CN106354070A - Hydropower engineering grouting construction information real-time acquisition and statistical analysis system - Google Patents

Hydropower engineering grouting construction information real-time acquisition and statistical analysis system Download PDF

Info

Publication number
CN106354070A
CN106354070A CN201610969651.0A CN201610969651A CN106354070A CN 106354070 A CN106354070 A CN 106354070A CN 201610969651 A CN201610969651 A CN 201610969651A CN 106354070 A CN106354070 A CN 106354070A
Authority
CN
China
Prior art keywords
grouting
data
module
information
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610969651.0A
Other languages
Chinese (zh)
Inventor
钟登华
马洪琪
郑爱武
沈嗣元
任炳昱
谷涛
卢吉
李晓超
张金海
曹学兴
樊贵超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
Tianjin University
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University, Huaneng Lancang River Hydropower Co Ltd filed Critical Tianjin University
Priority to CN201610969651.0A priority Critical patent/CN106354070A/en
Publication of CN106354070A publication Critical patent/CN106354070A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24215Scada supervisory control and data acquisition

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a hydropower engineering grouting construction information real-time acquisition and statistical analysis system, and belongs to the technical field of the real-time control on hydropower engineering dam foundation grouting. The system realizes the grouting construction data real-time acquisition, grouting data dynamic handling and storage and like functions, and the invention constructs a web information system for grouting information integration and analysis based on a B/S structure. The pilot hole information, grouting information, water pressure information and check information involved in the grouting process are dynamically acquired and digitally processed to realize the integration of various engineering information and the data sharing; and the dynamic update and maintenance of the comprehensive information are realized in the whole life cycle of the engineering so as to provide an information application and support platform for the engineering decision and management.

