CN106383291B - 一种现场测试避雷器漏电流的试验接线装置及方法 - Google Patents
一种现场测试避雷器漏电流的试验接线装置及方法 Download PDFInfo
- Publication number
- CN106383291B CN106383291B CN201610852427.3A CN201610852427A CN106383291B CN 106383291 B CN106383291 B CN 106383291B CN 201610852427 A CN201610852427 A CN 201610852427A CN 106383291 B CN106383291 B CN 106383291B
- Authority
- CN
- China
- Prior art keywords
- lightning arrester
- leakage current
- shielding wire
- direct current
- insulating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
- G01R1/0416—Connectors, terminals
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Relating To Insulation (AREA)
Abstract
本发明公开了一种现场测试避雷器漏电流的试验接线装置,避雷器顶部装有均压环,包括安装于均压环一侧的绝缘杆、绝缘绳、测量屏蔽线、直流发生器和漏电流测试仪;所述绝缘绳通过绝缘杆的一支点与测量屏蔽线的中段相连接,所述测量屏蔽线的一端连接在任一设于避雷器的法兰上,其另一端与直流发生器的高压端连接,直流发生器的接地端通过光纤和漏电流测试仪连接。本发明还公开了一种现场测试避雷器漏电流的试验接线方法。本发明的目的在于提供一种现场测试避雷器漏电流的试验接线装置及方法,解决直流参考电压及0.75倍直流参考电压下漏电流数值偏差大的问题,保证了现场测试的准确度,同时接线简单,减少重复换线次数,测试速度提高3‑4倍。
Description
技术领域
本发明涉及一种高压电气设备现场测试技术领域,属于现场测试避雷器漏电流的试验接线装置及方法。
背景技术
避雷器是电力***重要的电气设备之一,它对电力***的安全运行起着十分重要的作用。为了使避雷器在电力***安全可靠运行,根据电力行业标准DL/T596-1996《电力设备预防性试验规程》需要对避雷器进行预防性试验,其中现场测试直流参考电压及0.75倍直流参考电压下漏电流试验是判断避雷器是否正常的重要试验项目。
但在现场测试过程中,由于人员、设备以及避雷器的位置等因素的影响,现场测试避雷器直流参考电压及0.75倍直流参考电压下漏电流,经常会出现试验数据异常,但拆下在试验室进行试验又正常的现象,对于现场维护带来极大的不便。目前现场测试凭借试验人员的经验和历史数据进行判断,没有一个可靠的试验方案来解决该问题,给电网运行方和设备制造厂家带来很多不便和困扰。
发明内容
本发明的目的在于提供一种现场测试避雷器漏电流的试验接线装置及方法,能够解决直流参考电压及0.75倍直流参考电压下漏电流数值偏差大的问题,保证了现场测试的准确度,同时接线简单,减少重复换线次数,测试速度提高3-4倍。
为了实现上述目的,本发明采取的技术方案是:
一种现场测试避雷器漏电流的试验接线装置,避雷器顶部装有均压环,包括安装于均压环一侧的绝缘杆、绝缘绳、测量屏蔽线、直流发生器和漏电流测试仪;
所述绝缘绳通过绝缘杆的一支点与测量屏蔽线的中段相连接,所述测量屏蔽线的一端连接在任一设于避雷器的法兰上,其另一端与直流发生器的高压端连接,直流发生器的接地端通过光纤和漏电流测试仪连接。
所述的现场测试避雷器漏电流的试验接线装置还包括绝缘定滑轮,其中绝缘绳绕过绝缘定滑轮与测量屏蔽线的中段相连接,所述绝缘定滑轮安装在绝缘杆上远离避雷器的一端。
所述绝缘杆为长度可调节的绝缘杆。
测量屏蔽线的与设于避雷器的法兰相连接的一端所在的直线与避雷器轴向的夹角为90°。
一种现场测试避雷器漏电流的试验接线方法,包括以下步骤:
步骤1、将可调节长度的绝缘杆的一端安装在避雷器顶部的均压环上,将绝缘定滑轮安装在绝缘杆下远离避雷器的一端,根据绝缘杆与避雷器的距离调整绝缘杆的长度,使绝缘杆与均压环保持固定连接;
步骤2、将绝缘绳的一端绕过绝缘定滑轮后再连接测量屏蔽线,将测量屏蔽线的一端固定在任一设于避雷器的法兰上,拉动绝缘绳的另一端,使测量屏蔽线的与设于避雷器的法兰相连接的一端所在的直线与避雷器轴向的夹角为90°;
