CN106354814A - System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering - Google Patents

System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering Download PDF

Info

Publication number
CN106354814A
CN106354814A CN201610762394.3A CN201610762394A CN106354814A CN 106354814 A CN106354814 A CN 106354814A CN 201610762394 A CN201610762394 A CN 201610762394A CN 106354814 A CN106354814 A CN 106354814A
Authority
CN
China
Prior art keywords
construction
energy consumption
data
consumption analysis
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610762394.3A
Other languages
Chinese (zh)
Inventor
刘波
石志超
刘百兴
范五
范五一
王曙东
牛运华
潘少华
付琛
罗立哲
王科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201610762394.3A priority Critical patent/CN106354814A/en
Publication of CN106354814A publication Critical patent/CN106354814A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/28Databases characterised by their database models, e.g. relational or object models
    • G06F16/284Relational databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • G06F16/2358Change logging, detection, and notification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • G06F16/2393Updating materialised views
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/06Power analysis or power optimisation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Probability & Statistics with Applications (AREA)
  • Fuzzy Systems (AREA)
  • Computational Linguistics (AREA)
  • Software Systems (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system and a method for energy consumption analysis in a construction period of water conservancy and hydropower engineering. The system is characterized by comprising a data platform, a data storage module, a computational analysis module and a result output module. The data platform is used for storing data information of norms, construction method and construction machinery configuration and other information related to engineering; the data storage module is used for associating engineering quantity of each operation of a construction project with the information of the construction methods and the construction machinery configuration and storing into a database; the computational analysis module is used for statistical analysis of operation data stored in the database to obtain energy consumption analysis results; the result output module is used for outputting the analysis results in forms of tables and graphs according to set requirements. By the system and the method for energy consumption analysis, defects of complex steps, low efficiency and inconvenience for verification and examination in the prior art are overcome, multi-scheme energy consumption analysis of the same project is realized, and accordingly an optimal design scheme can be determined.

