CN106384188A - Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir - Google Patents

Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir Download PDF

Info

Publication number
CN106384188A
CN106384188A CN201610774795.0A CN201610774795A CN106384188A CN 106384188 A CN106384188 A CN 106384188A CN 201610774795 A CN201610774795 A CN 201610774795A CN 106384188 A CN106384188 A CN 106384188A
Authority
CN
China
Prior art keywords
well
horizontal well
index
production
development
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610774795.0A
Other languages
Chinese (zh)
Inventor
王自明
王斐
程亮
陆涛
崔力公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201610774795.0A priority Critical patent/CN106384188A/en
Publication of CN106384188A publication Critical patent/CN106384188A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Mining & Mineral Resources (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Geology (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Agronomy & Crop Science (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Game Theory and Decision Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Operations Research (AREA)
  • Animal Husbandry (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a water flooding production potential evaluating method for a single horizontal well of a strong heterogeneous carbonatite oil reservoir. An evaluation index group for evaluating the water flooding development degree of the horizontal well is defined on the basis of geological reservoir condition of the strong heterogeneous carbonatite oil reservoir and the water flooding production dynamic feature of the horizontal well and according to difference in reserve control capabilities in different states in the water flooding developing period of the horizontal well; a calculation model which can quantify the development degrees in different water flooding development stages of the horizontal well of the strong heterogeneous carbonatite oil reservoir is established by utilizing a weighted and zero-dimension method according to main factors that influence the evaluation indexes; and refined differentiated water flooding regulation and control of the horizontal well are realized, and the water flooding effect is optimized.

Description

Strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential
Technical field
The present invention relates to a kind of strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential, belong to Petroleum natural gas exploration field.
Background technology
Waterflooding extraction is the most frequently used secondary oil recovery means in oil field.Common analysis and evaluation individual well waterflooding extraction potentiality side Method is primarily adapted for use in Homogeneous Reservoir(Or weak heterogeneous reservoir)And straight well.For strong anisotropism Carbonate Reservoir horizontal well note Water is developed, and the strong anisotropism of reservoir leads to the waterflooding extraction feature significant difference of different parts horizontal well, Horizontal Well simultaneously Track distance walks strong Heterogeneous reservoir also makes water injection of horizontal well Development characteristics increasingly complex compared with straight well.
There is problems with strong anisotropism Carbonate Reservoir horizontal well individual well waterflooding extraction Potential Evaluation:
1st, the geology of impact horizontal well individual well flooding production potentiality and Development Factors are more, and same influence factor is to varying level The influence degree of well individual well productive potentialities is different, and these influence factors are difficult to be quantized.
2nd, affect the various factors of horizontal well individual well flooding production potentiality in comprehensive analysis after, the quantitative sign of neither one The index of individual well flooding production potentiality.
3rd, extract produces one of important means being waterflooding oil field in middle and high Water-cut Period stable yields, and currently without fixed The index of amount is evaluated to horizontal well individual well future extract productive potentialities.
Content of the invention
It is an object of the invention to the problems referred to above overcoming prior art to exist, provide a kind of strong heterogeneous carbonate oil Hide horizontal well individual well flooding production Assessment Method on Potential.The present invention is capable of horizontal well is become more meticulous, the water filling of differentiation is adjusted Control, optimal water injection effect.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential it is characterised in that include as Lower step:
A, according to strong anisotropism Carbonate Reservoir horizontal well different injection development phase feature, strong anisotropism is evaluated in definition Carbonate Reservoir horizontal well is in the evaluation index group of different development phases Exploitation degree;
B, according to strong anisotropism Carbonate Reservoir water injection of horizontal well characteristic of production dynamic, in conjunction with reservoir development feature, combing Summarize the principal element group affecting each evaluation index;
C, set up strong anisotropism Carbonate Reservoir water injection of horizontal well exploitation journey according to the principal element group of impact evaluation index Degree evaluation index computation model;
D, in horizontal well production process, according to set up evaluation index computation model, flooding production and regulation and control are carried out to horizontal well.
In described step a, according to the blowing of horizontal well experience, water filling, extract 3 different production phases, to horizontal well not Evaluated with stage development effectiveness.
In described step a, evaluation method is:Stratum natural energy is relied on according to blowing development period, the waterflooding extraction phase utilizes Artificial benefit and the principle of energy, in conjunction with zones of different, the horizontal well pair reserves control ability difference of different production phases, definition is commented Valency horizontal well pair history produce in reserves, remaining reserves, following produce in reserves control ability evaluation index group.
In described step b, it is analyzed according to horizontal well different phase characteristic of production dynamic, special in conjunction with reservoir development Point, selects the geology larger on evaluation index impact, manufacturing parameter composition principal element group.
Described principal element group includes history reserves exploitation index, remaining reserves employ index, index of potential productivity, water filling Demand index and extract index of potential productivity.
In described step c, according to the major influence factors group of screening, using weighting, zero dimension mathematical method, set up strong Anisotropism Carbonate Reservoir horizontal well development degree evaluation index computation model.
The model of described foundation is as follows:
History reserves exploitation index=oil well place construction location × 0.15+ brings in the time × 0.15+ oil well tire out oil production × 0.1+ oil well average daily oil productive capacity intensity of variation × 0.1+ oil well reserves are worn by perimeter well development degree × 0.25+ oil well well track More high permeability zone relative position relation and length × 0.25;
Remaining reserves employ index=(oil well geological model reserves/oil well tires out oil production) × edge position oil well reserves correction factor;
Index of potential productivity=history reserves exploitation index × remaining reserves employ index;
Water filling demand index=(the oil well initial stage Liquid output/current Liquid output of oil well) × accumulative injection-production ratio correction factor;
Extract index of potential productivity=index of potential productivity × 0.6+ (1- (1/ (water filling demand index × well well track with hypertonic Permeable layers position relationship correction factor))) × 0.4.
In described step d, in horizontal well production process, by the computation model of each principal element group, by actual production Data, well track data and geologic data substitute into and calculate, and obtain the development ability index of horizontal well different development phases, according to opening Send out capacity index and evaluate development effectiveness, strong anisotropism Carbonate Reservoir horizontal well is produced and regulation and control.
Using it is an advantage of the current invention that:
First, the present invention, based on strong anisotropism Carbonate Reservoir reservoir conditions, water injection of horizontal well characteristic of production dynamic, builds The evaluation methodology of vertical energy quantification strong anisotropism Carbonate Reservoir horizontal well different injection production phase development effectiveness, effectively Solve the difficult problem that strong anisotropism Carbonate Reservoir horizontal well future flooding production potentiality are difficult to quantitative assessment, be individual well water filling The determination of Optimizing manufacture strategy or measure provides theoretical foundation, realizes strong anisotropism Carbonate Reservoir horizontal well individual well is noted Water Optimizing manufacture.
2nd, the present invention considers the strong anisotropism of strong anisotropism Carbonate Reservoir reservoir, complicated production history, well All reserves exploitation situations, Horizontal Well track and the factors such as high permeability zone position relationship, and by these factor quantification, by adding Power, the mathematical method such as zero dimension, set up accurate water injection of horizontal well development response evaluation index method.
3rd, the present invention obtains strong anisotropism Carbonate Reservoir water using water injection of horizontal well development response evaluation index method The method of horizontal well different development phases development effectiveness belongs to horizontal well and produces analysis method innovation, is in strong anisotropism carbonic acid at present Reservoir horizontal well individual well waterflooding extraction influence factor is more, under conditions of flooding production ability is difficult to quantitative assessment, according to exploitation for rock salt Capacity index evaluates development effectiveness, thus realizing strong anisotropism Carbonate Reservoir horizontal well is become more meticulous difference production and regulation and control.
4th, the present invention also has:1st, real-time, this method is with strong anisotropism Carbonate Reservoir horizontal well different injection Based on development phase feature, thus can each production phase achieve horizontal well become more meticulous differentiation water filling regulation and control;2nd, low one-tenth This, this method be mathematical method, need not any experimental analysiss extra charge;3rd, easy to operate, once setting up strong anisotropism Carbonate Reservoir horizontal well development degree evaluation index computation model, can get each life of horizontal well by conventional software computing Product stage Exploitation degree index amount, simple to operate;4th, accuracy is higher, and this method is according to strong anisotropism Carbonate Reservoir water Horizontal well actual waterflooding extraction feature obtains, and than former empirical method, accuracy is higher.
To sum up, the present invention can be widely applicable to strong anisotropism Carbonate Reservoir water injection of horizontal well exploitation.
Specific embodiment
Embodiment 1
A kind of strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential it is characterised in that include as Lower step:
A, according to strong anisotropism Carbonate Reservoir horizontal well different injection development phase feature, strong anisotropism is evaluated in definition Carbonate Reservoir horizontal well is in the evaluation index group of different development phases Exploitation degree;
B, according to strong anisotropism Carbonate Reservoir water injection of horizontal well characteristic of production dynamic, in conjunction with reservoir development feature, combing Summarize the principal element group affecting each evaluation index;
C, set up strong anisotropism Carbonate Reservoir water injection of horizontal well exploitation journey according to the principal element group of impact evaluation index Degree evaluation index computation model;
D, in horizontal well production process, according to set up evaluation index computation model, flooding production and regulation and control are carried out to horizontal well.
In described step a, according to the blowing of horizontal well experience, water filling, extract 3 different production phases, to horizontal well not Evaluated with stage development effectiveness.
In described step a, evaluation method is:Stratum natural energy is relied on according to blowing development period, the waterflooding extraction phase utilizes Artificial benefit and the principle of energy, in conjunction with zones of different, the horizontal well pair reserves control ability difference of different production phases, definition is commented Valency horizontal well pair history produce in reserves, remaining reserves, following produce in reserves control ability evaluation index group.
In described step b, it is analyzed according to horizontal well different phase characteristic of production dynamic, special in conjunction with reservoir development Point, selects the geology larger on evaluation index impact, manufacturing parameter composition principal element group.
Described principal element group is history reserves exploitation index respectively(Characterize reserves in production history for the oil well and control energy Power), remaining reserves employ index(Characterize oil well region remaining reserves potentiality), index of potential productivity(Characterize oil well future Reserves control ability in production), water filling demand index(Characterize the desirability to water filling for the oil well current renwing stratum energy)、 Extract index of potential productivity(Characterize individual well and improve oil mass hoisting power after liquid measure produces).
In described step c, according to the major influence factors group of screening, using weighting, zero dimension mathematical method, set up strong Anisotropism Carbonate Reservoir horizontal well development degree evaluation index computation model.
The computation model set up is as follows
1)History reserves exploitation index is mainly calculated by 6 individual well indexs
History reserves exploitation index=oil well place construction location × 0.15+ brings in the time × 0.15+ oil well tire out oil production × 0.1+ oil well average daily oil productive capacity intensity of variation × 0.1+ oil well reserves are worn by perimeter well development degree × 0.25+ oil well well track More high permeability zone relative position relation and length × 0.25.
2)Remaining reserves are employed index and are mainly calculated by 3 individual well indexs
Remaining reserves employ index=(oil well geological model reserves/oil well tires out oil production) × edge position oil well reserves correction factor.
3)Index of potential productivity=history reserves exploitation index × remaining reserves employ index.
4)Water filling demand index is mainly calculated by 3 individual well indexs
Water filling demand index=(the oil well initial stage Liquid output/current Liquid output of oil well) × accumulative injection-production ratio correction factor.
5)Extract index of potential productivity
Extract index of potential productivity=index of potential productivity × 0.6+ (1- (1/ (water filling demand index × well well track with hypertonic Permeable layers position relationship correction factor))) × 0.4.
In described step d, in horizontal well production process, by actual production data, well track data and geologic data etc. Data substitutes into influence factor's group and is calculated, and obtains the development ability index of horizontal well different development phases, according to development ability Metrics evaluation development effectiveness, produces and regulation and control to strong anisotropism Carbonate Reservoir horizontal well.
Embodiment 2
The present invention based on anisotropism Carbonate Reservoir geologic reservoir condition, water injection of horizontal well characteristic of production dynamic, root According to horizontal well in waterflooding extraction life cycle the diversity to reserves control ability for the different phase, definition evaluate water injection of horizontal well The evaluation index group of Exploitation degree, sets up energy according to the principal element group of impact evaluation index using weighting, zero dimension method The computation model of quantification strong anisotropism Carbonate Reservoir horizontal well different injection development phase Exploitation degree, realizes to water Horizontal well becomes more meticulous, the water filling of differentiation regulation and control, optimal water injection effect.
Subordinate list 1 is being applied to of the actual Instructing manufacture institution adjustment that the present invention develops well group in certain oil-field flooding region Fruit table.Drawn certain water injection of horizontal well develop oil fields the water filling region well group stage produce adjustment suggestion.

Claims (8)

1. a kind of strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential is it is characterised in that include Following steps:
A, according to strong anisotropism Carbonate Reservoir horizontal well different injection development phase feature, strong anisotropism is evaluated in definition Carbonate Reservoir horizontal well is in the evaluation index group of different development phases Exploitation degree;
B, according to strong anisotropism Carbonate Reservoir water injection of horizontal well characteristic of production dynamic, in conjunction with reservoir development feature, combing Summarize the principal element group affecting each evaluation index;
C, set up strong anisotropism Carbonate Reservoir water injection of horizontal well exploitation journey according to the principal element group of impact evaluation index Degree evaluation index computation model;
D, in horizontal well production process, according to set up evaluation index computation model, flooding production and tune are carried out to horizontal well Control.
2. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 1, It is characterized in that:In described step a, according to the blowing of horizontal well experience, water filling, extract 3 different production phases, to horizontal well Different phase development effectiveness is evaluated.
3. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 2, It is characterized in that:In described step a, evaluation method is:Stratum natural energy, waterflooding extraction phase profit are relied on according to blowing development period With the principle of artificial benefit and energy, in conjunction with zones of different, the horizontal well pair reserves control ability difference of different production phases, definition Evaluate reserves during horizontal well pair history produces, remaining reserves, following produce in reserves control ability evaluation index group.
4. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 3, It is characterized in that:In described step b, it is analyzed according to horizontal well different phase characteristic of production dynamic, in conjunction with reservoir development Feature, selects the geology larger on evaluation index impact, manufacturing parameter composition principal element group.
5. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 4, It is characterized in that:Described principal element group includes history reserves exploitation index, remaining reserves employ index, index of potential productivity, Water filling demand index and extract index of potential productivity.
6. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 5, It is characterized in that:In described step c, according to the major influence factors group of screening, using weighting, zero dimension mathematical method, build Found strong anisotropism Carbonate Reservoir horizontal well development degree evaluation index computation model.
7. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 6, It is characterized in that:The model of described foundation is as follows:
History reserves exploitation index=oil well place construction location × 0.15+ brings in the time × 0.15+ oil well tire out oil production × 0.1+ oil well average daily oil productive capacity intensity of variation × 0.1+ oil well reserves are worn by perimeter well development degree × 0.25+ oil well well track More high permeability zone relative position relation and length × 0.25;
Remaining reserves employ index=(oil well geological model reserves/oil well tires out oil production) × edge position oil well reserves correction factor;
Index of potential productivity=history reserves exploitation index × remaining reserves employ index;
Water filling demand index=(the oil well initial stage Liquid output/current Liquid output of oil well) × accumulative injection-production ratio correction factor;
Extract index of potential productivity=index of potential productivity × 0.6+ (1- (1/ (water filling demand index × well well track with hypertonic Permeable layers position relationship correction factor))) × 0.4.
8. strong heterogeneous carbonate reservoir horizontal well individual well flooding production Assessment Method on Potential according to claim 7, It is characterized in that:In described step d, in horizontal well production process, by the computation model of each principal element group, will be actual raw Produce data, well track data and geologic data and substitute into calculating, obtain the development ability index of horizontal well different development phases, according to Development ability metrics evaluation development effectiveness, produces and regulation and control to strong anisotropism Carbonate Reservoir horizontal well.
CN201610774795.0A 2016-08-31 2016-08-31 Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir Pending CN106384188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610774795.0A CN106384188A (en) 2016-08-31 2016-08-31 Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610774795.0A CN106384188A (en) 2016-08-31 2016-08-31 Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir

Publications (1)

Publication Number Publication Date
CN106384188A true CN106384188A (en) 2017-02-08

Family

ID=57939453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610774795.0A Pending CN106384188A (en) 2016-08-31 2016-08-31 Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir

Country Status (1)

