CN106385852A - Method for leaching saline-alkali soil - Google Patents

Method for leaching saline-alkali soil Download PDF

Info

Publication number
CN106385852A
CN106385852A CN201610792224.XA CN201610792224A CN106385852A CN 106385852 A CN106385852 A CN 106385852A CN 201610792224 A CN201610792224 A CN 201610792224A CN 106385852 A CN106385852 A CN 106385852A
Authority
CN
China
Prior art keywords
alkali
salt
row
soil
irrigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610792224.XA
Other languages
Chinese (zh)
Inventor
王胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Sunway Garden Technology Co Ltd
Original Assignee
Shandong Sunway Garden Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Sunway Garden Technology Co Ltd filed Critical Shandong Sunway Garden Technology Co Ltd
Priority to CN201610792224.XA priority Critical patent/CN106385852A/en
Publication of CN106385852A publication Critical patent/CN106385852A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Soil Working Implements (AREA)
  • Agricultural Machines (AREA)

Abstract

A method for leaching saline-alkali soil comprises following steps: 1) land leveling, deep ditches which are 26 to 60 cm deep are dug with intervals of 0.4 to 8 meters; the deep ditches are one-way parallel ditches, or parallel ditches which are crossed in length and breadth with different density vertically and horizontally, a layer of sand which is 3 to 37 cm thick is laid at the bottom of the deep ditches to form underground alkali discharge sand ditches; 2) underground salt discharge pipes laying; 3) underground irrigation pipes laying; 4) deep scarification and knot breaking; 5) fresh water flooding irrigation; 6) salt water enhanced drainage: while fresh water flooding irrigation is being carried out, one ends of the underground salt discharge pipes are sealed with sealing plugs and the other ends are connected with water pumps to perform enhanced drainage on salt water leached to the underground salt discharge pipes; the leached salt water is drained to salt discharge ditches; 7) continuous irrigation and drainage: the fresh water flooding irrigation and the salt water enhanced drainage are repeated carrying out to quickly leach the salinity in the soil; when the salinity in the soil decreases to an expected target, irrigation and drainage are stopped.