步骤3、将测量屏蔽线的另一端连接直流发生器的高压端,直流发生器的接地端通过光纤和漏电流测试仪连接,以测量直流参考电压及0.75倍直流参考电压下避雷器的漏电流。
本发明的有益效果在于:
本发明提供一种现场测试避雷器直流参考电压及0.75倍直流参考电压下漏电流的试验接线装置和方法,它通过绕过定滑轮上的绝缘绳轻松的实现拉大测量屏蔽线同避雷器的角度,能够解决直流参考电压及0.75倍直流参考电压下漏电流数值偏差大的问题,其现场试验数据同实验室测试数据接近,直流参考电压的误差小于5%,0.75倍直流参考电压下漏电流的误差小于15μA,保证了现场测试的准确度;同时接线简单,减少重复换线次数,测试速度提高3-4倍。
附图说明
图1为本发明一种现场测试避雷器漏电流的试验接线装置的结构示意图;
其中:1、法兰;2、均压环;3、绝缘杆;4、绝缘定滑轮;5、绝缘绳;6、测量屏蔽线;7、直流发生器;8、光纤;9、漏电流测试仪。
具体实施方式
下面结合附图和具体实施方式对本发明的内容做进一步详细说明。
实施例
请参照图1所示,一种现场测试避雷器漏电流的试验接线装置,在避雷器顶部装有均压环2,包括安装于均压环2一侧的绝缘杆3、绝缘定滑轮4、绝缘绳5、测量屏蔽线6、直流发生器7和漏电流测试仪9,,所述绝缘定滑轮4安装在绝缘杆3上远离避雷器一端。所述绝缘杆3的长度可以自由调节,其根据避雷器所处的不同位置而调节绝缘杆3的长度使避雷器上的均压环2与绝缘杆3始终固定连接;其中绝缘绳5的一端绕过绝缘定滑轮4后与测量屏蔽线6连接于测量屏蔽线6的某一处,该测量屏蔽线6的一端固定在任一设于避雷器的法兰1上,其另一端与直流发生器7的高压端连接,通过拉动绝缘绳5的另一端,使测量屏蔽线6的与设于避雷器的法兰1相连接的一端所在的直线与避雷器轴向的夹角为90°左右。所述直流发生器7的接地端通过光纤8和漏电流测试仪9连接,测量直流参考电压及0.75倍直流参考电压下避雷器的漏电流。
一种现场测试避雷器漏电流试验接线方法,其包括以下步骤:
步骤1、将可调节长度的绝缘杆3的一端固定安装在避雷器顶部的均压环2上,将绝缘定滑轮4安装在绝缘杆3下远离避雷器的一端,当避雷器位于不同的位置时,根据绝缘杆3与避雷器的距离调节绝缘杆3的长度,使绝缘杆3与均压环2保持固定连接;
步骤2、将绝缘绳5的一端绕过绝缘定滑轮4后再与测量屏蔽线6连接于测量屏蔽线6的某一处,再将测量屏蔽线6的一端固定在任一设于避雷器的法兰上,通过拉动绝缘绳5的另一端,来带动绝缘绳5与测量屏蔽线6连接处的位置,从而控制避雷器轴向与测量屏蔽线6的角度。当拉大测量屏蔽线6同避雷器轴向的角度时,现场测试直流参考电压及0.75倍直流参考电压下漏电流数值与实验室测试数据误差不大。本实施例中,拉动绝缘绳5的另一端,使测量屏蔽线6的与设于避雷器的法兰相连接的一端所在的直线与避雷器轴向的夹角控制在90°左右;
步骤3、将测量屏蔽线6的另一端连接直流发生器7的高压端,直流发生器7的接地端通过光纤8和漏电流测试仪9连接,以测量直流参考电压及0.75倍直流参考电压下避雷器的漏电流。
本实施例中现场测试直流参考电压及0.75倍直流参考电压下的漏电流数值与实验室测试数据非常接近,直流参考电压下漏电流的误差小于5%,0.75倍直流参考电压下漏电流的误差小于15μA,保证了现场测试直流参考电压及0.75倍直流参考电压下的漏电流数值的准确度
虽然本发明是通过具体实施例进行说明的,本领域技术人员应当明白,在不脱离本发明范围的情况下,还可以对本发明进行各种变换及等同替代。另外,针对特定情形或应用,可以对本发明做各种修改,而不脱离本发明的范围。因此,本发明不局限于所公开的具体实施例,而应当包括落入本发明权利要求范围内的全部实施方式。
Claims (1)
1.一种现场测试避雷器漏电流的试验接线方法,其特征在于,避雷器顶部装有均压环(2),包括安装于均压环(2)一侧的绝缘杆(3)、绝缘绳(5)、测量屏蔽线(6)、直流发生器(7)和漏电流测试仪(9);
所述绝缘绳(5)通过绝缘杆(3)的一支点与测量屏蔽线(6)的中段相连接,所述测量屏蔽线(6)的一端连接在任一设于避雷器的法兰(1)上,其另一端与直流发生器(7)的高压端连接,直流发生器(7)的接地端通过光纤(8)和漏电流测试仪(9)连接;
其还包括绝缘定滑轮(4),其中绝缘绳(5)绕过绝缘定滑轮(4)与测量屏蔽线(6)的中段相连接,所述绝缘定滑轮(4)安装在绝缘杆(3)下远离避雷器的一端;所述绝缘杆(3)为长度可调节的绝缘杆;测量屏蔽线(6)的与设于避雷器的法兰(1)相连接的一端所在的直线与避雷器轴向的夹角为90°;包括以下步骤:
步骤1、将可调节长度的绝缘杆(3)安装在避雷器顶部的均压环(2)上,将绝缘定滑轮(4)安装在绝缘杆(3)远离避雷器的一端,根据绝缘杆(3)与避雷器的距离调整绝缘杆(3)的长度,使绝缘杆(3)与均压环(2)保持固定连接;