Description

A kind of hydroelectric project grouting construction real time information sampling and statistical analysis system
Technical field
The invention belongs to hydroelectric project dam foundation grouting technique of real-time control field, specifically, it is related to a kind of water power work Journey grouting construction real time information sampling and statistical analysis system.
Background technology
With the development of grouting technique, it has increasingly been widely used as the main of hydroelectric project dam foundation process Engineering measure.Grouting refer to serosity be sent to structure foundation crack, fault belt or building itself seam, split One of seam technology, it can effectively improve the performance of ground, improve Foundation Rock Mass intensity, and reduce its permeability, be The important work of the problems such as solution foundation settlement deformation, seepage stability, stability against deep sliding, guarantee dam long-term safety are stable Journey measure.
However, grouting works is a sufficiently complex system engineering in itself, its complicated construction technique, construction intensity be high, Grouting data volume magnanimity.It is related to numerous data messages during grouting construction, how these information are carried out comprehensive integration and have Effect management and analysis, realize automatically, long-range, easily management with control, for management of engineering construction provide comprehensively, quick, accurately Information service and decision support, be engineering construction with management in need the important technological problems that solve.Specifically, how to whole Individual filling process is effectively monitored and abnormal conditions is fed back in time, is the important ring controlling whole grouting works Section;How effectively to go to analyze the problem being likely encountered in construction with the grouting data that actual filling process produces, for next The construction of step provides reliable foundation, and construction technology and Optimizing Construction Scheme for grouting works teacher adjustment grout hole are very heavy Will;How timely and accurately to analyze the actual grouting effect of each monolith, project manager will be directly affected to construction information Dynamic assurance and decision-making.Whether these problems can effectively be processed, to ensureing the quality of whole grouting works and enter Spend, and engineering prolonged permeation stable operation is highly important.
With computer technology, automatic data collection is carried out to strengthening motoring, from the 1970s and 1980s in last century abroad some Engineering starts to apply, and from the beginning of the eighties, grouting automatic recorder application abroad is gradually popularized, the real-time monitoring of strengthening motoring Technology also is being continued for developing, and has been developed as now digital signal, data processing calculates data and shows.Abroad, 3 developmental stage, first stage, mainly simple work are divided into based on the filling process real time monitoring and analyzing of computer technology Journey application experience;Second stage, the function of main realization is collection and the displaying of grouting data, and canonical system is represented as Computer aided grout evaluation system, three phases are with system advanced integrated Analytical (aia) systems is representative it is achieved that the Real-time Collection of data is analyzed with corresponding.At home, China Water Diuretic electricity Science Institute of foundation engineering office and University Of Tianjin carry out the automation research that is in the milk earliest, and 1987 Firsts are intelligent to be filled Slurry autographic apparatuss are born, and popularization and application in many grouting works quickly, subsequently, domestic and several in succession develop work( The close grouting automatic recording instrument of energy, including Hua Rui big in the long State Scientific and Technological Commission, Beijing, intelligence is matched in Tianjin, Hangzhou English is won, Hangzhou Hai Te, length Sha Lijin, Novo RPS Ulc etc..Meanwhile it is directed to the monitoring of grouting data and the software system arranging also is evolving, Han Wei Et al. developing intellectual resource grouting monitoring system g2000, the parameter such as monitor in real time grouting pressure, flow and density, based on collection number According to completing automatically generating of grouting effect chart, and successful Application in moderate seas bottom water grouting works.Bao Yinggang discusses in its master Literary composition proposes grouting pressure, flow, the isoparametric monitor in real time of density under distributed data acquisition network.Liu Xiaoguang et al. proposes base In the grouting data compilation functional software of microsoft office access 2003 and delphi7.0, but this system is only fitted Close unit, and data of being in the milk is to manually enter.
From recent domestic scholar to the exploitation of grouting construction information gathering and analysis and corresponding system it is seen that, The system set up at present achieves the collection of data and the arrangement of corresponding data substantially, but current achievement in research is following several Individual aspect still needs to continue to deepen research: the 1, development of the progress with computer technology and network, the grouting realizing networking is adopted Collection and clearing system will be development trends.The arrangement automatization level of the 2nd, current system grouting effect data is relatively low, is people mostly Uploading system after carefully and neatly done reason, inefficiency.3rd, realizing user can be with real time inspection filling process in any place having network The data such as flow, pressure, density and grouting data " needing to obtain final product " are current institute shortcomings.
Content of the invention