Description

A kind of salinized soil ELUTION METHOD
Technical field
The present invention relates to row's alkali system is and in particular to a kind of salinized soil ELUTION METHOD.
Background technology
Salt-soda soil is huge potential resource, and developing salt-soda soil is to bring more land under cultivation, further developing agricultural life One of important measures produced.China there are about 1,500,000,000 mu of various salinized soil, accounts for the 26.3% of world's salinized soil area, strand and inland Saline-alkali Land area is larger, and most of salt-soda soil is all constantly in state to be developed.Particularly heavy saline-alkali area at seashore ground Lower water level height, soil salt height, soil compaction, soil fertility are low, poor air permeability is it is difficult to produce various industrial crops.How to make Salt-soda soil quick desalination, is the technical bottleneck of alkaline land improving.In the experience in transformation salt-soda soil, vertical drainage, horizontal drainage There are successful technology and method.In the sixties in last century to the nineties, the method for commonly used " shallow group wells, forced-ventilated fills by force " is entered Row desalting salinized soil, the method can realize salt-soda soil quick desalination, but need to beat a large amount of vertical shafts using vertical drainage, and arranges pump Stand, build drainage pipeline networks, not only up-front investment is high, and want constantly draining from vertical shaft, operational and administrative expenses is very big.Zhang Wanjun Etc. disclosing a kind of underground pipe salt drainage method in shallow groundwater littoral saline soil area, the method for embedding of hidden pipe is defined;Peng Chengshan Disclose the systematic approach that a kind of utilization closed drainage improves salt-soda soil, the construction method of closed drainage is limited Fixed;Chen Rongmao etc. discloses a kind of salt-soda soil salt discharge alkali reduction concealed conduit device for, and hidden pipe specification and laying specification are defined; But above-mentioned several hidden pipe Salt discharge method is not the system approach of salt-soda soil quick desalination it is impossible to realize salt-soda soil quick desalination.
The alkali method that changes in the salt-soda soil commonly used at present mainly has:1st, row's alkali ditch wild-flooding method, 2, embedded Pipe for draining alkali flood Flooding irrigation method, 3, take surface saline and alkaline layer method away, 4 in addition, somebody has applied for beating the national patent of alkaline discharging well wild-flooding method.Warp The present inventor is long-term it has been observed that method 1 and 3 has the defect changing alkali effect difference, and method 2 has investment greatly, and fertility runs off tight The defect of weight, method 4 has investment greatly, the defect of DeGrain.Above-mentioned three kinds of methods all project presence and change alkali cycle length Problem.
Content of the invention
In order to solve problems of the prior art, the present invention provides a kind of hidden pipe to fill row salt-soda soil quick desalination system Method.Heavy saline-alkali area at seashore using trench digging box dam, salt discharge hidden pipe laying, irrigate hidden pipe laying, subsoiling break knot, fresh water basin irrigation, A series of technological means such as salt water forced-ventilated, continuous filling row, anniversary salt discharge, realize salt-soda soil quick desalination.
The method of the invention comprises the following steps:
1) level land, interval 0.4-8 rice excavates deep 26-60 centimetre of zanjon, described zanjon is unidirectional parallel ditch or vertical Traversed by fork, the vertically and horizontally different parallel ditch of density, fill the sand of 3-37 centimetre of thick layer in the zanjon bottom held successfully, form ground Lower row's alkali sand furrow;Dig the row's alkali ditch connecting with underground every alkali layer, diversion irrigation arranges alkali, described be located at below sand every alkali layer, row The sand launder every alkali layer and for accommodating described Pipe for draining alkali road for the alkali pipeline distribution,
2) soil and modifying agent mixing, the component of modifying agent is humic acidss 40% by weight, zeolite 30%, acid conditioning Agent 20%, flyash 5%, furfural dregs 5%;The component of fertilizer is fermentation poultry dung 45% by weight, crushed straw 50%, wood Jealous woman liquid 5%;Modifying agent is 1: 1 with the weight ratio of fertilizer;Described acid conditioner is sulphuric acid, hydrochloric acid, nitric acid or/and phosphorus Acid;
3) salt discharge hidden pipe laying:Perpendicular to salt discharge ditch direction, parallel laid has the salt discharge hidden pipe of infiltration micropore, laying Depth 1-1.5m, Lay interval 10-50m, and ensure that laying depth is higher than salt discharge ditch bottom, the two ends of salt discharge hidden pipe enter row Salt ditch;