步骤2、将绝缘绳(5)的一端绕过绝缘定滑轮(4)后再与测量屏蔽线(6)相连接,将测量屏蔽线(6)的一端与任一设于避雷器的法兰(1)连接,拉动绝缘绳(5)的另一端,使测量屏蔽线(6)的与设于避雷器的法兰(1)相连接的一端所在的直线与避雷器轴向的夹角为90°;
步骤3、将测量屏蔽线(6)的另一端连接直流发生器(7)的高压端,直流发生器(7)的接地端通过光纤(8)和漏电流测试仪(9)连接,以测量直流参考电压及0.75倍直流参考电压下避雷器的漏电流。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610852427.3A CN106383291B (zh) | 2016-09-26 | 2016-09-26 | 一种现场测试避雷器漏电流的试验接线装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610852427.3A CN106383291B (zh) | 2016-09-26 | 2016-09-26 | 一种现场测试避雷器漏电流的试验接线装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106383291A CN106383291A (zh) | 2017-02-08 |
CN106383291B true CN106383291B (zh) | 2023-05-26 |
Family
ID=57937098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610852427.3A Active CN106383291B (zh) | 2016-09-26 | 2016-09-26 | 一种现场测试避雷器漏电流的试验接线装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106383291B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110618362A (zh) * | 2019-10-15 | 2019-12-27 | 国网天津市电力公司 | 用于输电线路避雷器的高压试验装置 |
CN111521847A (zh) * | 2020-05-20 | 2020-08-11 | 国家电网有限公司 | 避雷器直流试验接线转换器 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06309973A (ja) * | 1993-04-28 | 1994-11-04 | Sumitomo Wiring Syst Ltd | シールド付電線の供給方法及び供給装置 |
CN202421403U (zh) * | 2012-01-16 | 2012-09-05 | 宁夏电力公司超高压分公司 | 氧化锌避雷器直流泄漏试验装置 |
CN203396788U (zh) * | 2013-06-20 | 2014-01-15 | 国家电网公司 | 用于避雷器试验的加压线夹持工具 |
CN204142876U (zh) * | 2014-09-11 | 2015-02-04 | 国家电网公司 | 一种氧化锌避雷器泄漏电流测量辅助装置 |
CN105040755A (zh) * | 2015-08-12 | 2015-11-11 | 河海大学 | 一种基于透明岩体的嵌岩桩模型试验装置及其使用方法 |
CN205353126U (zh) * | 2016-02-24 | 2016-06-29 | 中国大唐集团科学技术研究院有限公司华中分公司 | 一种瓷绝缘子表面泄漏电流屏蔽操作杆 |
CN205506918U (zh) * | 2015-07-16 | 2016-08-24 | 国家电网公司 | 一种多节氧化锌避雷器泄漏电流测量装置 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105958351A (zh) * | 2016-07-22 | 2016-09-21 | 国网河南省电力公司南阳供电公司 | 减少变电站母线停电时间的工作方法 |
CN206209028U (zh) * | 2016-09-26 | 2017-05-31 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 一种现场测试避雷器漏电流的试验接线装置 |
-
2016
