CN106391392A - Battery coating equipment - Google Patents
Battery coating equipment Download PDFInfo
- Publication number
- CN106391392A CN106391392A CN201610356554.4A CN201610356554A CN106391392A CN 106391392 A CN106391392 A CN 106391392A CN 201610356554 A CN201610356554 A CN 201610356554A CN 106391392 A CN106391392 A CN 106391392A
- Authority
- CN
- China
- Prior art keywords
- coating
- hopper
- section
- set electron
- supplied materials
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C1/00—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating
- B05C1/04—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating for applying liquid or other fluent material to work of indefinite length
- B05C1/14—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating for applying liquid or other fluent material to work of indefinite length using a travelling band
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C11/00—Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
- B05C11/10—Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
- B05C11/1002—Means for controlling supply, i.e. flow or pressure, of liquid or other fluent material to the applying apparatus, e.g. valves
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C13/00—Means for manipulating or holding work, e.g. for separate articles
- B05C13/02—Means for manipulating or holding work, e.g. for separate articles for particular articles
Landscapes
- Coating Apparatus (AREA)
Abstract
The invention provides battery coating equipment, and belongs to the technical field of battery production. The battery coating equipment comprises a machine frame, a feeding channel and a coating mechanism. The feeding channel is arranged on the machine frame, used for conveying a collected electron and provided with a coating station. The coating mechanism is used for coating the outer wall of a copper nail of the collected electron located on the coating station with a coating, and a single butt connection point is formed between the coating mechanism and the copper nail of the collected electron. The battery coating equipment has the advantages of being reasonable in design and high in working efficiency.
Description
Technical field
The invention belongs to technical field of battery production, it is related to a kind of cell coating equipment, special
It is not a kind of cell coating equipment being applied to automatic battery production line.
Background technology
With the technological progress of battery, alkaline dry battery production technology is day by day ripe, market
Demand big, alkaline dry battery generally comprises housing, fastener, cathode bottom cover, sealing
Fastener and cathode bottom cover, during frock, are first welded to form a set electron, negative pole bottom by circle
Lid is connected with the nail rod of fastener, and the upper end of set electron is cathode bottom cover, and lower end is fastener.
In modernization battery production streamline, a procedure is wherein had to be to coat coating
On the fastener of set electron, and coating gradually wraps up in follow-up set electron insertion sealing ring
The outer wall of fastener.Because coating operations process actions are simple, existing battery production workshop
In, still continue the mode using manual application, waste time and energy, so manually simply will
Coating is coated on set electron, and the fastener outer wall coating being easily caused follow-up set electron covers
Irregular, also there is the situation of holiday.
In sum, need to design a kind of cell coating reasonable in design, high working efficiency
Equipment.
Content of the invention
The purpose of the present invention is to there are the problems referred to above for existing technology it is proposed that a kind of
Cell coating equipment reasonable in design, high working efficiency.
The purpose of the present invention can be realized by following technical proposal:A kind of cell coating sets
Standby, including:
Frame;
Supplied materials passage, is arranged in frame and is used for convey set electron, described supplied materials passage
It is provided with coating station;
Coating mechanism, for being coated in the copper of the set electron on coating station by coating
On nail outer wall, described coating mechanism is single with the docking point of set electron fastener.
As a further improvement on the present invention, described set electron is vertically inserted in supplied materials passage
On, the docking point of described coating mechanism and set electron fastener presses close to the edge of supplied materials passage.
As the further improvement of the present invention, described coating mechanism is included near coating work
Position and the coated article in activity setting, described coated article carries coating and is used for coating
It is coated on the fastener outer wall of the set electron on coating station.
As the further improvement of the present invention, described coated article is to be horizontally set on supplied materials
Timing Belt in front of passage, being provided with storage in frame has the hopper of coating, described synchronization
Carry the set electron fastener outer wall for the coating in hopper being coated in coating station.
As the further improvement of the present invention, described Timing Belt includes mutual UNICOM and shape
Become splicing section and the coating section in loop, described splicing section is used for receiving the coating in hopper,
Described coating section is used for coating coating, and described coating station is arranged on coating section medium position,
And coating section is that point contacts with the docking mode of set electron fastener.
