Surveying setting-out, and execute excavation pit;
Based on pipeline foundation levelling bullet center line, check pipeline quality, execution down tube operation;
Spelling steel truss crane, and its pipe both sides jack is installed, complete to lift by crane pipe operations to be installed;
Clean pipe bell and spigot, and rubber ring is installed;
Execution boil on the nape opposite the mouth draws in operation, and carries out steel truss crane described in quality examination backed off after random to the equipment after installing;
Underwater pipeline stabilizing operates, and carries out backfill operation after executing two correlation tests.
2. pipe laying method according to claim 1 is it is characterised in that described installation rubber ring is O-shaped rubber ring.
3. pipe laying method according to claim 1 is it is characterised in that wrap after the step of described installation rubber ring Include:The described rubber ring surface installed is lubricated with the spraying operation of agent.
4. pipe laying method according to claim 1 is it is characterised in that described two related experiment includes:Pipeline oozes Water test and the water pressure test.
5. a kind of pipe laying unit is it is characterised in that described device includes:
Measurement and excavation module, for surveying setting-out, and execute excavation pit;
Check and performing module, for based on pipeline foundation levelling bullet center line, checking pipeline quality, execution down tube operation;
First installation module, for spelling steel truss crane, and installs its pipe both sides jack, completes to lift by crane pipeline behaviour to be installed Make;
Second installation module, for cleaning pipe bell and spigot, and installs rubber ring;
Check and exit module, draw in operation for executing boil on the nape opposite the mouth, and quality examination backed off after random institute is carried out to the equipment after installing State steel truss crane;
Underwater pipeline stabilizing and backfill module, for underwater pipeline stabilizing operation, and carry out backfill operation after executing two correlation tests.
6. pipe laying unit according to claim 5 is it is characterised in that described installation rubber ring is O-shaped rubber ring.
7. pipe laying unit according to claim 5 is it is characterised in that also include:Spray performing module, for peace The described rubber ring surface of dress is lubricated the spraying operation of agent.
8. pipe laying unit according to claim 5 is it is characterised in that described two related experiment includes:Pipeline oozes Water test and the water pressure test.
CN201610942109.6A 2016-10-26 2016-10-26 Method and device for pipeline laying Pending CN106402492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610942109.6A CN106402492A (en) 2016-10-26 2016-10-26 Method and device for pipeline laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610942109.6A CN106402492A (en) 2016-10-26 2016-10-26 Method and device for pipeline laying

Publications (1)

Publication Number Publication Date
CN106402492A true CN106402492A (en) 2017-02-15

Family

ID=58013620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610942109.6A Pending CN106402492A (en) 2016-10-26 2016-10-26 Method and device for pipeline laying

Country Status (1)

Country Link
CN (1) CN106402492A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948458A (en) * 2017-05-19 2017-07-14 中国水利水电第四工程局有限公司 A kind of drainage management construction method
CN106978843A (en) * 2017-04-25 2017-07-25 杭州之江市政建设有限公司 Municipal drainage pipeline construction technology
CN107090870A (en) * 2017-05-19 2017-08-25 中国水利水电第四工程局有限公司 A kind of feedwater piping construction method
CN112145796A (en) * 2020-09-23 2020-12-29 鸿川建设工程有限公司 Hydraulic traction installation construction method for double-rubber-ring socket type large-diameter pipeline
CN115978296A (en) * 2022-12-08 2023-04-18 宁波市政工程建设集团股份有限公司 Anti-deformation construction method for electric melting connection of large-diameter flexible pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3978678A (en) * 1975-10-14 1976-09-07 Hydrotech International, Inc. Method and apparatus for plugging a pipeline
RU2170796C2 (en) * 1999-03-16 2001-07-20 Кубанский государственный аграрный университет Method for driving pipelines over slopes
CN1558129A (en) * 2004-01-30 2004-12-29 胜利油田胜利石油化工建设有限责任公 Construction method for river crossing pipeline
CN103485410A (en) * 2012-06-14 2014-01-01 中冶天工集团有限公司 Installation and construction method for super-large-diameter reinforced concrete rebated pipe
CN106351313A (en) * 2016-08-30 2017-01-25 中铁十九局集团矿业投资有限公司 Construction method and device based on pipeline laying frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3978678A (en) * 1975-10-14 1976-09-07 Hydrotech International, Inc. Method and apparatus for plugging a pipeline
RU2170796C2 (en) * 1999-03-16 2001-07-20 Кубанский государственный аграрный университет Method for driving pipelines over slopes
CN1558129A (en) * 2004-01-30 2004-12-29 胜利油田胜利石油化工建设有限责任公 Construction method for river crossing pipeline
CN103485410A (en) * 2012-06-14 2014-01-01 中冶天工集团有限公司 Installation and construction method for super-large-diameter reinforced concrete rebated pipe
CN106351313A (en) * 2016-08-30 2017-01-25 中铁十九局集团矿业投资有限公司 Construction method and device based on pipeline laying frame