4) irrigate hidden pipe laying:After having laid salt discharge hidden pipe, hidden pipe is irrigated in laying, lays depth 0.8-1.3m, protects Barrier laying depth is higher than salt discharge hidden pipe, and is provided with the outlet irrigating hidden pipe on raised fields surface;
4) subsoiling breaks knot:Subsoiling is carried out on raised fields surface to soil using subsoiling machinery, abolishes soil compaction;Subsoiling depth For 0.5-0.8m, ensure that subsoiling depth is higher than to irrigate hidden pipe laying depth
5) fresh water is basined irrigation:Using the irrigation hidden pipe having laid, raised fields is irrigated, transplant and plough deeply for first 5~10 days Plough, then pour into fresh water, make fresh water be higher than field face 2~4cm, then rotary tillage, soaked field was discharged after 1~2 day;Continue to pour into fresh water, Fresh water is made to be higher than field face 2~4cm, then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out;Pour into fresh water again, keep field Face 1~2cm water layer;
6) salt water forced-ventilated:While carrying out fresh water and basin irrigation, block salt discharge hidden pipe one end, the other end and water pump with sealing-plug Connect, forced-ventilated is carried out to the salt water in salt discharge hidden pipe for the drip washing;Drip washing salt water enters salt discharge ditch;
7) the continuous row of filling:Fresh water is basined irrigation and is repeatedly carried out with salt water forced-ventilated simultaneously, makes the quick drip washing of the salinity in soil, works as soil Earth salinity is reduced to during target and stops the row of filling.
29-60 centimetre of described zanjon, the thickness that zanjon bottom fills sand is 3-27 centimetre, deep plough and make ditch dug with a plow as deep as 16-33 centimetre, during deep ploughing in ditch dug with a plow the broken straw rod of dispenser 3-10 cm thick or sand.
The cross section that zanjon fills sand layer is up-narrow and down-wide, described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube is dug to have and oozes Alkali hole, described Pipe for draining alkali road is arranged with nonwoven layer, and the inclination angle of described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube is 0.05-0.15%.
Heavy saline first strips a field the salinization topsoil on 1-7 centimetre of surface, then levels land.
First time diversion irrigation row alkali after, then plough, the row's of watering alkali.With the method for the invention, can make in a short time Soil quick desalination.As compared to vertical Salt discharge methods such as " shallow group wells, forced-ventilated fills by force ", desalting effect is suitable, but up-front investment subtracts Less, salt water need not be extracted after a desalination for a long time, operational management cost reduces.With other hidden pipe Salt discharge method phases disclosed , in 3-5, the method for the invention can be with quick desalination for the desalination period of other hidden pipe Salt discharge methods, and desalination period exists for ratio 1-3 month, desalting effect was significantly better than additive method.
The improvement agent combination of the present invention is to improve soil CEC as the function of tonic chord, to have selected humic acidss and zeolite as main Component.Because humic-acid-type substances can effectively reduce soil pH value, improved soil structure, culture fertility, realize land used and increase soil fertility mutually tying Close, improve the ecological condition of soda alkaline land paddy growth.Soda alkaline land paddy field application of organic fertilizers has the meaning of particular importance Justice, because fermentation fertilizer plays a part similar humic acidss in improvement salt-soda soil.And with low cost, simple and easy to do, behaviour The property made is strong.Fertilizer is rich in N, P, K various nutrient elements, and fertilizer efficiency time is long.Substantially reduce in the soil liquid Na+ ion concentration and The content of commutativity Na+ in soil colloid, soil agreegate increases, and permeability greatly enhances.In order to recover soil further Physics and chemistry, auxiliary selects flyash, acid conditioner and furfural dregs.Select the chicken manure fermenting in view of the ecological agriculture, Crushed straw and pyroligneous liquor.In addition, the plough sole that the cooperation of these components may also function as under the topsoil of rice field forms anti-accumulation of salt in the surface soil knot Structure, neither blocks, and the plough sole structure of the not suitable Rice Production of the accumulation of salt in the surface soil.
Specific embodiment
With reference to embodiment, the present invention is further described.
Embodiment 1
1) level land, interval 0.4-8 rice excavates deep 26-60 centimetre of zanjon, described zanjon is unidirectional parallel ditch or vertical Traversed by fork, the vertically and horizontally different parallel ditch of density, fill the sand of 3-37 centimetre of thick layer in the zanjon bottom held successfully, form ground Lower row's alkali sand furrow;Dig the row's alkali ditch connecting with underground every alkali layer, diversion irrigation arranges alkali, described be located at below sand every alkali layer, row The sand launder every alkali layer and for accommodating described Pipe for draining alkali road for the alkali pipeline distribution,