As the further improvement of the present invention, described Timing Belt also includes two linkage sections,
One linkage section is used for the outlet of UNICOM's splicing section and the entrance of coating section, another connection
Section is used for the entrance of UNICOM's splicing section and the outlet of coating section, is provided with painting below linkage section
Material torr disk.
As a further improvement on the present invention, in splicing section, exit position is provided with stream
Amount controls support and flow controls support to be located above hopper, and described flow controls support to use
Reverse hopper in the coating content controlling on Timing Belt and by unnecessary coating.
As the further improvement of the present invention, described flow controls support to include installation
Frame is arranged on the Working rack of mounting bracket bottom with bending, and described Working rack digs
Have and pass through for splicing section and the open slot with the cooperation of splicing section gap, the sending of described splicing section
Material end face presses close to the setting of opening trench bottom, is provided with for controlling Timing Belt in opening trench bottom
On coating content flow control groove, in described splicing section, unnecessary coating is in Working rack
Stop and drop down onto hopper next time.
As a further improvement on the present invention, splicing section is additionally provided with for vertical direction
The Anti-moving support of upper limit Timing Belt, described Anti-moving stent cover is towards on the end face of hopper
Offer the Anti-moving groove passing through for splicing section and splicing section and the cooperation of Anti-moving groove gap.
As the present invention another improvement, on described hopper rotatably arranged with have for
Coating is sent into the conveying rotating disc of splicing section, and be provided with hopper for adjusting conveying
The regulation pressing plate of the coating content of rotating disk conveying, described regulation pressing plate is provided with positioned at conveying rotating disc
The regulating tank passing through in rotary motion trace and for conveying rotating disc, described conveying rotating disc respectively with connect
Material section, regulation pressing plate are vertical, and have gap between conveying rotating disc and regulation trench bottom.
As another improvement of the present invention, frame is rotatably mounted with main turntable,
Described supplied materials passage is arranged on main turntable and around the setting of its edge, on supplied materials passage
Equidistantly it is provided with and carrys out hopper for house set electron, described set electron is inserted in hopper
Interior, described supplied materials passage is tangential at coating station with coating section.
Based on technique scheme, the embodiment of the present invention at least can produce following technology effect
Really:Overall construction design is reasonable, when the set electron on supplied materials passage arrives at coating station,
Coating mechanism action simultaneously coating is coated on the fastener outer wall of this set electron, and in this case
It is coated operation by the way of single-contact, for single set electron, coating mechanism
Once, and coating mechanism is disposable coats the coating of a constant volume and make for coating operations
It is attached on fastener outer wall, overcomes the operation that many places coating or multiple coating bring
Loaded down with trivial details, in follow-up set electron insertion sealing ring, the coating at above-mentioned docking point gradually expands
Dissipate and wrap up fastener outer wall, reliable operation, compared to manual application's operating type, this electricity
Pond coating apparatus high working efficiency, it is to avoid holiday phenomenon produces.
Brief description
Below in conjunction with the accompanying drawings further details of theory is made to the specific embodiment of the present invention
Bright, wherein:
Fig. 1 is the structural representation of a preferred embodiment of the present invention.
Fig. 2 is the structural representation at another visual angle of Fig. 1.
Fig. 3 is the structural representation that in a preferred embodiment of the present invention, flow controls support.
Fig. 4 is the structural representation at another visual angle of Fig. 3.
Fig. 5 is the structural representation at another visual angle of Fig. 4.
In figure, 10, frame;20th, supplied materials passage;21st, coating station;22nd, supplied materials
Groove;30th, coating mechanism;31st, Timing Belt;311st, splicing section;312nd, it is coated with section;
313rd, linkage section;32nd, synchronizing wheel;40th, hopper;50th, coating pallet;60th, flow
Control support;61st, mounting bracket;62nd, Working rack;63rd, open slot;64th, flow
Amount control flume;70th, Anti-moving support;71st, Anti-moving groove;81st, conveying rotating disc;82、
Adjust pressing plate;821st, regulating tank;83rd, transmission shaft;84th, bearing support;85th, flat key;
90th, main turntable;100th, set electron;101st, fastener.
