CN106353060A - Mobile laboratory for preventive tests of electric power security tools and instruments - Google Patents

Mobile laboratory for preventive tests of electric power security tools and instruments Download PDF

Info

Publication number
CN106353060A
CN106353060A CN201610620312.1A CN201610620312A CN106353060A CN 106353060 A CN106353060 A CN 106353060A CN 201610620312 A CN201610620312 A CN 201610620312A CN 106353060 A CN106353060 A CN 106353060A
Authority
CN
China
Prior art keywords
platform
test
testing
voltage transmission
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610620312.1A
Other languages
Chinese (zh)
Other versions
CN106353060B (en
Inventor
王春胜
王维信
付斌
高光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saint Glory (group) Ltd
Original Assignee
Saint Glory (group) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=57843467&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN106353060(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Saint Glory (group) Ltd filed Critical Saint Glory (group) Ltd
Priority to CN201610620312.1A priority Critical patent/CN106353060B/en
Publication of CN106353060A publication Critical patent/CN106353060A/en
Application granted granted Critical
Publication of CN106353060B publication Critical patent/CN106353060B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M7/00Vibration-testing of structures; Shock-testing of structures
    • G01M7/08Shock-testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/08Measuring resistance by measuring both voltage and current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1245Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of line insulators or spacers, e.g. ceramic overhead line cap insulators; of insulators in HV bushings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/005Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A mobile laboratory for preventive tests of electric power security tools and instruments consists of a van and detection test equipment, and is characterized in that after being completely opened, a carriage cover is parallel and level to a roof, a large top cap is formed, one side of an automatic unfolding platform is movably connected with a bottom plate of a carriage, the other side of the automatic unfolding platform is connected with an outer platform through purpose-made hinges, a plurality of Y-shaped supporting legs are mounted on the lower part of a position where the automatic unfolding platform is connected with the outer platform, a front inner platform and a front outer platform are arranged on one side of the automatic unfolding platform and one side of the outer platform, a rear inner platform and a rear outer platform are arranged on the other side of the automatic unfolding platform and the other side of the outer platform, after being opened, the automatic unfolding platform, the outer platform, the front outer platform, the front inner platform, the rear inner platform and the rear outer platform are combined with the bottom plate of the carriage to form a test platform, and the test detection equipment is arranged on the test platform. The detection equipment and the retractable van are combined together organically to form the mobile laboratory. The speed of high-voltage electricity quick service and quick overhaul is three times higher than the speed in the prior art, time is saved, and working hours are shortened.