2) soil and modifying agent mixing, the component of modifying agent is humic acidss 40% by weight, zeolite 30%, acid conditioning Agent 20%, flyash 5%, furfural dregs 5%;The component of fertilizer is fermentation poultry dung 45% by weight, crushed straw 50%, wood Jealous woman liquid 5%;Modifying agent is 1: 1 with the weight ratio of fertilizer;Described acid conditioner is sulphuric acid, hydrochloric acid, nitric acid or/and phosphorus Acid;
3) salt discharge hidden pipe laying:Perpendicular to salt discharge ditch direction, parallel laid has the salt discharge hidden pipe of infiltration micropore, laying Depth 1-1.5m, Lay interval 10-50m, and ensure that laying depth is higher than salt discharge ditch bottom, the two ends of salt discharge hidden pipe enter row Salt ditch;
4) irrigate hidden pipe laying:After having laid salt discharge hidden pipe, hidden pipe is irrigated in laying, lays depth 0.8-1.3m, protects Barrier laying depth is higher than salt discharge hidden pipe, and is provided with the outlet irrigating hidden pipe on raised fields surface;
4) subsoiling breaks knot:Subsoiling is carried out on raised fields surface to soil using subsoiling machinery, abolishes soil compaction;Subsoiling depth For 0.5-0.8m, ensure that subsoiling depth is higher than to irrigate hidden pipe laying depth
5) fresh water is basined irrigation:Using the irrigation hidden pipe having laid, raised fields is irrigated, transplant and plough deeply for first 5~10 days Plough, then pour into fresh water, make fresh water be higher than field face 2~4cm, then rotary tillage, soaked field was discharged after 1~2 day;Continue to pour into fresh water, Fresh water is made to be higher than field face 2~4cm, then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out;Pour into fresh water again, keep field Face 1~2cm water layer;
6) salt water forced-ventilated:While carrying out fresh water and basin irrigation, block salt discharge hidden pipe one end, the other end and water pump with sealing-plug Connect, forced-ventilated is carried out to the salt water in salt discharge hidden pipe for the drip washing;Drip washing salt water enters salt discharge ditch;
7) the continuous row of filling:Fresh water is basined irrigation and is repeatedly carried out with salt water forced-ventilated simultaneously, makes the quick drip washing of the salinity in soil, works as soil Earth salinity is reduced to during target and stops the row of filling.
29-60 centimetre of described zanjon, the thickness that zanjon bottom fills sand is 3-27 centimetre, deep plough and make ditch dug with a plow as deep as 16-33 centimetre, during deep ploughing in ditch dug with a plow the broken straw rod of dispenser 3-10 cm thick or sand.
The cross section that zanjon fills sand layer is up-narrow and down-wide, described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube is dug to have and oozes Alkali hole, described Pipe for draining alkali road is arranged with nonwoven layer, and the inclination angle of described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube is 0.05-0.15%.
Heavy saline first strips a field the salinization topsoil on 1-7 centimetre of surface, then levels land.
Beneficial effects of the present invention, can be embodied further by following test data.It is 1.82% in initial salt content Heavy saline, carry out desalting effect test, setting 3 process:Untreated salt-soda soil, disclosed do not basined irrigation and by force The simple hidden pipe Salt discharge method of row, the method for the invention, 0-40cm topsoil soils saliferous after being processed using different technologies scheme Amount (%) can realize Soil Desalting in a short period of time, completes soil improvement then, the soil not accumulation of salt in the surface soil after desalination;And do not enter Row basin irrigation with forced-ventilated in the case of, the salt discharge effect of simple hidden pipe Salt discharge method is slow, its desalination of disclosed as shown by data Time is 3-5.
In such scheme, specification, size, quantity all can change.The description of the embodiment above is only used as the present invention one A kind of embodiment that kind of hidden pipe fills row salt-soda soil quick desalination system approach technical scheme proposes, not as to method, structure and The single restrictive condition of function.Ultimate principle and principal character and the advantages of the present invention of the present invention have been shown and described above. It should be understood by those skilled in the art that, the present invention is not restricted to the described embodiments, described in above-described embodiment and description Merely illustrate the principles of the invention, without departing from the spirit and scope of the present invention, the present invention also has various change And improvement, this will be apparent to those skilled in the art, and these changes and improvements both fall within claimed this In bright scope.Claimed scope is by appending claims and its equivalent thereof.