Specific embodiment
The following is the specific embodiment of the present invention and combine accompanying drawing, the technical side to the present invention
Case is further described, but the present invention is not limited to these embodiments.
The present invention protects a kind of cell coating equipment, for being coated in the coating such as sealing compound
The fastener outer wall of battery set electron, is equally applicable to other batteries outside coating sealing compound
Coating.
The mode of existing manual application, wastes time and energy, and so manually simply applies coating
Overlay on set electron, the fastener outer wall coating covering being easily caused follow-up set electron is irregular,
Also there is the situation of holiday.Therefore, design one kind more rational cell coating equipment is
Necessary.
With reference to Fig. 1 to Fig. 5, the technical scheme that the present invention provides is carried out specifically
Elaboration.
As shown in Figures 1 to 5, this cell coating equipment includes:
Frame 10, as installation pedestal and support carrier, is easy to the installation of each part;
Supplied materials passage 20, linear pattern passage can be chosen as it is also possible to be set to arc or
Shaped form channel design, flexible layout, it is arranged in frame 10 and is used for conveying current collection
Son 100, supplied materials passage 20 is provided with coating station 21;
Coating mechanism 30, for being coated in the current collection on coating station 21 by coating
On fastener 101 outer wall of son 100, coating mechanism 30 and set electron 100 fastener 101
Docking point be single.
In the present invention, above-mentioned coating is preferably sealing compound, and that is, this cell coating equipment is excellent
It is selected to sealing compound is coated on set electron 100.Due to fastener 101 surface and sealing
Circle surface will not be all real plane, have many capillary channels it is therefore necessary to
Sealing compound is coated, to block capillary channel on the outer wall of set electron 100 fastener 101.
In an initial condition, rationally, supplied materials leads to overall construction design this cell coating equipment
Road 20 is used for conveying the set electron 100 of uncoated coating, and by the set electron 100 after coating
Send, steadily, action links up it is ensured that the operating efficiency of transmission for transmission;In supplied materials passage
When set electron 100 on 20 arrives at coating station 21, coating mechanism 30 action simultaneously will apply
Material is coated on fastener 101 outer wall of this set electron 100 (i.e. on fastener 101 lateral surface),
And it is coated operation in this case by the way of single-contact, for single set electron
100, once, and coating mechanism 30 disposably coats coating mechanism 30 coating operations
The coating of one constant volume simultaneously makes it be attached on fastener 101 outer wall, overcomes many places coating
Or the complex operation that multiple coating brings;In follow-up set electron 100 insertion sealing ring,
Coating at above-mentioned docking point gradually spreads and wraps up fastener 101 outer wall, reliable operation,
Compared to manual application's operating type, this cell coating equipment high working efficiency, it is to avoid leakage
Apply phenomenon to produce.
Further, relatively reliable for making coating mechanism 30 work, preferably set electron
100 are vertically inserted on supplied materials passage 20, coating mechanism 30 and set electron 100 fastener
101 docking point presses close to the edge of supplied materials passage 20.Such structure setting, coating machine
Structure 30 docks accurately with supplied materials passage 20, after coating is coated on fastener 101, that is,
Make coating landing in transportation, it is also landing on fastener 101 outer wall, it is to avoid apply
Gob falls or spills outside equipment.
For making coating operations reliable it is ensured that operating efficiency is it is preferable that coating mechanism 30
Including near coating station 21 and in the movable coated article arranging, coated article carries coating
And for coating being coated in the fastener 101 of the set electron 100 on coating station 21
On outer wall.
In the present invention, setting coated article is close with the coating station 21 of supplied materials passage 20, no
Only ensure that the reliability that coated article is docked with set electron 100, also ensure that coating transmission,
Coating stationarity it is ensured that the operating efficiency of coating operations and coating effect.