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王丽丽: "大口径输气管道穿越长距离岩石层的技术研究与应用", 《工程技术》 *
郭艳林 等: "海底管道铺设施工设计分析", 《石油学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978843A (en) * 2017-04-25 2017-07-25 杭州之江市政建设有限公司 Municipal drainage pipeline construction technology
CN106978843B (en) * 2017-04-25 2019-11-15 杭州之江市政建设有限公司 Municipal drainage pipeline construction technology
CN106948458A (en) * 2017-05-19 2017-07-14 中国水利水电第四工程局有限公司 A kind of drainage management construction method
CN107090870A (en) * 2017-05-19 2017-08-25 中国水利水电第四工程局有限公司 A kind of feedwater piping construction method
CN112145796A (en) * 2020-09-23 2020-12-29 鸿川建设工程有限公司 Hydraulic traction installation construction method for double-rubber-ring socket type large-diameter pipeline
CN115978296A (en) * 2022-12-08 2023-04-18 宁波市政工程建设集团股份有限公司 Anti-deformation construction method for electric melting connection of large-diameter flexible pipeline

Similar Documents

Publication Publication Date Title
CN106402492A (en) Method and device for pipeline laying
CN106351313A (en) Construction method and device based on pipeline laying frame
CN111236957B (en) Mechanical pipe jacking construction process
CN105804758A (en) Shallow-earthing, large-section and small-distance construction method for rectangular pipe jacking overpass subway tunnel
CN109798396B (en) Long-distance large-caliber concrete pipe manual jacking process for complex stratum
CN111503368B (en) Pipe jacking construction method under sandy gravel geological condition
CN113756314B (en) Construction method suitable for excavation of deep large subway foundation pit of soft soil foundation in long triangular area
CN109797749B (en) Underwater foundation pit construction device and construction method
CN109083647A (en) A kind of shield machine translating station-crossing construction method
CN104929647A (en) Pipe jacking machine retaining device and mounting method thereof
CN115539095A (en) Waterproof and monitoring method for shield construction
CN104776268B (en) Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe
CN112681290A (en) Larsen steel sheet pile support construction process
CN113737796A (en) Construction method for high-pressure water flushing assisted pile driving and pile pulling synchronous grouting of steel plate pile
CN113236853A (en) Equipment and method for installing hole-penetrating pipe in long-distance embankment-penetrating sleeve
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN115369778A (en) Construction method of steel cross beam rotating body structure
CN113174931A (en) Underground continuous wall construction method based on in-situ pipeline protection
CN112815144A (en) Artificial pipe jacking construction process
CN110374109B (en) Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit
CN108797586A (en) A kind of construction method of anchor jacked pile
CN221150891U (en) Existing electric power pipe ditch suspension protection device for pipe gallery engineering
CN110242320B (en) Excavation method for middle steel pipe stand column of subway station
CN115143318A (en) Treatment method for incapability of drilling of jacking pipe in sand gravel layer jacking pipe construction process
CN113898006B (en) Stable and rapid jacking construction method for box culvert under large excavation surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170215