It is contemplated that overcoming the deficiencies in the prior art, a kind of hydroelectric project grouting construction real time information sampling and system are proposed Meter analysis method, the grouting construction monitoring network being combined using short-distance radio network and mobile communications network, scene is filled Slurry real time data acquisition, to data base, is dynamically arranged by struts+hibernate technological frame realization grouting data and divides Analysis is processed, and builds b/s structure interactive grouting information integration and analysis system, with system for the grouting of platform Dynamic Display in real time Data and grouting effect chart, realize the in-situ analysis of grouting works.System turns to design principle with module, for work of being in the milk Cheng Shi provides reliable grouting works and controls analysis platform.
For achieving the above object, the technical solution used in the present invention is as follows:
1. grouting construction real time data acquisition
From the angle of each data age of whole grouting works, grouting construction real time data can be splitted data into and (refer mainly to be in the milk Work progress data and performance data) and non-real-time data (checking data etc. such as after Grouting Design, arrangement and method for construction and filling).From The form of expression of data can be divided into digital data, picture type data and geometric model data.For data above, propose not Same acquisition method.
(1) grouting construction real time data and fill after inspection hole packer permeability test result be whole grouting works pass bond number According to belonging to grouting real time data, the present invention constructs the short-distance radio network meeting actual demand and mobile communications network phase In conjunction with grouting construction monitoring network, the corresponding strengthening motoring of grouting construction process of real-time monitoring is entered with Mobile state monitoring point Analysis, and the grouting construction information integration collecting to data base.
Described grouting construction real-time data acquisition module includes monitoring instrument, monitoring instrument data transmission blocks, wireless Data trunk module, hole data transmission blocks and first server data reception module;Described monitoring instrument, monitoring instrument Data transmission blocks, wireless data trunk module, hole data transmission blocks and first server data reception module order connect Connect;
Described monitoring device monitoring instrument is used for monitoring and the collection of grouting construction real time data;
Described monitoring instrument data transmission blocks are used for the data is activation gathering monitoring device to wireless data trunk module Equipment;
Described wireless data trunk module receives monitoring instrument data transmission blocks data, and by the data is activation receiving extremely Hole data transmission blocks;
Described hole data transmission blocks receive and are derived from wireless data trunk module data, and send data to first service Device data reception module;
First server data reception module is used for receiving the data of hole data transmission blocks transmission, and data transfer is stored To database server cpu control module.
(2) the drilling core picture of inspection hole and boring record after Grouting Design scheme, grouting construction scheme, grout hole and filling The information such as picture belong to non-real-time data, and data type includes word text-type, cad pattern memory picture type data, using web ring Under border, file uploading file realizes data acquisition.
Described grouting construction non-real-time data acquisition module includes data upload interface module and second server data Receiver module;Described data upload interface module is connected with second server data reception module;
Described data upload interface module is used for for grouting construction non-real-time data information entering row format conversion and is uploaded to clothes Business device;
Second server data reception module is used for the data that receiving data uploads interface module transmission, and data transfer is stored To database server cpu control module.
2. grouting data is dynamic arranges and storage
In the present invention, for the grouting dynamic arrangement of data and storage, preferable struts+ in being researched and developed by j2ee program Hibernate technological frame realizes grouting dynamic data processing.In conjunction with " hydraulic structure cement grout construction technique normalizing " Requirement to grouting works final acceptance of construction data is it is achieved that the dynamic generation of following leading schedule and result map, wherein form bag Include: grouting construction log, grouting construction achievement single hole statistical table, grouting construction achievement point sequence statistical table, grouting construction achievement Element project statistical table, inspection hole packer permeability test outcome table and grouting works performance table etc.;Result map includes: each order hole Unit cement injecting amount frequency curve chart, each order hole permeability rate frequency curve chart, each order hole permeability rate and unit cement injecting magnitude relation Figure, grouting composite profile and grouting effect plane graph etc.;And achieve core photo and boring video recording the looking in real time of picture Ask.
The dynamic arrangement of described grouting data includes database server cpu control module database clothes with memory module Business device data memory module;Described database server cpu control module database server data memory module is connected;
Described first server data reception module, second server data reception module are all controlled with database server cpu Molding block is connected, and the grouting construction real-time data acquisition that monitoring instrument is gathered is gathered to data with grouting construction non-real-time data Storehouse (database server cpu control module), enters Mobile state afterwards and arranges and storage;
Described database server cpu control module, the grouting construction real time data that gather monitoring instrument and grouting construction Non-real-time data enters Mobile state and arranges;
Grouting construction real time data and grouting construction that monitoring instrument is gathered by described database server data memory module Non-real-time data carries out dynamic memory.
3. grouting information integration and analysis
