CN106401629A - Yielding anchor rod capable of monitoring yielding amount in real-time - Google Patents

Yielding anchor rod capable of monitoring yielding amount in real-time Download PDF

Info

Publication number
CN106401629A
CN106401629A CN201611155226.4A CN201611155226A CN106401629A CN 106401629 A CN106401629 A CN 106401629A CN 201611155226 A CN201611155226 A CN 201611155226A CN 106401629 A CN106401629 A CN 106401629A
Authority
CN
China
Prior art keywords
main rod
real
rod body
time monitoring
yielding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611155226.4A
Other languages
Chinese (zh)
Inventor
范浩
朱传奇
李少波
刘怀付
庞冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201611155226.4A priority Critical patent/CN106401629A/en
Publication of CN106401629A publication Critical patent/CN106401629A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/02Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection having means for indicating tension

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention relates to a yielding anchor rod capable of monitoring the yielding amount in real-time, which comprises a main rod body, wherein a main anchor body is arranged on the front end of the main rod body, and is inserted into an insertion chamber at the front end of the main rod body; the main anchor body is connected with the main rod body through a spring; a pull rope is arranged on the main anchor body; one end of the pull rope stretches out of the main rod body and is connected with a displacement reading unit; the displacement reading unit is used for displaying the displacement amount of the pull rope. The yielding anchor rod is ingenious in design, compact in structure, large in anchor rod yielding amount, capable of monitoring the yielding amount of the anchor rod in real-time and timely judging the support quality, realizes a circulation support process of primary support-yielding support-re-reinforced support, and is good in support effect.