It is further preferred that coated article is the synchronization being horizontally set on supplied materials passage 20 front
Band 31, that is, Timing Belt 31 is to be in integrally to be horizontally set in frame 10, but Timing Belt 31
Erect to walk, its feeding end face in the vertical direction, to ensure coating operations
Reliability;Being provided with storage in frame 10 has the hopper 40 of coating and preferred hopper 40
In front of Timing Belt 31, to improve the compactedness of space layout, Timing Belt further
31 are used for the coating in hopper 40 is coated in set electron 100 fastener of coating station 21
On 101 outer walls.
During work, the coating in hopper 40 is taken up and is arriving at coating work by Timing Belt 31
Behind position 21, then coating is coated on the fastener 101 of above-mentioned set electron 100, and synchronous
Docking point with 31 and fastener 101 is single.
Further, relatively reliable for making Timing Belt 31 work, preferably Timing Belt
31 include mutual UNICOM and form splicing section 311 and the coating section 312 in loop, splicing section
311 are used for receiving the coating in hopper 40, and coating section 312 is used for coating coating, splicing
Section 311 is arranged in front of coating section 312 and the two is respectively a part for Timing Belt 31,
Coating station 21 is arranged on coating section 312 medium position it is ensured that coating section 312 is permissible
The coating of preset volume is entirely coated on set electron 100 it is ensured that each set electron 100
The coatings volume receiving is same or like, and is coated with section 312 and set electron 100 fastener 101
Docking mode be point contact.
In the present invention Timing Belt 31 contact with set electron 100 for contact and non-vertical side
To linear contact lay, actual coating operations demand can be met, it also avoid paint waste,
In set electron 100 indentation sealing circle, the coating of preset volume can gradually spread and all
The even outer surface covering fastener 101, if coated many coating, is also easy to cause coating
Layer local after or overflow, affect finished battery quality.
As the preferred or optional embodiment of one kind, for making Timing Belt 31 arrange more
Rationally, operating efficiency higher it is ensured that the stationarity of work, preferably Timing Belt 31 also includes
Two linkage sections 313, linkage section 313 be used for UNICOM's splicing section 311 outlet and
The entrance of coating section 312, another linkage section 313 is used for entering of UNICOM's splicing section 311
Mouth and the outlet of coating section 312, are provided with coating pallet 50 below linkage section 313, apply
Material torr disk 50 is used for accepting the coating of drippage on linkage section 313.
It is worth mentioning that:For making Timing Belt 31 transmit steadily, reliable operation, synchronous
The overall frame-shaped setting that is square of band 31, preferably Timing Belt 31 passes through four synchronizing wheels 32
Drive its action, four synchronizing wheels 32 are respectively placed in 31 4 edges of Timing Belt, and
Four Timing Belts 31 are respectively at linkage section 313 and splicing section 311 or coating section 312
Corner.
Preferably, for being precisely controlled the coating content of coating mechanism 30 coating operations, in splicing
Section 311 is provided with flow near exit position and controls support 60 and flow control support 60
Above hopper 40, flow controls support 60 to be used for controlling the coating on Timing Belt 31
Unnecessary coating is simultaneously reversed hopper 40 by amount.
Specifically, above-mentioned flow controls the Timing Belt 31 that is that support 60 controls to be coated in
Coating consumption on set electron 100, its can limit coating on Timing Belt 31 width
Degree and depth, it is to avoid paint waste, when Timing Belt 31 controls support 60 through inflow-rate of water turbine,
Unnecessary coating falls after rise to hopper 40, realizes resource reclaim, design ingenious it is ensured that
The efficiency of work and reliability.
Further, for making reliable operation, preferably flow controls support 60 to include installing
Support 61 is arranged on the Working rack 62 of mounting bracket 61 bottom, mounting bracket with bending
61 are easy to flow controls support 60 to be installed in frame 10, and the work bending setting is propped up
Frame 62 is then conveniently pressed close to Timing Belt 31 and is arranged;Dig on Working rack 62 and supplied splicing section
311 pass through and the open slots 63 with the cooperation of splicing section 311 gap, the sending of splicing section 311
Material end face presses close to the setting of open slot 63 bottom, is provided with for controlling in open slot 63 bottom
The flow control groove 64 of the coating content on Timing Belt 31, unnecessary painting in splicing section 311
Expect to stop in Working rack 62 and drop down onto hopper 40 next time.