Description

A kind of Construction for Hydroelectric Project phase energy consumption analysis method and system
Technical field
The invention belongs to Construction for Hydroelectric Project technical field, it is more specifically a kind of Construction for Hydroelectric Project Phase energy consumption analysis method and system.
Background technology
For implementing the fundamental state policy economizing on resources, improving efficiency of energy utilization, Hydraulic and Hydro-Power Engineering construction needs according to " China People's republic's economizing energy law ", " State Council with regard to strengthen energy conservation decision ", " investment projects of capital assets energy-conservation is commented Estimate and examine Tentative Measures " and the requirement about energy-conservation code, specification, carry out construction time energy consumption analysis.This work must be Carry out after the completion of the design of water conservancy project hinge and Design of Construction Organization, but achievement must be submitted to the design of water conservancy project hinge, have the time simultaneously The short, feature of task weight.
Traditional construction phase energy consumption analysis step is as follows: (1), for a construction operation, obtains certain construction equipment institute first The energy (as electric, oily etc.) consuming;(2) energy input of all construction equipments is collected by species, and then try to achieve a construction and make The energy input of industry;(3) energy input of all construction operations is collected by species, carry out the construction time energy consumption analysis of whole engineering.
Because Construction for Hydroelectric Project is long in time limit, construction method is various, construction equipment is numerous, traditional construction phase energy consumption is divided Analysis method not only needs to browse the data such as expense quota when substantial amounts of Design of Construction Organization handbook, quota of budgetary estimate, construction machinery platform, and And the data being also performed to many times calculates.Traditional analysis complex steps, inefficiency, and be not easy to check inspection.
Content of the invention
It is an object of the invention to overcoming the weak point of above-mentioned background technology, and a kind of Construction for Hydroelectric Project is proposed Phase energy consumption analysis method and system.
The first object of the present invention to be implemented by following technical solution: a kind of Construction for Hydroelectric Project phase energy consumption is divided Analysis method, it comprises the steps;
1., adopt relevant database access software in office office suite, in conjunction with built-in vba language development basis Data storage template, facilitates water conservancy and hydropower architectural engineering quota of budgetary estimate, equipment installation project quota of budgetary estimate, construction machinery Tai Shifei By norm, typing, storage and the renewal of construction method and construction machinery configuration basic data data;
2., extract quantities, construction method and Mechanical Equipment Matching according to the design of water conservancy project hinge and Design of Construction Organization to set Standby data information;Described data information is arranged the data form for needing;
3., using the desktop programs based on ado.net technological development, each for project under construction job engineering amount is applied with corresponding The construction machinery configuration of work method and employing is associated, and data is uploaded in access data base one by one by batch;
4., combine the desktop programs of step 3. middle exploitation, construction time energy consumption calculation carried out to projects under construction all in engineering, And energy consumption analysis result is exported with form and pictorial form;
If 5. the design of water conservancy project hinge and Design of Construction Organization adjustment, lead to quantities, construction method and machinery support etc. Relevant rudimentary data change, then reenter step 2. in;
6., analysis result is stored to data base.
In technique scheme: described step data information 1. can be with Large Copacity, high intensity, low power consuming, hydraulic pressure The emergence of novel device and novel construction method such as change and update.
In technique scheme: described step 5. in can carry out same engineering multiple designs construction time energy consumption Analysis, and result is analyzed, establish construction time energy consumption optimization design scheme.
In technique scheme: described step 6. in can carry out the construction time energy consumption analysis of multiple engineerings, build construction Phase energy consumption analysis knowledge base, as the reference material of Other Engineering energy consumption index and energy input.
The second object of the present invention to be implemented by following technical solution: a kind of Construction for Hydroelectric Project phase energy consumption is divided Analysis system, it includes following part;
Data platform: other related with engineering of storage quota, the data information that configure with construction machinery of construction method provide Material;
Data memory module: by the information of every job engineering amount of project under construction and construction method, construction machinery configuration Associate and be stored in data base;
Computation analysis module: statistical analysiss are carried out to the every work data being stored in data base, draws energy consumption analysis Result;
Result output module: analysis result is exported with the form of form and image according to the requirement formulated.
The present invention has a following technological merit: 1, the present invention is by quota used in construction time energy consumption analysis, construction method In the basic data input databases such as machinery support, the table based on .net framework using ado.net technological development Face application program, there is provided a kind of construction time energy consumption analysis flow process rapidly and efficiently and method;2nd, same engineering can be carried out multi-party The energy consumption analysis of case, thus establish optimization design scheme;3rd, also can carry out the construction time energy consumption analysis of multiple engineerings, and be stored in In system, build Energy Consumption of Construction analysis knowledge storehouse;4th, compared with traditional method, have quick and precisely, be easily modified and check Advantage.
Brief description
Fig. 1 is the inventive method flow chart.
Fig. 2 is present system flow chart.
Specific embodiment
Describe the performance of the present invention below in conjunction with the accompanying drawings in detail, but they do not constitute limitation of the invention, only For example, simultaneously by illustrate advantages of the present invention will become clearer from easy to understand.
With reference to shown in Fig. 1: a kind of present invention Construction for Hydroelectric Project phase energy consumption analysis method it is characterised in that: it wraps Include following steps;
1., adopt relevant database access software in office office suite, (a kind of grand in conjunction with built-in vba language Language, for extending office software function) exploitation basic data storage template, facilitate water conservancy and hydropower architectural engineering budgetary estimate fixed Quota, construction method and construction machinery configuration basic data data is taken when volume, equipment installation project quota of budgetary estimate, construction machinery platform Typing, storage and renewal;
2., extract quantities, construction method and Mechanical Equipment Matching according to the design of water conservancy project hinge and Design of Construction Organization to set Standby data information;Described data information is arranged the data form for needing;
3., using based on ado.net technology, (one group allows developer using standard, structurized, even connectionless Mode and data interaction technology) desktop programs developed, by each for project under construction job engineering amount and corresponding construction method It is associated with the construction machinery configuration adopting, and data is uploaded in access data base one by one by batch;
4., combine the desktop programs of step 3. middle exploitation, construction time energy consumption calculation carried out to projects under construction all in engineering, And energy consumption analysis result is exported with form and pictorial form;
If 5. the design of water conservancy project hinge and Design of Construction Organization adjustment, lead to quantities, construction method and machinery support etc. Relevant rudimentary data change, then reenter step 2. in;
6., analysis result is stored to data base.
Described step data information 1. can be with novel devices such as Large Copacity, high intensity, low power consuming, hydrofication and new The emergence of construction method and update.
Described step 5. in can carry out same engineering multiple designs construction time energy consumption analysis, and result is carried out Relative analyses, establish construction time energy consumption optimization design scheme.
Described step 6. in can carry out the construction time energy consumption analysis of multiple engineerings, build construction time energy consumption analysis knowledge base, Reference material as Other Engineering energy consumption index and energy input.
With reference to shown in Fig. 2: a kind of present invention Construction for Hydroelectric Project phase energy consumption analysis system it is characterised in that: it wraps Include following part;
Data platform: other related with engineering of storage quota, the data information that configure with construction machinery of construction method provide Material;
Data memory module: by the information of every job engineering amount of project under construction and construction method, construction machinery configuration Associate and be stored in data base;
Computation analysis module: statistical analysiss are carried out to the every work data being stored in data base, draws energy consumption analysis Result;
Result output module: analysis result is exported with the form of form and image according to the requirement formulated.
Above-mentioned unspecified part is prior art.