Description

A kind of have real-time monitoring and allow the pressure-relieving achor bar of pressure amount
Technical field
The present invention relates to technical field of tunnel construction is and in particular to a kind of have real-time monitoring and allow the pressure-relieving achor bar of pressure amount.
Background technology
Anchor pole, as a kind of supporting tool, is widely used in deep-lying tunnel.Due to the shadow by deep-lying tunnel high-ground stress Ring, country rock can produce larger deflection, traditional rigid anchor pole, when country rock produces moderate finite deformation, is easily pulled off, thus losing Remove anchorage effect, just necessary therefore, it is possible to the pressure-relieving achor bar of effective buffering rock deformation pressure.
For solving above-mentioned technical problem, Patent No.:201520177865.5 patent text in a kind of big change of kilometer Shape pressure-relieving achor bar, this anchor pole can allow for country rock and produces larger deformation, buffers larger rock deformation pressure, but above-mentioned anchor pole Allow during pressure it is impossible to real-time monitoring pressure-relieving achor bar allow pressure amount, thus effectively cannot be sentenced to the supporting effect of anchor pole Disconnected, it is unfavorable for grasping the real-time supporting situation of anchor pole.
Content of the invention
There is real-time monitoring allow the pressure-relieving achor bar of pressure amount it is an object of the invention to provide a kind of, real-time monitoring can allow pressure amount While, can reach the purpose of multi-level, multi-faceted, system circulation supporting.
For achieving the above object, this combinative structure invention employed technical scheme comprise that:
A kind of have real-time monitoring and allow the pressure-relieving achor bar of pressure amount, and including main rod body, the front end of described main rod body is provided with master Anchor body, described Bower Anchor body is plugged on the grafting within the chamber of main rod body front end, between described Bower Anchor body and main rod body by spring even Connect, described Bower Anchor body is provided with drawstring, one end of described drawstring is stretched out main rod body and is connected with displacement readings unit, institute's rheme Move reading cell to be used for showing the displacement of drawstring.
The supplementary features of the present invention also presence are:
Described main rod body rear end is stretched out and is provided with transparent bend pipe on the body of rod of country rock, and the shaft of described transparent bend pipe is arranged There is graduation mark, in described transparent bend pipe, be provided with indicating arm, described indicating arm is used for the number of division on display scale line, indicating arm It is connected with one end of extension spring, the other end of extension spring is connected with the upper end of transparent bend pipe.
Described Bower Anchor body is arranged to T shape with the inserted terminal of grafting chamber, and the outer wall of this inserted terminal is provided with rubber ring, The inwall of the outer wall of described rubber ring and grafting chamber is against the opening of grafting chamber is arranged to closing in shape, and described spring is located at Arrange between the inserted terminal of Bower Anchor body and grafting chamber.
Transparent bend pipe extend straight up and tube chamber in be provided with roller, described drawstring be resisted against roller and arrange prolong upwards Stretch.
Described main rod body rear end is stretched out and is cased with packing ring on the body of rod of country rock, is provided with pre-load nut outside packing ring.
Described main rod body rear end is stretched out and is provided with Grouting Pipe on the body of rod of country rock.
Compared with prior art, the technique effect that the present invention possesses is:This pressure-relieving achor bar designs ingenious, compact conformation, anchor Bar makes pressure amount big, can allow pressure amount with real-time monitoring anchor pole, and supporting quality is made timely judges it is achieved that " first The circulation Bracing Process of the strengthening supporting of shield-yield supporting-again ", supporting effect is good, meanwhile, the detachable Posterior circle of bent tube section Use, saved cost.
Brief description
Fig. 1 be have real-time monitoring allow pressure amount pressure-relieving achor bar structural representation.
Specific embodiment
In conjunction with Fig. 1, the present invention is further described:
A kind of have real-time monitoring and allow the pressure-relieving achor bar of pressure amount, including main rod body 10, the front end setting of described main rod body 10 There is Bower Anchor body 20, described Bower Anchor body 20 is plugged in the grafting chamber 11 of main rod body 10 front end, described Bower Anchor body 20 and main rod body Connected by spring 30 between 10, described Bower Anchor body 20 is provided with drawstring 21, main rod body 10 is stretched out in one end of described drawstring 21 And be connected with displacement readings unit, described displacement readings unit is used for showing the displacement of drawstring 21;
It is 30cm that the maximum of pressure-relieving achor bar disclosed by the invention allows pressure distance, during use, first injects in the boring being drilled Anchor Agent, is inserted into mounted anchor pole, hangs up anchor net on tunnel wall, now can be adjusted pre- according to the requirement of actual condition Jack panel, and then adjust pretightning force.In Bracing Process, when country rock deforms, main rod body 10 and Bower Anchor body 20 can produce Relative displacement, and compress high-strength spring 30, thus releasing stress it is achieved that yield supporting, during this, drawstring 21 meeting Produce displacement, and using displacement readings unit, the displacement of drawstring 21 shown, i.e. this anchor pole of this displacement real-time Allow pressure amount, now, the anchoring quality of anchor pole can be judged according to the actual pressure amount that allows, if find to allow pressure amount be more than 25cm, can lead to Cross the mode of slip casting again strengthening supporting it is achieved that the circulation supporting of " initial support-yield supporting-again strengthening supporting " Journey.
This pressure-relieving achor bar designs ingenious, compact conformation, and anchor pole makes pressure amount big, can allow pressure amount with real-time monitoring anchor pole, and Supporting quality is made and timely judges the circulation supporting it is achieved that " initial support-yield supporting-again strengthening supporting " Journey, supporting effect is good, and meanwhile, the detachable Posterior circle of bent tube section uses, and has saved cost.
As the preferred version of the present invention, described main rod body 10 rear end is stretched out and is provided with transparent bend pipe on the body of rod of country rock 40, the shaft of described transparent bend pipe 40 is provided with graduation mark 41, in described transparent bend pipe 40, is provided with indicating arm 42, described finger Show bar 42 for the number of division on display scale line 41, indicating arm 42 is connected with one end of extension spring 50, the other end of extension spring 50 and The upper end of transparent bend pipe 40 connects;
In above-described embodiment, due to the relative displacement producing between Bower Anchor body 20 and main rod body 10, pull drawstring 21, drawstring 21 displacement is so that indicating arm 42 is located at slip in transparent bend pipe 40, thus operating personnel knows anchor pole through transparent bend pipe 40 Allow pressure amount, the anchoring quality of anchor pole is judged according to the actual pressure amount that allows, if find to make pressure amount larger, can be by the side of slip casting Formula strengthening supporting again.
Described Bower Anchor body 20 is arranged to T shape with the inserted terminal of grafting chamber 11, and the outer wall of this inserted terminal is provided with rubber Cushion rubber 22, the outer wall of described rubber ring 22 and the inwall of grafting chamber 11 against, the opening of grafting chamber 11 is arranged to closing in shape, Described spring 30 is arranged between the inserted terminal and grafting chamber 11 of Bower Anchor body 20.
Transparent bend pipe 40 extend straight up and tube chamber in be provided with roller 43, described drawstring 21 is resisted against roller 43 and sets Put and upwardly extend.
Described main rod body 10 rear end is stretched out and is cased with packing ring 60 on the body of rod of country rock, is provided with pre-load nut 70 outside packing ring 60; During above-mentioned anchor bolt construction, pre-load nut 70 can be adjusted according to the requirement of actual condition, and then adjust the pretightning force of anchor pole.
For realize anchor pole can slip casting function, described main rod body 10 rear end is stretched out and is provided with slip casting on the body of rod of country rock Pipe 12 and grout outlet.
It should be noted that above example, only in order to technical scheme to be described, is not intended to limit, although ginseng According to previous embodiment, the present invention is described in detail, it will be understood by those within the art that:It is still permissible Technical scheme described in foregoing embodiments is modified, or equivalent is carried out to wherein some technical characteristics, and These modifications or replacement, do not make the essence of appropriate technical solution depart from spirit and the model of various embodiments of the present invention technical scheme Enclose.