Further preferably above-mentioned open slot 63 is square setting, above-mentioned flow control groove
64 settings triangular in shape so that the coating of outer end contact with set electron 100 more quickly,
Reliable, during work, Timing Belt 31 passes through open slot 63, in the limit of flow control groove 64
Under system, the coating that Timing Belt 31 carries preset volume passes through, and unnecessary coating is worked and props up
Frame 62 scrapes and is recycled in hopper 40.
Herein, it should be added that:Above-mentioned open slot 63 and splicing section 311 gap
Cooperation, especially splicing section 311 top and bottom are coordinated with open slot 63 gap, permissible
Play the effect preventing Timing Belt play about 31, further in the vertical direction is to synchronization
With 31 carry out spacing it is ensured that transmission stationarity and work reliability.
As the preferred or optional embodiment of one kind, for preventing Timing Belt 31 transmit process
In upper and lower play, be preferably additionally provided with splicing section 311 for vertical direction upper limit with
Walk the Anti-moving support 70 with 31, Anti-moving support 70 faces on the end face of hopper 40
Offer the Anti-moving groove 71 passing through for splicing section 311 and splicing section 311 and Anti-moving groove
71 gap cooperations, that is, splicing section 311 upper end, lower end have respectively at Anti-moving groove 71
Small gap, with its upper and lower play spacing it is ensured that transmitting stationarity and the reliability of work
Property.
In the present invention, for convenience of the feeding of hopper 40 and the splicing of Timing Belt 31, excellent
On hopper feedback 40 rotatably arranged with have for by coating send into splicing section 311 conveying turn
Disk 81, and the coating content for adjusting conveying rotating disc 81 conveying is provided with hopper 40
Regulation pressing plate 82, can be convenient and practical with the amount of feeding of real-time regulation coating;Adjust pressure
The tune that plate 82 is provided with conveying rotating disc 81 rotary motion trace and passes through for conveying rotating disc 81
Section groove 821, conveying rotating disc 81 is vertical with splicing section 311, regulation pressing plate 82 respectively, and
Between conveying rotating disc 81 and regulating tank 821 bottom, there is gap.
The rotation direction of above-mentioned conveying rotating disc 81 first passes through regulating tank 821 and moves to splicing
Section 311, during by regulating tank 821, unnecessary coating is reversed in hopper 40, adjusts
Convenient, practical;Further, preferably above-mentioned conveying rotating disc 81 is near splicing section
311 entrance setting, and connect for the line of vertical direction with the connected mode of splicing section 311
Touch so that coating transmission is steady.
As improving further, for making the work of hopper 40 part more steady, coating is defeated
Send reliability, preferably above-mentioned conveying rotating disc 81 is hinged in frame 10 by transmission shaft 83,
And the two ends of transmission shaft 83 are placed in frame 10 by bearing support 84 respectively, conveying rotating disc
81 pass through flat key 85 is fixed with transmission shaft 83, and below hopper 40, side is also equipped with
For heating the heat block of coating it is ensured that the fluid property of coating.
In the present invention, for make set electron 100 feeding more steadily, reliable it is ensured that
Supplied materials passage 20 is smooth with docking of Timing Belt 31, preferably in frame 10 rotationally
Main turntable 90 is installed, supplied materials passage 20 is arranged on main turntable 90 and around its edge
Setting, is equidistantly provided with supplied materials passage 20 and carrys out hopper for house set electron 100
22, set electron 100 is inserted in hopper 22, supplied materials passage 20 and coating section 312
It is tangential at coating station 21.
Specific embodiment described herein is only theory for example to present invention spirit
Bright.Those skilled in the art can be to described specific embodiment
Make various modifications or supplement or substituted using similar mode, but without departing from
The spirit of the present invention or surmount scope defined in appended claims.
Claims (10)
1. a kind of cell coating equipment it is characterised in that:Including:
Frame;
Supplied materials passage, is arranged in frame and is used for convey set electron, described supplied materials passage
It is provided with coating station;
Coating mechanism, for being coated in the copper of the set electron on coating station by coating
On nail outer wall, described coating mechanism is single with the docking point of set electron fastener.