Claims (5)

1. a kind of salinized soil ELUTION METHOD, including:
1) level land, interval 0.4-8 rice excavates deep 26-60 centimetre of zanjon, described zanjon is unidirectional parallel ditch or hands in length and breadth Fork, the vertically and horizontally different parallel ditch of density, fill the sand of 3-37 centimetre of thick layer in the zanjon bottom held successfully, form underground row Alkali sand furrow;Dig the row's alkali ditch connecting with underground every alkali layer, diversion irrigation arranges alkali, described be located at below sand every alkali layer, Pipe for draining alkali The sand launder every alkali layer and for accommodating described Pipe for draining alkali road for the road distribution,
2) soil and modifying agent mixing, the component of modifying agent is humic acidss 40% by weight, zeolite 30%, acid conditioner 20%, flyash 5%, furfural dregs 5%;The component of fertilizer is fermentation poultry dung 45% by weight, crushed straw 50%, pyroligneous Liquid 5%;Modifying agent is 1: 1 with the weight ratio of fertilizer;Described acid conditioner is sulphuric acid, hydrochloric acid, nitric acid or/and phosphoric acid;
3) salt discharge hidden pipe laying:Perpendicular to salt discharge ditch direction, parallel laid has the salt discharge hidden pipe of infiltration micropore, lays depth 1-1.5m, Lay interval 10-50m, and ensure that laying depth is higher than salt discharge ditch bottom, the two ends of salt discharge hidden pipe enter salt discharge Ditch;
4) irrigate hidden pipe laying:After having laid salt discharge hidden pipe, hidden pipe is irrigated in laying, lays depth 0.8-1.3m, ensures paving If depth is higher than salt discharge hidden pipe, and it is provided with the outlet irrigating hidden pipe on raised fields surface;
4) subsoiling breaks knot:Subsoiling is carried out on raised fields surface to soil using subsoiling machinery, abolishes soil compaction;Subsoiling depth is 0.5-0.8m, ensures that subsoiling depth is higher than to irrigate hidden pipe laying depth
5) fresh water is basined irrigation:Using the irrigation hidden pipe having laid, raised fields is irrigated, transplanting is ploughed deeply cultivated, so for first 5~10 days After pour into fresh water, make fresh water be higher than field face 2~4cm, then rotary tillage, soaked field was discharged after 1~2 day;Continue to pour into fresh water, make fresh water Higher than field face 2~4cm, then rotary tillage is carefully harrowed, and soaked field to top layer clarification of water heel row goes out;Pour into fresh water again, keep field face 1~ 2cm water layer;
6) salt water forced-ventilated:While carrying out fresh water and basin irrigation, block salt discharge hidden pipe one end with sealing-plug, the other end is with water pump even Connect, forced-ventilated is carried out to the salt water in salt discharge hidden pipe for the drip washing;Drip washing salt water enters salt discharge ditch;
7) the continuous row of filling:Fresh water is basined irrigation and is repeatedly carried out with salt water forced-ventilated simultaneously, makes the quick drip washing of the salinity in soil, works as soil salt Divide to be reduced to during target and stop the row of filling.
2. according to claim 1 salinized soil ELUTION METHOD it is characterised in that 29-60 centimetre of described zanjon, zanjon bottom Portion fill sand thickness be 3-27 centimetre, deep plough and make ditch dug with a plow as deep as 16-33 centimetre, during deep ploughing in ditch dug with a plow 3-10 li of dispenser The thick broken straw rod of rice or sand.
3. salinized soil ELUTION METHOD according to claim 1 or claim 2 is it is characterised in that zanjon fills the cross section of sand layer For up-narrow and down-wide, described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube dug to have and oozes alkali hole, described Pipe for draining alkali road is arranged with non-woven fabrics Layer, the inclination angle of described row's alkali longitudinal tubule (L tubule) and/or row's alkali transverse tube is 0.05-0.15%.
4. salinized soil ELUTION METHOD according to claim 1 or claim 2 it is characterised in that heavy saline first strips a field surface 1-7 centimetre of salinization topsoil, then level land.
5. alkali-removing modifying method far alkaline land according to claim 1 or claim 2 it is characterised in that first time diversion irrigation row alkali after, Plough again, the row's of watering alkali.
CN201610792224.XA 2016-08-31 2016-08-31 Method for leaching saline-alkali soil Withdrawn CN106385852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792224.XA CN106385852A (en) 2016-08-31 2016-08-31 Method for leaching saline-alkali soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792224.XA CN106385852A (en) 2016-08-31 2016-08-31 Method for leaching saline-alkali soil

Publications (1)

Publication Number Publication Date
CN106385852A true CN106385852A (en) 2017-02-15

Family

ID=58001056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792224.XA Withdrawn CN106385852A (en) 2016-08-31 2016-08-31 Method for leaching saline-alkali soil

Country Status (1)

Country Link
CN (1) CN106385852A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107182341A (en) * 2017-07-21 2017-09-22 浙江德润市政园林有限公司 A kind of beach saline land modification method
CN107318293A (en) * 2017-07-21 2017-11-07 浙江德润市政园林有限公司 Beach saline land comprehensive processing method
CN107455035A (en) * 2017-08-03 2017-12-12 内蒙古和盛生态育林有限公司 A kind of salt-soda soil, the ecology garden landscape remodeling method of swale
CN108633368A (en) * 2018-04-19 2018-10-12 中国水产科学研究院淡水渔业研究中心 A kind of coastal saline-alkali soil modifying agent and its application method
CN109892188A (en) * 2019-05-06 2019-06-18 江苏润顺生态农业科技有限公司 The method that heavy saline fresh water fills row's control salt rice cultivation
CN110896698A (en) * 2019-12-05 2020-03-24 青岛九天智慧农业集团有限公司 Method for improving beach bathing daub land into rice field
CN111742636A (en) * 2020-05-30 2020-10-09 杭州聚和土地规划设计有限公司 Salt washing treatment system and method for salt pan
CN112462032A (en) * 2020-11-12 2021-03-09 武汉大学 Method suitable for evaluating drainage and salt discharge effects of concealed pipes in saline land area
CN113728746A (en) * 2021-09-28 2021-12-03 中国科学院遗传与发育生物学研究所农业资源研究中心 Saline-alkali soil treatment method combining concealed pipe salt elimination and icing irrigation

