CN106354824A CN201610772690.1A CN201610772690A CN106354824A CN 106354824 A CN106354824 A CN 106354824A CN 201610772690 A CN201610772690 A CN 201610772690A CN 106354824 A CN106354824 A CN 106354824A
Authority
CN
China
Prior art keywords
data
file
mark
same
version
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610772690.1A
Other languages
Chinese (zh)
Inventor
陈建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Glodon Polytron Technologies Inc
Glodon Co Ltd
Original Assignee
Glodon Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Glodon Polytron Technologies Inc filed Critical Glodon Polytron Technologies Inc
Priority to CN201610772690.1A priority Critical patent/CN106354824A/en
Publication of CN106354824A publication Critical patent/CN106354824A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/215Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention provides a data management method and a data management device. The data management method includes the steps: determining characteristics of data of component levels in a BIM (building information modeling) item; using identifications corresponding to the characteristics to divide and organize the data. According to the technical scheme, a large amount of data redundancies can be avoided, so that high storage cost is avoided, and the access performance of the data is ensured.

Description

Data managing method data managing device
Technical field
The present invention relates to technical field of data administration, in particular to a kind of data managing method and a kind of data pipe Reason device.
Background technology
At present, towards BIM (building information modeling, the bim) solution of web In, for baroque BIM, the wherein number of component (can be regarded as Architectural Elements, such as pillar, beam, door, window) Magnitude reaches 100,000 grades to million grades.In BIM application, browsing for the ease of BIM, to building letter The management of the related business datum of breath model, needs the data of component rank is carried out structuring or semi-structured storage.In item Substantial amounts of data redundancy can be produced, this will produce huge carrying cost in the case that mesh registration is higher.And exist a large amount of Data redundancy also can reduce the performance of data access.
Therefore, how to avoid there is substantial amounts of data redundancy becomes problem demanding prompt solution.
Content of the invention
The present invention is based on the problems referred to above it is proposed that a kind of new technical scheme, can avoid there is substantial amounts of data Redundancy, thus avoiding the high cost storing, and the access performance ensureing data.
In view of this, a first aspect of the present invention proposes a kind of data managing method, comprising: determine structure in bim project The characteristic of the data of part rank;Divide and organize described data using mark corresponding with described characteristic.
In this technical scheme, divided according to the corresponding mark of the characteristic of data and organize organization data so that the depositing of data Storage is more reasonable, it is to avoid the redundant data of storing excess, thus avoiding the high cost storing, and the access optimizing data Energy.
It is preferable that described divided using mark corresponding with described characteristic and organize described in technique scheme The step of data, specifically includes: for the corresponding described number of same file between the disparity items version of same bim project According to and/or different bim project the corresponding described data of same file, divided using the mark of file model and organize institute State data;The corresponding described data of different FileVersions for the same file of same bim project and/or same bim project The corresponding described data of disparity items version, divided using the mark of file and organize described data;For same bim item The corresponding described data of same file version between purpose disparity items version, the mark using FileVersion divides and group Knit described data.
In this technical scheme, for the corresponding data of same file between the disparity items version of same bim project, Divided using the mark of file model and organize organization data, thus between solving the disparity items version of same bim project, phase The data redundancy that same file content (unmodified file) is caused.For the corresponding data of same file of different bim projects, make Divided with the mark of file model and organize organization data, solve between different bim projects, the data that same file content causes Redundancy.This scheme is be applied to parsing the data obtaining from model file.
For the corresponding data of different FileVersions of the same file of same bim project, the mark using file to be drawn Divide and organize such data, thus solving in same bim project, the different FileVersions (file has modification) of same file Data redundancy.For the corresponding data of disparity items version of same bim project, divided using the mark of file and organize number According to, thus the data redundancy between solving the disparity items version of same bim project.This scheme is be applied to modification history Unessential data, during Xiang Mingda, data directly updates, and does not retain historical data.
For the corresponding data of same file version between the disparity items version of same bim project, using file version This mark, to divide and to organize organization data, solves between the disparity items version of same bim project, same file version is (not Modification file) between data redundancy it is adaptable to need preserve modification history data.