Claims (6)

1. a kind of have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Including main rod body (10), described main rod body (10) front end is provided with Bower Anchor body (20), and described Bower Anchor body (20) is plugged on the grafting chamber (11) of main rod body (10) front end Interior, it is connected by spring (30) between described Bower Anchor body (20) and main rod body (10), described Bower Anchor body (20) is provided with drawstring (21), one end of described drawstring (21) is stretched out main rod body (10) and is connected with displacement readings unit, and described displacement readings unit is used Displacement in display drawstring (21).
2. according to claim 1 have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Described main rod body (10) rear end is stretched out and is provided with transparent bend pipe (40) on the body of rod of country rock, and the shaft of described transparent bend pipe (40) is provided with scale Line (41), is provided with indicating arm (42) in described transparent bend pipe (40), described indicating arm (42) is used for display scale line (41) Number of division, indicating arm (42) is connected with one end of extension spring (50), the upper end of the other end of extension spring (50) and transparent bend pipe (40) Connect.
3. according to claim 1 and 2 have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Described Bower Anchor Body (20) is arranged to T shape with the inserted terminal of grafting chamber (11), and the outer wall of this inserted terminal is provided with rubber ring (22), described The inwall of the outer wall of rubber ring (22) and grafting chamber (11) is against the opening of grafting chamber (11) is arranged to closing in shape, described Spring (30) is arranged between the inserted terminal and grafting chamber (11) of Bower Anchor body (20).
4. according to claim 2 have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Transparent bend pipe (40) It is provided with roller (43) straight up, described drawstring (21) is resisted against roller (43) and setting upwardly extends in extension and tube chamber.
5. according to claim 2 have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Described main rod body (10) rear end is stretched out and is cased with packing ring (60) on the body of rod of country rock, is provided with pre-load nut (70) outside packing ring (60).
6. according to claim 5 have real-time monitoring allow pressure amount pressure-relieving achor bar it is characterised in that:Described main rod body (10) rear end is stretched out and is provided with Grouting Pipe (12) and grout outlet on the body of rod of country rock.
CN201611155226.4A 2016-12-14 2016-12-14 Yielding anchor rod capable of monitoring yielding amount in real-time Pending CN106401629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611155226.4A CN106401629A (en) 2016-12-14 2016-12-14 Yielding anchor rod capable of monitoring yielding amount in real-time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611155226.4A CN106401629A (en) 2016-12-14 2016-12-14 Yielding anchor rod capable of monitoring yielding amount in real-time

Publications (1)

Publication Number Publication Date
CN106401629A true CN106401629A (en) 2017-02-15

Family

ID=58087560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611155226.4A Pending CN106401629A (en) 2016-12-14 2016-12-14 Yielding anchor rod capable of monitoring yielding amount in real-time

Country Status (1)

Country Link
CN (1) CN106401629A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559033A (en) * 2017-10-31 2018-01-09 武汉理工大学 A kind of multi-functional pressure-relieving achor bar
CN110195608A (en) * 2019-06-18 2019-09-03 福州大学 A kind of large deformation tunnel pressure-relieving achor bar measuring pressure from surrounding rock
CN110274567A (en) * 2019-06-20 2019-09-24 天地科技股份有限公司 A kind of detection device and detection method of roadway surrounding rock sliding deformation
WO2020224223A1 (en) * 2019-05-05 2020-11-12 中国矿业大学 Anchor rod for surrounding rock support and instability monitoring, and mounting method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1312179A2 (en) * 1985-04-04 1987-05-23 Войсковая Часть 13073 Roof bolt setting method
CN2076227U (en) * 1990-06-06 1991-05-01 中国矿业大学 Pipe seam anchoring type multi-point displacement meter
JPH1143941A (en) * 1997-07-29 1999-02-16 Ohbayashi Corp Anchor fixture part structure
CN102536283A (en) * 2012-02-24 2012-07-04 安徽理工大学 Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN202866844U (en) * 2012-09-02 2013-04-10 山东科技大学 Resistance increasing deformed anchor rod or anchor cable anchoring quality monitoring device
CN103643977A (en) * 2013-11-21 2014-03-19 中国矿业大学 Full-anchor partition pressure transferring grouting anchor rod and application method thereof
CN204511481U (en) * 2015-03-27 2015-07-29 中国矿业大学 A kind of large deformation pressure-relieving achor bar
CN205277467U (en) * 2015-12-31 2016-06-01 西安科技大学 Elasticity lets presses early warning stock
CN206256922U (en) * 2016-12-14 2017-06-16 安徽理工大学 A kind of pressure-relieving achor bar for allowing pressure amount with real-time monitoring

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1312179A2 (en) * 1985-04-04 1987-05-23 Войсковая Часть 13073 Roof bolt setting method
CN2076227U (en) * 1990-06-06 1991-05-01 中国矿业大学 Pipe seam anchoring type multi-point displacement meter
JPH1143941A (en) * 1997-07-29 1999-02-16 Ohbayashi Corp Anchor fixture part structure
CN102536283A (en) * 2012-02-24 2012-07-04 安徽理工大学 Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN202866844U (en) * 2012-09-02 2013-04-10 山东科技大学 Resistance increasing deformed anchor rod or anchor cable anchoring quality monitoring device
CN103643977A (en) * 2013-11-21 2014-03-19 中国矿业大学 Full-anchor partition pressure transferring grouting anchor rod and application method thereof
CN204511481U (en) * 2015-03-27 2015-07-29 中国矿业大学 A kind of large deformation pressure-relieving achor bar
CN205277467U (en) * 2015-12-31 2016-06-01 西安科技大学 Elasticity lets presses early warning stock
CN206256922U (en) * 2016-12-14 2017-06-16 安徽理工大学 A kind of pressure-relieving achor bar for allowing pressure amount with real-time monitoring

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559033A (en) * 2017-10-31 2018-01-09 武汉理工大学 A kind of multi-functional pressure-relieving achor bar
WO2020224223A1 (en) * 2019-05-05 2020-11-12 中国矿业大学 Anchor rod for surrounding rock support and instability monitoring, and mounting method thereof
CN110195608A (en) * 2019-06-18 2019-09-03 福州大学 A kind of large deformation tunnel pressure-relieving achor bar measuring pressure from surrounding rock
CN110274567A (en) * 2019-06-20 2019-09-24 天地科技股份有限公司 A kind of detection device and detection method of roadway surrounding rock sliding deformation
CN110274567B (en) * 2019-06-20 2021-03-12 天地科技股份有限公司 Detection device and detection method for roadway surrounding rock slippage deformation

Similar Documents

Publication Publication Date Title
CN106401629A (en) Yielding anchor rod capable of monitoring yielding amount in real-time
CN201254993Y (en) O-shaped composite supporting construction for tunnel
CN206256922U (en) A kind of pressure-relieving achor bar for allowing pressure amount with real-time monitoring
CN103982206B (en) A kind of underground engineering roadway yield supporting system
CN105937407A (en) Gob-side entry retaining concrete filled wall annular air bag construction method
CN202882942U (en) Confined concrete quantifying yielding arch centering based on mining U-shaped steels
CN206143771U (en) Belted steel strip aerify stock
CN205260049U (en) Deep roadway support uses novel concrete support
CN206346505U (en) A kind of cast-in-place integral system construction supporting structure of heat-preserving wall
CN209510356U (en) A kind of novel high-strength anchor pole
CN203483491U (en) Vertebral body dilator
CN201254995Y (en) U-shaped composite supporting construction for tunnel
CN207160261U (en) A kind of assembled architecture reinforced concrete foundation detached column element structure
CN203813354U (en) Special bracket for inserting cable in municipal engineering
CN208792732U (en) A kind of limited block for building
CN105490233B (en) A kind of wire highway crossing device
CN210439961U (en) Plug-in type cat ladder of installation in ground well
CN208073459U (en) A kind of frictional airbag apparatus for fixing multipoint displacement meter
CN203925532U (en) A kind of tunnel i-beam frame
CN209523771U (en) A kind of pressure-relieving achor bar enhancing anchoring
CN206571131U (en) A kind of builder's jack for housing construction
CN208831031U (en) A kind of building municipal works anchor pole
CN208462495U (en) A kind of reinforced concrete works structure bar planting formula planting trough construction
CN206205896U (en) A kind of tunnel anti-collapse supporting construction
CN207245046U (en) A kind of guardrail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215