Description

Electric-power safe instruments preventive trial mobile laboratory
Technical field
The present invention relates to a kind of electric-power safe instruments preventive trial mobile laboratory, belong to high-tension electricity guarantee, inspection The technical field of the mobile laboratory's aspect being integrated such as repair, detect, testing.
Background technology
At present, known technology is that Chinese invention patent cn105067978a such as discloses integrated portable insulation work device Tool test platform, including a casing, equipped with guide rail, guide rail is provided with one and moves back and forth along guide rail and itself can for casing side Open 180 ° of high-voltage probe group, casing both sides are symmetrically respectively equipped with a telescopic telescopic insulating bar;Described casing is divided into Two regions, one is insulating boot pilot region, and one is insulation gloves experiment region;It is an advantage of the invention that can portable to applying Work scene is tested, and can demarcate the pilot region of three projects in strict accordance with electric power safety code, meets electric power safety life Produce code, insulating boot, insulating glove can be carried out, insulating bar is tested, and has largely saved total time on test, improve Work efficiency.
Chinese utility model patent cn202837482u discloses a kind of livewire work and electric power safety insulating tool is comprehensive Close testing stand, including the testing stand of operating board, testing transformer and powered current relay;Operating board is provided with operation button and electricity Volt-ammeter, testing stand is provided with test platform, the both sides of test platform be from top to bottom sequentially provided with adjustable, insulating support and Scalable metal rack;It is provided with rustless steel high-field electrode support, rustless steel high-field electrode support above adjustable, insulating support It is provided with electrode test line, above scalable metal rack, be provided with insulating bar class testing support;Test platform is provided with bucket, The lower end of electrode test line is corresponding to described insulating bar class testing support and bucket;Testing transformer pass through high-tension electricity polar curve with not Rust steel high-field electrode support connects, and operating board is passed through wire and connected with the binding post on testing transformer and electric current relay respectively Connect.The technical problem solve prior art and have that test facilities investment is big, occupied ground is many, needing more than tester.
Chinese utility model patent cn203965250u discloses a kind of electric-power safe instruments mechanical property pull test Machine, including pole, base, hydraulic system, expansion link and triangle call wire pulley, the bottom surface of base is equipped with four rolling;Base Four angles of lower section are respectively arranged with screw positioner;Pole is fixed in base by the bottom that the iron plate of 2mm is rolled into taper pole On, pole rear wall is drilled with the aperture for aerofluxuss radiating, pole pre- portion envelope has iron plate, and iron plate is provided with perforate, expansion link Bottom is fixed on base and the perforate through on iron plate for the expansion link, the top affixed triangle call wire pulley of expansion link;Hydraulic pressure System is fixed on the base in pole.It is many that this utility model can carry out safety helmet, seat belt, safety rope, climbers etc. simultaneously The test of kind of instrument, function is many, has saved production cost, improves testing efficiency it is ensured that production safety.
Chinese utility model patent cn201859093u discloses a kind of Preventability mechanical test device for ladder, including hydraulic pressure Testing machine, ladder supporting mechanism, pulling force drive mechanism, ladder supporting mechanism is by the two parallel cross bars fixing on the ground And the multiple parallel montant being connected between two cross bars forms, pulling force drive mechanism includes be fixed on cylinder body first Fixed pulley, the second fixed pulley being movably disposed on ladder supporting mechanism, it is located in the first fixed pulley and the second fixed pulley On transmission belt, the first described fixed pulley is contour with the second fixed pulley and parallel relative, described transmission belt one end and piston The perpendicular connection in upper end of bar, the described transmission belt other end at the trial, corresponding to ladder to be measured ladder the perpendicular connection of shelves. This device meets the angle requirement of the experimental code of electric-power safe instruments, all gears can be tested it is ensured that ladder The reliability of tool, has larger utilization and extention and is worth.
Chinese utility model patent cn202943626u discloses a kind of electric-power safe instruments car, including car body, setting Constitute in the slideway of car body inwall and the drawer that can slide in slideway being embedded in slideway, described drawer is arranged on car The both sides of body.Using this utility model, various power engineering security tool categories can be placed by classification in each of car body and take out It is dragged to working site by motor vehicles in bucket, used according to Practical Project situation fetching tool at construction working scene, serve work Tool puts specification, convenient use, saves working time, the effect of raising work efficiency.
Publish in " Chinese science and technology review ", source: -2014. (43) -331-332, entitled: to brief talk novel electric power Managing security tools and instruments mechanical property tensile testing machine is researched and developed, the new novel electric power managing security tools and instruments mechanical property pulling force of this institute research and development Testing machine, including control section (notebook) and test device two parts, test device part comprise hydraulic system, steel wire rope, The integral types such as expansion link, safety helmet head mould.Control main frame adopts notebook (being easy to carry), installs test soft on notebook Part, test software is directed to experimental project using friendly man machine interface, software, carries out modularity setting, and interface is using succinctly straight The pictorial manner seen, sets up menu for the electric power safety utensil such as safety helmet, safety rope, climbers, experimenter only needs basis Data display, countdown window, show real-time coordinates, test interface adopts picture window, intuitively succinctly, operates simultaneously Facilitate understandable.Report interface can be clicked through after off-test, form is formulated according to GB, display experimental project, the vertical value of test, Censorship unit, identifier, result of the test, visual examination, the loading curve of test force value, form can be printed by printer Satisfactory papery a4 paper form preserves it is also possible to click on, and form is saved on the hard disk of computer.(this technology is by " river Scientific-technical information of northern province academy " enters line retrieval)
Content of the invention
It is an object of the invention to provide a kind of electric-power safe instruments preventive trial mobile laboratory.
A kind of electric-power safe instruments preventive trial mobile laboratory, by van and electric-power safe instruments inspection Survey testing equipment composition it is characterised in that: control chamber is provided with van, the control system of control chamber is hydraulic jack A (22) provides electric power, so that railway carriage or compartment lid (21) is opened by hydraulic jack a (22), and is promoted to the position concordant with roof (20), After roof (20) and railway carriage or compartment lid (21) are combined together, form a big top cover;It is provided with roof (20) four corners below Lift clutch (35), its lift clutch (35) is placed in compartment and is connected with compartment, in lift clutch (35) Side is provided with stabilizing bracket (24), by adjusting the height of lift clutch (35) and then the big top cover of change;Automatic-expanding platform (23) side is flexibly connected with platform floor, and opposite side passes through special gemel connection outer platform (36), in Automatic-expanding platform (23) with the junction bottom of outer platform (36), multiple y shape supporting leg (40) are installed, in Automatic-expanding platform (23) with outer put down The side of platform (36) is provided with front inner platform (27) and front outer platform (26), and opposite side is provided with rear inner platform (28) and rear outer platform (29);Automatic-expanding platform (23), outer platform (36), front inner platform (27), front outer platform (26), rear inner platform (28) and after The bottom of outer platform (29) is provided with multiple platform lower limbs (30) as supporting, its Automatic-expanding platform (23), outer platform (36), Constitute test and put down with platform floor after front outer platform (26), front inner platform (27), rear inner platform (28), rear outer platform (29) are opened Platform;Setting test, testing equipment on test platform;It is provided with back door (38) at compartment rear portion.
Described railway carriage or compartment lid (21) and Automatic-expanding platform (23) launch round about.
It is provided with protruding block (45), the groove on its protruding block (45) and platform floor in the bottom of Automatic-expanding platform (23) (25) match, protruding block (45) side pass through bearing pin connecting steering mechanism (17), its rotating mechanism (17) be arranged on van-type The hydraulic jack c (43) of bottom of car is connected by bearing pin, and hydraulic jack c (43) drives rotating mechanism (17) action, enters And launch or pack up Automatic-expanding platform (23).
It is provided with support b (19) and support a (18), its support a in the bottom of Automatic-expanding platform (23) and outer platform (36) (18) it is connected with connecting rod one (41) and connecting rod two (42) by bearing pin with support b (19), in connecting rod one (41) and connecting rod two (42) Contact point at hydraulic jack b (31) is connected by bearing pin, its hydraulic jack b (31) is fixed on Automatic-expanding platform (23), Hydraulic jack b (31) drive link one (41) and connecting rod two (42) action, and then launch or pack up outer platform (36).
Test platform is provided with by test key station (1-1), safety helmet test machine (1-2), test portion (1-3) and The 2t tensile testing machine that ladder testing jig (1-4) forms, wherein test key station (1-1), safety helmet test machine (1-2) and test Partly (1-3) is placed in the overlying corner portions of platform floor, and ladder testing jig (1-4) is fixed on outer platform (36), and it tests master control Platform (1-1) passes through connection safety helmet test machine (1-2), and the internal pumping plant of test key station (1-1) connects examination by oil circuit Test part (1-3), test portion (1-3) is connected with the sensor being arranged on ladder testing jig (1-4), in car by steel wire rope Workbox (1) is placed with the base plate of railway carriage or compartment.
Operating board (4) is provided with platform floor, potentiometer (4-1) and examination are provided with Automatic-expanding platform (23) Test transformator (4-2), potentiometer (4-1) is connected with testing transformer 4-2 by protective resistance 4-3, the output of its operating board (4) Terminal is connected with the lead-out terminal of testing transformer (4-2) by connecting lead wire, and potentiometer (4-1) passes through connecting line and operating board (4) instrument terminals connect, its operating board (4), potentiometer (4-1), testing transformer (4-2), protective resistance (4-3) composition work Frequency pressure test transformator.
Testing equipment (2) for detecting insulation offset plate and insulated target is provided with test platform, is carrying out detection absolutely When edge offset plate and insulated target, one end connecting detection equipment of the high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) (2) one end of another high-voltage transmission bar (12), being connected with high-voltage transmission electrode (10) connects potentiometer (4-1).
Insulating rope test frame (6) is provided with test platform, when carrying out detecting insulating cord, with high-voltage transmission electrode (10) one end joint test frame (6) of the high-voltage transmission bar (12) connecting, another being connected with high-voltage transmission electrode (10) One end of high-voltage transmission bar (12) connects potentiometer (4-1).
Testing machine (9) is provided with test platform, its testing machine (9) is used for detecting insulating boot and insulating glove, described Testing machine (9) include six insulating boot proof boxs and six insulation gloves experiment casees;Platform floor is provided with for placing The folding table (3) of notebook computer (13), on the hook that its folding table (3) is suspended on compartment inwall in transport;Described pen Remember this computer (13) and testing machine (9) connection, be provided with for detecting insulating boot, insulation handss notebook computer (13) is inner The inspection software of set;In the side of folding table (3), earth lead resistance meter (11) in groups are installed.
Laser marker (5) is provided with platform floor.
Test stand for electroscope (7) is provided with test platform, when detecting that electroscope starts voltage, with high-voltage transmission electricity The one end of the high-voltage transmission bar (12) that pole (10) connects connects test stand for electroscope (7), is connected with high-voltage transmission electrode (10) Another high-voltage transmission bar (12) one end connect potentiometer (4-1).
Insulating bar pressure test frame (8) is provided with test platform, when carrying out detecting insulating bar;With high-voltage transmission electricity The one end of the high-voltage transmission bar (12) that pole (10) connects connects pressure test frame (8), is connected with high-voltage transmission electrode (10) One end of another high-voltage transmission bar (12) connects potentiometer (4-1).
Be placed with safe fence a (14) above test platform, when being tested, its safe fence a (14) be used for every From operation equipment and high-tension testing apparatus, safe fence b (15) is placed at 1.5 meters of separating test platform, to prevent non-test people Member is close.
Described safe fence a (14) and safe fence b (15) is all made using stainless steel, its safe fence Warning tape there is scalability.
Move for convenience, roller can be installed additional in the bottom of testing equipment.
Described test, testing equipment can be directly placed in the specified location of test platform, and be fastened by bolt lock Fixed.
In compartment, the one end near headstock is provided with vehicle front platform baffle plate (33), on vehicle front platform baffle plate (33) It is provided with the hook mounting utensil.
Testing crew enters laboratory for convenience, is provided with step on carriage back door (38).
Electric-power safe instruments testing equipment and stretching, extension car are combined by the present invention, constitute one and may move Laboratory.High-tension electricity quick service fast procuratorial organ face is faster than past three times, has not only saved time but also the man-hour of decreasing, and develops specially Management software is placed in notebook computer.Survey report can be provided at the scene, also can be by 4g network by experiment information Data is uploaded on upper server, realizes the unified management to total system laboratory.For convenience testing equipment is pushed to Tested on the interim platform launching, can be installed additional roller in part test device bottom.
Brief description
Fig. 1 is the structural representation when railway carriage or compartment lid of the present invention is opened;
Fig. 2 be Fig. 1 railway carriage or compartment lid fully open after structural representation;
Fig. 3 is that the Automatic-expanding platform of the present invention launches procedure structure schematic diagram;
Fig. 4 is Automatic-expanding platform and the outer platform deployed configuration schematic diagram of the present invention;
Fig. 5 is the present invention looks up structural representation of Fig. 4;
Fig. 6 is the backsight structural representation of Fig. 4;
Fig. 7 is enlarged diagram at a of Fig. 2;
Fig. 8 is enlarged diagram at the b of Fig. 5;
Fig. 9 is enlarged diagram at the c of Fig. 5;
Figure 10 is the present invention looks up structural representation after the present invention launches test platform;
Figure 11 is the perspective view after the present invention launches test platform;
Figure 12 is the perspective view that is well placed of testing equipment of Figure 11;
Figure 13 is the overlooking the structure diagram after Figure 11 removes big top cover;
Figure 14 is the overlooking the structure diagram after Figure 12 removes big top cover.
In figure: 1 workbox, 1-1 test key station, 1-2 safety helmet test machine, 1-3 test portion, 1-4 ladder testing jig, 2 testing equipments, 3 folding tables, 4 operating board, 4-1 potentiometer, 4-2 testing transformer, 4-3 protective resistance, 5 laser markers, 6 exhausted Edge rope test stand, 7 test stand for electroscopes, 8 insulating bar pressure test framves, 9 testing machines, 10 high-voltage transmission electrodes, 11 earth leads become Group resistance meter, 12 high-voltage transmission bars, 13 notebook computers, 14 safe fence a, 15 safe fence b, 16 cable windings Disk, 17 rotating mechanisms, 18 support a, 19 support b, 20 roofs, 21 railway carriage or compartment lids, 22 hydraulic jack a, 23 Automatic-expanding platforms, 24 consolidate Frame, 25 grooves, outer platform before 26, inner platform before 27, inner platform after 28, outer platform, 30 platform lower limbs, 31 hydraulic jacks after 29 B, 32 grounding device, 33 vehicle front platform baffle plates, 34 vehicle rear platform baffle plates, 35 lift clutch, 36 outer platforms, 37 oil cylinder tops Post, 38 carriage back doors, 39 inspection car control chambers, 40y shape supporting leg, 41 connecting rods one, 42 connecting rods two, 43 hydraulic jack c, 44 back doors Hydraulic jack, 45 protruding blocks.
Specific embodiment
As shown in Fig. 1,2,3,4,5,6,11,12, a kind of electric-power safe instruments preventive trial mobile laboratory, by railway carriage or compartment Formula automobile and electric-power safe instruments detection testing equipment composition it is characterised in that: on van, control chamber is installed, The control system of control chamber provides electric power for hydraulic jack a22, makes the railway carriage or compartment lid 21 of van side pass through hydraulic jack a22 Open, and be promoted to the position concordant with roof 20, after roof 20 and railway carriage or compartment lid 21 are combined together, form a big top cover, its Big top cover is used for sunshade and rain-proof.Four corners below roof 20 are provided with lift clutch 35, its lift clutch 35 It is placed in compartment and is connected with compartment, be provided with stabilizing bracket 24 in the side of lift clutch 35, by adjusting automatic lifting Device 35 and then the height of the big top cover of change.Automatic-expanding platform 23 side is flexibly connected with platform floor, and opposite side passes through special Gemel connection outer platform 36, is provided with multiple y shape supporting legs 40 in the junction bottom of Automatic-expanding platform 23 and outer platform 36, Inner platform 27 and front outer platform 26 before the side of Automatic-expanding platform 23 and outer platform 36 is provided with, opposite side is provided with rear inner platform 28 and rear outer platform 29, Automatic-expanding platform 23, outer platform 36, front inner platform 27, front outer platform 26, rear inner platform 28 and after The bottom of outer platform 29 is provided with multiple platform lower limb 30 as support, its Automatic-expanding platform 23, outer platform 36, front outer platform 26th, front inner platform 27, rear inner platform 28, rear outer platform 29 open rear and platform floor composition test platform, make the work of the present invention Make area and increase further to widen, setting test, testing equipment on test platform, before experiment work is carried out, for preventing railway carriage or compartment Formula automobile rocks, and four below van corner is provided with oil cylinder fore-set 37, is provided with carriage back door 38 at compartment rear portion, is Facilitate testing crew to enter laboratory, carriage back door 38 is provided with step.In compartment, the one end near headstock is provided with car Front platform baffle plate 33, is provided with, on vehicle front platform baffle plate 33, the hook mounting utensil.
As shown in Fig. 6,7,9, railway carriage or compartment lid 21 launches upwards, and Automatic-expanding platform 23 launches laterally.Described compartment 21 He Automatic-expanding platform 23 launches round about.Be provided with protruding block 45 in the bottom of Automatic-expanding platform 23, its protruding block 45 with Groove 25 on platform floor matches, and bearing pin connecting steering mechanism 17, its rotating mechanism 17 and peace are passed through in protruding block 45 side The hydraulic jack c43 being contained in van bottom is connected by bearing pin, and hydraulic jack c43 drives rotating mechanism 17 action, And then launch or pack up Automatic-expanding platform 23.
As shown in Fig. 6,8, it is provided with support b19 and support a18 in the bottom of Automatic-expanding platform 23 and outer platform 36, its Frame a18 and support b19 is connected with connecting rod 1 and connecting rod 2 42 by bearing pin, at the contact point of connecting rod 1 and connecting rod 2 42 Hydraulic jack b31 is connected by bearing pin, its hydraulic jack b31 is fixed on Automatic-expanding platform (23), hydraulic jack b31 drives Connecting rod 1 and connecting rod 2 42 action, and then launch or pack up outer platform (36).
As shown in Figure 11,12,13,14, test platform is provided with by test key station 1-1, safety helmet test machine 1- 2nd, 2t (20kn) tensile testing machine of test portion 1-3 and ladder testing jig 1-4 composition, wherein test key station 1-1, safety helmet Test machine 1-2 and test portion 1-3 is placed in the overlying corner portions of platform floor, and ladder testing jig 1-4 is fixed on outer platform (36), Its test key station 1-1 passes through connection safety helmet test machine 1-2, and the pumping plant within test key station 1-1 is by oil circuit even Meet test portion 1-3, test portion 1-3 is connected with the sensor being arranged on ladder testing jig 1-4, in compartment by steel wire rope Workbox 1 is placed with base plate.Its operation principle: set test pressure and test period by testing key station 1-1, utilize Pumping plant in test key station 1-1 provides power so that the oil cylinder in test portion 1-3 rises or declines, at this moment test portion Sensor in 1-3 records a data, and this data passes to test key station 1-1, and data reaches test key station 1-1 and sets Pressure, test key station 1-1 gives the order of one holding tension and compression force signal of pumping plant.At this moment set by test key station 1-1 Test period start timing, give after the test period reaching setting pumping plant unload pressure signal, when sensor gives When the signal of test key station 1-1 reaches 0.Key station 1-1 is to mono- out-of-work signal of test portion 1-3 for test.Examination Test and complete printed report.Safety helmet test machine 1-2 operation principle: key station 1-1 is to mono- telecommunications of safety helmet test machine 1-2 for test Number, the release on safety helmet test machine 1-2 discharges after receiving signal and has hung jump bit above or puncture awl.Fall Jump bit or puncture awl are just fallen on safety helmet, and safety helmet is worn on head mould.The power that jump bit produces passes to sensing Device, at this moment to test key station 1-1, test key station 1-1 judges whether signal meets the requirements to the signal transmission of sensor;Puncture Cone drops on safety helmet, and whether test key station 1-1 receives the signal of telecommunication to judge result of the test.Ladder test machine 1-4 work Make principle: set test pulling force, test period by testing key station 1-1, provide power using the pumping plant in key station 1-1, The oil cylinder in test portion 1-3 is made to rise or decline, at this moment the sensor in ladder test machine 1-4 records a data, This data passes to test key station 1-1, and data reaches test key station 1-1 and sets pulling force, and test key station 1-1 give pumping plant The order of one holding pulling force signal.At this moment the test period set by test key station 1-1 starts timing, reaches the examination of setting The signal that pumping plant unloads pulling force is given, when the signal that sensor gives test key station 1-1 reaches 0 after testing the time.Test Key station 1-1 completes printed report to mono- out-of-work signal of safety helmet test machine 1-2, test.
Operating board 4 is provided with platform floor, potentiometer 4-1 is provided with Automatic-expanding platform 23 and test becomes Depressor 4-2, potentiometer 4-1 are connected with testing transformer 4-2 by protective resistance 4-3, and the lead-out terminal of its operating board 4 passes through even The lead-out terminal connecing lead with testing transformer 4-2 is connected, and potentiometer 4-1 is passed through connecting line and connected with the instrument terminals of operating board 4 Connect, its operating board 4, potentiometer 4-1, testing transformer 4-2, protective resistance 4-3 group voltage divider 4-1.Operating board 4 is by 220v work Frequency voltage changes over the voltage output of 0-200v by internal slide rheostat, generates high pressure using testing transformer 4-2, protects Shield resistance 4-3 protection test transformator 4-2 excessively stream punctures, in order to avoid damage equipment, the potentiometer 4-1 collection signal of telecommunication passes to operating board 4, operating board 4 shows magnitude of voltage.
Testing equipment 2 for detecting insulation offset plate and insulated target is placed with test platform, is carrying out detection insulation When offset plate and insulated target, one end connecting detection equipment 2 of the high-voltage transmission bar 12 being connected with high-voltage transmission electrode 10, with high pressure The one end of another high-voltage transmission bar 12 that transmission electrode 10 connects connects potentiometer 4-1.Operation principle: when detection insulating cement When plate or insulated target, offset plate or insulated target are lain on testing equipment 2, detected insulation offset plate or insulated target up and down and Periphery is equipped with wet cloth or metal forming less than 200mm.Thus check offset plate or insulated target have or not burn, puncture, fever phenomenon. High-voltage transmission electrode 10 is connected use with high-voltage transmission bar 12, plays the effect of high-voltage transmission.Potentiometer 4-1 output high pressure leads to Cross hv transmission line rod 12 by high-voltage transmission to high-voltage transmission electrode 10, high-voltage transmission electrode 10 passes through another hv transmission line Rod 12 by high-voltage transmission to testing equipment 2, thus reaching the purpose of industrial frequency withstand voltage.
Voltage is raised to the magnitude of voltage of regulation by hookup: a. by potentiometer 4-1.B. the wet cloth laid up and down or metal The edge of paper tinsel should overlap.C. when detecting the industrial frequency withstand voltage test of offset plate surface, offset plate is lain on measurement equipment 2, insulate offset plate Lay long 70mm, the metal polar plate of wide 30mm up and down, two electrodes away from for 300mm.D. voltage is raised to by rule by potentiometer 4-1 Fixed magnitude of voltage.E. when detect offset plate industrial frequency withstand voltage when, offset plate is lain on testing equipment 2, offset plate lay up and down wet cloth or Metal forming.F. lay-up cover test product, except upper and lower edge respectively reserve 200mm about distance in addition to, remaining region install gold Belong to pole plate.G. by potentiometer 4-1, voltage is raised to the magnitude of voltage of regulation, thus check that offset plate has or not and burning, puncture, generating heat now As.
As shown in Figure 11,12,13,14, insulating rope test frame 6 is placed with test platform, is carrying out detecting insulating cord When, one end joint test frame 6 of the high-voltage transmission bar 12 being connected with high-voltage transmission electrode 10, it is connected with high-voltage transmission electrode 10 Another high-voltage transmission bar 12 one end connect potentiometer 4-1.
Operation principle: when detecting insulating cord, insulating cord is wound on the aluminum wheel of insulating rope test frame 6, by potentiometer 4-1 Voltage is raised to the magnitude of voltage of regulation, thus check insulating cord have or not burn, puncture, fever phenomenon.High-voltage transmission electrode 10 with High-voltage transmission bar 12 connects use, plays the effect of high-voltage transmission.Potentiometer 4-1 output high pressure passes through high-voltage transmission bar 12 By high-voltage transmission to high-voltage transmission electrode 10, high-voltage transmission electrode 10 passes through high-voltage transmission bar 12 by high-voltage transmission to insulating cord Test stand 6, thus reach the purpose of industrial frequency withstand voltage.
Test stand for electroscope 7 is provided with test platform, when detecting that electroscope starts voltage, with high-voltage transmission electrode One end of the high-voltage transmission bar 12 of 10 connections connects test stand for electroscope 7, and another be connected with high-voltage transmission electrode 10 high One end of pressure transmission bar 12 connects potentiometer 4-1.When detecting that electroscope starts voltage, electricity is contacted according to different electroscopies Pole, the distance of adjustment test stand for electroscope 7 grading ring and voltage equalizing ball.Experiment process is as follows: indicator is contacted electrode and all presses Ball contacts, and is boosted by potentiometer 4-1.When voltage has indication signal and occurs, stop boosting, if signal exists, Record starts magnitude of voltage this moment;Thus checking whether conformance with standard requires electroscope startup magnitude of voltage.
Insulating bar pressure test frame 8 is provided with test platform, when carrying out detecting insulating bar, with high-voltage transmission electrode One end of the high-voltage transmission bar 12 of 10 connections connects pressure test frame 8, another high pressure being connected with high-voltage transmission electrode 10 One end of transmission bar 12 connects potentiometer 4-1.Operation principle: different according to test products during detection, electric pressure is different, adjusts Distance between whole insulating bar pressure test frame 8, test products are put on insulating bar pressure test frame 8, will by potentiometer 4-1 Voltage is raised to the magnitude of voltage of regulation.Thus check insulating bar have or not burn, puncture, fever phenomenon.High-voltage transmission electrode 10 and height Pressure transmission bar 12 connects use, plays the effect of high-voltage transmission.Potentiometer 4-1 output high pressure passes through high-voltage transmission bar 12 will To high-voltage transmission electrode 10, high-voltage transmission electrode 10 passes through high-voltage transmission bar 12 to high-voltage transmission, and high-voltage transmission is resistance to insulating bar Pressure test stand 8, thus reach the purpose of industrial frequency withstand voltage.
Folding table 3 for placing notebook computer 13 is provided with platform floor, its folding table 3 is suspended in transport On the hook of compartment inwall, its notebook computer 13 and testing machine 9 connection being arranged on test platform, in notebook electricity Inspection software for detecting insulating boot, insulating glove is installed in brain 13, earth lead is installed in groups in the side of folding table 3 Resistance meter 11.Its testing machine 9 be used for detect insulating boot and insulating glove, testing machine 9 include six insulating boot proof boxs and Six insulation gloves experiment casees, once can complete the pressure test of three pairs of insulating boots or glove simultaneously, accurately detect six tunnels simultaneously Leakage Current.Test voltage and Ge Lu leakage current are respectively displayed in respective field, simultaneously graphically real-time It is shown in dynamic test observation window, test situation can be very clear.Test result automatically record can preserving for a long time, facilitate with When check and print.Its earth lead assembly testing instrument 11 to be measured using the unidirectional current pressure decline method mode of current voltage meter method, examination Galvanoscope should be not less than 30a.Length and DC resistance between by each Wiring nose of measurement, calculate the resistance value of every 1m.Described Earth lead assembly testing instrument 11 is used exclusively for detecting the equipment of ground lead resistance value, can detect earth lead three-phase in groups simultaneously Between and three-phase and earth terminal wire resistance value, the service behaviour of product to be tested can be fully understanded by test, to electricity Vital effect is played using safety in masterpiece industry.
Described testing machine 9 is made up of test main frame and testing stand two large divisions, and testing stand is fixed, and by earth lead Connect, connect the order wire of main frame and high-voltaghe compartment.
When testing to insulating glove: 1 insulating glove can be put in each insulation gloves experiment case, every time can be simultaneously 6 insulating gloves of test.Tap water is loaded insulating glove and insulation gloves experiment case, insulating glove is put into insulating glove examination Tryoff, the water surface elevation of the inside and outside water loading of described insulating glove is identical, and insulating glove surfaces part 90mm drying, Put the electrodes in insulating glove internal water and tested.During test, soft by the insulating glove testing apparatus in notebook computer 13 Setting in part boosts to setting, measures leakage current, thus check insulating glove have or not burn, puncture, fever phenomenon.
When carrying out trying dangerous to insulating boot or footwear: auxiliary type insulating boot or footwear are inserted the insulating boot examination being placed with sponge and water In tryoff, put in insulating boot or footwear and be placed with sheet metal under metal ball, metal ball.At the trial, by notebook computer 13 Setting in insulating boot testing apparatus software boosts to setting, measures leakage current, thus check insulating boot or footwear have or not burn, Puncture, fever phenomenon.
Laser marker 5 is provided with platform floor, after the completion of detection test, the result that detection is tested is according to conjunction Lattice are no to carry out classification printing.
As shown in figure 14, it is placed with safe fence a14 above test platform, when being tested, its safe fence a14 For isolated operation equipment and high-tension testing apparatus, safe fence b15 is placed at 1.5 meters of separating test platform, to prevent non-examination Test personnel close.
Described safe fence a14 and safe fence b15 is all made using stainless steel, the police of its safe fence Show that band has a scalability, and be printed on the printed words of " halt Keep Clear-High Voltage ".
Move for convenience, roller can be installed additional in the bottom of testing equipment.Described testing equipment can be directly placed at examination Test in the specified location of platform, and be locked by bolt.

Claims (18)

1. a kind of electric-power safe instruments preventive trial mobile laboratory, by van and electric-power safe instruments detection Testing equipment composition it is characterised in that: control chamber is provided with van, the control system of control chamber is hydraulic jack a (22) provide electric power, so that railway carriage or compartment lid (21) is opened by hydraulic jack a (22), and be promoted to the position concordant with roof (20), After roof (20) and railway carriage or compartment lid (21) are combined together, form a big top cover;It is provided with roof (20) four corners below Lift clutch (35), its lift clutch (35) is placed in compartment and is connected with compartment, in lift clutch (35) Side is provided with stabilizing bracket (24), by adjusting the height of lift clutch (35) and then the big top cover of change;Automatic-expanding platform (23) side is flexibly connected with platform floor, and opposite side passes through special gemel connection outer platform (36), in Automatic-expanding platform (23) with the junction bottom of outer platform (36), multiple y shape supporting leg (40) are installed, in Automatic-expanding platform (23) with outer put down The side of platform (36) is provided with front inner platform (27) and front outer platform (26), and opposite side is provided with rear inner platform (28) and rear outer platform (29);Automatic-expanding platform (23), outer platform (36), front inner platform (27), front outer platform (26), rear inner platform (28) and after The bottom of outer platform (29) is provided with multiple platform lower limbs (30) as supporting, its Automatic-expanding platform (23), outer platform (36), Constitute test and put down with platform floor after front outer platform (26), front inner platform (27), rear inner platform (28), rear outer platform (29) are opened Platform;Setting test, testing equipment on test platform;It is provided with carriage back door (38) at compartment rear portion.
2. mobile laboratory according to claim 1 it is characterised in that: described railway carriage or compartment lid (21) and Automatic-expanding platform (23) launch round about.
3. mobile laboratory according to claim 1 it is characterised in that: be provided with convex in the bottom of Automatic-expanding platform (23) Bittiness (45), its protruding block (45) is matched with the groove (25) on platform floor, and protruding block (45) side is connected by bearing pin Rotating mechanism (17), its rotating mechanism (17) is connected admittedly by bearing pin with the hydraulic jack c (43) being arranged on van bottom Fixed, hydraulic jack c (43) drives rotating mechanism (17) action, and then launches or pack up Automatic-expanding platform (23).
4. mobile laboratory according to claim 1 it is characterised in that: in Automatic-expanding platform (23) and outer platform (36) Bottom be provided with support b (19) and support a (18), its support a (18) and support b (19) pass through bearing pin and connecting rod one (41) and even Bar two (42) connects, and connects hydraulic jack b (31), its liquid by bearing pin at the contact point of connecting rod one (41) and connecting rod two (42) Compressing cylinder b (31) is fixed on Automatic-expanding platform (23), and hydraulic jack b (31) drive link one (41) and connecting rod two (42) move Make, and then launch or pack up outer platform (36).
5. laboratory according to claim 1 it is characterised in that: be provided with test platform by test key station (1- 1), the 2t tensile testing machine that safety helmet test machine (1-2), test portion (1-3) and ladder testing jig (1-4) form, its pilot scale Test the overlying corner portions that key station (1-1), safety helmet test machine (1-2) and test portion (1-3) are placed in platform floor, ladder is tested Frame (1-4) is fixed on outer platform (36), and connection safety helmet test machine (1-2), test are passed through in its test key station (1-1) The internal pumping plant of key station (1-1) passes through oil circuit joint test part (1-3), and test portion (1-3) passes through steel wire rope and installation Sensor on ladder testing jig (1-4) connects, and is placed with workbox (1) on platform floor.
6. mobile laboratory according to claim 1 it is characterised in that: operating board (4) is provided with platform floor, Potentiometer (4-1) and testing transformer (4-2) are provided with Automatic-expanding platform (23), potentiometer (4-1) passes through protective resistance 4-3 is connected with testing transformer 4-2, and the lead-out terminal of its operating board (4) passes through the defeated of connecting lead wire and testing transformer (4-2) Go out terminal to connect, potentiometer (4-1) is connected with the instrument terminals of operating board (4) by connecting line, its operating board (4), potentiometer (4-1), testing transformer (4-2), protective resistance (4-3) composition industrial frequency withstand voltage testing transformer.
7. laboratory according to claim 1 it is characterised in that: be provided with test platform for detecting insulation offset plate With the testing equipment (2) of insulated target, when carrying out detection insulation offset plate and insulated target, the height being connected with high-voltage transmission electrode (10) One end connecting detection equipment (2) of pressure transmission bar (12), another hv transmission line being connected with high-voltage transmission electrode (10) The one end of excellent (12) connects potentiometer (4-1).
8. mobile laboratory according to claim 1 it is characterised in that: insulating rope test frame is provided with test platform (6), when carrying out detecting insulating cord, one end joint test of the high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) Frame (6), the one end of another high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) connects potentiometer (4-1).
9. mobile laboratory according to claim 1 it is characterised in that: testing machine (9) is provided with test platform, its Testing machine (9) is used for detecting insulating boot and insulating glove, and described testing machine (9) includes six insulating boot proof boxs and six absolutely Edge glove proof box;Folding table (3) for placing notebook computer (13) is provided with platform floor, its folding table (3) exists It is suspended on during transport on the hook of compartment inwall;Described notebook computer (13) and testing machine (9) connection, in notebook The inner inspection software being provided with for detecting insulating boot, insulating glove of computer (13);In the side of folding table (3), ground connection is installed Line resistance meter (11) in groups.
10. mobile laboratory according to claim 1 it is characterised in that: laser marker is provided with platform floor (5).
11. mobile laboratories according to claim 1 it is characterised in that: be provided with test platform electroscope test Frame (7), when detecting that electroscope starts voltage, the one end of the high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) is even Connect test stand for electroscope (7), the one end of another high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) is connected to be divided Depressor (4-1).
12. mobile laboratories according to claim 1 it is characterised in that: insulating bar is provided with test platform pressure Test stand (8), when carrying out detecting insulating bar;The one end of the high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) is even Connect pressure test frame (8), the one end of another high-voltage transmission bar (12) being connected with high-voltage transmission electrode (10) connects partial pressure Device (4-1).
13. mobile laboratories according to claim 1 it is characterised in that: be placed with safe fence a above test platform (14), when being tested, its safe fence a (14) is used for isolated operation equipment and high-tension testing apparatus, safe fence b (15) It is placed at 1.5 meters of separating test platform, to prevent non-test personnel close.
14. mobile laboratories according to claim 13 it is characterised in that: described safe fence a (14) with safety enclose Hurdle b (15) is all made using stainless steel, and the warning tape of its safe fence has scalability.
15. mobile laboratories according to claim 1 it is characterised in that: move for convenience, in the bottom of testing equipment Roller can be installed additional.
16. mobile laboratories according to claim 1 it is characterised in that: described test, testing equipment can directly be placed In the specified location of test platform, and it is locked by bolt.
17. mobile laboratories according to claim 1 it is characterised in that: in compartment, be provided with car near one end of headstock Front platform baffle plate (33), is provided with, on vehicle front platform baffle plate (33), the hook mounting utensil.
18. mobile laboratories according to claim 1 it is characterised in that: for convenience testing crew enter laboratory, Carriage back door (38) is provided with step.
CN201610620312.1A 2016-08-02 2016-08-02 Electric-power safe instruments preventive trial mobile laboratory Active CN106353060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610620312.1A CN106353060B (en) 2016-08-02 2016-08-02 Electric-power safe instruments preventive trial mobile laboratory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610620312.1A CN106353060B (en) 2016-08-02 2016-08-02 Electric-power safe instruments preventive trial mobile laboratory