The present invention adopts database technology, computer graphics disposal technology, Object-oriented Technique and three-dimensional visualization technique, for The demand of actual grouting works, is designed to system using modularization principle, sets up the grouting information integration based on b/s structure With analysis platform.
Described grouting information integration and analysis module include application server cpu control module, grouting information integration with Analysis platform module and grouting information integration and analysis platform terminal unit;Described application server cpu control module, grouting letter Breath is integrated to be connected with analysis platform terminal unit order with analysis platform module and grouting information integration, realizes looking into of grouting information Ask analysis;
Described database server data memory module is also connected with application server cpu control module;
Described application server cpu control module is used for the data in the server data memory module of called data storehouse, then Carry out the integrated and analysis process data processing that is in the milk, realize the structure of grouting information integration and analysis platform;
Grouting information integration and analysis platform module are used for the performance of grouting integrated information;
Grouting information integration and analysis platform terminal unit provide the user using grouting information integration and analysis platform.
It is further preferred that described monitoring device monitoring instrument is grouting automatic recorder.
It is further preferred that described grouting information integration and analysis platform terminal unit are computer or mobile phone.
Described grouting information integration and analysis platform module may include following functions module: the collection of data and importing mould Block, real time data inspecting module, Grouting Design information module, grouting effect analysis module, fill after Inspection and analysis module, grouting system One model module, material check and write off module, achievement-sharing module, progress report module and unit monitors reporting modules.
Integrated use database management technology of the present invention, network technology, multimedia and virtual reality (vr) technology etc., propose The real time data acquisition of dam grouting construction process and integrated approach, the dynamic arrangement of grouting data and analysis system and side Method.Dynamic acquisition and number are carried out to the pilot hole information being related in filling process, grouting information, pressure water information and inspection information Wordization is processed, and realizes various engineering informations integration datas and shares, and in engineering whole life cycle, realizes integrated information Dynamic renewal and maintenance, are engineering decision and management offer Information application and support platform.This system yet there are no in grouting field Report.
Compared with prior art, its advantage is the present invention:
(1) compared with existing technology, the present invention passes through to cover the grouting information gathering network at each position in full work area, by grouting note Instrument dispersed nodes are integrated and consolidated network for record, realize collection while multiple stage grouting record data, and the grouting collecting is applied Work information sends to rear party database;
(2) by setting up grouting construction data monitoring network, file interface such as uploads at the technology under web environment, for dissimilar Grouting data, using different acquisition methods it is achieved that the collection of all kinds of grouting data with integrated it is ensured that grouting information Integrity;
(3) pass through grouting construction parameter monitor in real time, grouting works teacher is capable of the grouting state of the whole job site of remote monitoring, To main strengthening motoring such as grouting pressure, grouting flow, the ratio of mud of serosity and the real time inspection and the feedback control that lift value, full The demand to the round-the-clock remote real-time monitoring of work progress for the sufficient grouting works teacher.
(4) compare traditional grouting data compilation to work often by artificial means, present patent application achieves and is in the milk into The dynamic process of fruit, thus improve the arrangement efficiency of data it is ensured that grouting works teacher to Analysis for grouting achievement " need is ".
(5) present patent application is using grouting collecting method and the grouting dynamic method for sorting of data, and establishes and be based on The grouting information integration of b/s structure and analysis system, realize the grouting data monitor in real time beyond job site, and set up one The management platform of whole grouting works.Disclosure satisfy that the demand of actual grouting works, effectively ensure the matter of whole grouting works Amount and progress.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, also may be used So that other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation of hydroelectric project grouting construction real time information sampling of the present invention and statistical analysis system.
Wherein, 1, grouting construction real time data acquisition module;1-1, grouting construction real-time data acquisition module;1-2, grouting Construction non-real-time data acquisition module;1-1-1, monitoring instrument;1-1-2, monitoring instrument data transmission blocks;1-1-3, no line number According to trunk module;1-1-4, hole data transmission blocks;1-1-5, first server data reception;1-2-1, data upload and connect Mouth module;1-2-2, second server data reception module;2nd, grouting data is dynamic arranges and memory module;2-1, data base's clothes Business device cpu control module;2-2, database server data memory module;3rd, grouting information integration and analysis module;3-1, should With server cpu control module;3-2, grouting information integration and analysis platform module;3-3, grouting information integration and analysis platform Terminal unit.
The direction of arrow indication is data transfer direction or signal trend.
Specific embodiment
With reference to embodiment, the present invention is described in further detail.