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107182341A (en) * 2017-07-21 2017-09-22 浙江德润市政园林有限公司 A kind of beach saline land modification method
CN107318293A (en) * 2017-07-21 2017-11-07 浙江德润市政园林有限公司 Beach saline land comprehensive processing method
CN107455035A (en) * 2017-08-03 2017-12-12 内蒙古和盛生态育林有限公司 A kind of salt-soda soil, the ecology garden landscape remodeling method of swale
CN108633368A (en) * 2018-04-19 2018-10-12 中国水产科学研究院淡水渔业研究中心 A kind of coastal saline-alkali soil modifying agent and its application method
CN109892188A (en) * 2019-05-06 2019-06-18 江苏润顺生态农业科技有限公司 The method that heavy saline fresh water fills row's control salt rice cultivation
CN110896698A (en) * 2019-12-05 2020-03-24 青岛九天智慧农业集团有限公司 Method for improving beach bathing daub land into rice field
CN111742636A (en) * 2020-05-30 2020-10-09 杭州聚和土地规划设计有限公司 Salt washing treatment system and method for salt pan
CN112462032A (en) * 2020-11-12 2021-03-09 武汉大学 Method suitable for evaluating drainage and salt discharge effects of concealed pipes in saline land area
CN112462032B (en) * 2020-11-12 2022-03-04 武汉大学 Method suitable for evaluating drainage and salt discharge effects of concealed pipes in saline land area
CN113728746A (en) * 2021-09-28 2021-12-03 中国科学院遗传与发育生物学研究所农业资源研究中心 Saline-alkali soil treatment method combining concealed pipe salt elimination and icing irrigation

Similar Documents

Publication Publication Date Title
CN106385852A (en) Method for leaching saline-alkali soil
CN100473271C (en) System engineering method for modifying alkaline land by use of pipe drainage method
CN104429214B (en) One engineering-chemistry-desalination water-saving technology preliminary transformation salinity ground method
CN103460843B (en) Quick saline-alkali land desalting system method by means of concealed-tube irrigation and drainage
CN103262689A (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN102138491B (en) Soil and ecological control method for coastal beaches
CN103141176A (en) Method for improving saline soil in excavated grooves of border trees in coastal region
CN108076719A (en) A kind of engineering improvement on heavy salinized ground of haftplatte and ecological planting and establishing method
CN106954406A (en) A kind of modification method for the alkaline earth that is cracked
CN204762460U (en) Planting system in saline and alkaline land
CN104521363A (en) Reclamation method for rural residence lands on coastal saline land region
CN102870523B (en) Terrain processing method for improving seashore solonchak
CN106358479A (en) Open trench-concealed conduit combined water discharging and salt reducing method
CN105144888A (en) Saline land improvement method and improvement system
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
CN106068754B (en) The method of flour sand Muddy Bottoms strand tidal flat revegetation
CN109197501A (en) A kind of pair of beach saline land carries out the greening method after soil improvement
CN101387113B (en) Coastal saline soil improvement method
CN100500312C (en) Alkali-removing modifying method for alkaline land
CN102612883B (en) Saline discharge and alkali reduction concealed conduit device for saline-alkali soil
CN108464225A (en) A kind of desert marginal zone sacsaoul wood drip irrigation system and sacsaoul wood implantation methods and application
CN111345139A (en) Three-dimensional space cooperative type comprehensive treatment mode and construction method for heavy salinization farmland
CN108112294A (en) A kind of saline and alkali land improvement method
CN107027369A (en) Return salt-soda soil control system and its method in a kind of greenhouse
CN102144523A (en) Sidewalk-frozen tree planting method for coastal saline-salt soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170215

WW01 Invention patent application withdrawn after publication