2. a kind of cell coating equipment according to claim 1 it is characterised in that:
Described set electron is vertically inserted on supplied materials passage, described coating mechanism and set electron fastener
Docking point press close to the edge of supplied materials passage.
3. a kind of cell coating equipment according to claim 1 and 2, its feature exists
In:Described coating mechanism includes the coated article arranging near coating station and in activity, institute
State coated article and carry coating and for coating being coated in the current collection on coating station
On the fastener outer wall of son.
4. a kind of cell coating equipment according to claim 3 it is characterised in that:
Described coated article is the Timing Belt being horizontally set in front of supplied materials passage, is provided with frame
Storage has the hopper of coating, and described Timing Belt is used for for the coating in hopper being coated in coating
On the set electron fastener outer wall of station.
5. a kind of cell coating equipment according to claim 4 it is characterised in that:
Described Timing Belt includes mutual UNICOM and forms splicing section and the coating section in loop, described connects
Material section is used for receiving the coating in hopper, and described coating section is used for coating coating, described painting
Cloth station is arranged on coating section medium position, and is coated with the side of docking of section and set electron fastener
Formula is point contact.
6. a kind of cell coating equipment according to claim 5 it is characterised in that:
In splicing section, exit position is provided with flow control support and flow controls support to be located at
Above hopper, described flow controls support to be used for controlling the coating content on Timing Belt and will be many
Remaining coating reverses hopper.
7. a kind of cell coating equipment according to claim 6 it is characterised in that:
Described flow controls support to include mounting bracket and bend the work being arranged on mounting bracket bottom
Make support, described Working rack has dug for splicing section by and join with splicing section gap
The open slot closing, the feeding end face of described splicing section presses close to the setting of opening trench bottom, is opening
Mouthful trench bottom is provided with the flow control groove for controlling the coating content on Timing Belt, described connects
In material section, unnecessary coating drops down onto hopper next time in Working rack stop.
8. a kind of cell coating equipment according to claim 5 it is characterised in that:
Anti-moving support for vertical direction upper limit Timing Belt, institute are additionally provided with splicing section
State Anti-moving stent cover and the Anti-moving groove passing through for splicing section is offered towards on the end face of hopper
And splicing section is coordinated with Anti-moving groove gap.
9. a kind of cell coating equipment according to claim 5 it is characterised in that:
Rotatably arranged with the conveying rotating disc having for coating being sent into splicing section on described hopper,
And the regulation pressing plate of the coating content for adjusting conveying rotating disc conveying is provided with hopper,
Described regulation pressing plate is provided with conveying rotating disc rotary motion trace and passes through for conveying rotating disc
Regulating tank, described conveying rotating disc is vertical with splicing section, regulation pressing plate respectively, and conveying turns
Between disk and regulation trench bottom, there is gap.
10. a kind of cell coating equipment according to claim 5 it is characterised in that:
Frame is rotatably mounted with main turntable, described supplied materials passage is arranged on main turntable
And around the setting of its edge, supplied materials passage is equidistantly provided with for housing set electron
Carry out hopper, described set electron is inserted in hopper, described supplied materials passage and coating section phase
It is cut at coating station.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610356554.4A CN106391392B (en) | 2016-05-24 | 2016-05-24 | A kind of cell coating equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610356554.4A CN106391392B (en) | 2016-05-24 | 2016-05-24 | A kind of cell coating equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106391392A true CN106391392A (en) | 2017-02-15 |
CN106391392B CN106391392B (en) | 2018-07-10 |
Family
ID=58006446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610356554.4A Expired - Fee Related CN106391392B (en) | 2016-05-24 | 2016-05-24 | A kind of cell coating equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106391392B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107737691A (en) * | 2017-12-04 | 2018-02-27 | 东莞市意艾迪数控科技有限公司 | One kind passs oily structure and oily side machine |
CN109952158A (en) * | 2017-02-24 | 2019-06-28 | 杜尔***股份公司 | Applicator and method of application |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201644328U (en) * | 2010-04-21 | 2010-11-24 | 吕立华 | Full-automatic gumming machine |
CN101920238A (en) * | 2010-07-30 | 2010-12-22 | 东莞新能源科技有限公司 | Automatic glue spreading machine |
JP2012130907A (en) * | 2010-12-02 | 2012-07-12 | Fuji Kikai Kogyo Kk | Intermittent coating apparatus |
JP2013071042A (en) * | 2011-09-27 | 2013-04-22 | Toa Kogyo Kk | Coating apparatus |
CN103084306A (en) * | 2013-01-28 | 2013-05-08 | 中银(宁波)电池有限公司 | Battery steel shell inner wall graphite spraying equipment |
CN204234269U (en) * | 2014-11-13 | 2015-04-01 | 重庆市腾瀚工贸有限公司 | Automobile rod member brushing streamline |
-
2016
- 2016-05-24 CN CN201610356554.4A patent/CN106391392B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201644328U (en) * | 2010-04-21 | 2010-11-24 | 吕立华 | Full-automatic gumming machine |
CN101920238A (en) * | 2010-07-30 | 2010-12-22 | 东莞新能源科技有限公司 | Automatic glue spreading machine |
JP2012130907A (en) * | 2010-12-02 | 2012-07-12 | Fuji Kikai Kogyo Kk | Intermittent coating apparatus |
JP2013071042A (en) * | 2011-09-27 | 2013-04-22 | Toa Kogyo Kk | Coating apparatus |
CN103084306A (en) * | 2013-01-28 | 2013-05-08 | 中银(宁波)电池有限公司 | Battery steel shell inner wall graphite spraying equipment |
CN204234269U (en) * | 2014-11-13 | 2015-04-01 | 重庆市腾瀚工贸有限公司 | Automobile rod member brushing streamline |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109952158A (en) * | 2017-02-24 | 2019-06-28 | 杜尔***股份公司 | Applicator and method of application |
US11596968B2 (en) | 2017-02-24 | 2023-03-07 | Dürr Systems Ag | Applicator and application method |
CN107737691A (en) * | 2017-12-04 | 2018-02-27 | 东莞市意艾迪数控科技有限公司 | One kind passs oily structure and oily side machine |
Also Published As
Publication number | Publication date |
---|---|
CN106391392B (en) | 2018-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108816645B (en) | Base band extrusion type coating system of power lithium battery | |
CN102312380B (en) | Production method and equipment for double-sided adhesive waterproof coiled material of macromolecular tire | |
CN105235116B (en) | A kind of volume to volume impregnates coating system | |
CN106391392A (en) | Battery coating equipment | |
WO2010139126A1 (en) | Coating machine | |
CN205966369U (en) | Battery coating equipment | |
CN205966370U (en) | Improved generation battery coating equipment | |
CN105355706A (en) | Roll-to-roll dipping coating system and preparation method of flexible transparent conductive material | |
CN205044039U (en) | A volume to volume dip plating membrane system for flexible film | |
CN205044040U (en) | Volume to volume dip plating membrane system | |
CN107214039A (en) | Silicon steel steel band insulating coating coating unit and silicon steel steel band insulating coating painting method | |
CN110498303A (en) | A kind of water-fertilizer integral water pipe recycling windlass device | |
CN105903633A (en) | Improved battery coating equipment | |
CN206986033U (en) | A kind of large-scale flat glass coating apparatus | |
CN207013213U (en) | Silicon steel steel band insulating coating coating unit | |
CN106086822B (en) | Suitable for the roll-to-roll vacuum coating reaction unit of batch processing | |
CN211964874U (en) | Coating machine constant temperature drying device | |
CN114602728A (en) | Gluing device for valve bag production | |
CN114719589A (en) | Drying device for coating | |
CN206537823U (en) | Facing plate conveying device | |
CN206536942U (en) | Plate aluminum coated steel device | |
CN205995690U (en) | A kind of novel solvent-free composite membrane machine | |
CN221046364U (en) | Diaphragm double-sided spraying mechanism and coating equipment | |
CN206716353U (en) | A kind of paper battery coating device | |
CN216704971U (en) | Coating and drying device of coating machine for packaging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180710 Termination date: 20210524 |