It will be understood to those of skill in the art that the following example is merely to illustrate the present invention, and should not be regarded as limiting this Bright scope.Unreceipted particular technique or condition person in embodiment, according to the technology described by document in the art or condition Or carry out according to product description.
Those skilled in the art of the present technique are it is understood that the function of the correlation module that is related in the present invention and its realization It is to carry conventional computer software programs in prior art in the device of the hardware after improvement and its composition, device or system Or relevant agreement achieves that, it is not that computer software programs of the prior art or relevant agreement are improved.For example, Computer hardware system after improvement still can realize the spy of this hardware system by loading existing operation system of software Determine function.It is understood, therefore, that the innovation of the present invention is the improvement to hardware module in prior art and its company Connect syntagmatic, rather than be only in hardware module for realizing the improvement of the software or agreement carried about function.
Those skilled in the art of the present technique are it is understood that the correlation module mentioned in the present invention is performed for the application Described in operation, method, the step in flow process, measure, in scheme one or more of hardware device.Described hardware device can Think that required purpose specially designs and manufactures, or can also using the known device in general purpose computer or known its His hardware device.Described general purpose computer has and activates or reconstruct with being stored in its interior procedure Selection.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singulative used herein, institute State and this may also comprise plural form.It is to be further understood that wording includes referring to used in the description of the present invention There is described feature, integer, step, operation, element and/or assembly, but it is not excluded that exist or add one or more its His feature, integer, step, operation, element, assembly and/or their group.It should be understood that when we claim element to be connected or coupling When being connected to another element, it can be directly connected or coupled to other elements, or can also there is intermediary element.Additionally, this In the connection that uses or couple and can include wirelessly connecting or coupling.Wording used herein and/or inclusion are one or more Associated lists any cell of item and whole combination.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and all terms used herein (include technology art Language and scientific terminology) there is general understanding identical meaning with the those of ordinary skill in art of the present invention.Also should It is understood by, those terms defined in such as general dictionary should be understood that the meaning having with the context of prior art The consistent meaning of justice, and unless defined as here, will not be explained with idealization or excessively formal implication.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and annexation used herein is without spy Different explanation, enables the function of the present invention, and identical with the general understanding of the those of ordinary skill in art of the present invention ?.
As shown in figure 1, a kind of hydroelectric project grouting construction real time information sampling and statistical analysis system, including grouting construction The dynamic arrangement with memory module 2, grouting information integration and analysis module 3 of real time data acquisition module 1, grouting data can be electricity Brain or mobile phone, but not limited to this.
Described grouting construction real time data acquisition module 1 includes grouting construction real-time data acquisition module 1-1 and grouting Construction non-real-time data acquisition module 1-2, wherein grouting construction real-time data acquisition module 1-1 includes monitoring instrument 1-1-1, prison Survey instrument data sending module 1-1-2, wireless data trunk module 1-1-3, hole data transmission blocks 1-1-4 and first service Device data reception module 1-1-5, grouting construction non-real-time data acquisition module 1-2 include data upload interface module 1-2-1 with Second server data reception module 1-2-2;
Described monitoring instrument 1-1-1, monitoring instrument data transmission blocks 1-1-2, wireless data trunk module 1-1-3, hole Data transmission blocks 1-1-4 are linked in sequence with first server data reception module 1-1-5;
Described data upload interface module 1-2-1 is connected with second server data reception module 1-2-2;
The dynamic arrangement of described grouting data includes database server cpu control module 2-1 database clothes with memory module 2 Business device data memory module 2-2;
Described database server cpu control module 2-1 database server data memory module 2-2 is connected;
Described first server data reception module 1-1-5, second server data reception module 1-2-2 is all taken with data base Business device cpu control module 2-1 is connected, will be non-with grouting construction for the grouting construction real-time data acquisition of monitoring instrument 1-1-1 collection Real-time data acquisition, to database server cpu control module 2-1, enters Mobile state afterwards and arranges and storage;
Described grouting information integration and analysis module 3 include application server cpu control module 3-1, grouting information integration with Analysis platform module 3-2 and grouting information integration and analysis platform terminal unit 3-3;
Described application server cpu control module 3-1, grouting information integration and analysis platform module 3-2 and grouting information integration It is connected with analysis platform terminal unit 3-3 order, realize the query analysis of grouting information;
Described database server data memory module 2-2 is also connected with application server cpu control module 3-1
Described monitoring instrument 1-1-1 is grouting automatic recorder;
Described grouting information integration and analysis platform terminal unit 3-3 are computer or mobile phone;
Described grouting information integration and analysis platform module 3-2 may include following functions module: the collection of data and importing mould Block, real time data inspecting module, Grouting Design information module, grouting effect analysis module, fill after Inspection and analysis module, grouting system One model module, material check and write off module, achievement-sharing module, progress report module and unit monitors reporting modules.
A kind of hydroelectric project grouting construction real time information sampling and statistical analysis technique, are applied using the grouting of above-mentioned hydroelectric project Work real time information sampling and statistical analysis system, comprise the steps:
(1) grouting construction real time data acquisition
Grouting construction real time data, the networking plan of employing is mobile communication network technology (gprs, wcdma etc.) and short distance The networking plan that radio network technique combines, the data during two kinds of networks realize grouting construction jointly is managed concentratedly and is passed Defeated.Its detailed process is: the multiple stage detecting instrument of local is formed LAN by wireless data trunk module, grouting data is led to Cross LAN and be real-time transmitted to hole data transmission blocks.Single or multiple short-distance radio networks are collected the grouting number obtaining According to terminal server being sent to by distance mobile communications network, is connect data by first server data reception module Receive.
Grouting construction non-real-time data, realizes data acquisition using file uploading file under web environment.Uploaded using data Grouting construction non-real-time data information is entered row format conversion and is uploaded onto the server by interface module, second server data receiver Module receiving data uploads the data of interface module transmission, and data transfer is stored to data base.
(2) grouting data is dynamic arranges and storage
In the present invention, for the grouting dynamic arrangement of data and storage, preferable struts+ in being researched and developed by j2ee program Hibernate technological frame realizes grouting dynamic data processing.In conjunction with " hydraulic structure cement grout construction technique normalizing " Requirement to grouting works final acceptance of construction data is it is achieved that the dynamic generation of following leading schedule and result map, wherein form bag Include: grouting construction log, grouting construction achievement single hole statistical table, grouting construction achievement point sequence statistical table, grouting construction achievement Element project statistical table, inspection hole packer permeability test outcome table and grouting works performance table etc.;Result map includes: each order hole Unit cement injecting amount frequency curve chart, each order hole permeability rate frequency curve chart, each order hole permeability rate and unit cement injecting magnitude relation Figure, grouting composite profile and grouting effect plane graph etc.;And achieve core photo and boring video recording the looking in real time of picture Ask.
Database server cpu control module, the grouting construction real time data that monitoring instrument is gathered is non-with grouting construction Real time data is entered Mobile state and is arranged, the grouting construction real time data that monitoring instrument is gathered by database server data memory module Carry out dynamic memory with grouting construction non-real-time data.
(3) grouting information integration and analysis
The present invention adopts database technology, computer graphics disposal technology, Object-oriented Technique and three-dimensional visualization technique, for The demand of actual grouting works, is designed to system using modularization principle, sets up the grouting information integration based on b/s structure With analysis platform.
Application server cpu control module is used for the integrated and analysis process data processing that is in the milk, and realizes grouting information integration With the structure of analysis platform, information integration of being in the milk and analysis platform module are used for the performance of grouting integrated information, grouting information Integrated providing the user with analysis platform terminal unit uses grouting information integration and analysis platform.User by terminal unit is Inquiry of achievable grouting information etc.
Application examples
During hydroelectric project grouting construction, live grouting automatic recorder real time data, by by data transmitting equipment, no line number According to short-distance radio network and the mobile communications network of trunking and hole data transmitting equipment composition, send in real time to data Storehouse server.Using data upload interface, non-real-time data is uploaded onto the server.Realize the Real-time Collection of data.
Using grouting data dynamic arrangement and memory module it is achieved that the dynamic life of following leading schedule and result map Become, wherein form includes: grouting construction log, grouting construction achievement single hole statistical table, grouting construction achievement point sequence statistical table, Grouting construction achievement element project statistical table, inspection hole packer permeability test outcome table and grouting works performance table etc.;Result map Including: each order hole unit cement injecting amount frequency curve chart, each order hole permeability rate frequency curve chart, each order hole permeability rate and list Position cement injecting magnitude relation figure, grouting composite profile and grouting effect plane graph etc..
Using grouting information integration and analysis platform.Realize ten big systemic-functions: the collection of data and importing, real time data Monitoring, the analysis of Grouting Design information, grouting effect, fill after Inspection and analysis, grouting unified model, material check and write off, achievement-sharing, enter Degree report and unit monitors report.
Ultimate principle, principal character and the advantages of the present invention of the present invention have been shown and described above.The technology of the industry , it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and description is originally for personnel The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, these changes Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and its Equivalent thereof.