- 2016-09-26 CN CN201610852427.3A patent/CN106383291B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06309973A (ja) * | 1993-04-28 | 1994-11-04 | Sumitomo Wiring Syst Ltd | シールド付電線の供給方法及び供給装置 |
CN202421403U (zh) * | 2012-01-16 | 2012-09-05 | 宁夏电力公司超高压分公司 | 氧化锌避雷器直流泄漏试验装置 |
CN203396788U (zh) * | 2013-06-20 | 2014-01-15 | 国家电网公司 | 用于避雷器试验的加压线夹持工具 |
CN204142876U (zh) * | 2014-09-11 | 2015-02-04 | 国家电网公司 | 一种氧化锌避雷器泄漏电流测量辅助装置 |
CN205506918U (zh) * | 2015-07-16 | 2016-08-24 | 国家电网公司 | 一种多节氧化锌避雷器泄漏电流测量装置 |
CN105040755A (zh) * | 2015-08-12 | 2015-11-11 | 河海大学 | 一种基于透明岩体的嵌岩桩模型试验装置及其使用方法 |
CN205353126U (zh) * | 2016-02-24 | 2016-06-29 | 中国大唐集团科学技术研究院有限公司华中分公司 | 一种瓷绝缘子表面泄漏电流屏蔽操作杆 |
Also Published As
Publication number | Publication date |
---|---|
CN106383291A (zh) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7167007B2 (en) | Apparatus and method for field testing MOV arresters | |
US20050231210A1 (en) | Apparatus and method for field testing polymer insulators | |
CN102914731B (zh) | 一种基于双电极的冲击电压下变压器油中尖端放电的检测装置 | |
CN103901309B (zh) | 220kV氧化锌避雷器不拆高压引线试验装置试验方法 | |
WO2016023141A1 (zh) | ±800kV特高压直流线路带电更换耐张硬管母跳线绝缘子工艺 | |
CN106383291B (zh) | 一种现场测试避雷器漏电流的试验接线装置及方法 | |
CN104569609A (zh) | 一种测量引下线异频电流的杆塔接地阻抗测试方法 | |
CN107688136B (zh) | 一种特高压长距离输电线路接地点判断与定位方法 | |
CN208580172U (zh) | 一种用于电力***设备接地状况快速检测装置 | |
CN206209028U (zh) | 一种现场测试避雷器漏电流的试验接线装置 | |
CN110045188B (zh) | 一种不拆除高压侧引线测量变压器绝缘电阻的***及方法 | |
CN110957875B (zh) | 一种大型电机定子绕组交流耐压时防止线棒误击穿的工艺方法 | |
CN107167698A (zh) | 一种避雷器泄漏电流带电测试装置及方法 | |
CN110726954A (zh) | 一种500kV氧化锌避雷器泄漏电流免登高测试装置 | |
CN201697974U (zh) | 有线、无线一体化核相仪 | |
CN201622319U (zh) | 自动工频耐压试验控制装置 | |
CN205562682U (zh) | 一种10kV配电线路绝缘子绝缘电阻用测量装置 | |
CN204758752U (zh) | 一种电缆外护层的绝缘故障检测装置 | |
Jianye et al. | Research on X-ray Live Inspection Method for Tensile Clamps of Transmission Lines | |
CN204831702U (zh) | 新型带电sf6检漏装置 | |
CN203433045U (zh) | 接地电阻测试装置 | |
CN110749807A (zh) | 一种500kV氧化锌避雷器高空测试装置 | |
CN104502740B (zh) | 一种直流输电***换流站雷电侵入波采样装置及采样方法 | |
KR20190001388U (ko) | 접지설비의 측정용 장비 | |
CN110672890A (zh) | 一种500kV氧化锌避雷器跳线装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |