CN106351252A - Rapid construction method for earth-retaining wall - Google Patents

Rapid construction method for earth-retaining wall Download PDF

Info

Publication number
CN106351252A
CN106351252A CN201610779469.9A CN201610779469A CN106351252A CN 106351252 A CN106351252 A CN 106351252A CN 201610779469 A CN201610779469 A CN 201610779469A CN 106351252 A CN106351252 A CN 106351252A
Authority
CN
China
Prior art keywords
retaining wall
rapid construction
construction method
grouting pipe
construction according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610779469.9A
Other languages
Chinese (zh)
Inventor
谭斌
杨德志
李娜
郭继舟
李少祥
罗劲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201610779469.9A priority Critical patent/CN106351252A/en
Publication of CN106351252A publication Critical patent/CN106351252A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a rapid construction method for an earth-retaining wall. The rapid construction method includes the steps: S1 setting up a scaffold and fixing die plates; S2 fixing a plurality of grouting pipes between the die plates and forming drain holes in the die plates; S3 filling rock blocks into the die plates; S4 injecting concrete grout for filling gaps among the rock blocks by the grouting pipes; S5 performing preservation after grouting; S6 detaching the die plates. Compared with a grouted rubble earth-retaining wall construction method, the rapid construction method has the advantages of high construction speed, high efficiency, safety and reliability. Compared with a concrete earth-retaining wall construction method, the rapid construction method has the advantages that concrete quantity is more effectively reduced, hydration heat is low, and cost is reduced.

Description

A kind of method of retaining wall rapid construction
Technical field
A kind of the present invention relates to retaining wall construction field, more particularly, it relates to method of retaining wall rapid construction.
Background technology
Retaining wall construction technology at this stage, typically has marsonary retaining wall and concrete retaining wall.Cemented rock keeps off Cob wall is piled up using manual type, and speed of application is very slow, and efficiency of construction is not high, and in work progress, personal safety risk is high.And adopt When being constructed with concrete retaining wall, concrete amount is big, high cost.These factors result in retaining wall speed of application slowly and apply The shortcomings of work is relatively costly.
Content of the invention
The technical problem to be solved in the present invention is, provides a kind of method of retaining wall rapid construction.
The technical solution adopted for the present invention to solve the technical problems is: construct a kind of method of retaining wall rapid construction, Comprise the following steps:
S1, set up scaffold, fixed form;
S2, fix multiple Grouting Pipe between template, spilled water hole is arranged on template;
S3, insert block stone into template;
S4, by Grouting Pipe inject concrete grout stone filling between space;
After the completion of s5, slip casting, carry out health preserving;
S6, form removal.
In such scheme, also include after described step s6 step s7, whole retaining wall face is carried out repair, ditch baste or Increase external decoration.
In such scheme, described Grouting Pipe is slip casting flexible pipe.
In such scheme, many Grouting Pipe are in that plum blossom-shaped arranges.
In such scheme, the arrangement pitch of Grouting Pipe 3 is not more than 2/3rds of retaining wall height.
In such scheme, described block of stone is graded broken stone.
The method implementing the retaining wall rapid construction of the present invention, has the advantages that
1st, the present invention have the advantages that speed of application is fast than marsonary retaining wall construction, efficiency high, safe and reliable.
2nd, the present invention has and more saves amount of concrete than concrete retaining wall, and the heat of hydration is low, the advantage of reduces cost.
Brief description
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is elevation during retaining wall construction;
Fig. 2 is the structural representation of Grouting Pipe;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the schematic diagram of ruggedized construction 6;
Fig. 5 is cross rib and the schematic diagram of perpendicular rib.
Specific embodiment
In order to be more clearly understood to the technical characteristic of the present invention, purpose and effect, now comparison accompanying drawing describes in detail The specific embodiment of the present invention.
As Figure 1-3, the method for retaining wall rapid construction of the present invention comprises the following steps:
S1, set up scaffold, then supporting module 1;
S2, fix multiple Grouting Pipe 3 between template 1, spilled water hole is arranged on template 1.Grouting Pipe 3 is slip casting flexible pipe, Its surface is provided with multiple slurry outlets 5, and many Grouting Pipe 3 are in that plum blossom-shaped arranges, and the arrangement pitch of Grouting Pipe 3 is not more than retaining wall height 2/3rds of degree are it is ensured that the speed of slip casting and uniformity.
S3, insert block stone 2 into template 1, block stone 2 diameter is not more than the half of width in template 1 space, and block stone 2 should This has certain level and joins, and makes block stone intermediate gap less, can reduce grouting amount further.
S4, by Grouting Pipe 3 inject concrete grout stone filling 1 between space;
After the completion of s5, slip casting, carry out health preserving;
S6, form removal;
S7, whole retaining wall face is carried out repair, ditch baste or increase external decoration.
As shown in Figures 4 and 5, during construction, can adopt and with the following method retaining wall be reinforced.
The step of the retaining wall reinforcement construction method that the present embodiment provides is as follows:
1), cross rib 64 and perpendicular rib 63 are sequentially set in retaining wall lateral surface, and place sleeve pipe 62 at perpendicular rib 63 so that being somebody's turn to do Sleeve pipe 62 is located in cross rib 64 and perpendicular rib 63, and one end is pressed on retaining wall lateral surface, and the other end extends out to outside perpendicular rib Surface, has hollow structure in this sleeve pipe 62;Sleeve pipe 62 can propped up between gear template 1 and original soil mould with pre-plugged.
2), utilize jumbolter, by the hollow structure of sleeve pipe 62 in retaining wall pore-forming, continue in wall through after body of wall Hole in the soil body afterwards, the bolthole that can be passed through for anchor pole 65 with formation and connect with the hollow structure in sleeve pipe 62;
3) in bolthole, insert anchor pole 65 muscle body, muscle body revealed section exposes to beyond perpendicular rib 63, and one end of anchor pole 65 is put In bolthole, the other end passes through the hollow structure of sleeve pipe 62, extends to outside perpendicular rib 63;
4), inject cement mortar in bolthole, after maintenance expires, after that is, cement mortar reaches design strength, to anchor pole 65 carry out prestressed stretch-draw and are locked on perpendicular rib 63.
By above four steps, complete the operation of arrangement cross rib 64, perpendicular rib 63 and anchor pole 65 on retaining wall, gear soil Under the compressing of cross rib 64 and perpendicular rib 63, ruggedized construction is securely attached together wall with retaining wall, cross rib 64 and perpendicular rib 63 Ensure retaining wall will not tympanites and fall block, the anchor force of anchor pole 65 passes through cross rib 64 and perpendicular rib 63 increased the antidumping of retaining wall Moment is it is ensured that retaining wall will not sliding or topple, thus realizing the reinforcing of retaining wall.
Due to, in above-mentioned construction method, sequentially cross rib 64 and perpendicular rib 63 being poured on retaining wall lateral surface first, and And in this process, be provided with, in cross rib 64 and perpendicular rib 63, the sleeve pipe 62 running through cross rib 64 and perpendicular rib 63, in sleeve pipe 62, have hollow Structure, so, in subsequent operation, using jumbolter 17 by the hollow structure in sleeve pipe 62 ground after retaining wall and wall Hole in body.Due to there being the protective effect of cross rib 64 and perpendicular rib 63, during boring, retaining wall will not be damaged, not result in drill hole gear The large area of cob wall slabstone drops, and especially when repeatedly being holed, will not destroy the globality of retaining wall, preferably protect Former retaining wall, thus can avoid retaining wall to cave in work progress.
Many times, in order to ensure the steadiness that cross rib 64 is connected with retaining wall lateral surface, in above-mentioned steps 1) in pour Before cross rib 64, need the lateral surface of retaining wall is cleared up, manner of cleaning up can variation.
In above-mentioned construction method step 4) in, after anchor pole 65 carries out prestressed stretch-draw, the other end of anchor pole 65 is exposed at Outside perpendicular rib 63, as such, it is possible to pour sealing off and covering anchorage body 66 on the outer surface of perpendicular rib 63, expose outside outside perpendicular rib 63 for wrapping up anchor pole 65 The other end on surface, prevents anchor pole 65 to be corroded.
According to above-mentioned construction method, the present embodiment additionally provides retaining wall reinforcement structure 6, specific as follows:
This ruggedized construction 6 includes the cross rib 64 being sequentially cast on retaining wall lateral surface and perpendicular rib 63, sets in retaining wall Have in bolthole, cross rib 64 and perpendicular rib and be equipped with sleeve pipe 62, in sleeve pipe 62, there is hollow structure, this hollow structure connects retaining wall In anchor pole 65 hollow structure run through perpendicular rib, panel and retaining wall that is to say, that hollow structure and bolthole form one Hole position, is equipped with anchor pole 65 in the hollow structure of sleeve pipe 62, one end of anchor pole 65 is placed in the bolthole of retaining wall, and the other end is put In the hollow structure through sleeve pipe 62, it is placed in outside perpendicular rib 63.
So, using above-mentioned ruggedized construction 6, so that retaining wall is effectively reinforced, prevent retaining wall from drum occurring Swollen, ftracture and phenomenon of toppling.
So that cross rib 64 can preferably be pressed on retaining wall, retaining wall is played with reinforcement effect, cross rib 64 pours Build on the lateral surface of retaining wall, and be in the skewed setting to inside retaining wall, so, the moment that cross rib 64 self gravitation produces Act on retaining wall, retaining wall is played with the relatively firm effect reinforced.
Same reason, perpendicular rib 63 is cast on cross rib 64 outer surface, and is in the skewed setting to inside retaining wall.
In order to preferably support perpendicular rib 63, along retaining wall lateral surface lower end bearing of trend, perpendicular rib 63 lower end is provided with grade beam 61.
After anchor pole 65 carries out prestressed stretch-draw locking, the other end of anchor pole 65 is exposed at outside perpendicular rib 63, so, in order to protect Shield anchor pole 65, pours sealing off and covering anchorage body 66 on the outer surface of perpendicular rib 63, and its parcel anchor pole 65 exposes outside the another of perpendicular rib 63 outer surface End.
Above in conjunction with accompanying drawing, embodiments of the invention are described, but the invention is not limited in above-mentioned concrete Embodiment, above-mentioned specific embodiment is only schematically, rather than restricted, those of ordinary skill in the art Under the enlightenment of the present invention, in the case of without departing from present inventive concept and scope of the claimed protection, also can make a lot Form, these belong within the protection of the present invention.

Claims (6)

1. a kind of method of retaining wall rapid construction is it is characterised in that comprise the following steps:
S1, set up scaffold, fixed form;
S2, fix multiple Grouting Pipe between template, spilled water hole is arranged on template;
S3, insert block stone into template;
S4, by Grouting Pipe inject concrete grout stone filling between space;
After the completion of s5, slip casting, carry out health preserving;
S6, form removal.
2. the method for retaining wall rapid construction according to claim 1 is it is characterised in that also include after described step s6 Step s7, whole retaining wall face is carried out repair, ditch baste or increase external decoration.
3. the method for retaining wall rapid construction according to claim 1 is it is characterised in that described Grouting Pipe is that slip casting is soft Pipe.
4. the method for retaining wall rapid construction according to claim 1 is it is characterised in that many Grouting Pipe are in that plum blossom-shaped is arranged Row.
5. retaining wall rapid construction according to claim 4 method it is characterised in that the arrangement pitch of Grouting Pipe 3 not More than retaining wall height 2/3rds.
6. the method for retaining wall rapid construction according to claim 1 is it is characterised in that described block of stone is graded broken stone.
CN201610779469.9A 2016-08-30 2016-08-30 Rapid construction method for earth-retaining wall Pending CN106351252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610779469.9A CN106351252A (en) 2016-08-30 2016-08-30 Rapid construction method for earth-retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610779469.9A CN106351252A (en) 2016-08-30 2016-08-30 Rapid construction method for earth-retaining wall

Publications (1)

Publication Number Publication Date
CN106351252A true CN106351252A (en) 2017-01-25

Family

ID=57856275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610779469.9A Pending CN106351252A (en) 2016-08-30 2016-08-30 Rapid construction method for earth-retaining wall

Country Status (1)

Country Link
CN (1) CN106351252A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700523A (en) * 2017-09-26 2018-02-16 福州市规划设计研究院 The prefabricated drainage system and construction method for facing upward inclined retaining wall
CN115404909A (en) * 2022-10-13 2022-11-29 中建八局浙江建设有限公司 Reverse construction method for plate rib type anchor rod retaining wall process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700523A (en) * 2017-09-26 2018-02-16 福州市规划设计研究院 The prefabricated drainage system and construction method for facing upward inclined retaining wall
CN107700523B (en) * 2017-09-26 2023-07-18 福州市规划设计研究院集团有限公司 Drainage system of prefabricated upward inclined retaining wall and construction method
CN115404909A (en) * 2022-10-13 2022-11-29 中建八局浙江建设有限公司 Reverse construction method for plate rib type anchor rod retaining wall process

Similar Documents

Publication Publication Date Title
CN104746517B (en) A kind of suspension roof support system of total length below artesian head
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN110778328B (en) Loess tunnel entrance section construction method for passing through landslide body
CN206319886U (en) Tunnel lining structure
CN111119935A (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN104389628A (en) Landslide section tunnel reinforcing device and reinforcing construction method
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN107724436A (en) A kind of post-cast strip Seepage method
CN110593258B (en) Reinforcing construction method and reinforcing structure for steel sleeve pile of existing building pile foundation
CN108867690A (en) The reverse construction of peg board barricade of big foundation pit
CN113529765B (en) Rapid water-lowering construction method for anti-floating anchor rod
CN205024710U (en) Adopt raft foundation structure of anti prestressed anchorage of floating cable
CN205205832U (en) Structure is propped in trading of underground building
CN106351252A (en) Rapid construction method for earth-retaining wall
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN111577355B (en) Composite construction method for long anchor cable locking feet of secondary arch frame of extra-soft stratum tunnel interval
CN108798730A (en) A kind of mine worked-out section artificial ore pillar connects top method
CN208151875U (en) A kind of steel flanged beam cemented rock arch bridge side wall ruggedized construction
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
CN112983435B (en) Tunnel surge body excavation method
CN215053032U (en) Protection architecture that deep basal pit closes on existing shallow basis
CN112176994B (en) Construction method of prestressed anchor cable structure suitable for broken rock mass
CN201635072U (en) Centrally grouted static-pressured anchor pile former

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125