It is preferable that also including in any of the above-described technical scheme: calculate the digest value of same file by digest algorithm; Using described digest value as described file model mark.
In this technical scheme, due to the content in the digest value representative model file of file, if the summary between file Value is consistent, and the content in file is also necessarily consistent, realizes the data-reusing of digest value same file.
It is preferable that the mark of described file is random with being designated of described FileVersion in any of the above-described technical scheme Number or sequence number, wherein, the mark of described file and the mark of described FileVersion have uniqueness.
In this technical scheme, by the mark of unique file and the mark of FileVersion, data is managed, Thus ensure that the reliability of data management.
A second aspect of the present invention proposes a kind of data administrator, comprising: the first determining unit, for determining bim The characteristic of the data of component rank in project;Administrative unit, for being divided and being organized using mark corresponding with described characteristic Described data.
In this technical scheme, divided according to the corresponding mark of the characteristic of data and organize organization data so that the depositing of data Storage is more reasonable, it is to avoid the redundant data of storing excess, thus avoiding the high cost storing, and the access optimizing data Energy.
It is preferable that described administrative unit is specifically for for the different item of same bim project in technique scheme The corresponding described data of same file between mesh version and/or the corresponding described data of same file of different bim project, Divided using the mark of file model and organize described data, for the different file versions of the same file of same bim project This corresponding described data and/or the corresponding described data of disparity items version of same bim project, using the mark of file To divide and to organize described data, for the corresponding institute of same file version between the disparity items version of same bim project State data, divided using the mark of FileVersion and organize described data.
In this technical scheme, for the corresponding data of same file between the disparity items version of same bim project, Divided using the mark of file model and organize organization data, thus between solving the disparity items version of same bim project, phase The data redundancy that same file content (unmodified file) is caused.For the corresponding data of same file of different bim projects, make Divided with the mark of file model and organize organization data, solve between different bim projects, the data that same file content causes Redundancy.This scheme is be applied to parsing the data obtaining from model file.
For the corresponding data of different FileVersions of the same file of same bim project, the mark using file to be drawn Divide and organize such data, thus solving in same bim project, the different FileVersions (file has modification) of same file Data redundancy.For the corresponding data of disparity items version of same bim project, divided using the mark of file and organize number According to, thus the data redundancy between solving the disparity items version of same bim project.This scheme is be applied to modification history Unessential data, during Xiang Mingda, data directly updates, and does not retain historical data.
For the corresponding data of same file version between the disparity items version of same bim project, using file version This mark, to divide and to organize organization data, solves between the disparity items version of same bim project, same file version is (not Modification file) between data redundancy it is adaptable to need preserve modification history data.
It is preferable that also including in any of the above-described technical scheme: computing unit is identical for being calculated by digest algorithm The digest value of file;Second determining unit, for using described digest value as described file model mark.
In this technical scheme, due to the content in the digest value representative model file of file, if the summary between file Value is consistent, and the content in file is also necessarily consistent, realizes the data-reusing of digest value same file.
It is preferable that the mark of described file is random with being designated of described FileVersion in any of the above-described technical scheme Number or sequence number, wherein, the mark of described file and the mark of described FileVersion have uniqueness.
In this technical scheme, by the mark of unique file and the mark of FileVersion, data is managed, Thus ensure that the reliability of data management.
By technical scheme, can avoid there is substantial amounts of data redundancy, thus avoiding the cost mistake storing Height, and ensure the access performance of data.
Brief description
Fig. 1 shows the schematic flow sheet of data managing method according to an embodiment of the invention;
Fig. 2 shows the sectional drawing of model file according to an embodiment of the invention;
Fig. 3 shows the relation schematic diagram between the level concept of BIM according to an embodiment of the invention;
Fig. 4 shows the block diagram of data administrator according to an embodiment of the invention.
Specific embodiment
In order to the above objects, features and advantages of the present invention can be more clearly understood that, below in conjunction with the accompanying drawings and specifically real Mode of applying is further described in detail to the present invention.It should be noted that in the case of not conflicting, the enforcement of the application Feature in example and embodiment can be mutually combined.
Elaborate a lot of details in the following description in order to fully understand the present invention, but, the present invention also may be used To be implemented different from other modes described here using other, therefore, protection scope of the present invention is not described below Specific embodiment restriction.
Fig. 1 shows the schematic flow sheet of data managing method according to an embodiment of the invention.
As shown in figure 1, data managing method according to an embodiment of the invention, comprising:
Step 102, determines the characteristic of the data of component rank in bim project.
Bim project: the information management project set up in units of single construction-engineering project.
Bim project is based on modelling file (generally using the revit file of autodesk company) and sets up, for complexity Model, be generally divided into multiple model files, such as, as shown in Fig. 2 by building floor, Engineering Speciality partitioning model literary composition Part.
Step 104, is divided and is organized described data using mark corresponding with described characteristic.
In this technical scheme, divided (using the subregion of data base, index etc. according to the corresponding mark of characteristic of data Technology is divided) and organize organization data so that the storage of data is more reasonable, it is to avoid the redundant data of storing excess, thus keeping away Exempt from the high cost storing, and the access performance optimizing data.
It is preferable that described divided using mark corresponding with described characteristic and organize described in technique scheme The step of data, specifically includes: for the corresponding described number of same file between the disparity items version of same bim project According to and/or different bim project the corresponding described data of same file, divided using the mark of file model and organize institute State data;The corresponding described data of different FileVersions for the same file of same bim project and/or same bim project The corresponding described data of disparity items version, divided using the mark of file and organize described data;For same bim item The corresponding described data of same file version between purpose disparity items version, the mark using FileVersion divides and group Knit described data.
Described in detail by Fig. 3 between project p, Item version pv, file f, FileVersion fv, single model m and component e Relation.
As shown in figure 3, project p1 has two Item versions, respectively p1v1 and p1v2, file f 1 has a version f1v1, File f 2 has two versions, is f2v1 and f2v2 respectively, and the project of p1v1 version includes the file of f1v1 and f2v1, p1v2 version This project includes the file of f1v1 and f2v2, and f1v1 corresponds to model m1, and f2v1 corresponds to model m2, and f2v2 corresponds to model m3, Model m1 includes component e1 and e2, and model m2 includes component e1.Project p2 has a version p2v1, the project of p2v1 version Include the file of f1v1.
The relation between stored items, Item version, file, FileVersion, model is needed, this partial data amount in system Less, it is not described in detail herein, the data that component rank is primarily described herein divides and organizes.
Single model in above-mentioned refers to the model corresponding to single file.
In this technical scheme, for the corresponding data of same file between the disparity items version of same bim project, Divided using the mark of file model and organize organization data, thus between solving the disparity items version of same bim project, phase The data redundancy that same file content (unmodified file) is caused.For the corresponding data of same file of different bim projects, make Divided with the mark of file model and organize organization data, solve between different bim projects, the data that same file content causes Redundancy.
This scheme is be applied to parsing the data obtaining from model file.Such as structure attribute, for describing the number of component According to including the geological information of component, also including design and the service related information of component, come from revit file.
Divided using the mark of file model and to organize organization data as shown in table 1:
Table 1
The data redundancy that partial component can lead to unmodified component (as " component 1 " in table 1) only be have modified for file, by In component Data Comparison cost prohibitively expensive it is allowed to this kind of redundancy.
For the corresponding data of different FileVersions of the same file of same bim project, the mark using file to be drawn Divide and organize such data, thus solving in same bim project, the different FileVersions (file has modification) of same file Data redundancy.For the corresponding data of disparity items version of same bim project, divided using the mark of file and organize number According to, thus the data redundancy between solving the disparity items version of same bim project.This scheme is be applied to modification history Unessential data, during Xiang Mingda, data directly updates, and does not retain historical data.
Divided using the mark of file and to organize organization data as shown in table 2:
Table 2
In table 2, even if the mark of " file 1 " and " file 2 " corresponding same file model, if not in disparity items In, in business because data related to project it is also desirable to be stored separately.When being changed due to FileVersion, the mark of file is not Can change, it is thus achieved that the multiplexing of data between same project identical file difference FileVersion (data is in non-final version Using might have the situation that cannot match component in this, business is allowed), and same project disparity items version Between data-reusing.
For the corresponding data of same file version between the disparity items version of same bim project, using file version This mark, to divide and to organize organization data, solves between the disparity items version of same bim project, same file version is (not Modification file) between data redundancy it is adaptable to need preserve modification history data.
Divided using the mark of FileVersion and to organize organization data as shown in table 3:
Table 3
In table 3, even if " FileVersion 1 " and " FileVersion 2 " corresponding same file mark, due to needing reservation to go through History edition data is it is also desirable to be stored separately.During Item version change, for unmodified file, the mark of FileVersion will not Change, it is thus achieved that between same project disparity items version unmodified file part data-reusing.
In addition, needing to retrieve data by Item version, and above divide and organizational form can not meet performance requirement In the case of it is still desirable to press Item version mark divide and group organization data, shown in concrete chart 4:
Table 4
This kind of mode such as can run into performance issue, be used for when across multiple models, FileVersion, document retrieval data Improve data access performance.
It is preferable that also including in any of the above-described technical scheme: calculated identical by digest algorithm (such as md5 algorithm) The digest value of file;Using described digest value as described file model mark.
In this technical scheme, due to the content in the digest value representative model file of file, if the summary between file Value is consistent, and the content in file is also necessarily consistent, realizes the data-reusing of digest value same file.
It is preferable that the mark of described file is random with being designated of described FileVersion in any of the above-described technical scheme Number or sequence number, wherein, the mark of described file and the mark of described FileVersion have uniqueness.
In this technical scheme, by the mark of unique file and the mark of FileVersion, data is managed, Thus ensure that the reliability of data management.
Fig. 4 shows the block diagram of data administrator according to an embodiment of the invention.
As shown in figure 4, data administrator 400 according to an embodiment of the invention, comprising: the first determining unit 402 He Administrative unit 404.
First determining unit 402, for determining the characteristic of the data of component rank in bim project;Administrative unit 404, uses In using mark corresponding with described characteristic dividing and to organize described data.
In this technical scheme, divided according to the corresponding mark of the characteristic of data and organize organization data so that the depositing of data Storage is more reasonable, it is to avoid the redundant data of storing excess, thus avoiding the high cost storing, and the access optimizing data Energy.
It is preferable that described administrative unit 404 is specifically for for the difference of same bim project in technique scheme The corresponding described data of same file between Item version and/or the corresponding described number of same file of different bim project According to being divided using the mark of file model and organize described data, for the different files of the same file of same bim project The corresponding described data of disparity items version of the corresponding described data of version and/or same bim project, using the mark of file Know and to divide and to organize described data, corresponding for the same file version between the disparity items version of same bim project Described data, is divided using the mark of FileVersion and organizes described data.
In this technical scheme, for the corresponding data of same file between the disparity items version of same bim project, Divided using the mark of file model and organize organization data, thus between solving the disparity items version of same bim project, phase The data redundancy that same file content (unmodified file) is caused.For the corresponding data of same file of different bim projects, make Divided with the mark of file model and organize organization data, solve between different bim projects, the data that same file content causes Redundancy.This scheme is be applied to parsing the data obtaining from model file.
For the corresponding data of different FileVersions of the same file of same bim project, the mark using file to be drawn Divide and organize such data, thus solving in same bim project, the different FileVersions (file has modification) of same file Data redundancy.For the corresponding data of disparity items version of same bim project, divided using the mark of file and organize number According to, thus the data redundancy between solving the disparity items version of same bim project.This scheme is be applied to modification history Unessential data, during Xiang Mingda, data directly updates, and does not retain historical data.
For the corresponding data of same file version between the disparity items version of same bim project, using file version This mark, to divide and to organize organization data, solves between the disparity items version of same bim project, same file version is (not Modification file) between data redundancy it is adaptable to need preserve modification history data.
It is preferable that also including in any of the above-described technical scheme: computing unit 406, for phase is calculated by digest algorithm Digest value with file;Second determining unit 408, for using described digest value as described file model mark.
In this technical scheme, due to the content in the digest value representative model file of file, if the summary between file Value is consistent, and the content in file is also necessarily consistent, realizes the data-reusing of digest value same file.
It is preferable that the mark of described file is random with being designated of described FileVersion in any of the above-described technical scheme Number or sequence number, wherein, the mark of described file and the mark of described FileVersion have uniqueness.
In this technical scheme, by the mark of unique file and the mark of FileVersion, data is managed, Thus ensure that the reliability of data management.
Technical scheme is described in detail above in association with accompanying drawing, can avoid there is substantial amounts of data redundancy, from And avoid the high cost storing, and ensure the access performance of data.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of data managing method is it is characterised in that include:
Determine the characteristic of the data of component rank in bim project;
Divide and organize described data using mark corresponding with described characteristic.
2. data managing method according to claim 1 is it is characterised in that described use mark corresponding with described characteristic Step to divide and organize described data, specifically includes:
For the corresponding described data of same file between the disparity items version of same bim project and/or different bim item The corresponding described data of purpose same file, is divided using the mark of file model and organizes described data;
The corresponding described data of different FileVersions for the same file of same bim project and/or same bim project The corresponding described data of disparity items version, is divided using the mark of file and organizes described data;
For the corresponding described data of same file version between the disparity items version of same bim project, using file version This mark is dividing and to organize described data.
3. data managing method according to claim 2 is it is characterised in that also include:
Calculate the digest value of same file by digest algorithm;
Using described digest value as described file model mark.
4. the data managing method according to Claims 2 or 3 it is characterised in that
The mark of described file is designated random number or sequence number with described FileVersion,
Wherein, the mark of described file and the mark of described FileVersion have uniqueness.
5. a kind of data administrator is it is characterised in that include:
First determining unit, for determining the characteristic of the data of component rank in bim project;
Administrative unit, for being divided and being organized described data using mark corresponding with described characteristic.
6. data administrator according to claim 5 it is characterised in that described administrative unit specifically for,
For the corresponding described data of same file between the disparity items version of same bim project and/or different bim item The corresponding described data of purpose same file, is divided using the mark of file model and organizes described data,
The corresponding described data of different FileVersions for the same file of same bim project and/or same bim project The corresponding described data of disparity items version, is divided using the mark of file and organizes described data,
For the corresponding described data of same file version between the disparity items version of same bim project, using file version This mark is dividing and to organize described data.
7. data administrator according to claim 6 is it is characterised in that also include:
Computing unit, for calculating the digest value of same file by digest algorithm;
Second determining unit, for using described digest value as described file model mark.
8. the data administrator according to claim 6 or 7 it is characterised in that
The mark of described file is designated random number or sequence number with described FileVersion,
Wherein, the mark of described file and the mark of described FileVersion have uniqueness.
CN201610772690.1A 2016-08-30 2016-08-30 Data management method and data management device Pending CN106354824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610772690.1A CN106354824A (en) 2016-08-30 2016-08-30 Data management method and data management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610772690.1A CN106354824A (en) 2016-08-30 2016-08-30 Data management method and data management device

Publications (1)

Publication Number Publication Date
CN106354824A true CN106354824A (en) 2017-01-25

Family

ID=57856771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610772690.1A Pending CN106354824A (en) 2016-08-30 2016-08-30 Data management method and data management device

Country Status (1)

Country Link
CN (1) CN106354824A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107229426A (en) * 2017-06-09 2017-10-03 深圳市斯维尔科技股份有限公司 The compression of BIM model datas, restoring method and device
CN108694158A (en) * 2017-04-08 2018-10-23 大连万达集团股份有限公司 The method whether changed for checking BIM model files
CN109977085A (en) * 2019-03-21 2019-07-05 广联达科技股份有限公司 A kind of duplicate method and apparatus of identification model component file
CN111401017A (en) * 2020-03-11 2020-07-10 广联达科技股份有限公司 Method and system for automatically generating list report
CN111814227A (en) * 2020-06-19 2020-10-23 中民筑友有限公司 BIM-based assembly type design construction drawing generation method, device, equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
CN104573002A (en) * 2015-01-08 2015-04-29 浪潮通信信息***有限公司 Data organization model based on human, affair and object classification filing
CN105069020A (en) * 2015-07-14 2015-11-18 国家信息中心 3D visualization method and system of natural resource data
CN105868502A (en) * 2016-04-22 2016-08-17 广州硕品物联网科技有限公司 BIM (building information modeling) based material management system and control method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
CN104573002A (en) * 2015-01-08 2015-04-29 浪潮通信信息***有限公司 Data organization model based on human, affair and object classification filing
CN105069020A (en) * 2015-07-14 2015-11-18 国家信息中心 3D visualization method and system of natural resource data
CN105868502A (en) * 2016-04-22 2016-08-17 广州硕品物联网科技有限公司 BIM (building information modeling) based material management system and control method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张慧娜等: "统一产品结构模型构建", 《科学技术与工程》 *
张泳等: "基于BIM的建设项目文档集成管理***开发", 《武汉理工大学学报 信息与管理工程版》 *
杨秀仁: "《城市轨道交通工程BIM设计实施基础标准研究》", 31 January 2016, 中国铁道出版社 *
欧特克软件(中国)有限公司构件开发组: "《Autodesk Revit Structure2012应用宝典》", 31 January 2012, 同济大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108694158A (en) * 2017-04-08 2018-10-23 大连万达集团股份有限公司 The method whether changed for checking BIM model files
CN107229426A (en) * 2017-06-09 2017-10-03 深圳市斯维尔科技股份有限公司 The compression of BIM model datas, restoring method and device
CN109977085A (en) * 2019-03-21 2019-07-05 广联达科技股份有限公司 A kind of duplicate method and apparatus of identification model component file
CN111401017A (en) * 2020-03-11 2020-07-10 广联达科技股份有限公司 Method and system for automatically generating list report
CN111814227A (en) * 2020-06-19 2020-10-23 中民筑友有限公司 BIM-based assembly type design construction drawing generation method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN106354824A (en) Data management method and data management device
CN103902632B (en) The method, apparatus and electronic equipment of file system are built in key assignments storage system
CN104077423B (en) Consistent hash based structural data storage, inquiry and migration method
CN106021266B (en) Fast multi-tier index supporting dynamic updates
US10140351B2 (en) Method and apparatus for processing database data in distributed database system
EP2302538B1 (en) Method and system for capturing change of data
CN111858615B (en) Database table generation method, system, computer system and readable storage medium
US7571182B1 (en) Emulation of a balanced hierarchy from a nonbalanced hierarchy
EP2891993A1 (en) Method for virtualizing large-scale distributed heterogeneous data
CN104123359A (en) Resource management method of distributed object storage system
US20130066883A1 (en) Data management apparatus and system
KR20220097956A (en) Method and apparatus for managing IOT devices, and server and storage medium thereof
CN102270225A (en) Data change log monitoring method and device
CN105608224A (en) Orthogonal multilateral Hash mapping indexing method for improving massive data inquiring performance
CN108268614B (en) Distributed management method for forest resource spatial data
CN103064906A (en) File management method and device
CN109472446A (en) Project Budget preparation method based on BIM model
CN102999637B (en) According to the method and system that file eigenvalue is file automatic powder adding add file label
CN105426373A (en) Database synchronization method and device
CN104391992A (en) Asset data-oriented data processing system
US8949282B1 (en) Efficient storage of non-searchable attributes
US8275808B2 (en) Identifiers for non-searchable attributes
US8930336B2 (en) Retrieval of searchable and non-searchable attributes
US8694546B2 (en) Optimized fetching for customization object attributes
KR101368441B1 (en) Apparatus, method and computer readable recording medium for reusing a free space of database

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125