Country Link
CN (1) CN106384188A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107366529A (en) * 2017-06-28 2017-11-21 中国石油化工股份有限公司 Heterogeneous water-drive pool Dimensionless liquid production index curve characterizing method
CN107832900A (en) * 2017-05-09 2018-03-23 中国石油化工股份有限公司 Sandy conglomerate bodies Evaluation of Affusion Effect method
CN108518219A (en) * 2018-03-29 2018-09-11 中国石油大港油田勘探开发研究院 It is a kind of that the evaluation method of well is selected based on the natural energy scale extract that develops oil fields
CN110080743A (en) * 2018-01-24 2019-08-02 中国石油天然气股份有限公司 Oil well potentiality detection method
CN110761755A (en) * 2019-09-25 2020-02-07 中国石油天然气股份有限公司 Low-permeability oilfield water flooding development effect evaluation method
CN112502677A (en) * 2020-12-14 2021-03-16 西南石油大学 Water injection development effect evaluation method based on multiple linear regression
CN114810006A (en) * 2021-01-27 2022-07-29 中国石油化工股份有限公司 Potential evaluation method for regulating and controlling high-water-consumption zone by separate-layer water injection after heterogeneous flooding
CN114810006B (en) * 2021-01-27 2024-05-31 中国石油化工股份有限公司 Heterogeneous flooding post-treatment separate layer water injection regulation and control high water consumption layer potential evaluation method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832900A (en) * 2017-05-09 2018-03-23 中国石油化工股份有限公司 Sandy conglomerate bodies Evaluation of Affusion Effect method
CN107366529A (en) * 2017-06-28 2017-11-21 中国石油化工股份有限公司 Heterogeneous water-drive pool Dimensionless liquid production index curve characterizing method
CN110080743A (en) * 2018-01-24 2019-08-02 中国石油天然气股份有限公司 Oil well potentiality detection method
CN108518219A (en) * 2018-03-29 2018-09-11 中国石油大港油田勘探开发研究院 It is a kind of that the evaluation method of well is selected based on the natural energy scale extract that develops oil fields
CN108518219B (en) * 2018-03-29 2021-08-31 中国石油天然气股份有限公司 Evaluation method for oil field scale extract well selection based on natural energy development
CN110761755A (en) * 2019-09-25 2020-02-07 中国石油天然气股份有限公司 Low-permeability oilfield water flooding development effect evaluation method
CN110761755B (en) * 2019-09-25 2021-11-02 中国石油天然气股份有限公司 Low-permeability oilfield water flooding development effect evaluation method
CN112502677A (en) * 2020-12-14 2021-03-16 西南石油大学 Water injection development effect evaluation method based on multiple linear regression
CN114810006A (en) * 2021-01-27 2022-07-29 中国石油化工股份有限公司 Potential evaluation method for regulating and controlling high-water-consumption zone by separate-layer water injection after heterogeneous flooding
CN114810006B (en) * 2021-01-27 2024-05-31 中国石油化工股份有限公司 Heterogeneous flooding post-treatment separate layer water injection regulation and control high water consumption layer potential evaluation method

Similar Documents

Publication Publication Date Title
CN106384188A (en) Water flooding production potential evaluating method for single horizontal well of strong heterogeneous carbonatite oil reservoir
CN104453804B (en) Dynamic monitoring and evaluating method for gas-drive reservoir development
CN102041995B (en) System for monitoring complicated oil deposit flooding conditions
CN105740563B (en) Preferential channel identification method for secondary development of mature oil field
CN105822301B (en) A kind of logging prediction mathematical model establishing method of organic carbon content
CN110617042B (en) Layered water injection regulation and control method for high water-consumption zone development oil reservoir
CN105842753B (en) To the method and device that remaining organic carbon content is recovered in hydrocarbon source rock
CN109948272A (en) Tune based on inter well connectivity blocks up dynamic prediction method and system
CN105089585A (en) Medium and high permeability oil pool ultrahigh water content later low-cost equivalent water flooding method
CN107676064A (en) A kind of water cut in water flooding reservoir Forecasting Methodology and its prediction meanss
CN105525909A (en) Method for analyzing heterogeneous property of oil reservoir
CN108229811A (en) A kind of method for evaluating fracture and vug carbonate reservoir flood effectiveness
CN106894800A (en) A kind of profile control well selection decision-making technique suitable for Offshore Heavy Oil Field oil reservoir
CN107038516A (en) Complex Fault Block Oil Reservoir water flooding effectiveness quantitative evaluation method is oozed in one kind
CN109538181A (en) Improve the optimization method of side water heavy crude reservoir Simulation on whole pay zones effect
CN104216341A (en) Reservoir production real-time optimization method based on improved random disturbance approximation algorithm
CN107218019A (en) A kind of polymer flooding production optimization method and system based on Monte carlo algorithm
CN109214022A (en) A kind of individual well can adopt the method for building up and exploration project reserves index prediction technique of changing rule dynamic model
CN110984974B (en) Method for determining reasonable gas production speed of water-gas reservoir based on water invasion speed
CN109829586A (en) A kind of low-permeability oil deposit polymer microballoon deep profile correction technology oil increment evaluation method
CN106481315A (en) Land sandstone oil reservoir individual well recoverable reserves quickly determines model and method for building up
CN108119121A (en) A kind of horizontal well refracturing potentiality well rapid screening method
CN108442921A (en) It is a kind of to consider that the oil well output of time-varying and interlayer interference splits a point method
CN106150454B (en) Offshore oilfield vector quantization production and injection proration method
CN102606120B (en) Steam flooding injection and production scheme determining method based on stochastic disturbance particle swarm optimization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170208