Publications (2)

Publication Number Publication Date
CN106353060A true CN106353060A (en) 2017-01-25
CN106353060B CN106353060B (en) 2017-06-09

Family

ID=57843467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610620312.1A Active CN106353060B (en) 2016-08-02 2016-08-02 Electric-power safe instruments preventive trial mobile laboratory

Country Status (1)

Country Link
CN (1) CN106353060B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329063A (en) * 2017-08-10 2017-11-07 广州市恒力检测股份有限公司 A kind of electric-power safe instruments nigration car
CN108196172A (en) * 2018-01-26 2018-06-22 浙江倬瑜服饰有限公司 A kind of electric insulation gloves overpressure resistance detecting device
CN108447378A (en) * 2018-06-05 2018-08-24 合肥哈工海渡工业机器人有限公司 A kind of movable cabinet being used in robot Multifunctional mobile platform
CN109506869A (en) * 2018-09-28 2019-03-22 黄选贤 Electric-power safe instruments mechanical property test equipment
CN109932605A (en) * 2019-04-09 2019-06-25 武汉奋进电力技术有限公司 A kind of electric power instrument instruction carriage
JP2020051989A (en) * 2018-09-28 2020-04-02 中国電力株式会社 Surge measurement system and measurement system with safety function
CN111123024A (en) * 2020-02-13 2020-05-08 河北翔卓电力科技有限公司 High-voltage mobile test platform
CN112014783A (en) * 2020-09-02 2020-12-01 陕西中兴祥林电子科技有限公司 Portable preventive test vehicle for safety tools
CN113008680A (en) * 2020-05-11 2021-06-22 河北航道汽车制造有限公司 Electric power safety tool detection vehicle and electric power safety tool detection system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003011718A (en) * 2001-07-04 2003-01-15 Toshiba Corp Mobile vehicle loaded with high voltage test device
CN202837482U (en) * 2012-10-08 2013-03-27 郯城县明珠发展有限公司 Hot-line work and electric power security insulating tool comprehensive test-bed
CN202943626U (en) * 2012-10-30 2013-05-22 河北省电力公司电力科学研究院 Electric power security instrument vehicle
CN103552495A (en) * 2013-11-21 2014-02-05 国家电网公司 Automatic unfolding type on-site verification vehicle for high-voltage transformers
CN103600680A (en) * 2013-12-02 2014-02-26 国家电网公司 Alternating current withstand voltage vehicle-mounted testing platform for 750kV ultrahigh voltage equipment
CN203965250U (en) * 2014-07-25 2014-11-26 周调彪 A kind of electric-power safe instruments mechanical property tension tester
CN204495960U (en) * 2015-04-20 2015-07-22 国家电网公司 Multifunctional mobile insulating tool verification handcart
CN104880655A (en) * 2015-06-18 2015-09-02 江苏省电力公司太仓市供电公司 Portable insulation safety tool power-frequency voltage-withstand dolly
CN105067978A (en) * 2015-08-09 2015-11-18 曾宪雄 Integrated portable insulation tool and instrument test platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003011718A (en) * 2001-07-04 2003-01-15 Toshiba Corp Mobile vehicle loaded with high voltage test device
CN202837482U (en) * 2012-10-08 2013-03-27 郯城县明珠发展有限公司 Hot-line work and electric power security insulating tool comprehensive test-bed
CN202943626U (en) * 2012-10-30 2013-05-22 河北省电力公司电力科学研究院 Electric power security instrument vehicle
CN103552495A (en) * 2013-11-21 2014-02-05 国家电网公司 Automatic unfolding type on-site verification vehicle for high-voltage transformers
CN103600680A (en) * 2013-12-02 2014-02-26 国家电网公司 Alternating current withstand voltage vehicle-mounted testing platform for 750kV ultrahigh voltage equipment
CN203965250U (en) * 2014-07-25 2014-11-26 周调彪 A kind of electric-power safe instruments mechanical property tension tester
CN204495960U (en) * 2015-04-20 2015-07-22 国家电网公司 Multifunctional mobile insulating tool verification handcart
CN104880655A (en) * 2015-06-18 2015-09-02 江苏省电力公司太仓市供电公司 Portable insulation safety tool power-frequency voltage-withstand dolly
CN105067978A (en) * 2015-08-09 2015-11-18 曾宪雄 Integrated portable insulation tool and instrument test platform

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329063A (en) * 2017-08-10 2017-11-07 广州市恒力检测股份有限公司 A kind of electric-power safe instruments nigration car
CN107329063B (en) * 2017-08-10 2023-04-28 广州市恒力检测股份有限公司 Electric power safety tool removes test car
CN108196172A (en) * 2018-01-26 2018-06-22 浙江倬瑜服饰有限公司 A kind of electric insulation gloves overpressure resistance detecting device
CN108447378A (en) * 2018-06-05 2018-08-24 合肥哈工海渡工业机器人有限公司 A kind of movable cabinet being used in robot Multifunctional mobile platform
CN109506869A (en) * 2018-09-28 2019-03-22 黄选贤 Electric-power safe instruments mechanical property test equipment
JP2020051989A (en) * 2018-09-28 2020-04-02 中国電力株式会社 Surge measurement system and measurement system with safety function
JP7115188B2 (en) 2018-09-28 2022-08-09 中国電力株式会社 Systems for measuring surges, measuring systems with safety functions
CN109932605A (en) * 2019-04-09 2019-06-25 武汉奋进电力技术有限公司 A kind of electric power instrument instruction carriage
CN111123024A (en) * 2020-02-13 2020-05-08 河北翔卓电力科技有限公司 High-voltage mobile test platform
CN111123024B (en) * 2020-02-13 2024-05-31 河北翔卓电力科技有限公司 High-voltage mobile test platform
CN113008680A (en) * 2020-05-11 2021-06-22 河北航道汽车制造有限公司 Electric power safety tool detection vehicle and electric power safety tool detection system
CN112014783A (en) * 2020-09-02 2020-12-01 陕西中兴祥林电子科技有限公司 Portable preventive test vehicle for safety tools

Also Published As

Publication number Publication date
CN106353060B (en) 2017-06-09

Similar Documents

Publication Publication Date Title
CN106353060B (en) Electric-power safe instruments preventive trial mobile laboratory
CN107329063B (en) Electric power safety tool removes test car
CN206671474U (en) Vehicle-mounted removable electric-power safe instruments chamber
CN202837482U (en) Hot-line work and electric power security insulating tool comprehensive test-bed
CN103440759B (en) A kind of multifunction power meter reading tool
CN109932605A (en) A kind of electric power instrument instruction carriage
CN203397504U (en) Novel multifunctional electric power meter reading tool
CN209055613U (en) A kind of earth detector suitable for different form stringing
CN105425189B (en) Extra-high voltage transformer separate type verifies platform and its installation and checking method
CN210720626U (en) Power line fault detection device
CN206002564U (en) A kind of dielectric loss and insulation resistance test conversion equipment and pilot system
CN102879657B (en) Method for checking phase sequences of lines
CN205656242U (en) Tower impulse grounding resistance measuring instrument with spark effect correction function
CN205363815U (en) Multifunctional protector examines workstation surely
CN205157712U (en) Insulating telescopic link detection device is put in combined electrical apparatus office
CN201654177U (en) Locating device for detecting internal local discharge of gas-insulated combined electrical equipment
CN205748710U (en) Optical fiber temperature-measurement device and transformer oil paper insulation test system
CN105929205A (en) Insulation resistance test auxiliary device for high-altitude equipment
CN107064764A (en) Mine low-voltage cable insulation fault detector and method based on infrared technique
CN208654305U (en) Current transformer error calibration equipment
CN207423517U (en) A kind of motor for door of garage test device
CN101813743A (en) Method for detecting partial discharge in gas insulated switchgear and detecting and positioning device
CN205679638U (en) Eminence apparatus insulated resistance test auxiliary device
CN205786721U (en) A kind of insulating bar pressure test frame
CN205786924U (en) High-potting intelligent integrated operating console

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant