CN106351251B - A kind of construction method of concrete retaining wall drain hole greening structure - Google Patents

A kind of construction method of concrete retaining wall drain hole greening structure Download PDF

Info

Publication number
CN106351251B
CN106351251B CN201610762533.2A CN201610762533A CN106351251B CN 106351251 B CN106351251 B CN 106351251B CN 201610762533 A CN201610762533 A CN 201610762533A CN 106351251 B CN106351251 B CN 106351251B
Authority
CN
China
Prior art keywords
retaining wall
net
shoulders
drain hole
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610762533.2A
Other languages
Chinese (zh)
Other versions
CN106351251A (en
Inventor
张之琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zezhong Garden Co ltd
Original Assignee
Wenzhou Lefa Education Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Lefa Education Technology Co Ltd filed Critical Wenzhou Lefa Education Technology Co Ltd
Priority to CN201610762533.2A priority Critical patent/CN106351251B/en
Publication of CN106351251A publication Critical patent/CN106351251A/en
Application granted granted Critical
Publication of CN106351251B publication Critical patent/CN106351251B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of construction methods of concrete retaining wall drain hole greening structure,Including retaining wall and drape over one's shoulders net,Several drain holes are provided with above the retaining wall,It is fixed equipped with obstruction net inside the drain hole,Groove is fixed in retaining wall outer surface,The quantity of the groove is two groups,And it is mutually perpendicular between two groups of grooves,Expansion tube is equipped in inside grooves,It is described to drape over one's shoulders that setscrew is crossed by Netcom and expansion tube is fixedly mounted on retaining wall outer surface,Described drape over one's shoulders is additionally provided with plant soil layer between net and retaining wall,The concrete structure of entire retaining wall is all coated on and drapes over one's shoulders net inside,And plant soil layer is added between net and retaining wall draping over one's shoulders,Plant structure can beautify concrete wall,Both green building theory had been reached,It can sluice again along exterior wall greenbelt,Do not destroy barrier wall structure,Wide-angle flood discharge can be carried out by being directed to peak flood,Further prevent current from breaking through the inhibition of net is hindered directly to break up the soil texture of plant soil layer and directly destroy foundation.

Description

A kind of construction method of concrete retaining wall drain hole greening structure
Technical field
The present invention relates to construction engineering technical fields, are specially a kind of construction of concrete retaining wall drain hole greening structure Method.
Background technology
As the development of society, urbanization promote rapidly, there are many gear protection structures in city-building, be particularly at Abrupt slope area, cob wall protective equipment application is especially extensive, and current most widely used barrier wall structure is general using concrete structure All over structure be exactly that several drain holes are added on concrete guard wall, but this structure be easiest to the problem be exactly appearance not Meet the beautification requirement for prepaying modern city and towns construction, under secondly drain hole is often drenched along concrete outer surface, cause appearance Face is drenched for a long time, and without filtration facility, being easy to cause the soil of the cob wall inside barricade can flow out along drain hole, cause interior Portion is hollow, but also can wash away the backfill of lower part along barricade, destroys foundation structure, foundation softening at toe of wall is caused to hold Carrying power reduces, and causes a series of security risk.
A kind of concrete retaining wall drain hole greening structure that Chinese patent CN105104002A is announced only is merely to letting out Water hole has just carried out virescence rebuild, still needs, using downpipe, to improve the difficulty for using and installing, make in transformation process With of high cost.
The content of the invention
In view of the above problems, the present invention provides a kind of construction methods of concrete retaining wall drain hole greening structure, plant Object structure can beautify concrete wall, not only reach green building theory, but also can sluice along exterior wall greenbelt, not destroy Barrier wall structure can be solved the problems, such as effectively in background technology.
To achieve the above object, the present invention provides following technical solution:A kind of concrete retaining wall drain hole greening structure, Including retaining wall and net is draped over one's shoulders, several drain holes are provided with above the retaining wall, fixed be equipped with is hindered inside the drain hole Net is fixed with groove in retaining wall outer surface, and the quantity of the groove is two groups, and is mutually perpendicular between two groups of grooves, Inside grooves are equipped with expansion tube, described to drape over one's shoulders that setscrew is crossed by Netcom and expansion tube is fixedly mounted on retaining wall outer surface, described to drape over one's shoulders Plant soil layer is additionally provided between net and retaining wall.
Preferably, it is described to hinder net is internal to be enclosed with no soil sand gravel.
Preferably, the distance between described parallel groove is equal.
Preferably, aproll plate is equipped with below the drain hole, and headrace is installed below aproll plate.
In addition a kind of concrete retaining wall drain hole greening method has also been devised in the present invention, includes the following steps:
(1) carry out foundation compacting and build base, the surface dust of foundation is rejected, and is excavated, it is necessary to be dug to hard soil layer Or the bearing beds such as rock stratum;
(2) compacting is poured, is poured using 12% lime stone and concrete mix;
(3) progress wall first pours after building base compacting, it is necessary to carry out structure using large-scale stone in casting process The stabilization of performance carries out jointing between large-scale stone using cement mortar, and the purity of cement mortar cannot be less than 80%, and Groove is carved during wall pours;
(4) wall pours complete after carry out maintenance 2-3 talent and can carry out the construction of sluicing pore structure, carrying out drain hole It builds fever and obstruction net is installed simultaneously, and fill sand gravel;
(5) build drain hole and aproll plate and headrace are installed afterwards;
(6) in inside grooves expander mounting tube, and net is draped over one's shoulders by setscrew and expansion tube installation, before net is draped over one's shoulders in installation First plant soil layer is mounted on exterior wall;
(7) soil horizon is subjected to backfill after installing, installation construction can be completed.
Preferably, the step (2) pays attention to compacting during pouring, and fraction porosity is less than 10%, entire During pouring, the thickness poured cannot be less than 40 centimetres, maintain 3 days.
Compared with prior art, the beneficial effects of the invention are as follows:The concrete retaining wall drain hole greening structure, by setting It puts and drapes over one's shoulders net, the concrete structure of entire retaining wall is all coated on and drapes over one's shoulders net inside, and plant is added between net and retaining wall draping over one's shoulders Object soil layer can facilitate planting plants, and plant structure can beautify concrete wall, not only reach green building theory, but also can be suitable It exterior wall greenbelt to sluice, does not destroy barrier wall structure, aproll plate particularly is arranged below in drain hole, be to be directed to peak Flood designs, and can carry out wide-angle flood discharge, further prevents current from breaking through the inhibition of net is hindered directly to break up plant soil Layer soil texture and directly destroy foundation.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is aproll plate structure schematic diagram of the present invention.
In figure:1- retaining walls;2- drapes over one's shoulders net;3- drain holes;4- hinders net;5- grooves;6- expansion tubes;7- setscrews;8- Plant soil layer;9- aproll plates;10- headraces.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment belongs to the scope of protection of the invention.
Embodiment:
It please refers to Fig.1 and Fig. 2, the present invention provides a kind of technical solution:A kind of concrete retaining wall drain hole greening structure, Including retaining wall 1 and net 2 is draped over one's shoulders, the retaining wall 1 is provided with several drain holes 3 above, and the 3 inside fixation of drain hole is equipped with Net 4 is hindered, groove 5 is fixed in 1 outer surface of retaining wall, the quantity of the groove 5 is two groups, and phase between two groups of grooves 5 It is mutually vertical, expansion tube 6 is internally provided in groove 5, the net 2 that drapes over one's shoulders is fixedly mounted on retaining wall by setscrew 7 and expansion tube 6 1 outer surface, described drape over one's shoulders are additionally provided with plant soil layer 8 between net 2 and retaining wall 1.
No soil sand gravel is enclosed with inside the obstruction net 4;The distance between described parallel groove 5 is equal;It is described 3 lower section of drain hole is equipped with aproll plate 9, and headrace 10 is equipped with below aproll plate 9.
Its greening method includes the following steps:
(1) carry out foundation compacting and build base, the surface dust of foundation is rejected, and is excavated, it is necessary to be dug to hard soil layer Or the bearing beds such as rock stratum;
(2) compacting is poured, is poured using 12% lime stone and concrete mix, and during pouring Pay attention to compacting, fraction porosity is less than 10%, and during entire pour, the thickness poured cannot be less than 40 centimetres, protect It supports 3 days;
(3) progress wall first pours after building base compacting, it is necessary to carry out structure using large-scale stone in casting process The stabilization of performance carries out jointing between large-scale stone using cement mortar, and the purity of cement mortar cannot be less than 80%, and Groove is carved during wall pours;
(4) wall pours complete after carry out maintenance 2-3 talent and can carry out the construction of sluicing pore structure, carrying out drain hole It builds fever and obstruction net is installed simultaneously, and fill sand gravel;
(5) build drain hole and aproll plate and headrace are installed afterwards;
(6) in inside grooves expander mounting tube, and net is draped over one's shoulders by setscrew and expansion tube installation, before net is draped over one's shoulders in installation First plant soil layer is mounted on exterior wall;
(7) soil horizon is subjected to backfill after installing, installation construction can be completed.
The advantage of the invention is that:The concrete retaining wall drain hole greening structure drapes over one's shoulders net, by entire earth-retaining by setting The concrete structure of wall, which is all coated on, drapes over one's shoulders net inside, and plant soil layer is added between net and retaining wall draping over one's shoulders, and can facilitate kind Plant is planted, plant structure can beautify concrete wall, not only reach green building theory, but also can have been let out along exterior wall greenbelt Water does not destroy barrier wall structure, and aproll plate particularly is arranged below in drain hole, is to be directed to peak flood to design, can be into Row wide-angle flood discharge further prevents current from breaking through the inhibition of net is hindered directly to break up the soil texture of plant soil layer and straight Connect destruction foundation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (2)

1. a kind of construction method of concrete retaining wall drain hole greening structure, concrete retaining wall drain hole greening structure include Retaining wall (1) and net (2) is draped over one's shoulders, the retaining wall (1) is provided with several drain holes (3) above, solid inside the drain hole (3) Fixed that groove (5) is fixed in retaining wall (1) outer surface equipped with net (4) is hindered, the quantity of the groove (5) is two groups, and two Be mutually perpendicular between group groove (5), expansion tube (6) be internally provided in groove (5), it is described drape over one's shoulders net (2) by setscrew (7) and Expansion tube (6) is fixedly mounted on retaining wall (1) outer surface, and described drape over one's shoulders is additionally provided with plant soil layer between net (2) and retaining wall (1) (8);Aproll plate (9) is equipped with below the drain hole (3), and headrace (10) is installed below aproll plate (9);
It is characterized in that, construction method includes the following steps:
The first step carries out foundation compacting and builds base, the surface dust of foundation is rejected, and is excavated, it is necessary to be dug to hard soil layer Or rock stratum;
Second step pours compacting, is poured using 12% lime stone and concrete mix;
3rd step, progress wall first pours after building base compacting, it is necessary to carry out structure using large-scale stone in casting process The stabilization of performance carries out jointing between large-scale stone using cement mortar, and the purity of cement mortar cannot be less than 80%, and Groove is carved during wall pours;
4th step, wall pours completion carries out maintenance 2-3 talent afterwards can carry out the construction of sluicing pore structure, carry out drain hole It builds and obstruction net is installed simultaneously, and fill sand gravel;
5th step builds installation aproll plate and headrace after drain hole;
6th step drapes over one's shoulders net, before net is draped over one's shoulders in installation in inside grooves expander mounting tube, and by setscrew and expansion tube installation First plant soil layer is mounted on exterior wall;
Soil horizon is carried out backfill after installing and installation construction can be completed by the 7th step.
2. a kind of construction method of concrete retaining wall drain hole greening structure according to claim 1, it is characterised in that: No soil sand gravel is enclosed with inside the obstruction net (4).
CN201610762533.2A 2016-08-29 2016-08-29 A kind of construction method of concrete retaining wall drain hole greening structure Expired - Fee Related CN106351251B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610762533.2A CN106351251B (en) 2016-08-29 2016-08-29 A kind of construction method of concrete retaining wall drain hole greening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610762533.2A CN106351251B (en) 2016-08-29 2016-08-29 A kind of construction method of concrete retaining wall drain hole greening structure

Publications (2)

Publication Number Publication Date
CN106351251A CN106351251A (en) 2017-01-25
CN106351251B true CN106351251B (en) 2018-05-25

Family

ID=57856450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610762533.2A Expired - Fee Related CN106351251B (en) 2016-08-29 2016-08-29 A kind of construction method of concrete retaining wall drain hole greening structure

Country Status (1)

Country Link
CN (1) CN106351251B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305259B (en) * 2020-03-30 2021-05-07 徐州工程学院 Be used for wisdom city concrete retaining wall outlet greening structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6494009B1 (en) * 2001-08-30 2002-12-17 Soo-Yong Kang Green concrete retaining wall and method for constructing the same
CN102804993A (en) * 2012-08-09 2012-12-05 江苏美尚生态景观股份有限公司 Method of vagetaion matrix spray-seeding afforestation
CN103835298A (en) * 2013-12-05 2014-06-04 大连环复生态技术有限公司 Concrete-sprayed face side slope greening method and system
CN104727341A (en) * 2015-03-20 2015-06-24 重庆文理学院 Unidirectional water-permeable subgrade river side retaining wall
CN104805845A (en) * 2015-04-21 2015-07-29 安徽农业大学 Flexible slope protection method for soft sandstone natural side slope
CN204811233U (en) * 2015-08-21 2015-12-02 中机中联工程有限公司 Concrete retaining wall outlet afforestation structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6494009B1 (en) * 2001-08-30 2002-12-17 Soo-Yong Kang Green concrete retaining wall and method for constructing the same
CN102804993A (en) * 2012-08-09 2012-12-05 江苏美尚生态景观股份有限公司 Method of vagetaion matrix spray-seeding afforestation
CN103835298A (en) * 2013-12-05 2014-06-04 大连环复生态技术有限公司 Concrete-sprayed face side slope greening method and system
CN104727341A (en) * 2015-03-20 2015-06-24 重庆文理学院 Unidirectional water-permeable subgrade river side retaining wall
CN104805845A (en) * 2015-04-21 2015-07-29 安徽农业大学 Flexible slope protection method for soft sandstone natural side slope
CN204811233U (en) * 2015-08-21 2015-12-02 中机中联工程有限公司 Concrete retaining wall outlet afforestation structure

Also Published As

Publication number Publication date
CN106351251A (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN106759104B (en) Ecological slope protection structure and construction method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN102444233A (en) Multifunctional assembling and pouring type templated block, use method and use thereof
CN109594568A (en) A kind of rock slope ecological safeguard structure and its method
CN108560949A (en) Adobe wall alien invasion ruggedized construction and adobe wall alien invasion reinforcement means
CN108643133A (en) A kind of detachable arch dam and its construction, method for dismounting
CN108930263B (en) Foundation treatment structure based on ground water level
CN103790170A (en) Prefabricated concrete hollow framework slope protection structure
CN106351251B (en) A kind of construction method of concrete retaining wall drain hole greening structure
CN202248483U (en) Multifunctional assembling pouring type modularized building block
CN204715364U (en) A kind of foundation pit support device
CN217150275U (en) High water level weak foundation pit supporting device
CN207003470U (en) A kind of pin-connected panel ecological anchor rod retaining wall structure
CN206545257U (en) A kind of novel greening band water storage structure
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN205421303U (en) High water level silt ground water treatment facilities falls
CN110258584B (en) Foundation pit side slope soil nailing pipe wall enclosure structure and construction method
CN210151667U (en) A seepage prevention structure for city river course
CN208831025U (en) A kind of hydrous fluids underground chamber concrete construction anti-seepage device
CN203716160U (en) Prefabricated concrete hollow framework slope protection structure
CN109296382B (en) Large-span underground cavern horizontal-diagonal four-fork excavation supporting method
CN106567382A (en) Foundation pit curtain construction method in gravel layer
CN206428708U (en) It is a kind of to use six ribs block with holes and the combination protective slope structure of soil nailing
CN207727716U (en) A kind of water storage filter well and floral tube convolution rainwater side slope
CN111962632A (en) Rainwater sewer and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200612

Address after: 401320 No.1-2, Ronghui Avenue, lijiatuo, Banan District, Chongqing

Patentee after: Chongqing Zezhong Garden Co.,Ltd.

Address before: District B building two floor C No. 209 Wenchang road Longwan Puzhou Street District of Wenzhou City, Zhejiang province 325000 05 station

Patentee before: WENZHOU LEFA EDUCATION TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525