Claims (3)

1. a kind of hydroelectric project grouting construction real time information sampling and statistical analysis system are it is characterised in that include grouting construction Real time data acquisition module (1), grouting data are dynamic to be arranged and memory module (2), grouting information integration and analysis module (3);
Described grouting construction real time data acquisition module (1) includes grouting construction real-time data acquisition module (1-1) and grouting Construction non-real-time data acquisition module (1-2), wherein grouting construction real-time data acquisition module (1-1) include monitoring instrument (1- 1-1), monitoring instrument data transmission blocks (1-1-2), wireless data trunk module (1-1-3), hole data transmission blocks (1- 1-4) with first server data reception module (1-1-5), grouting construction non-real-time data acquisition module (1-2) is included in data Pass interface module (1-2-1) and second server data reception module (1-2-2);
Described monitoring instrument (1-1-1), monitoring instrument data transmission blocks (1-1-2), wireless data trunk module (1-1- 3), hole data transmission blocks (1-1-4) and first server data reception module (1-1-5) are linked in sequence;
Described data upload interface module (1-2-1) is connected with second server data reception module (1-2-2);
The dynamic arrangement of described grouting data includes database server cpu control module (2-1) data with memory module (2) Storehouse server data memory module (2-2);
Described database server cpu control module (2-1) database server data memory module (2-2) is connected;
Described first server data reception module (1-1-5), second server data reception module (1-2-2) are all and data Storehouse server cpu control module (2-1) is connected, the grouting construction real-time data acquisition that gather monitoring instrument (1-1-1) and filling Slurry construction non-real-time data gathers to database server cpu control module (2-1);
Described grouting information integration includes application server cpu control module (3-1) with analysis module (3), and be in the milk information collection Become and analysis platform module (3-2) and grouting information integration and analysis platform terminal unit (3-3);
Described application server cpu control module (3-1), grouting information integration and analysis platform module (3-2) and grouting information Integrated order is connected with analysis platform terminal unit (3-3), realizes the query analysis of grouting information;
Described database server data memory module (2-2) is also connected with application server cpu control module (3-1).
2. hydroelectric project grouting construction real time information sampling according to claim 1 and statistical analysis system, its feature exists In described monitoring instrument (1-1-1) is grouting automatic recorder.
3. hydroelectric project grouting construction real time information sampling according to claim 1 and statistical analysis system, its feature exists In described grouting information integration is computer or mobile phone with analysis platform terminal unit (3-3).
CN201610969651.0A 2016-11-04 2016-11-04 Hydropower engineering grouting construction information real-time acquisition and statistical analysis system Pending CN106354070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610969651.0A CN106354070A (en) 2016-11-04 2016-11-04 Hydropower engineering grouting construction information real-time acquisition and statistical analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610969651.0A CN106354070A (en) 2016-11-04 2016-11-04 Hydropower engineering grouting construction information real-time acquisition and statistical analysis system

Publications (1)

Publication Number Publication Date
CN106354070A true CN106354070A (en) 2017-01-25

Family

ID=57864485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610969651.0A Pending CN106354070A (en) 2016-11-04 2016-11-04 Hydropower engineering grouting construction information real-time acquisition and statistical analysis system

Country Status (1)

Country Link
CN (1) CN106354070A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107943823A (en) * 2017-10-17 2018-04-20 杨勇 The real-time big data processing platform of digitlization construction
CN110544226A (en) * 2019-09-26 2019-12-06 天津大学 real-time display system of water and electricity engineering grouting information based on augmented reality technology
CN112213998A (en) * 2020-10-10 2021-01-12 武汉长江仪器自动化研究所有限公司 Grouting construction data cloud storage and depth analysis system
CN114457804A (en) * 2020-10-21 2022-05-10 天津大学 Integrated hydropower station intelligent grouting monitoring system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943074U (en) * 2011-03-31 2011-08-24 成都山江岩土科技有限责任公司 Automatic monitoring equipment for grouting
CN102182190A (en) * 2011-03-31 2011-09-14 成都山江岩土科技有限责任公司 Automatic grouting monitoring equipment and method
CN202092668U (en) * 2011-05-05 2011-12-28 武汉长江仪器自动化研究所 Wireless grouting data monitoring system capable of freely networking
CN102393711A (en) * 2011-10-28 2012-03-28 中国长江三峡集团公司 Method and system for monitoring grouting process on site
CN202443299U (en) * 2011-10-28 2012-09-19 中国长江三峡集团公司 Grouting on-site process monitoring system
CN202524431U (en) * 2012-03-19 2012-11-07 湖南诺维科技发展有限公司 Grouting monitoring system based on zigbee wireless network
CN104678954A (en) * 2015-01-23 2015-06-03 中国长江三峡集团公司 Dam safety intelligent monitoring and pre-warning system based on full life circle and method thereof
CN104863159A (en) * 2015-06-12 2015-08-26 中国长江三峡集团公司 Integrated intelligent grouting system
CN105332378A (en) * 2015-10-19 2016-02-17 中国水利水电科学研究院 Intelligent temperature control grouting system for concrete dam joint
CN206270704U (en) * 2016-11-04 2017-06-20 华能澜沧江水电股份有限公司 A kind of hydroelectric project grouting construction real time information sampling and statistical analysis system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943074U (en) * 2011-03-31 2011-08-24 成都山江岩土科技有限责任公司 Automatic monitoring equipment for grouting
CN102182190A (en) * 2011-03-31 2011-09-14 成都山江岩土科技有限责任公司 Automatic grouting monitoring equipment and method
CN202092668U (en) * 2011-05-05 2011-12-28 武汉长江仪器自动化研究所 Wireless grouting data monitoring system capable of freely networking
CN102393711A (en) * 2011-10-28 2012-03-28 中国长江三峡集团公司 Method and system for monitoring grouting process on site
CN202443299U (en) * 2011-10-28 2012-09-19 中国长江三峡集团公司 Grouting on-site process monitoring system
CN202524431U (en) * 2012-03-19 2012-11-07 湖南诺维科技发展有限公司 Grouting monitoring system based on zigbee wireless network
CN104678954A (en) * 2015-01-23 2015-06-03 中国长江三峡集团公司 Dam safety intelligent monitoring and pre-warning system based on full life circle and method thereof
CN104863159A (en) * 2015-06-12 2015-08-26 中国长江三峡集团公司 Integrated intelligent grouting system
CN105332378A (en) * 2015-10-19 2016-02-17 中国水利水电科学研究院 Intelligent temperature control grouting system for concrete dam joint
CN206270704U (en) * 2016-11-04 2017-06-20 华能澜沧江水电股份有限公司 A kind of hydroelectric project grouting construction real time information sampling and statistical analysis system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫福根: "水利水电工程坝基灌浆统一模型与分析理论及应用", 《中国博士学位论文全文数据库 工程科技II辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107943823A (en) * 2017-10-17 2018-04-20 杨勇 The real-time big data processing platform of digitlization construction
CN107943823B (en) * 2017-10-17 2021-12-14 北京壹陆科技发展有限公司 Real-time big data processing platform of digital construction
CN110544226A (en) * 2019-09-26 2019-12-06 天津大学 real-time display system of water and electricity engineering grouting information based on augmented reality technology
CN112213998A (en) * 2020-10-10 2021-01-12 武汉长江仪器自动化研究所有限公司 Grouting construction data cloud storage and depth analysis system
CN114457804A (en) * 2020-10-21 2022-05-10 天津大学 Integrated hydropower station intelligent grouting monitoring system

Similar Documents

Publication Publication Date Title
CN107730394B (en) Multi-element heterogeneous data fusion method for panoramic power grid based on big data
CN106354070A (en) Hydropower engineering grouting construction information real-time acquisition and statistical analysis system
CN103941675B (en) Safety monitoring based on wireless network manages system
CN106595565A (en) BIM-based intelligent monitoring system
CN109495290B (en) Operation and maintenance system main station and sub station interaction method and system
CN109507924B (en) Remote monitoring system for oil field operation equipment
CN105139292A (en) Power transmission and transformation engineering construction stage environment supervision inspection system and method
CN109274737B (en) C/S technical architecture system for oil field exploration, development and production
CN103866769A (en) Dam grouting construction analysis and control method based on 3D (three-dimensional) geological model and real-time monitoring
CN110958327A (en) Intelligent substation remote testing system and method
CN104269937A (en) Operation monitoring system for distributed photovoltaic power station
CN103353857B (en) The communication test method of a kind of transformer station comprehensive monitoring unit
CN107066500A (en) A kind of electrical network mass data quality indicator method based on PMS models
CN201600585U (en) Distribution type coal mine production and safety information monitoring system
CN109903008B (en) Visual management and control system and method for subway construction project progress
CN110690756A (en) Intelligent management and control system for grounding wire of power transmission line
CN206270704U (en) A kind of hydroelectric project grouting construction real time information sampling and statistical analysis system
CN101847312A (en) System for implementing data acquisition and early warning in slip forming
CN111105598A (en) Landslide monitoring system
CN104182818A (en) Method and system for collecting substation information automatically and intelligently
CN207393256U (en) A kind of constructing tunnel deformation auto-monitoring system
CN110298548A (en) The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system
CN104252159A (en) Traffic control Internet of Things efficient patrol cloud system
CN112213998A (en) Grouting construction data cloud storage and depth analysis system
CN213874461U (en) Dam safety intelligent monitoring early warning system based on full life cycle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125