Claims (5)

1. a kind of Construction for Hydroelectric Project phase energy consumption analysis method it is characterised in that: it comprises the steps;
1., adopt relevant database access software in office office suite, in conjunction with built-in vba language development basic data Storage template, facilitates to take when water conservancy and hydropower architectural engineering quota of budgetary estimate, equipment installation project quota of budgetary estimate, construction machinery platform and determines Volume, construction method and construction machinery configure typing, storage and the renewal of basic data data;
2., quantities, construction method and Mechanical Equipment Matching number of devices are extracted according to the design of water conservancy project hinge and Design of Construction Organization According to data;Described data information is arranged the data form for needing;
3., using the desktop programs based on ado.net technological development, by each for project under construction job engineering amount and corresponding construction party The construction machinery configuration of method and employing is associated, and data is uploaded in access data base one by one by batch;
4., combine the desktop programs of step 3. middle exploitation, construction time energy consumption calculation is carried out to projects under construction all in engineering, and with Form and pictorial form output energy consumption analysis result;
If 5. the design of water conservancy project hinge and Design of Construction Organization adjustment, lead to the correlations such as quantities, construction method and machinery support Basic data change, then reenter step 2. in;
6., analysis result is stored to data base.
2. a kind of Construction for Hydroelectric Project phase energy consumption analysis method according to claim 1 it is characterised in that:
Described step data information 1. can be with the novel devices such as Large Copacity, high intensity, low power consuming, hydrofication and new construction The emergence of method and update.
3. a kind of Construction for Hydroelectric Project phase energy consumption analysis method according to claim 1 and 2 it is characterised in that:
Described step 5. in can carry out same engineering multiple designs construction time energy consumption analysis, and result is contrasted Analysis, establishes construction time energy consumption optimization design scheme.
4. a kind of Construction for Hydroelectric Project phase energy consumption analysis method according to claim 3 it is characterised in that: described step Rapid 6. in can carry out the construction time energy consumption analysis of multiple engineerings, build construction time energy consumption analysis knowledge base, as Other Engineering energy Consumption index and the reference material of energy input.
5. a kind of Construction for Hydroelectric Project phase energy consumption analysis system it is characterised in that: it includes following part;
Data platform: storage quota, the data information that configures with construction machinery of construction method other data related with engineering;
Data memory module: by the information association of every job engineering amount of project under construction and construction method, construction machinery configuration And it is stored in data base;
Computation analysis module: statistical analysiss are carried out to the every work data being stored in data base, draws energy consumption analysis result;
Result output module: analysis result is exported with the form of form and image according to the requirement formulated.
CN201610762394.3A 2016-08-29 2016-08-29 System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering Pending CN106354814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610762394.3A CN106354814A (en) 2016-08-29 2016-08-29 System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610762394.3A CN106354814A (en) 2016-08-29 2016-08-29 System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering

Publications (1)

Publication Number Publication Date
CN106354814A true CN106354814A (en) 2017-01-25

Family

ID=57856050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610762394.3A Pending CN106354814A (en) 2016-08-29 2016-08-29 System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering

Country Status (1)

Country Link
CN (1) CN106354814A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110430A (en) * 2019-04-30 2019-08-09 南方电网调峰调频发电有限公司 A kind of mathematics library towards water power field and analysis system and its implementation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101042744A (en) * 2006-03-21 2007-09-26 上海浦东国际集装箱码头有限公司 Synthesis examination system and method for container harbor resource operation efficiency
US7437333B1 (en) * 2002-06-12 2008-10-14 Herrin Gregg A Method and system for providing an energy cost estimation for a water distribution network
CN103150634A (en) * 2013-03-29 2013-06-12 重庆大学 Energy consumption simulating method orienting machining task of machine shop
CN105184652A (en) * 2014-06-17 2015-12-23 金华市公路管理局 Road engineering carbon emission analysis system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7437333B1 (en) * 2002-06-12 2008-10-14 Herrin Gregg A Method and system for providing an energy cost estimation for a water distribution network
CN101042744A (en) * 2006-03-21 2007-09-26 上海浦东国际集装箱码头有限公司 Synthesis examination system and method for container harbor resource operation efficiency
CN103150634A (en) * 2013-03-29 2013-06-12 重庆大学 Energy consumption simulating method orienting machining task of machine shop
CN105184652A (en) * 2014-06-17 2015-12-23 金华市公路管理局 Road engineering carbon emission analysis system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
庞博慧: "基于碳足迹理论的水电枢纽工程能耗分析研究", 《中国博士学位论文全文数据库 工程科技I辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110430A (en) * 2019-04-30 2019-08-09 南方电网调峰调频发电有限公司 A kind of mathematics library towards water power field and analysis system and its implementation

Similar Documents

Publication Publication Date Title
Cheng et al. Industry 4.0 development and application of intelligent manufacturing
Sepúlveda et al. FPGA v/s DSP performance comparison for a VSC-based STATCOM control application
CN109408102A (en) Version comparison method and device, household electrical appliance and network equipment
KR101505546B1 (en) Keyword extracting method using text mining
CN104182800B (en) The intelligent Forecasting of time series based on trend and cyclic swing
CN103309801A (en) Method and device for determining regression testing range
CN103885882A (en) Testing script based on SAP platform and parameter integration method
CN108628972A (en) A kind of processing method of tables of data, device and storage medium
CN106354814A (en) System and method for energy consumption analysis in construction period of water conservancy and hydropower engineering
CN103853938A (en) High-throughput sequencing data processing and analysis flow control method
Conte et al. A practical approach for the derivation of algebraically stable two-step Runge-Kutta methods
CN106611012A (en) Heterogeneous data real-time search method in big data environment
CN102799137B (en) Method for cross-platform transportation of programmable logic controller (PLC) software of wind power control system
CN106372359A (en) Universal framework for equipment virtual prototype system
CN115618777A (en) File generation method, device, equipment and storage medium
Wang et al. Integrated materials design and informatics platform within the materials genome framework
Xue et al. Towards real application: A development in Cadence design environment for evolutionary analog integrated circuit design
CN103077284A (en) Method and system for automatically generating auxiliary code file by using general text template
Shan et al. Integration and application of lean principles and six sigma in residential construction
CN103177163A (en) Follow-up forecast method for milling deformation of complex integral structural components
Kyriakidis et al. A DC power flow extension
Tongke Hadoop-based data analysis system architecture for telecom enterprises
Habib Cosmology and computers: HACCing the universe
Wu et al. Evaluation Research on Technology Innovation Efficiency of High-End Equipment Manufacturing Based on DEA Malmquist Index Method—Taking Guangdong Province as an Example
García Garino et al. Computational mechanics software as a service project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125