CN106392492A - Steel ball production machining method - Google Patents

Steel ball production machining method Download PDF

Info

Publication number
CN106392492A
CN106392492A CN201611035230.7A CN201611035230A CN106392492A CN 106392492 A CN106392492 A CN 106392492A CN 201611035230 A CN201611035230 A CN 201611035230A CN 106392492 A CN106392492 A CN 106392492A
Authority
CN
China
Prior art keywords
steel ball
prefabricated steel
carried out
content
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611035230.7A
Other languages
Chinese (zh)
Other versions
CN106392492B (en
Inventor
张晶磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Original Assignee
ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd filed Critical ANSHUN HONGYI SPECIAL STEEL BALL MANUFACTURING Co Ltd
Priority to CN201611035230.7A priority Critical patent/CN106392492B/en
Publication of CN106392492A publication Critical patent/CN106392492A/en
Application granted granted Critical
Publication of CN106392492B publication Critical patent/CN106392492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a steel ball production machining method. The method comprises the steps of selecting a proper finished product wire raw material, sequentially carrying out wire straightening, shearing, passivating, annealing, quenching, first-time tempering, grinding, second-time tempering and cleaning, and obtaining steel ball finished products. A shorn cylindrical blank is subject to passivating treatment through a tumbling mill, defects of flanges and the like generated after shearing are overcome, the under-punching defect appearing in the subsequent cold upsetting process is overcome, and in addition, compared with an existing heat treatment technology, the method has the beneficial effects that the hardness and the strength of the steel balls are obviously improved, and the quality requirement of the steel balls is met.

Description

Steel ball production and processing method
Technical field
The present invention relates to a kind of metal processing sectors are and in particular to a kind of steel ball production and processing method.
Background technology
Steel ball is important base parts and components, and especially accurate industrial ball plays huge work in the national economic development With.It is often necessary to the steel ball of special substance under some specific conditions, to complete the required function of reaching under varying environment. Some special substance steel balls are widely used in national economy every field in fact, including 9Cr18,3Cr13 rustless steel, copper, Aluminum, titanium alloy steel and Achatess, glass, Ceramic Balls etc..Their popularization and application, have not only promoted steel ball to produce the development of industry, And also promote technology development and the scientific and technological progress of relevant industries.In existing steel ball production and processing method at present, obtain Steel ball surface quality difference and geometric accuracy not high, and do not reach the qualified hardness of bearing steel ball and intensity.
Content of the invention
For above-mentioned the deficiencies in the prior art, the technical problem to be solved is:A kind of steel ball how is provided to become Type quality is high, surface accuracy high so as to get steel ball there is the steel ball production and processing method of high rigidity and high intensity.
In order to solve above-mentioned technical problem, present invention employs following technical scheme:
A kind of steel ball production and processing method it is characterised in that:Comprise the following steps:
1)Choose finished product wire feedstock:C content be 0.15~0.20%, Si content be 0.03~0.10%, Mn content be 0.30~ 0.90%, P content is 0.015~0.030%, S content is 0.017~0.035%;
2)Finished wire rod is carried out straightening processing by straightener, then finished wire rod is cut into cylinder blank, then Cylinder blank is put in cleaning mill, the corner on cylinder blank is passivated processing, afterwards cold-heading is carried out to it and obtain To prefabricated steel ball;
3)Prefabricated steel ball is carried out spheroidizing process:Firing rate according to 12 DEG C/min is heated to 400 to prefabricated steel ball~ 450 DEG C, and it is incubated 0.5~1h, then the firing rate of 8 DEG C/min is heated to 850~900 DEG C to prefabricated steel ball again, and is incubated 3 ~4h, then stove come out of the stove after being cooled to 500 DEG C, then be air cooled to room temperature;
4)Prefabricated steel ball is carried out again Quenching Treatment:Prefabricated steel ball is heated to 800~850 DEG C, and is incubated 1h, be again heated to 970~1020 DEG C, and it is incubated 2h, afterwards prefabricated steel ball is put into 40~60 DEG C of quenching-in water to pre-manufactured steel spherical surface temperature extremely After 300~350 DEG C, take out after placing in 30~50 DEG C of machine oil to pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is carried out again temper:Prefabricated steel ball is tempered, temperature is 150~200 DEG C, tempering is situated between Matter is oil, and tempering time is 2~3h;
6)Prefabricated steel ball is put in grinder, and adds lapping liquid to carry out grinding for the first time, lapping liquid includes granularity and is less than Or the corundum equal to 0.1 μm and oil, take out prefabricated steel ball afterwards and be reentered in grinder, and add metalworking coolant to carry out Grind for second, finally obtain fine grinding steel ball;
7)Fine grinding steel ball is carried out double tempering process:Temperature is 150~200 DEG C, and temper medium is air, tempering time For 6~7h;
8)Fine grinding steel ball is carried out, obtains finished product.
In sum, the beneficial effects of the present invention is:The cylinder blank that the present invention obtains after shearing is through cleaning mill Passivation Treatment, allow the defect such as overlap producing after shearing to be eliminated, it is to avoid the defect of owe punching in follow-up cold-heading. In addition, compared with existing Technology for Heating Processing, the hardness of steel ball and strength character are all significantly increased, and meet the quality of steel ball Require.
Specific embodiment
The present invention is described in further detail below.
Embodiment 1
Steel ball production and processing method in this specific embodiment, comprises the following steps:
1)Choose finished product wire feedstock:C content is 0.15%, Si content is 0.30% for 0.03%, Mn content, and P content is 0.015%, S content is 0.017%;
2)Finished wire rod is carried out straightening processing by straightener, then finished wire rod is cut into cylinder blank, then Cylinder blank is put in cleaning mill, the corner on cylinder blank is passivated processing, afterwards cold-heading is carried out to it and obtain To prefabricated steel ball;
3)Prefabricated steel ball is carried out spheroidizing process:Firing rate according to 12 DEG C/min is heated to 400 DEG C to prefabricated steel ball, And it is incubated 0.5h, then the firing rate of 8 DEG C/min is heated to 850 DEG C to prefabricated steel ball again, and is incubated 3h, and then stove is cooled to Come out of the stove after 500 DEG C, then be air cooled to room temperature;
4)Prefabricated steel ball is carried out again Quenching Treatment:Prefabricated steel ball is heated to 800 DEG C, and is incubated 1h, be again heated to 970 DEG C, And it is incubated 2h, afterwards prefabricated steel ball is put into 40 DEG C of quenching-in water to pre-manufactured steel spherical surface temperature to after 300 DEG C, place into 30 DEG C machine oil in pre-manufactured steel spherical surface temperature to oil temperature after take out;
5)Prefabricated steel ball is carried out again temper:Prefabricated steel ball is tempered, temperature is 150 DEG C, temper medium is Oil, tempering time is 2h;
6)Prefabricated steel ball is put in grinder, and adds lapping liquid to carry out grinding for the first time, lapping liquid includes granularity and is less than Or the corundum equal to 0.1 μm and oil, take out prefabricated steel ball afterwards and be reentered in grinder, and add metalworking coolant to carry out Grind for second, finally obtain fine grinding steel ball;
7)Fine grinding steel ball is carried out double tempering process:Temperature is 150 DEG C, and temper medium is air, and tempering time is 6h;
8)Fine grinding steel ball is carried out, obtains finished product.
Embodiment 2
Steel ball production and processing method in this specific embodiment, comprises the following steps:
1)Choose finished product wire feedstock:C content is 0.20%, Si content is 0.90% for 0.10%, Mn content, and P content is 0.030%, S content is 0.035%;
2)Finished wire rod is carried out straightening processing by straightener, then finished wire rod is cut into cylinder blank, then Cylinder blank is put in cleaning mill, the corner on cylinder blank is passivated processing, afterwards cold-heading is carried out to it and obtain To prefabricated steel ball;
3)Prefabricated steel ball is carried out spheroidizing process:Firing rate according to 12 DEG C/min is heated to 450 DEG C to prefabricated steel ball, And it is incubated 1h, then the firing rate of 8 DEG C/min is heated to 900 DEG C to prefabricated steel ball again, and is incubated 4h, and then stove is cooled to 500 Come out of the stove after DEG C, then be air cooled to room temperature;
4)Prefabricated steel ball is carried out again Quenching Treatment:Prefabricated steel ball is heated to 850 DEG C, and is incubated 1h, be again heated to 1020 DEG C, And it is incubated 2h, afterwards prefabricated steel ball is put into 60 DEG C of quenching-in water to pre-manufactured steel spherical surface temperature to after 350 DEG C, place into 50 DEG C machine oil in pre-manufactured steel spherical surface temperature to oil temperature after take out;
5)Prefabricated steel ball is carried out again temper:Prefabricated steel ball is tempered, temperature is 200 DEG C, temper medium is Oil, tempering time is 3h;
6)Prefabricated steel ball is put in grinder, and adds lapping liquid to carry out grinding for the first time, lapping liquid includes granularity and is less than Or the corundum equal to 0.1 μm and oil, take out prefabricated steel ball afterwards and be reentered in grinder, and add metalworking coolant to carry out Grind for second, finally obtain fine grinding steel ball;
7)Fine grinding steel ball is carried out double tempering process:Temperature is 200 DEG C, and temper medium is air, and tempering time is h;
8)Fine grinding steel ball is carried out, obtains finished product.
Finally illustrate, above example only in order to technical scheme to be described and unrestricted, although by ginseng According to the preferred embodiments of the present invention, invention has been described, it should be appreciated by those of ordinary skill in the art that can So that in the form and details it is made with various changes, the present invention being limited without departing from appended claims Spirit and scope.

Claims (1)

1. a kind of steel ball production and processing method it is characterised in that:Comprise the following steps:
1)Choose finished product wire feedstock:C content be 0.15~0.20%, Si content be 0.03~0.10%, Mn content be 0.30~ 0.90%, P content is 0.015~0.030%, S content is 0.017~0.035%;
2)Finished wire rod is carried out straightening processing by straightener, then finished wire rod is cut into cylinder blank, then Cylinder blank is put in cleaning mill, the corner on cylinder blank is passivated processing, afterwards cold-heading is carried out to it and obtain To prefabricated steel ball;
3)Prefabricated steel ball is carried out spheroidizing process:Firing rate according to 12 DEG C/min is heated to 400 to prefabricated steel ball~ 450 DEG C, and it is incubated 0.5~1h, then the firing rate of 8 DEG C/min is heated to 850~900 DEG C to prefabricated steel ball again, and is incubated 3 ~4h, then stove come out of the stove after being cooled to 500 DEG C, then be air cooled to room temperature;
4)Prefabricated steel ball is carried out again Quenching Treatment:Prefabricated steel ball is heated to 800~850 DEG C, and is incubated 1h, be again heated to 970~1020 DEG C, and it is incubated 2h, afterwards prefabricated steel ball is put into 40~60 DEG C of quenching-in water to pre-manufactured steel spherical surface temperature extremely After 300~350 DEG C, take out after placing in 30~50 DEG C of machine oil to pre-manufactured steel spherical surface temperature to oil temperature;
5)Prefabricated steel ball is carried out again temper:Prefabricated steel ball is tempered, temperature is 150~200 DEG C, tempering is situated between Matter is oil, and tempering time is 2~3h;
6)Prefabricated steel ball is put in grinder, and adds lapping liquid to carry out grinding for the first time, lapping liquid includes granularity and is less than Or the corundum equal to 0.1 μm and oil, take out prefabricated steel ball afterwards and be reentered in grinder, and add metalworking coolant to carry out Grind for second, finally obtain fine grinding steel ball;
7)Fine grinding steel ball is carried out double tempering process:Temperature is 150~200 DEG C, and temper medium is air, tempering time For 6~7h;
8)Fine grinding steel ball is carried out, obtains finished product.
CN201611035230.7A 2016-11-23 2016-11-23 Steel ball production and processing method Active CN106392492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611035230.7A CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611035230.7A CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Publications (2)

Publication Number Publication Date
CN106392492A true CN106392492A (en) 2017-02-15
CN106392492B CN106392492B (en) 2018-06-15

Family

ID=58081788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611035230.7A Active CN106392492B (en) 2016-11-23 2016-11-23 Steel ball production and processing method

Country Status (1)

Country Link
CN (1) CN106392492B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186447A (en) * 2017-07-15 2017-09-22 芜湖市宇恒特种钢球有限公司 A kind of processing method of bearing steel ball
CN109082518A (en) * 2018-09-19 2018-12-25 铜陵市明诚铸造有限责任公司 A kind of annealing and cooling device of hot rolling steel ball
CN110303304A (en) * 2019-07-23 2019-10-08 重庆申耀机械工业有限责任公司 A kind of processing technology of roller
CN110977346A (en) * 2019-12-10 2020-04-10 苏州工业园区科海机电工程有限公司 Steel product processing technology
CN112059542A (en) * 2020-08-19 2020-12-11 云南昆钢耐磨材料科技股份有限公司 Production process of high-carbon microalloyed steel ball

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0783232A (en) * 1993-09-20 1995-03-28 Nippon Seiko Kk Manufacture of ball for ball bearing
EP1270142A2 (en) * 2001-06-28 2003-01-02 Koyo Seiko Co., Ltd. Manufacturing method of steel ball for rolling bearing
CN101186005A (en) * 2007-11-30 2008-05-28 洛阳轴研科技股份有限公司 Processing technique of 9Cr18 stainless steel capable of being improved to G3 level
CN101185955A (en) * 2007-12-21 2008-05-28 江南大学 Steel ball cold heading technique and steel ball cold header
CN101724742A (en) * 2008-10-22 2010-06-09 洛阳轴研科技股份有限公司 Heat treatment process of notch ductile steel bearing balls
CN102252024A (en) * 2011-02-14 2011-11-23 江苏力星通用钢球股份有限公司 Steel ball special for third-age hub bearing for luxury cars
CN103008994A (en) * 2012-12-12 2013-04-03 山东东阿钢球集团有限公司 Production method for dedicated steel ball for bearing of high-speed high-precision numerical control machine tool
CN104259790A (en) * 2014-10-04 2015-01-07 芜湖市宇恒特种钢球有限公司 Method for machining high-precision steel ball

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0783232A (en) * 1993-09-20 1995-03-28 Nippon Seiko Kk Manufacture of ball for ball bearing
EP1270142A2 (en) * 2001-06-28 2003-01-02 Koyo Seiko Co., Ltd. Manufacturing method of steel ball for rolling bearing
CN101186005A (en) * 2007-11-30 2008-05-28 洛阳轴研科技股份有限公司 Processing technique of 9Cr18 stainless steel capable of being improved to G3 level
CN101185955A (en) * 2007-12-21 2008-05-28 江南大学 Steel ball cold heading technique and steel ball cold header
CN101724742A (en) * 2008-10-22 2010-06-09 洛阳轴研科技股份有限公司 Heat treatment process of notch ductile steel bearing balls
CN102252024A (en) * 2011-02-14 2011-11-23 江苏力星通用钢球股份有限公司 Steel ball special for third-age hub bearing for luxury cars
CN103008994A (en) * 2012-12-12 2013-04-03 山东东阿钢球集团有限公司 Production method for dedicated steel ball for bearing of high-speed high-precision numerical control machine tool
CN104259790A (en) * 2014-10-04 2015-01-07 芜湖市宇恒特种钢球有限公司 Method for machining high-precision steel ball

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186447A (en) * 2017-07-15 2017-09-22 芜湖市宇恒特种钢球有限公司 A kind of processing method of bearing steel ball
CN109082518A (en) * 2018-09-19 2018-12-25 铜陵市明诚铸造有限责任公司 A kind of annealing and cooling device of hot rolling steel ball
CN110303304A (en) * 2019-07-23 2019-10-08 重庆申耀机械工业有限责任公司 A kind of processing technology of roller
CN110303304B (en) * 2019-07-23 2022-03-15 重庆申耀机械工业有限责任公司 Processing technique of roller
CN110977346A (en) * 2019-12-10 2020-04-10 苏州工业园区科海机电工程有限公司 Steel product processing technology
CN112059542A (en) * 2020-08-19 2020-12-11 云南昆钢耐磨材料科技股份有限公司 Production process of high-carbon microalloyed steel ball

Also Published As

Publication number Publication date
CN106392492B (en) 2018-06-15

Similar Documents

Publication Publication Date Title
CN106392492B (en) Steel ball production and processing method
CN105583588B (en) A kind of processing method for taper roll bearing Internal and external cycle
CN104388859A (en) Method for simultaneously improving strength and plasticity of copper aluminum alloy
CN107345290B (en) A kind of manufacturing method of TC4 titanium alloy thin wall ring
CN104328259A (en) GCr15 high carbon chromium bearing steel on-line rapid spheroidizing annealing technology
CN109290371B (en) Cold rolling manufacturing method of copper-aluminum composite plate strip
CN109894473A (en) A kind of method that continuous casting billet directly forges production hot die steel
CN105088085A (en) High-performance cold mill intermediate roll and preparation method thereof
Gorbatyuk et al. Reindustrialization principles in the heat treatment of die steels
CN102766803A (en) Free forging processing process of alloyed tool steel 5CrNiMo for footstep shaft
CN110804690A (en) Manufacturing process for improving ultrasonic detection qualification rate of 42CrMo forge piece
CN102251250B (en) Rolling method for pickling line thermal annealing of low-chromium 400 series stainless steel
CN105420470A (en) Surface-hardening treatment method for austenitic steel
CN105714027A (en) Heat treatment process for hardening and tempering of 45 steel
CN103753116A (en) Method for manufacturing working roll of sendzimir mill
CN110153199A (en) A kind of controlled rolling method of large scale rod bar
CN104745787B (en) Production method of tool steel capable of being directly cold rolled
CN112536406B (en) Forging drawing method for avoiding surface cracking
CN105215641A (en) The forging processing method of locking bolt
CN107984173A (en) A kind of processing method of bearing ring
CN110592341A (en) Annealing softening heat treatment method for rock drilling tool steel
CN115555806A (en) Wire rod preparation method capable of improving stainless steel rivet yield
CN110153186B (en) Method for preparing high alloy tool and die steel hollow pipe blank, hollow pipe blank and annular cutter
CN106048455B (en) A kind of processing method of mold materials for high intensity forging
CN105986080A (en) Heat treatment technology of 38CrMnAl steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant